This is a construction drawing document for the Village of Little Chute, Wisconsin, detailing the installation of four Tesla V4 Superchargers at 2221 Freedom Road. The project encompasses the complete electrical and civil infrastructure required to support the EV charging station, including a 625kVA Tesla V4 Supercharger Power Cabinet, a 750kVA utility transformer with combined current transformer and meter socket, a 1200A main switchboard, and full electrical infrastructure in accordance with approved specifications and Wisconsin Department of Transportation requirements. The civil work includes four EV charging stalls with one van-accessible stall and aisle, concrete foundations, grading, and drainage improvements. The chargers will feature NACS and CCS1 compatibility via Tesla Magic Dock with no substitutions permitted. The project requires phased construction to maintain the operational status of the adjacent Shell gas station and ensure safe customer access throughout the work period. All site finishing work, including signage, striping, bollards, emergency disconnect installation, and associated permits and inspections, are included in the scope.

The project requires coordination with Kaukauna Utilities for transformer installation and integration with their utility infrastructure. Contractors must hold a valid Wisconsin Electrical License and EVITP (Electric Vehicle Infrastructure Training Program) certification to be eligible for the work. The drawing document serves as the technical specification for construction execution and is designated as Revision 2, work order WO15464, establishing the baseline for all construction activities and inspections required to complete the installation to code and project standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WO 1546410122 OO

4" Conduit

1/0 URD Primary

(1) - 750kVA URD Tub (277/480V)

(3) - 1/0 Elbows

(3) - 1/0 Elbow Arresters

(2) - Rod (15') - 1/0 Copper

(1) - 4" Plastic Elbow

(1) - Meter Socket - Prewired

(1) - Customer Poured Pad

3-Phase Riser

(1) - 45ft. Pole

(1) - 8ft. Pupi 2000TB

(2) - 8ft. Pupi 1000

(3) - Cutouts

(3) - Arresters

(3) - 1/0 Potheads

(3) - Pothead Holders (75') - #4 Copper (15') - 1/0 Copper

(1) - Rod

(1) - 3" Steel Boot

(1) - 3" Steel U-Guard

(2) - 3" Plastic U-Guard

(1) - 4" Plastic Elbow