Shell _ UNE2672R07.pdf

PDF 8 MB Posted

Attached to
EV Charging Station Installation – LITTLE CHUTE, WI
Solicitation number
RFP-Little Chute-WI-003
Issued by
Outagamie County, Wisconsin

About this file

This is a comprehensive construction design document prepared for the Village of Little Chute Community Development and Inspections Department in Wisconsin for the installation of electric vehicle charging infrastructure at a Shell gas station located at 2221 Freedom Road, Little Chute, Wisconsin. The project, managed by Universal EV LLC as developer with Nordic Asia Solutions as engineer and Connect Electrical as contractor, involves the installation of four Tesla V4 Superchargers with NACS and CCS1 connectors via Tesla Magic Dock technology. The scope of work includes converting five existing standard parking stalls into four EV charging stalls (three standard non-accessible and one van-accessible with a five-foot accessible aisle), constructing 118 square feet of concrete pavement with appropriate foundations, installing one 750kVA utility transformer with combined CT and meter socket coordinated with Kaukauna Utilities, installing one 1200A main switchboard, one Tesla V4 Supercharger Power Cabinet (625kVA), installing four EV sign posts with bollard protection, and completing all associated civil and electrical infrastructure per WisDOT standards. The project must maintain the active Shell gas station operations throughout construction with phased work and safe customer access maintained at all times.

All construction work must comply with 2021 International Building Code, 2017 Accessibility Code, 2021 International Fire Code, 2021 International Existing Building Code, 2017 National Electrical Code, Wisconsin Energy Code 2021, and Wisconsin Accessibility Code 2017. The contractor is required to obtain all necessary permits from governing agencies and coordinate with the Village of Little Chute Building Codes Department and Outagamie County Engineer for required inspections. The contractor must verify all plans, existing dimensions, and site conditions before proceeding and immediately notify the engineer of any discrepancies. All equipment must comply with the Build America Buy America Act, and the contractor shall warranty all installed systems for proper operation for not less than one calendar year from the project completion date. Upon completion, the contractor must submit as-built redlines, all brochures, operating and maintenance manuals, catalogs, shop drawings, and other required documents. The contractor must possess a Wisconsin Electrical License and EVITP certification. Post-construction, civil and electrical drawings must be updated to reflect as-built status and submitted to Wisconsin DOT.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IMAGE REFERENCE

AERIAL IMAGERY PROVIDED BY:

GOOGLE

SITE

VICINITY MAP DRAWING INDEX PROJECT DESCRIPTION

SITE INFORMATIONAPPLICABLE CODES

CS0.0

C O

VE

R

S H

EE

T

NOTE:

IN THE EVENT OF CONFLICT, THE MOST RESTRICTIVE CODE SHALL PREVAIL.

PERMITTING JURISDICTION:

VILLAGE OF LITTLE CHUTE COMMUNITY DEVELOPMENT AND

INSPECTIONS DEPARTMENT

LATITUDE :

44.29597

LONGITUDE :

-88.31392

SITE COUNTY:

OUTAGAMIE COUNTY

SITE ADDRESS:

2221 FREEDOM RD,

LITTLE CHUTE, WI 54140

CONTRACTOR SHALL COMPLETE INSTALL PER THE SIGNED AND THE SEALED SET OF DRAWINGS.

ANY NECESSARY DEVIATIONS FROM THE DRAWINGS MUST BE SUBMITTED THROUGH AN RFI

REQUEST PROCESS WITH ENGINEERING FOR AN APPROVAL PRIOR TO CONTRACTOR PROCEEDING

WITH A DEVIATION OF THE SIGNED AND SEALED SET OF DRAWINGS.

CONTRACTOR SHALL VERIFY ALL PLANS, EXISTING DIMENSIONS AND CONDITIONS ON THE JOB SITE

THEN IMMEDIATELY NOTIFY THE ENGINEER IN WRITING OF ANY DISCREPANCIES BEFORE

PROCEEDING WITH THE WORK.

CONTRACTOR IS TO VERIFY PRESENCE

AND EXACT LOCATION OF ALL UTILITIES

PRIOR TO CONSTRUCTION.

CAUTION!!

INSTALLATION OF ELECTRIC VEHICLE CHARGING INFRASTRUCTURE

SHELL

SITE

EV LOCATION

SHEET NUMBER SHEET TITLE

CS0.0 COVER SHEET

G1.0 GENERAL NOTES

C0.0 PROPERTY LAYOUT - EXISTING CONDITION

C2.0 CIVIL DETAILS -1

EV1.0 EV CHARGER PLAN

EV2.0 CHARGING STALL SIGNAGE AND BOLLARD LAYOUT

CIVIL DETAILS -2C3.0

THREE LINE DIAGRAM

C1.0 EV INFRASTRUCTURE PLAN

EV3.0

ELECTRICAL DETAILS

NOT TO SCALE

NORTH

GENERAL PLAN DESIGNATION : GENERAL COMMERCIAL

EV5.0

DATASHEETS -1EV6.0

DATASHEETS -2EV7.0

2221 FREEDOM RD,

LITTLE CHUTE, WI 54140

NOT TO SCALE

NORTH

CONTRACTOR NOTES

AERIAL MAP

CODE INSPECTIONS:

OWNER AND/OR CONTRACTOR SHALL COORDINATE CONSTRUCTION ACTIVITIES WITH CITY OF LITTLE CHUTE BUILDING CODES DEPARTMENT AND THE OUTAGAMIE COUNTY ENGINEER AS NECESSARY TO COMPLY WITH ANY AND ALL INSPECTIONS REQUIRED BY FEDERAL, STATE, AND/OR LOCAL CODE AUTHORITIES. IT IS THE RESPONSIBILITY OF THE DEVELOPER TO OBTAIN ALL APPROPRIATE PERMITS FROM ALL THE GOVERNING AGENCIES THAT HAVE JURISDICTION

OVER THE AREA WHERE THE WORK IS PROPOSED TO BE DONE

NOTE: NO CONSTRUCTION PERMITS SHALL

BE ISSUED UNLESS AND UNTIL A PLAN IS

APPROVED BY THE VILLAGE OF LITTLE CHUTE

COMMUNITY DEVELOPMENT AND INSPECTIONS

DEPARTMENT

PERMITS:

IT IS THE RESPONSIBILITY OF THE DEVELOPER/CONTRACTOR TO OBTAIN ALL APPROPRIATE PERMITS FROM ALL THE GOVERNING AGENCIES THAT HAVE JURISDICTION OVER THE AREA WHERE WORK IS PROPOSED TO BE DONE.

OWNER:

SHELL

ENGINEER:

NORDIC ASIA SOLUTIONS

CONTRACTOR:

CONNECT ELECTRICAL

DEVELOPER:

UNIVERSAL EV LLC.

305 W SPRING CREEK PKWY,

SUITE 100 B PLANO, TX 75023

SH

EL

L

F

R

EE

D O

M R

D

LI

TT

LE

C

H U

TE

, W

I 5

0 1 2 3 4 5 6 7 8 9N o.

BY

D

AT

E

IS

SU

E

BL

O C

K

DESIGNED BY:

CHECKED BY:

DRAWN BY:

AD

VP

VP

DOCUMENT DATE: AUG 27, 2026

NORDIC PROJECT ID/R: UNE-26-72/07

SHEET NUMBER

SH

EE

T

TI

TL

E:

3040 78 TH AVENUE SE,

UNIT 1619, MERCER ISLAND, WA 98040

Mob:720 492 2885 | www.nordicasia.net www.nordicasia.net

UNIVERSAL EV LLC

NORDIC ASIA

C0.1 DEMOLITION PLAN

NOTES:

1. THE PLANS PROVIDED ARE DESIGNED FOR CONSTRUCTION. POST COMPLETION OF CONSTRUCTION, DRAWINGS

(CIVIL AND ELECTRICAL) ARE TO BE UPDATED TO REFLECT AS-BUILT STATUS AND SUBMITTED TO WISCONSIN DOT

2. CONTRACTOR MUST REFER TO THE O&M AND COMMISSIONING PLAN DOCUMENTS FROM UNIVERSAL EV FOR

ADDITIONAL CONSTRUCTION-RELATED DETAIL THAT COULD NOT BE INCLUDED IN THESE PLANS.

SYSTEM LABELING DETAILS

EV4.0

C1.1 EXPANDED VIEW OF GRADING PLAN

ALL WORK SHALL COMPLY WITH THE FOLLOWING APPLICABLE CODES:

· 2021 INTERNATIONAL BUILDING CODE

· 2017 ACCESSIBILITY CODE

· 2021 INTERNATIONAL FIRE CODE

· 2021 INTERNATIONAL EXISTING BUILDING CODE

· 2017 NATIONAL ELECTRICAL CODE

· WISCONSIN ENERGY CODE 2021

· WISCONSIN ACCESSIBILITY CODE 2017

THIS PLAN IS DEVELOPED WITH THE INTENT TO PROVIDE PUBLIC ELECTRIC VEHICLE (EV) CHARGING STATIONS IN AN EXISTING PARKING LOT. THE EXTENT OF DESIGN WITHIN THIS CONSTRUCTION DOCUMENT INCLUDES THE EV

CHARGING STATIONS AND THEIR ACCOMPANYING CIVIL AND ELECTRICAL INFRASTRUCTURE.

• DEMOLITION OF EXISTING SURFACES FOR THE INSTALLATION OF EV CHARGERS.

• GRADING OF SURFACES ASSOCIATED WITH EV SERVICE EQUIPMENT TO COMPLY WITH ADA

REQUIREMENTS.

SCOPE OF WORK:

• CONVERTING (5) STANDARD PARKING STALLS TO (3) STANDARD (NON-ACCESSIBLE) EV PARKING STALLS AND

(1) VAN ACCESSIBLE EV PARKING STALL WITH A 5 FOOT ACCESSIBLE AISLE.

• INSTALL (1) UTILITY TRANSFORMER WITH CT & METER SOCKET TO BE COORDINATED WITH UTILITY PROVIDER.

• INSTALL (1) MAIN SWITCHBOARD.

• INSTALL (1) TESLA V4 SUPERCHARGER POWER CABINET.

• INSTALL (4) TESLA V4 SUPERCHARGER.

• INSTALL (4) EV SIGN POSTS.

• CONSTRUCT 118 SQ.FT CONCRETE PAVEMENT.

• CONSTRUCT (4) CONCRETE EV CHARGER FOUNDATIONS.

• CONSTRUCT (1) CONCRETE SWITCHBOARD FOUNDATION.

• CONSTRUCT (1) CONCRETE POWER CABINET FOUNDATION.

• CONSTRUCT (1) CONCRETE TRANSFORMER FOUNDATION.

CIVIL DETAILS -3C4.0

http://www.nordicasia.net

305 W SPRING CREEK PKWY,

SUITE 100 B PLANO, TX 75023

SH

EL

L

F

R

EE

D O

M R

D

LI

TT

LE

C

H U

TE

, W

I 5

0 1 2 3 4 5 6 7 8 9N o.

BY

D

AT

E

IS

SU

E

BL

O C

K

DESIGNED BY:

CHECKED BY:

DRAWN BY:

AD

VP

VP

DOCUMENT DATE: AUG 27, 2026

NORDIC PROJECT ID/R: UNE-26-72/07

SHEET NUMBER

SH

EE

T

TI

TL

E:

3040 78 TH AVENUE SE,

UNIT 1619, MERCER ISLAND, WA 98040

Mob:720 492 2885 | www.nordicasia.net www.nordicasia.net

UNIVERSAL EV LLC

NORDIC ASIA

G1.0

G

EN

ER

AL

N O

TE

S

1. Installation shall comply with all applicable laws, codes, government regulations, utility company requirements, etc. of all authorities having jurisdiction in effect at the time of the building permit.

2. Where conflicts exist between codes, standards or this specification, the higher requirement shall apply.

3. The contractor is solely responsible for the safety of his workers,all construction means, methods,techniques, sequences and procedures for coordinating the work under this contract.

4. Continuously maintain the construction premises in a neat and orderly condition.

Damage to finishes shall be properly restored.

5. EVSE enclosure shall be NEMA rated.

6. EVSE cord length shall not exceed 25'.

7. EVSE charging stations has 4 doors i.e. front, rear, left and right. clear 24” distance on the four sides of a charger to be maintained for air circulation for cooling and opening panel for maintenance.

8. Mechanical and electrical support components, including strut and hardware, shall be hot dipped galvanized or equivalent electroplated finish.

9. All grounded conductors are white and equipment grounding conductors are green or bare per (NEC 200-6 (A), EX 5).

10. Liquid tight flexible metal conduit is generally suitable for installation in wet and dry locations. should it be employed, supports will be no more 12 inches from boxes (junction box, cabinets, or conduit fitting) and no more than 54 inches apart per

NEC.

11. All conductors below 100A shall be copper, unless otherwise noted.

12. In order to provide accessible operation of EVSE, a 3’ by 3’ (minimum) handicapped accessible operating area must be kept clear of vehicles and snow between the nose of the vehicle and the EVSE.

13. Reliable protective grounding must be provided. it is recommended to have separate dedicated ground exclusively for the charger considering the safety aspects. The ground resistance should be less than or equal to 4Ω copper cable of in accordance with NEC shall be used to connect charge housing to external ground.

14. The raceway shall not be less than trade size 1 (nominal 1-inch inside diameter).

The raceway shall originate at the main service or sub-panel and shall terminate into a listed cabinet, box or enclosure in close proximity to the proposed location of the EV space.

15. Location of installation is not located where excessive water run-offs, pooling or flooding may occur.

16. Exterior signs and zoning concerns per site requirements.

FOOTINGS:

Footings shall bear on firm undisturbed material or on engineered fill material. Any unsuitable material shall be removed from the footings excavations and spot reinforced.

Foundation concrete shall be poured the same day excavations are opened, or steps shall be taken to adequately protect the open excavation.

FROST PROTECTION:

The underside of all footings and grade beams subjected to outside weather conditions shall have a minimum cover of 24" from top of finished grade to bottom of footing at any point above the footing, unless otherwise noted. This meets the frost depth of 24 inches as set forth by the Wisconsin Building Code, 2021 edition with latest errata.

SITE PREPARATION:

Prior to construction of any permanent structure, all topsoil and organic material or frozen, wet, soft, loose or undesirable soil shall be stripped from the site.

TYPICAL DETAILS:

Typical details shown herein are provided to illustrate design intent and minimum requirements. The contractor shall be responsible for accommodating specific field conditions while providing for the intent of the typical details.

REBAR CONTINUOUS THRU CORNERS:

All reinforcing steel shall be continuous through corners.

WELDING OF REINFORCEMENT STEEL:

Welding, including tack welding, of reinforcing steel is prohibited, unless weldable rebar is used with approval of engineer.

LAP SPLICES:

All lap splices shall be Class ‘B’ laps of minimum 24-inches in accordance with the requirements of ACI 318 – current edition, unless otherwise noted.

PLACEMENT OF STEEL:

All reinforcement, including dowels, shall be tied in place before placing concrete.

Inserting dowels into the plastic concrete shall not be permitted. Contractor shall furnish additional reinforcing bars as necessary, whether shown in plans or not, to tie all reinforcements in place and to form cages to withstand forces due to placing and consolidation of concrete.

CONCRETE PLACEMENT:

The placement of concrete shall conform to ACI-304R, "Guide for Measuring, Mixing, Transporting and Placing Concrete", unless otherwise noted herein. The sides of all footings and foundation systems shall be formed to the exact dimensions as shown herein. Pouring concrete in trenches using sides of earth as forms is not permitted, except for spread footings.

ADVERSE WEATHER:

Placement of concrete in cold weather shall be in accordance with ACI-306R-88, "Cold Weather Concreting". Placement of concrete in hot weather shall be in accordance with ACI-305R-99, "Hot Weather Concreting".

CHEMICAL ADMIXTURES:

No chemical or mineral admixtures other than those noted herein shall be used in concrete without expressed and written consent by the engineer.

SECURING STEEL REINFORCEMENT:

All steel reinforcement shall be secured in-place prior to placement of concrete.

ELEVATION OF FOOTINGS:

All footings shall bear on solid undisturbed soil of consistent bearing to generally support an allowable bearing pressure of 2000 PSF. Any soft or unsuitable areas of bearing shall be undercut and properly replaced.

DESIGN CONSIDERATIONS:

CONCRETE: f'c = 3500PSI (Curb & Sidewalk) f'c = 4000PSI (Footings/Foundations) (Min. Comp. Strength at 28 days) Air Content = 6% Slump 3 – 5 inches REINF.STEEL: fy = 60KSI (ASTM A615 Grade 60) DESIGN CODE: Wisconsin Building Code, 2021

CONCRETE COVER:

Concrete cover shall be provided for reinforcing steel as outlined below unless noted otherwise:

FOOTINGS: Top: 2" Cover Bottom & Sides: 3" Clear (Unformed)

FORMED WALLS & PIERS: Stirrups: 1-1/2" Clear Reinf. Bars: 1-1/4" Clear

CONTROL JOINTS:

Sidewalks to have construction or control joints not to exceed 5ft apart.

Control joints shall be a min. depth of 25% of slab thickness unless noted otherwise and shall be sawn within 4 to 6 hours of placement of concrete.

SUBGRADE PREPARATION, EXCAVATION AND BACK FILLING:

Where fill is required under slabs, sidewalks, trenches, pavements, etc., fill material shall be compacted Dense Graded Aggregate (DGA).

All subgrade material to be compacted to 95% of its maximum density as measured by the Modified Proctor Method. Use mechanical compactor.

Slab sub base material under concrete shall be 57's crushed stone.

CODE INSPECTIONS:

Owner and/or contractor shall coordinate construction activities with code officials as needed to comply with any and all inspections as deemed necessary by code officials.

NOTES:

• All jobsite activities will be conducted in a safe and orderly manner in compliance with OSHA requirements.

• The jobsite area shall be clearly marked and barricaded with orange barrels, safety cones, and/or caution fence as appropriate.

• All potential erosion shall be controlled in such a manner so as to prevent any displacement of silt to the area adjacent to the project.

• Erosion control shall be properly inspected and maintained during the entirety of the project.

• Contractor shall remove erosion control measures upon completion of project and only after potential for erosion has been eliminated.

• All equipment must comply with Build America Buy America Act (BABA).

WARRANTY AND DELIVERABLES UPON PROJECT COMPLETION:

A. WARRANTY: The contractor shall warranty all of the systems for proper operation installed by the contractor for not less than one calendar year from date of project completion. this completion date shall be set by the architect, engineer deliverables.

B. DELIVERABLES: The contractor shall submit a complete set of as-built redlines, all brochures, operating and maintenance manuals, catalogs, shop drawings, and other documents upon completion of the project.

SAFETY:

A. The general contractor shall be responsible for the safety of work area, adjacent areas and building occupants that are likely to be affected by the work under this contract. work shall conform to all osha requirements and the local jurisdiction.

B. The contractor shall provide portable fire extinguishers with a rating of not less than 2-a:10-b:c and shall be within 25 feet of travel distance to all portions of where the work is being completed during construction.

C. All existing active sewer, water, gas, electric, and other utilities shall be protected at all times, and where required for the proper execution of the work, shall be relocated as directed by the engineer. extreme caution should be used by the contractor when excavating or drilling piers around or near utilities. the contractor shall provide safety training for the working crew. this shall include but not be limited to a) fall protection, b) confined space, c) electrical safety, and d) trenching and excavation.

D. The general contractor shall be responsible for security of the site for the duration of construction until job completion.

SUPERCHARGER NOTES:

1. All conduit shall be furnished and installed by the contractor. All wiring shall be furnished and installed by the contractor. The Tesla signal wire shall be provided by Tesla and installed by the contractor.

2. All bushings and wiring internal of proposed service equipment provided by manufacturer. Any modifications shall require engineering approval prior to any changes being made.

3. All aluminum(Al) conductors to receive anti-oxidation coating during installation. All other conductors are copper unless otherwise noted.

4. The following charging cabinets and the charging posts used on this project comply with the following Standards:

· IEC 61851-23: 2014 / EN 61851-23: 2014

· UL 2202: 2009(R2012)

· CAN CSA C22.2 NO. 107.1-01(R2011)

6. The aforementioned standards identify the requirements met by the equipment, including but not limited to:

· Protection against electric shock

· Overload and short circuit protection

· Fault protection

· Degrees of protection against access to hazardous live parts

· The internal components of the system are proprietary. Any questions concerning actual internal protective devices must be coordinated directly with tesla.

7. Tesla supercharger signal wiring rated 1000V and used for power limited class 1 circuits shall be permitted to run in conduits, cable trays, wire ways, or raceways along with associated DC conductors as allowed per NEC 725.48(B)(1), 300.3(C)(1) and 620.36.

8. Supercharger cabinet ac conductors sized under engineering supervision using thermal modeling software. Specifications about the trenching requirements are shown in the electrical details.

9. For DC runs in excess of 330 feet, contact tesla.

10. Underground conduits shall be schedule 40 PVC or UL listed HDPE. The aboveground portion of an underground/aboveground transition shall be schedule 80 PVC or UL listed HDPE.

11. Aboveground conduits exposed to vehicular or equivalent physical damage shall be RMC. Aboveground conduits not exposed to vehicular or equivalent damage shall be permitted to be EMT.

12. Wire splices are not permitted to extend wire run length. Contractor is responsible for rerunning full length of wire if run length is miscalculated.

13. Special inspection is required for all post-installed concrete anchors.

14. Plant guarantee: contractor shall guarantee all plants for a period of one (1) year from date of project acceptance by the owner.

Contractor is responsible for plant maintenance for the first growing season.

15. If existing grass is damaged/removed during construction, contractor shall apply seed per hydroseed method. Rating of seed shall be per distributor based on species type.

16. Contractor shall match existing landscape; use grass, river rock, mulch etc. To match existing landscape around equipment, unless otherwise noted.

17. Contractor to install weed barrier in front of supercharger cabinets and switchboard. Barrier to extend full width and depth of

NEC required working clearances.

18. For (N) accessible EV charging area(S), contractor to field verify slopes are compliant per accessible stall detail (ref.

architectural or structural sheets). Regrade and add asphalt overlay, new full depth asphalt, and/or asphalt milling if required.

existing spot elevations are approximate per survey data and are to be field verified by contractor.

19. Pad extents and footing to be confirmed by contractor prior to construction.

20. All precast foundations should have 1" separation filled with asphaltic material, between all precast pads and maintenance pads

21. Switchboard dimensions and anchor locations are liable to change. Contractor to verify against vendor final shop drawings.

GENERAL NOTES :

FR

EED

O M

R D

PATRIOT DR

FR

EED

O M

R D

FR

EED

O M

R D

PATRIOT DR

DRIVEW

AY

(APPROX.)

(APPROX.)

(APPR

O

X.)

(APPR

O

X.)

(APPR

O

X.)

DRIVEWAY

D R

IVEW

AY

D R

IVEW

AY

DRIVEWAY

EXISTING

BUILDING

W

ALKW

AY

W

ALKW

AY

W

ALKW

AY

D R

IVEW

AY

EXISTING GAS

PUMP CANOPY

U

E

U

E

OE

OE

OE

O

E

729728

726 727

PROPERTYLINE

PROPERTYLINE

PR

O

PER

TY LIN

E

PR

O

PER

TY LIN

E

PR

O

PER

TY LIN

E

EXISTING LIGHT POLE (TYP)

EXISTING BUILDING

EXISTING CURB RAMP

EXISTING BILLBOARD

EXISTING STORM

WATER INLET

EXISTING GAS STATION

UNDERGROUND FUEL

TANK MAN HOLES

EXISTING BILLBOARD

EXISTING LIGHT POLE

EXISTING LIGHT POLE

EXISTING LIGHT POLE

EXISTING LIGHT POLEEXISTING LIGHT POLE

EXISTING UTILITY POLE

W/ TRANSFORMER EXISTING UTILITY POLE

EXISTING UTILITY POLE

EXISTING DUMPSTER'S

EXISTING STORM

WATER INLET

U E

U E

U E

U

E

U E

U E

N

E

S

W270

350 0 10

4O

170180190

305 W SPRING CREEK PKWY,

SUITE 100 B PLANO, TX 75023

SH

EL

L

F

R

EE

D O

M R

D

LI

TT

LE

C

H U

TE

, W

I 5

0 1 2 3 4 5 6 7 8 9N o.

BY

D

AT

E

IS

SU

E

BL

O C

K

DESIGNED BY:

CHECKED BY:

DRAWN BY:

AD

VP

VP

DOCUMENT DATE: AUG 27, 2026

NORDIC PROJECT ID/R: UNE-26-72/07

SHEET NUMBER

SH

EE

T

TI

TL

E:

3040 78 TH AVENUE SE,

UNIT 1619, MERCER ISLAND, WA 98040

Mob:720 492 2885 | www.nordicasia.net www.nordicasia.net

UNIVERSAL EV LLC

NORDIC ASIA

Scale : N.T.S C0.0

PR

O

PE

R

TY

L

AY

O

U T

EX

IS

TI

N G

C O

N D

IT

IO

N

Note:

Property lines shown are approximate.

LEGEND:

- EXISTING BUILDING

- EXISTING LANDSCAPE AREA

- EXISTING CONCRETE SIDEWALK

- UNDERGROUND ELECTRICUE

- OVERHEAD ELECTRICOE

Total existing parking spaces : 89 (Including ADA) Total existing ADA Aisle : 2 Existing parking space converted for proposed EV charging : 5 (Including ADA) Non-EV Parking Stalls : 84 Proposed Standard (Non-Accessible) EV Stalls : 2 Proposed Van Accessible EV Stall : 1 Proposed Standard Accessible EV Stall : 1 Proposed ADA Aisle : 1

(*) NOTE: REQUIRED PARKING BASED ON REPORT OF 70 HOTEL

SUITES AND MAX ON-SITE STAFF OF 10 PERSONS.

PARKING SUMMARY

(APPROX.)

D R

IVEW

AY

DRIVEWAY

EXISTING

BUILDING

D R

IVEW

AY

O

E

O

E

729728

EXISTING STORM WATER INLET

EXISTING UTILITY POLE W/

TRANSFORMER (TO BE PROTECTED)

EXISTING STORM WATER

INLET (TO BE PROTECTED)

EXISTING LANDSCAPE AREA

EXISTING LANDSCAPE

AREA REMOVAL (551 SQ FT)

(2.89%)

(1.11%)

(4.17%

(3.27%

(0.89%)

(0.89%)

(4.16%

(1.78%)

(1.67%)

(4.22%

(0.44%)

(1.67%)

(3.61%

(0.67%)

(0.56%)

(3.66%

(0.44%)

(0.56%)

(3.61%

(0.55%)

(0.56%)

(3.05%

(0.33%)

(0.56%)

(2.61%

(2.22%

(0.22%)

(0.56%)

(1.94%

(0%)

(0.56%)

EXISTIO

N

G C

O N

C R

ETE SID

EW

ALK

(727.58) (727.66) (727.82) (727.86) (727.92) (727.96) (727.91) (727.88) (727.86) (727.86)

(727.32)

(726.73) (727.21) (7

.5 1)

(727.76)

(727.78)

(727.96) (728.12)

(727.41)

(727.65)

(728.17)

(728.49) (728.35)

(728.50

(728.50) (728.63) (729.43)

(729.57)

(728.17)

(729.08) (730.55)

(730.08)

(730.35)

(730.63) (730.08)

734.36) (730.35)

(729.55) (729.26)

(729.81)

(730.39)

(729.32)

(729.50)

(729.45) (729.47)

(729.43)(729.42)

(729.41)(729.63) (729.44)

(729.48) (729.25)

(729.75)

(729.70)

(729.69)

(729.76)

(729.62) (728.52)

(728.55)

(728.67)

(728.34)

(729.73)

(728.82)

(730.24)

(728.47)

(728.43)

(728.43) (728.28) (727.85) (728.11)

(728.80)

(726.83) (726.91) (727.06) (727.26) (727.31)

(727.36)

(727.41) (727.46)

7'

7'

3'

EXISTING FULL-DEPTH ASPHALT

PAVEMENT TO BE REMOVED (1640 SQ FT)

REMOVED THE EXISTING ASPHALT

PAVEMENT STRIPING (TYP)

EXISTING CONCRETE SIDEWALK

TO BE REMOVED (49 SQ FT)

(727.59)

(726.75)

LO

D

LO

D

LODLOD

LO

D

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LODLODLODLOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LODLODLODLODLODLOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

3.8'3.9'

37.3'

18.1'

.9

46'

.8

37.3'

10.3'

12.9'

305 W SPRING CREEK PKWY,

SUITE 100 B PLANO, TX 75023

SH

EL

L

F

R

EE

D O

M R

D

LI

TT

LE

C

H U

TE

, W

I 5

0 1 2 3 4 5 6 7 8 9N o.

BY

D

AT

E

IS

SU

E

BL

O C

K

DESIGNED BY:

CHECKED BY:

DRAWN BY:

AD

VP

VP

DOCUMENT DATE: AUG 27, 2026

NORDIC PROJECT ID/R: UNE-26-72/07

SHEET NUMBER

SH

EE

T

TI

TL

E:

3040 78 TH AVENUE SE,

UNIT 1619, MERCER ISLAND, WA 98040

Mob:720 492 2885 | www.nordicasia.net www.nordicasia.net

UNIVERSAL EV LLC

NORDIC ASIA

C0.1

D

EM

O

LI

TI

O

N P

LA

N

SPOT ELEVATION KEY:

(XXX.XX) - EXISTING ELEVATION

- LIMITS OF DISTURBANCE (1798 SF)

DEMOLITION PLAN LEGEND:-

- SAWCUT LINE

LOD

- REFERENCE POINT FOR MEASUREMENT

Sheet size : 24" X 36"

1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ANY

AND ALL PERMITS AND SHALL PAY ALL FEES NECESSARY FOR

ENCROACHMENT, GRADING, DEMOLITION, AND DISPOSAL OF SAID

MATERIALS AS REQUIRED BY PRIVATE, LOCAL AND STATE

JURISDICTIONS.

2. ALL DEMOLITION SHALL COMPLY WITH CHAPTER 24 OF THE

INTERNATIONAL FIRE CODE.

3. CONTINUOUS ACCESS SHALL BE MAINTAINED FOR SURROUNDING

PROPERTIES AT ALL TIMES DURING DEMOLITION OF EXISTING

FACILITIES.

4. THE CONTRACTOR SHALL VERIFY AND LOCATE ALL EXISTING ABOVE

AND UNDERGROUND UTILITIES. THE LOCATIONS OF EXISTING

INFRASTRUCTURE DEPICTED IN THIS PLAN ARE APPROXIMATE AND

ARE SHOWN FOR REFERENCE ONLY.

5. THE CONTRACTOR SHALL PERFORM A PRE-CONSTRUCTION SITE

VISUAL INSPECTION TO FAMILIARIZE THEMSELVES WITH EXISTING

CONDITIONS AND THE EXTENT OF DEMOLITION WORK AS SHOWN

ON THE PLANS.

6. EROSION CONTROL MEASURES SHALL BE IMPLEMENTED TO

PREVENT DEBRIS AND UNSUITABLE MATERIALS FROM ENTERING

STORM DRAINS, SANITARY SEWERS AND STREETS.

7. DUST CONTROL MEASURES SHALL BE IMPLEMENTED DURING

DEMOLITION.

8. REMOVAL OF LANDSCAPING SHALL INCLUDE ROOTS AND ORGANIC

MATERIAL.

9. CONTRACTOR TO INSTALL CHAIN LINK FENCE WITH MESH SCREEN

TO PROTECT PUBLIC FROM ENTERING CONSTRUCTION AREA.

10. THE CONTRACTOR SHALL CLEAR THE PROJECT SITE AREA WITHIN

THE CONFINES OF THE SAWCUT LINE. THE CONTRACTOR SHALL

DEMOLISH AND REMOVE FROM THE SITE ANY NOTED EXISTING

UTILITY STRUCTURES, PLANTERS, TREES, AND OTHER SITE

FEATURES, NOTED TO BE REMOVED ON THE DEMOLITION PLAN.

11. REFER TO THE PROPERTY LAYOUT (EXISTING CONDITION) ON

SHEET C0.0 FOR ADDITIONAL DETAILS OF EXISTING STRUCTURES,

ETC., LOCATED WITHIN THE PROJECT AREA. UNLESS OTHERWISE

NOTED, ALL EXISTING STRUCTURES, SLABS, CONCRETE, ASPHALT,

DEBRIS PILES, SIGNS, AND ALL APPURTENANCES SHALL BE

REMOVED FROM THE SITE BY THE CONTRACTOR SHALL BE

PROPERLY DISPOSED OF AS PART OF THIS PLAN. SOME ITEMS TO

BE REMOVED MAY NOT BE DEPICTED ON THE PROPERTY SURVEY. IF

ANY ITEMS ARE IN QUESTION, THE CONTRACTOR SHALL CONTACT

THE OWNER PRIOR TO REMOVAL OF SAID ITEMS.

12. CONTRACTOR TO USE CARE IN HANDLING DEBRIS FROM SITE TO

ENSURE THE SAFETY OF THE PUBLIC. HAUL ROUTE TO BE CLOSELY

MONITORED FOR DEBRIS OR MATERIALS TRACKED ONTO

ADJOINING ROADWAYS, SIDEWALKS, ETC. ROADWAYS AND

WALKWAYS TO BE CLEARED DAILY OR AS NECESSARY TO MAINTAIN

PUBLIC SAFETY.

13. ALL MATERIAL REMOVED FROM THIS SITE BY THE CONTRACTOR

SHALL BE DISPOSED OF BY THE CONTRACTOR IN A LEGAL MANNER.

14. THE CONTRACTOR SHALL RETURN SIDEWALKS, LANDSCAPING,

PLANTERS, IRRIGATION SYSTEMS, AND ANY OTHER FACILITIES

DISTURBED OR OTHERWISE DAMAGED DURING CONSTRUCTION TO

THE SAME OR BETTER CONDITION THAN EXISTED PRIOR TO THE

COMMENCEMENT OF THE WORK.

15. ALL QUANTITIES LISTED ON THIS PLAN ARE FOR THE CONVENIENCE

OF THE CLIENT / CONTRACTOR AND SHALL BE CONSIDERED

APPROXIMATIONS. ACTUAL QUANTITIES FOR BIDDING AND

CONSTRUCTION ARE THE RESPONSIBILITY OF THE CONTRACTOR.

16. UNLESS OTHERWISE NOTED, THE CONTRACTOR SHALL PROTECT

IN-PLACE ALL EXISTING SITE ELEMENTS AND INFRASTRUCTURE

WITHIN THE AREA OF IMPROVEMENTS.

17. ALL DIMENSIONS ARE TO THE FACE OF CURB UNLESS NOTED

OTHERWISE.

18. ALL EXISTING STRIPING AND PAVEMENT MARKINGS OR TEXT WITHIN

THE LIMITS OF THE WORK AREA SHALL BE REMOVED VIA SODIUM

BICARBONATE (SODA) BLASTING. ANY DIRECTIONAL ARROWS, STOP

BARS/TEXT OR CROSSWALKS THAT ARE NOT CORRECTLY LOCATED

OR INCONSISTENT WITH THE DETAILS PROVIDED SHOULD BE

REMOVED. APPLY SEAL COAT TO THE EXTENT THAT THE STRIPING

OR TEXT HAS BEEN REMOVED IN A SINGLE COMPLETE RECTANGLE

TO COVER ALL REMOVED STRIPING. DO NOT APPLY SEAL COAT

OVER EXISTING STRIPING OR CONCRETE. INSTALL NEW STRIPING

AND SIGNAGE AS SHOWN ON THE SITE CONSTRUCTION PLAN.

DEMOLITION NOTES:

CONTRACTOR SHALL VERIFY ALL PLANS, EXISTING DIMENSIONS &

CONDITIONS ON THE JOB SITE & SHALL IMMEDIATELY NOTIFY THE

ENGINEER IN WRITING OF ANY DISCREPANCIES BEFORE PROCEEDING

WITH THE WORK.

EXISTING CONDITIONS NOTES:

FOR THE PURPOSE OF THIS PLAN, THE LIMITS OF DISTURBANCE (LOD) IS

THE BOUNDARY WITHIN WHICH ALL CONSTRUCTION, CLEARING,

EXCAVATION, GRADING, AND RELATED ACTIVITIES SHALL OCCUR.

EXISTING IRRIGATION NOTE:

DIGGERS HOTLINE WISCONSIN UNDERGROUND

(800-242-8511/ 811) (CALL BEFORE YOU DIG)

UNDERGROUND UTILITIES/STRUCTURES WERE NOT LOCATED FOR

PREPARATION OF THIS PLAN. BURIED UTILITIES/STRUCTURES MAY

BE ENCOUNTERED. IDENTIFICATION AND LOCATION OF UTILITIES

SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE

CONTRACTOR IS ADVISED THAT HE/SHE MAY CALL 811 (DIGGERS

HOTLINE WISCONSIN UNDERGROUND -FORMERLY B.U.D.) A MINIMUM

OF TWO (2) DAYS AND NO MORE THAN 10 DAYS PRIOR TO

EXCAVATION FOR LOCATION OF UNDERGROUND UTILITIES. THE

CONTRACTOR IS FURTHER ADVISED THAT HE/SHE IS RESPONSIBLE

FOR LOCATION OF ANY AND ALL UNDERGROUND UTILITIES,

INCLUDING THOSE THAT DO NOT SUBSCRIBE AND/OR PARTICIPATE

IN THE 811 SYSTEM.

- FULL DEPTH ASPHALT PAVEMENT REMOVAL (1640 SF)

00 5' 10'

Scale : 1" = 5'

- EXISTING CONCRETE SIDEWALK REMOVAL (49 SF)

N

E

S

W270

350 0 10

4O

170180190

U

E

U

E

O

E

O

E

729728

DRIVEWAY

(727.58) (727.66) (727.82) (727.86) (727.92) (727.96) (727.91) (727.88)

(727.86) (727.86) (727.32)

(726.73) (727.21) (727.51)

(727.23)

(726.16)

(726.29)

(725.91)

(725.94)

(725.66)

(727.41)

(727.65) (727.26)(727.12)

(726.91)

(727.38)

(727.41)

(727.46)

(727.51)

(726.11)

(725.93)

(725.64)

(728.17)

(728.49) (728.35)

(728.50

(728.50) (728.63) (729.43)

(729.57)

(728.17)

(729.08) (730.55)

(730.08)

(730.35)

(730.63) (730.08) 734.36)

(730.35)

(729.55) (729.26)

(729.81)

(730.39)

(729.32)

(729.50)

(729.45) (729.47)

(729.43)(729.42)

(729.41)(729.63) (729.44)

(729.48) (729.25)

(729.75)

(729.70)

(729.69)

(729.76)

(729.62)

(728.52)

(728.55)

(728.67)

(728.34)

(729.73)

(728.82)

(728.43)

(727.65)

(727.63)

(728.43) (728.28) (727.85)(727.63)

(726.39)

(728.80)

PROPOSED ADA PATH

TF:728.23

FG:727.73

EXISTING STORM WATER

INLET (TO BE PROTECTED)

(726.83) (726.91) (727.06) (727.26)

(727.31) (727.36) (727.41) (727.46)

EXISTING BUILDING

7.

4'

4'

4.8'

8.6'

TF:727.82

FG:727.32

3'

U E

U E

U E

U

E

TF:727.82

FG:727.32

3'

EXISTING LIGHT POLE

W/ NEW CAMERA

NO

PARKING

(FS:728.28)

FS:727.90

FS:728.48

FS:728.10

FS:728.53

FS:728.10(FS:727.96)(FS:727.92)

FS:728.15FS:727.76(FS:727.31)(FS:727.26)

4.77%

4.33%

1.90%

1.55%

2.78%

1.89%

(0.44%)

(0.56%)

(3.61%

(3.67%

1.81%

1.90%

1.81%

1.40%

1.00%

0.60%

(2.89%)

(1.11%)

(4.17%

(0.89%)

(0.89%)

(4.16%

(1.78%)

(1.67%)

(4.22%

(0.44%)

(1.67%)

(3.61%

(0.67%)

(0.56%)

(FS:727.88)

(FG:728.25)

FS:729.31

FS:729.31

TC:729.83

TC:729.73

(1.42%)

(7.42%

42.1'

9' 9' 9' 5' 11'

PROPERTY LINE PROPERTY LINE

4.

2'

21'

FS:728.90

FS:728.85

(1.00%)

(1.95%

(727.44)

18'

7'

7'

5.5'4.4'

TF:727.80

FG:727.30

TF:728.02

FG:727.52

TF:729.40

FG:728.90

TF:728.50

FG:728.40

DEMO'ED TRENCH TO BE RESTORED

TO MATCH EXISTING CONDITIONS IN

ALL LOCATIONS (TYP.)

EVCS-1D EVCS-1C EVCS-1B EVCS-1A

CONSTRUCT 1640 SQ FT OF

FULL-DEPTH PROPOSED ASPHALT

PAVEMENT (SEE DETAIL 5 / SH C2.0)

EXISTING UTILITY POLE

W/ TRANSFORMER

(TO BE PROTECTED)

4.

8'

17.1'

.2

(FS:728.10)

10'

(FS:728.73)

(1.81%

(1.70%

11'

FS:728.67

(1.20%)

(727.59)

(726.75)

(FS:728.30)

(FS:728.85)

(FS:728.80)

FS:729.31

FS:729.29

(FS:727.53)

11'

18'

.8

12.9'

37.3'

14.1'

(3.58%)

(4.46%)

2.05%

2.94% 3.63%

3.36%

PROPOSED CONCRETE

PAVEMENT (69 SQFT)

PROPOSED CONCRETE

PAVEMENT (49 SQFT)

(1.00%)(1.00%)

10.8'

.2

16.6'

305 W SPRING CREEK PKWY,

SUITE 100 B PLANO, TX 75023

SH

EL

L

F

R

EE

D O

M R

D

LI

TT

LE

C

H U

TE

, W

I 5

0 1 2 3 4 5 6 7 8 9N o.

BY

D

AT

E

IS

SU

E

BL

O C

K

DESIGNED BY:

CHECKED BY:

DRAWN BY:

AD

VP

VP

DOCUMENT DATE: AUG 27, 2026

NORDIC PROJECT ID/R: UNE-26-72/07

SHEET NUMBER

SH

EE

T

TI

TL

E:

3040 78 TH AVENUE SE,

UNIT 1619, MERCER ISLAND, WA 98040

Mob:720 492 2885 | www.nordicasia.net www.nordicasia.net

UNIVERSAL EV LLC

NORDIC ASIA

C1.0

EV

IN

FR

AS

TR

U

C

TU

R E

PL

AN

N

E

S

W270

350 0 10

4O

170180190

LEGEND & ABBREVIATION:

Sheet size : 24" X 36"

1. THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY

PIPES OR STRUCTURES SHOWN ON THEIR PLANS ARE OBTAINED BY A

SEARCH OF THE AVAILABLE RECORDS. TO THE BEST OF MY

KNOWLEDGE, THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN

ON THESE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE DUE

PRECAUTION. ANY MEASURES TO PROTECT THE UTILITIES AND

STRUCTURES SHOWN AND ANY OTHER LINES OR STRUCTURES NOT

OF RECORD OR NOT SHOWN ON THESE PLANS, AND IS RESPONSIBLE

FOR THE PROTECTION OF, AND ANY DAMAGE TO, THESE LINES OR

STRUCTURES.

2. CONTRACTOR TO VERIFY CLEARANCE AT ALL UTILITY CROSSINGS.

IF INTERFERENCE OCCURS, OTHER THAN NOTED ON PLAN,

CONTRACTOR TO CONTACT DESIGN ENGINEER FOR POSSIBLE

REDESIGN. IF REDESIGN IS UNFEASIBLE, CONTRACTOR TO RELOCATE

UTILITY AT NO EXPENSE TO ENGINEER.

3. THE CONTRACTOR AGREES THAT HE WILL ASSUME SOLE AND

COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE

COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY

OF PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL

APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING

HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY,

AND HOLD THE OWNER AND ENGINEER HARMLESS FROM ANY AND

ALL LIABILITY REAL OR ALLEGED IN CONNECTION WITH THE

PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR

LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR

THE ENGINEER, OR ANY PUBLIC AGENCY.

CIVIL ENGINEER’S NOTICE

TO CONTRACTOR:NEW EV CHARGING STATION SITE PLAN

1. CONTRACTOR TO BORE AND/OR HAND-TRENCH CONDUIT AS

REQUIRED PER NEC.

2. ALL EQUIPMENT SHALL BE INSTALLED PER CLIENT DESIGN

STANDARDS.

3. CONTRACTOR TO RETURN ALL AREAS OF DISTURBANCE BACK TO

EXISTING GRADE AND UP TO OR BETTER THAN EXISTING CONDITIONS.

4. ALL DIMENSIONS ARE TO THE FACE OF CURB UNLESS NOTED

OTHERWISE.

CONSTRUCTION NOTES:

1. CONTRACTOR SHALL TAKE FIELD MEASUREMENTS OR OTHERWISE

ESTABLISH A SURVEY OF THE EXISTING STRIPING IN ALL WORK

AREAS IN ORDER TO ESTABLISH ALL EXISTING PAVEMENT MARKINGS

WITH FULL COORDINATION OF NEW MARKINGS.

2. UNLESS OTHERWISE INDICATED ON THIS PLAN, THE CONTRACTOR

SHALL ESTABLISH PAVEMENT MARKINGS FOR ALL FIRE LANES,

DIRECTIONAL ARROWS, STOP BARS, CURBS, SIDEWALK, LIGHT POLE

BASES, SIGN BASES AND PARKING STALLS TO MATCH THE EXISTING

SITE WITHIN REPAIR LIMITS.

3. CONTRACTOR TO USE APPROPRIATE PAINT COLORS TO MATCH THE

EXISTING FEATURES. ADA BARRIER-FREE AREAS TO COMPLY WITH

ALL LOCAL AND FEDERAL ADA STANDARDS. PAVEMENT MARKINGS

SHALL BE A HIGH QUALITY PAINT RECOMMENDED BY THE PAINT

MANUFACTURER. PAINT COLORS SHALL CLOSELY MATCH THE

FEDERAL STANDARD 595B COLOR NUMBERS AS FOLLOWS:

BLUE—COLOR 15080, WHITE—COLOR 37925, AND YELLOW—COLOR

33538.

4. IN AREAS NOT BEING RESURFACED BUT REQUIRING RESTRIPING,

CONTRACTOR SHALL REMOVE EXISTING STRIPING BY EITHER SAND

BLASTING, WATER BLASTING, OR BY ANOTHER APPROVED METHOD

OF STRIPING REMOVAL. WHERE THE STRIPING REMOVAL CHANGES

THE SURFACE TEXTURE OF THE EXISTING ASPHALT, CONTRACTOR

SHALL SEAL THAT AREA PRIOR TO RESTRIPING. CONTRACTOR TO

SUBMIT STRIPING REMOVAL METHOD TO PROPERTY MANAGER AND

ENGINEER FOR APPROVAL PRIOR TO CONSTRUCTION.

PAVEMENT MARKING NOTES:

2221 FREEDOM RD, LITTLE CHUTE, WI 54140

CONSTRUCTION NOTES:-

NOTES:

• ALL TREES, SIDEWALKS, CURB & FLOW LINES SHALL BE PROTECTED IN PLACE.

• CONTRACTOR SHOULD VERIFY THE EXISTING SPOT ELEVATION AND SLOPES, TO HAVE

POSITIVE DRAINAGE AWAY FROM BUILDING AND EV DEVICES.

• CONTRACTOR TO FIRST INSTALL V4 CABINET AND THEN INSTALL BOLLARDS FOR

PROTECTION ON THE SIDE, AS THE MINIMUM REQUIRED CLEARANCE FOR CONSTRUCTION

OF V4 CABINET IS 36" AND THE MINIMUM REQUIRED CLEARANCE FOR SERVICING IS 18".

- PROPOSED ELEVATIONXXX.XX

- EXISTING ELEVATION(XXX.XX)

- FINISHED SURFACEFS

- TOP OF FOUNDATIONTF

- EXISTING LANDSCAPE

- TOP OF CURBTC

- FINISHED GRADEFG

CONSTRUCT EV CHARGING PER STRUCTURAL/ELECTRICAL PLAN

CONSTRUCT CONCRETE PAD FOR POWER CABINET PER STRUCTURAL/ELECTRICAL PLAN

CONSTRUCT CONCRETE PAD FOR MAIN SWITCHBOARD PER STRUCTURAL/ELECTRICAL PLAN

CONSTRUCT CONCRETE PAD FOR TRANSFORMER WITH CT & METER SOCKET PER STRUCTURAL/ELECTRICAL PLAN

INSTALL EV SIGNBOARD CENTERED IN EACH PARKING SPACE, ALIGNED WITH THE CONCRETE PAD OF EV CHARGERS, PER

DETAIL F ON SHEET EV2.0

INSTALL EV "USE LAST" SIGNBOARD PER DETAIL G ON SHEET EV2.0

PAINT STRIPING ACCESSIBLE PARKING SPOTS PER DETAIL 8 ON SHEET C2.0

INSTALL TRUNCATED DOMES PER CITY OF LITTLE CHUTE STANDARD, PER DETAIL 7 ON SHEET C2.0

PROVIDE 48" X 30" GROUND CLEAR SPACE IN FRONT OF ADA EV CHARGER

INSTALL BOLLARDS IN FRONT OF THE EQUIPMENT, PER DETAIL 10 ON SHEET C2.0.

INSTALL EMERGENCY DISCONNECT SWITCH IN NEARBY THE ADA ACCESS, PER DETAIL E ON SHEET EV2.0

ACCESSIBLE PATH OF TRAVEL SHALL HAVE LESS THAN 2% CROSS SLOPE AND 5% RUNNING SLOPE AT ALL TIMES.

INCLUSIVE OF GUTTER LIP.

CONSTRUCT NEW ASPHALT PAVEMENT, AGGREGATE BASE, AND SUBGRADE TO THE REQUIRED ELEVATIONS TO ACHIEVE THE

PROPOSED SLOPES AND SURFACE ELEVATIONS SHOWN ON THE PLANS. PLACE COMPACTED BASE MATERIAL TO THE

REQUIRED ELEVATION AND INSTALL ASPHALT PER DETAIL 6 ON SHEET C2.0.

REPLACE THE EXISTING LANDSCAPE AREA WITH A 4-INCH-THICK CONCRETE PAD TO CREATE THE REQUIRED ADA-COMPLIANT

LANDING AREA FOR THE EV CHARGER.

EXISTING LANDSCAPE IS REPLACED WITH CONCRETE WHERE THE EQUIPMENT IS MOUNTED.

CONCRETE FOOTING SCHEDULE

ITEM QUANTITY

DIMENSION REINFORCEMENT

(EACH WAY BOTTOM, UNO)

WIDTH LENGTH DEPTH

TRANSFORMER 1 8'-6" 7'-4" 3'-10" 13 X #6 REBAR

MAIN SWITCHBOARD 1 4'-10" 4'-0" 2'-6" 11 X #6 REBAR

POWER CABINET 2 5'-7" 4'-11" 10" 13 X #5 REBAR

EV CHARGER 4 2'-0" 4'-8" 1'-6"

10 X #4 REBAR

4 X #5 REBAR

STRIPING SCHEDULE

ITEM QUANTITY

DIMENSION PROPERTIES

WIDTH LENGTH ON CENTER TYPE COLOR

PAVEMENT STRIPING 3 4" 18'-0" 9'-0" SOLID WHITE— 37925

ADA AISLE 3 4" 20'-0" 11'-0" & 5'-0" SOLID WHITE— 37925

ADA AISLE STRIPING 6 4" 6'-1" 3'-0" SOLID WHITE— 37925

PATH OF TRAVEL 2 8" 41'-7" 4'-0" SOLID WHITE— 37925

PATH OF TRAVEL STRIPING 20 6" 4'-0" 4'-0" SOLID WHITE— 37925

Note: The quantities and dimensions are above mentioned items are nominal and not intended for bidding purposes.

Scale : N.T.S

- PROPOSED ASPHALT PAVEMENT BOUNDARY

- PROPOSED ASPHALT PAVEMENT FILL (1640 SQFT)

- PROPOSED FLOW ARROW (DIRECTION AND SLOPE)## %

- EXISTING FLOW ARROW (DIRECTION AND SLOPE)(## %)

- PROPOSED CONCRETE PAVEMENT (118 SQFT)

NOTE:

1. CONCRETE (CAST-IN-PLACE): ALL CONCRETE WORK SHALL MEET WISDOT

STANDARD SPECS SECTIONS 501 AND 716. PADS, FOOTINGS, AND FOUNDATIONS

TO BE REINFORCED WITH BUY AMERICA CERTIFIED STEEL. MINIMUM COMPRESSIVE

STRENGTH PER DRAWINGS (TYPICALLY 4,000 PSI AT 28 DAYS).

2. ELECTRICAL CONDUIT: CONDUIT SHALL MEET WISDOT SPEC SECTION 652. INSTALL

UNDERGROUND UNLESS NOTED OTHERWISE. SIZE PER NEC AND WISDOT

STANDARDS; MUST BE RATED FOR DIRECT BURIAL.

3. ELECTRICAL WIRING: WIRING SHALL MEET WISDOT SPEC SECTION 655. USE

COPPER, THWN-2 RATED CONDUCTORS. SIZE PER LOAD REQUIREMENTS AND

VOLTAGE DROP CALCULATIONS. INSTALL PER NEC AND WISDOT STANDARDS.

4. SIGNAGE: EV CHARGING SIGNAGE SHALL COMPLY WITH MUTCD AND BE MADE

FROM BUY AMERICA CERTIFIED MATERIALS.

5. PROTECTIVE BOLLARDS: FABRICATE AND INSTALL USING BUY AMERICA CERTIFIED

STEEL.

6. STEEL REINFORCEMENT: ALL REBAR FOR CAST-IN-PLACE CONCRETE SHALL BE

BUY AMERICA CERTIFIED.

PATRIOT DR

DRIVEWAY

PROPOSED ADA PATH

TF:728.23

FG:727.73

EXISTING STORM WATER

INLET (TO BE PROTECTED)

EXISTING

BUILDING

7.

4'

4'

4.8'

8.6'

TF:727.82

FG:727.32

3'

U E

U E

U E

U

E

TF:727.82

FG:727.32 3'

EXISTING LIGHT POLE

W/ NEW CAMERA

NO

PARKING

(FS:728.28)

FS:727.90

FS:728.48

FS:728.10

FS:728.53

FS:728.10 (FS:727.96)

(FS:727.92)

FS:728.15 FS:727.76 (FS:727.31) (FS:727.26)

4.77%

4.33%

1.

1.55%

2.78%

1.

(0.44%)

(0.56%)

(3 .6

1%

(3 .6

7%

1.81%

1.

1.81%

1.

1.00%

0.60%

(FS:727.88)

(FG:728.25)

FS:729.31

FS:729.31

(TC:729.83)

(TC:729.73)

(1.42%)

(7 .4

2%

42.1'

9'9'9'5'11'

PROPERTY LINEPROPERTY LINE

4.

2'

21'

FS:728.90

FS:728.85

(1.00%)

(1 .9

5%

18'

7'

7'

5.5' 4.4'

TF:727.80

FG:727.30

TF:728.02

FG:727.52

TF:729.40

FG:728.90

TF:728.50

FG:728.40

DEMO'ED TRENCH TO BE RESTORED

TO MATCH EXISTING CONDITIONS

IN ALL LOCATIONS (TYP.)

EVCS-1DEVCS-1CEVCS-1BEVCS-1A

CONSTRUCT 1640 SQ FT OF

FULL-DEPTH PROPOSED ASPHALT

PAVEMENT (SEE DETAIL 5 / SH C2.0)

EXISTING UTILITY POLE

W/ TRANSFORMER (TO

BE PROTECTED)

4.

8'

17.1'

.2

(FS:728.10)

10'

(FS:728.73)

(1 .8

1%

(1.70%)

11'

FS:728.67

(1.20%)

(FS:728.30)

(FS:728.85)

(FS:728.80)

FS:729.31

FS:729.29

(FS:727.53)

11'

18'

.8

12.9'

37.3'

14.1'

10.8'

(3.58%)

(4.46%)

2.05%2.94%3.63%

3.36%

3.5'

(1.00%)(1.00%)

PROPOSED CONCRETE

PAVEMENT (49 SQFT)

PROPOSED CONCRETE

PAVEMENT (69 SQFT)

.2

305 W SPRING CREEK PKWY,

SUITE 100 B PLANO, TX 75023

SH

EL

L

F

R

EE

D O

M R

D

LI

TT

LE

C

H U

TE

, W

I 5

0 1 2 3 4 5 6 7 8 9N o.

BY

D

AT

E

IS

SU

E

BL

O C

K

DESIGNED BY:

CHECKED BY:

DRAWN BY:

AD

VP

VP

DOCUMENT DATE: AUG 27, 2026

NORDIC PROJECT ID/R: UNE-26-72/07

SHEET NUMBER

SH

EE

T

TI

TL

E:

3040 78 TH AVENUE SE,

UNIT 1619, MERCER ISLAND, WA 98040

Mob:720 492 2885 | www.nordicasia.net www.nordicasia.net

UNIVERSAL EV LLC

NORDIC ASIA

C1.1

EX

PA

N D

ED

V

IE

W

O F

G R

AD

IN

G P

LA

N

SPOT ELEVATION KEY:

TF - TOP OF FOUNDATION

FS - FINISHED SURFACE

FG - FINISHED GRADE

- PROPOSED ELEVATIONS

GRADING PLAN LEGEND:-

- EXISTING LANDSCAPE AREA FILL

- PROPOSED ASPHALT PAVEMENT BOUNDARY

- PROPOSED ASPHALT PAVEMENT FILL (1640 SQFT)

- PROPOSED FLOW ARROW (DIRECTION AND SLOPE)## %

- EXISTING FLOW ARROW (DIRECTION AND SLOPE)(## %)

- PROPOSED CONCRETE PAVEMENT (118 SQFT)

Sheet size : 24" X 36" Scale : 1" = 5'

00 5' 10'

N

E

S

W270

350 0 10

4O

170180190

60°

4" WHITE PAINT,

60 DEGREES

2'-4" ON CENTER

(20' M

IN

SEE SITE PLA

N

FO

R D

IM

PER PLAN

(5' MIN.)

36"O.C.

M

AX.

NO

PARKING

THE WORDS "NO PARKING"

SHALL BE PAINTED ON THE

GROUND WITHIN THE

ACCESS AISLE. THIS NOTICE

SHALL BE PAINTED IN WHITE

LETTERS NO LESS THAN 12

INCHES HIGH

BT

M e nc b ox

FRONT VIEWSIDE VIEW

MAX 10"

1.

3'

4' 4'

6.

4'

1.

2'

2.2'

1.

3'

4'

1'-1" 4'

2.5'

2.3'

REBOUNDING

BOLLARD

48" X 30"

GROUND SPACE

HANDLE TERMINUS

CABLE TERMINUS

CABLE TERMINUS

HANDLE

EMERGENCY

DISCONNECT BUTTON

(MOUNTED ON POLE)

0.8'

M ax 4'

GROUND

LEVEL

TOP VIEW

SECTION VIEW

CONCRETE

FOUNDATION

DUCTILE IRON

STEEL PIPE

BOLLARD,FILLED

WITH CONCRETE

CAP

CONCRETE

FOUNDATION

BOLLARD

1/2"X9" STEEL

ROD THRU

BOLLARD

3' 2.

7'

3'.3

1.3'

1.

3'Ø

.4'Ø

4" THICK CONCRETE SIDEWALK

WITH 6x6-W1.2xAW1.2 WELDED

WIRE MESH REINFORCEMENT.

2,500 PSI AT 28 DAYS.

PREPARED EARTH SUBGRADE

(COMPACTED TO AT LEAST 95

PERCENT MODIFIED PROCTOR)

VARIES

REFER TO SITE PLAN TACK COAT (INCLUDING VERTICAL FACES)

MATCH EXISTING ASPHALT SURFACE COURSE

REMOVE EXISTING ASPHALT PAVEMENT, AGGREGATE BASE, AND

SUBGRADE MATERIAL TO REQUIRED ELEVATION TO ACHIEVE

PROPOSED SLOPES AND SURFACE ELEVATIONS SHOWN ON PLANS.

PLACE COMPACTED BASE MATERIAL TO REQUIRED ELEVATION AND

PLACE ASPHALT PER CROSS SECTION BELOW.

EXISTING AGGREGATE BASE COURSE MEETING

MATERIAL & COMPACTION REQUIREMENTS - TO

REMAIN. ADD OR REMOVE MATERIAL AS

NECESSARY TO ACHIEVE FINAL PROPOSED GRADES.

MATCH EXISTING ASPHALT SURFACE COURSE

EXISTING SUBGRADE - TO REMAIN

PROPOSED PAVEMENTEXISTING PAVEMENT

2” HMA SURFACE COURSE IL-9.5, MIX D, N50

2-1/4” HMA BINDER COURSE, IL-19, N50

6" COMP. DGA BASE

SAW CUT

0.40 LBS/SY ASPHALT MATERIAL FOR TACK COAT

MATCH EXISTING ASPHALT SURFACE COURSE

REMOVE EXISTING ASPHALT PAVEMENT,

AGGREGATE BASE, AND SUBGRADE MATERIAL

TO REQUIRED ELEVATION TO ACHIEVE

PROPOSED SLOPES AND SURFACE ELEVATIONS

SHOWN ON PLANS. PLACE COMPACTED BASE

MATERIAL TO REQUIRED ELEVATION AND

PLACE ASPHALT PER CROSS SECTION BELOW.

EXISTING DENSE GRADED AGGREGATE BASE

COURSE MEETING MATERIAL & COMPACTION

RATE OF 95% - TO REMAIN. ADD OR REMOVE

MATERIAL AS NECESSARY TO ACHIEVE FINAL

PROPOSED GRADES.

MATCH EXISTING ASPHALT SURFACE COURSE

EXISTING COMP. SOIL SUBGRADE - TO REMAIN

ELEVATION

PLAN

0.90" MIN

0.92" MAX

0.

M

IN

0.

M A

X

2.30" MIN O.C.

2.40" MAX O.C.

2.

M

IN

O

.C

2.

M

A X

O .C

0.45" MIN

0.47" MAX

48" MAX. TO

TOP OF BUTTON

FINISHED GRADE

V4 TESLA

SUPERCHARGER

POST

BUTTON TO

ACTIVATE

MAGIC DOCK

(OPERABLE PART)

(N) LOOP HANDLE

ATTACHMENT

305 W SPRING CREEK PKWY,

SUITE 100 B PLANO, TX 75023

SH

EL

L

F

R

EE

D O

M R

D

LI

TT

LE

C

H U

TE

, W

I 5

0 1 2 3 4 5 6 7 8 9N o.

BY

D

AT

E

IS

SU

E

BL

O C

K

DESIGNED BY:

CHECKED BY:

DRAWN BY:

AD

VP

VP

DOCUMENT DATE: AUG 27, 2026

NORDIC PROJECT ID/R: UNE-26-72/07

SHEET NUMBER

SH

EE

T

TI

TL

E:

3040 78 TH AVENUE SE,

UNIT 1619, MERCER ISLAND, WA 98040

Mob:720 492 2885 | www.nordicasia.net www.nordicasia.net

UNIVERSAL EV LLC

NORDIC ASIA

C2.0

N.T.S.

SCALE 10

N.T.S.

SCALE 8

ACCESSIBILITY EV DETAILS N.T.S.

SCALE 1 OPERABLE PARTS HEIGHT N.T.S.

SCALE 2 ADA ACCESSIBILITY STANDARDS N.T.S.

SCALE 3

PAVEMENT STRIPING DETAILN.T.S.

SCALE 5

SCALE

C

IV

IL

D

ET

AI

LS

FOUNDATION DETAILS-BOLLARD

CONCRETE:

f'c = 3500 PSI

NOTE: BOLLARD TO BE COVERED

WITH SMOOTH UV RESISTANT

YELLOW BOLLARD SLEEVE.

CONCRETE SIDEWALK N.T.S.

SCALE 4 FULL DEPTH ASPHALT PAVEMENT DETAIL N.T.S.

SCALE 7SAWCUT & FULL DEPTH ASPHALT PAVEMENT DETAIL

NOTES:

1. PROPOSED ASPHALT 5.0% MAX. TRANSITION SLOPE TO EXISTING GRADE, UNLESS OTHERWISE SHOWN ON PLANS.

2. CREATE A SMOOTH TRANSITION TO MATCH EXISTING GRADE. SEE PLAN FOR APPROXIMATE REMOVE, REGRADE, AND REPLACE LIMITS.

3. SURFACE COURSE SHALL BE INSTALLED AT THE SAME TIME AS ADJACENT PAVEMENT REPAIR SURFACE COURSES.

4. IF AGGREGATE BASE COURSE IS NOT PRESENT CONTRACTOR TO NOTIFY ENGINEER OF RECORD IMMEDIATELY.

5. THE AGGREGATE BASE COURSE SHALL BE INSPECTED BY THE TESTING AGENCY, OWNER OR DESIGN

CONSULTANT AFTER ASPHALT REMOVAL AND BASE PREPARATION, PRIOR TO ASPHALT REPLACEMENT.

NOT USED

N.T.S.

SCALE 11V4 MAGIC DOCK ACCESSIBILITY DETAIL

N.T.S.

SCALE 6 TRUNCATED DOME

N.T.S.

SCALE 9

N.T.S. 12

NOT USED

6" CONCRETE

PAD (TYP)

FOUNDATION DETAIL - MAIN

SWITCHBOARD

MAIN SWITCHBOARD -

TOP VIEW

FRONT VIEW

SIDE VIEW

MAIN

SWITCHBOARD

MAIN SWITCHBOARD

MAIN SWITCHBOARD

CONCRETE

4000 PSI

CONCRETE

4000 PSI

(6) #6 REBARS @ 10" OC

(5) #6 REBARS @ 10" OC

4 X 4" PVC

CONDUIT FROM CT CABINET

3 X 4" PVC

1 X 1" PVC

CONDUIT TO POWER CABINET

FINISH GRADE

FINISH GRADE

FINISH GRADE

(6) #6 REBARS @ 10" OC

(5) #6 REBARS @ 10" OC

3" CLEAR TYP.

EACH SIDE

(6) #6 REBARS @ 10" OC

(5) #6 REBARS @ 10" OC

1/2" DIAMETER SS THREADED ROD, W/

SIMPSON SET-3G ADHESIVE ANCHOR

SYSTEM WITH 4" MIN. EMBEDMENT INTO

(N) EQUIPMENT SLAB IN ACCORDANCE

WITH ESR-4057 OR APPROVED EQUAL.

DRILL AND SET OF EPOXY ANCHORS SHALL

NOT OCCUR LESS THAN 7 DAYS FROM

POURING CONCRETE.

5.

4'

3.8'

3.8'

3'

.5

2.

5'

4.8'

2' .5

4'

4'

4.8'

.3'

1/2" DIAMETER SS THREADED ROD, W/

SIMPSON SET-3G ADHESIVE ANCHOR

SYSTEM WITH 4" MIN. EMBEDMENT INTO

(N) EQUIPMENT SLAB IN ACCORDANCE

WITH ESR-4057 OR APPROVED EQUAL.

DRILL AND SET OF EPOXY ANCHORS SHALL

NOT OCCUR LESS THAN 7 DAYS FROM

POURING CONCRETE.

(6) #6 REBARS @ 18" OC

(7) #6 REBARS @ 14" OC

FOUNDATION DETAIL - TOP VIEW

TRANSFORMER - TOP VIEW

.3'

SAND

4" PVC - 3' MINIMUM PAST

CONCRETE MARK END

WITH A LATH

10" THICK

CONCRETE PAD

WITH #5 REBARSTEEL 90°

SWEEP

SOIL / DIRT

TOP SOIL

.5

.7

3'

6.4'.5'

.3'

FILLED WITH SAND

62" X 20" OPENING IN

BASEMENT

4" BASEMENT

FLANGE

4" SERVICE

CONDUIT

3ø PRIMARY

TRANSFORMER

.7

.7

3'

FINISH GRADE

(6) #6 REBARS @ 18" OC

(7) #6 REBARS @ 14" OC

TRANSFORMER

CONCRETE

4000 PSI

5' 1.

3'

CONCRETE

4000 PSI

(6) #6 REBARS @ 18" OC

(7) #6 REBARS @ 14" OC

FINISH GRADE

TRANSFORMER

FRONT VIEW

SIDE VIEW

FR

O

N T

TRANSFORMER - SIDE VIEW

FR

O

N T

3'

4 X 4" PVC

CONDUIT TO CT CABINET

.8

.8 ' 7.5'

8.6'

8.6'

7.

5'

8.6'

7.

5' 305 W SPRING CREEK PKWY,

SUITE 100 B PLANO, TX 75023

SH

EL

L

F

R

EE

D O

M R

D

LI

TT

LE

C

H U

TE

, W

I 5

0 1 2 3 4 5 6 7 8 9N o.

BY

D

AT

E

IS

SU

E

BL

O C

K

DESIGNED BY:

CHECKED BY:

DRAWN BY:

AD

VP

VP

DOCUMENT DATE: AUG 27, 2026

NORDIC PROJECT ID/R: UNE-26-72/07

SHEET NUMBER

SH

EE

T

TI

TL

E:

3040 78 TH AVENUE SE,

UNIT 1619, MERCER ISLAND, WA 98040

Mob:720 492 2885 | www.nordicasia.net www.nordicasia.net

UNIVERSAL EV LLC

NORDIC ASIA

C3.0N.T.S.

SCALE A MAIN SWITCHBOARD DETAIL N.T.S.

SCALE BTRANSFORMER DETAIL

C

IV

IL

D

ET

AI

LS

-2

NO

PARKING

REBOUNDING

BOLLARD

ACCESSIBLE VAN EV CHARGE STALL - IBC & ADA

V4 TESLA

SUPERCHARGER POST

WEIGHT: 198 LBS

TESLA SUPERCHARGER HANDLE

(MAX. 48" HEIGHT FOR

ACCESSIBLE CHARGE POSTS)

(4) 1/2" DIA SS HILTI KWIK-BOLT

TZ2 WITH 3.75" MIN. EMBEDMENT

PER ESR-4266, OR (4) 1/2" DIA SS

THREADED ROD WITH HILTI HIT-HY

200 V3 ADHESIVE ANCHOR SYSTEM

WITH 4" EMBEDMENT PER ESR-4868,

OR APPROVED EQUAL.

(10) #4 REBAR @ 10" O.C.

(TOP&BOTTOM)

(E) GRADE @ ACCESSIBLE

EV CHARGE POSTS

REBOUNDING

BOLLARD

(4) #5 REBAR @

TOP & BOTTOM

NATIVE SOIL

6" MIN. COMPACTED CLASS

2 AGGREGATE BASE

(N) V4 TESLA

SUPERCHARGER POST

(N) CIP PAD FLUSH

WITH (E) PAVEMENT

NATIVE SOIL

6" MIN. COMPACTED CLASS

2 AGGREGATE BASE

#4 REBAR (TOP&BOTTOM)

18" O.C. @ HORIZONTAL

12" O.C. @ VERTICAL

EXISTING

LANDSCAPE

FRONT VIEW

TOP VIEW

SIDE VIEW

IF ACCESSIBLE ROUTE PASSES

BEHIND THE HEAD OF THE

ACCESSIBLE STALL, ENSURE

MINIMUM 4' CLEAR SPACE AT

BACK OF CHARGE POST, AND

1:48 MAX SLOPE ALL DIRECTIONS

FOR ACCESSIBLE ROUTE AT

HEAD OF STALL

HANDLE TERMINUS

BOLLARD SIGN

30" X 48" CLEAR

FLOOR SPACE

4" WHITE BORDER

AND CROSS

STRIPING, TYP.

5' WIDE ACCESS

AISLE

12" HIGH WHITE

TEXT

1:48 MAX SLOPE ALL DIRECTIONS AT ACCESSIBLE EV

VEHICLE STALL AND ACCESS AISLE

CABLE TERMINUS

(10) #4 REBAR @ 10" O.C.

(TOP&BOTTOM)

(4) #5 REBAR

(TOP&BOTTOM)

18" O.C. @ HORIZONTAL

12" O.C. @ VERTICAL

FOUNDATION DETAIL - TOP VIEW

2.3'

2'

.5 '4" M

IN

2'

.5

1.

5'

6.

4'

2.2'

1.

5'

1'-1" 4'

.3

.3'

.3

.3'

M

IN

11' MIN 5' MIN

.2

HANDLE TERMINUS

CABLE TERMINUS

5'-6"

CABLE TERMINUS

2'

4.7'

.3'

4.7'

7.

5'

3 X 4" PVC

CONDUIT FROM MAIN

SWITCHBOARD

4.6'

3.

9'

5.1'

4.

4'

GROUND LEVEL

GROUND LEVEL

4.9'

5.6'

.8

SIDE VIEW

FRONT VIEW

FOUNDATION DETAIL - TOP VIEW

POWER

CABINET

3.3'

2.8'

.5

3"

POWER CABINET TOP VIEW

FRONT

VIEW

4.7'

.9'

.3

.3

1 X 1" PVC

CONDUIT FROM MAIN

SWITCHBOARD

4 X 4" PVC

CONDUIT TO

EV CHARGER

.8

PROVIDE 6" MIN. FROM

ANCHORS TO

CONDUIT WINDOW

AND PAD EDGE

(6) #5 REBARS

@ 10.5" OC

(7) #5 REBARS @ 10" OC

(6) #5 REBARS

@ 10.5" OC

(7) #5 REBARS

@ 10" OC

CONCRETE 4500 PSI

(6) #5 REBARS @ 10.5" OC

(7) #5 REBARS @ 10" OC

POWER CABINET

ETHERNET CONDUIT

(ETHER-LOOP)

DC POST CONDUIT

(CABINET TO POST)

CABINET ANCHORAGE

LOCATIONS, (TYP. 4)

1/2" DIAMETER SS THREADED ROD, W/

SIMPSON SET-3G ADHESIVE ANCHOR

SYSTEM WITH 4" MIN. EMBEDMENT INTO

(N) EQUIPMENT SLAB IN ACCORDANCE

WITH ESR-4057 OR APPROVED EQUAL.

DRILL AND SET OF EPOXY ANCHORS SHALL

NOT OCCUR LESS THAN 7 DAYS FROM

POURING CONCRETE.

AC CONDUIT

(SWITCHBOARD

TO CABINET)

.6'

.6'

5.6'

4.

9'

.1

10"

12"

MIN.

NOTE: MAX. CONTINUOUS SLAB

LENGTH SHOULD NOT EXCEED

50 FT W/O EXPANSION JOINT

EQUIPMENT PAD & ANCHOR SECTION

6" MIN

EDGE DISTANCE

1/2" DIAMETER SS THREADED ROD, W/

SIMPSON SET-3G ADHESIVE ANCHOR

SYSTEM WITH 4" MIN. EMBEDMENT INTO

(N) EQUIPMENT SLAB IN ACCORDANCE

WITH ESR-4057 OR APPROVED EQUAL.

DRILL AND SET OF EPOXY ANCHORS SHALL

NOT OCCUR LESS THAN 7 DAYS FROM

POURING CONCRETE.

3" MIN.

6" MAX.

FINISHED

GRADE

18"

MIN.

1/2" DIAMETER SS THREADED ROD, W/

SIMPSON SET-3G ADHESIVE ANCHOR

SYSTEM WITH 4" MIN. EMBEDMENT INTO

(N) EQUIPMENT SLAB IN ACCORDANCE

WITH ESR-4057 OR APPROVED EQUAL.

DRILL AND SET OF EPOXY ANCHORS SHALL

NOT OCCUR LESS THAN 7 DAYS FROM

POURING CONCRETE.

IN ORDER TO MAINTAIN POSITIVE DRAINAGE,

TOP OF SLAB SHALL SLOPE BETWEEN 0.5%

AND 2% IN THE DOWNHILL DIRECTION.

12" MIN., 95% RELATIVE COMPACTED

CLASS 2 AGGREGATE BASE

(7) #5 REBARS

@ 10" OC

(6) #5 REBARS

@ 10.5" OC

305 W SPRING CREEK PKWY,

SUITE 100 B PLANO, TX 75023

SH

EL

L

F

R

EE

D O

M R

D

LI

TT

LE

C

H U

TE

, W

I 5

0 1 2 3 4 5 6 7 8 9N o.

BY

D

AT

E

IS

SU

E

BL

O C

K

DESIGNED BY:

CHECKED BY:

DRAWN BY:

AD

VP

VP

DOCUMENT DATE: AUG 27, 2026

NORDIC PROJECT ID/R: UNE-26-72/07

SHEET NUMBER

SH

EE

T

TI

TL

E:

3040 78 TH AVENUE SE,

UNIT 1619, MERCER ISLAND, WA 98040

Mob:720 492 2885 | www.nordicasia.net www.nordicasia.net

UNIVERSAL EV LLC

NORDIC ASIA

C4.0POWER CABINET DETAIL N.T.S.

SCALE C EV CHARGER DETAIL N.T.S.

SCALE D

C

IV

IL

D

ET

AI

LS

-3

NOTE:

1. Charger slab foundation shall be of concrete slab with the dimensions of 4.7' length x 2' width, to accommodate the weight and dimensions of the EV charger base.

2. Each charger should include a QR code for payment and chargers should also include a credit card reader with RFID support for contactless payment.

3. Expansion joint material to be pre-formed with top tear-off for application of SL-2 Elastomeric sealant or approved equal.

PR

O

PER

TY LIN

E

PROPOSED ADA PATH

EXISTING STORM WATER INLET

7.

4'

4'

4.8'

8.6'

3'

U E

U E

U E

U

E

U E

U E

3'

NO

PARKING

42.1'

5'

PR

O

PER

TY LIN

E

PR

O

PER

TY LIN

E

PROPERTY LINE PROPERTY LINE

21.1' 21'

POWER

CABINET

NEW PAD MOUNT

TRANSFORMER

WITH METER

PROTECTION

BOLLARD

EXISTING LIGHT POLE ON CONCRETE

BASE W/ NEW CAMERA

MAIN

SWITCHBOARD

C4.0 C

C3.0 B

C2.0

C3.0 A

USELAST

ELECTRIC VEHICLE

PARKING

9' 9' 9'

' 20

11'

C4.0 D TESLA V4 500 kW

SUPERCHARGER -

1A,1B,1C & 1D

EV2.0

GVAN ACCESSIBLE EV PARKING

SIGN WITH BOLLARDS

EMERGENCY DISCONNECT

SWITCH (MOUNTED ON POLE)EV2.0

E

30"X48" GROUND SPACE

STANDARD EV PARKING

SIGN WITH BOLLARDSEV2.0

F

1.90%

(1.81%)

(1.90%

(1.81%)

1.40%

(1.00%)

(0.60%)

(1.00%)

(1.81%

(1.95%

EXISTING POLE MOUNT

TRANSFORMER

VAN ACCESSIBLE

DEMO'ED TRENCH TO BE RESTORED

TO MATCH EXISTING CONDITIONS

IN ALL LOCATIONS (TYP.)

7'

7'

305 W SPRING CREEK PKWY,

SUITE 100 B PLANO, TX 75023

SH

EL

L

F

R

EE

D O

M R

D

LI

TT

LE

C

H U

TE

, W

I 5

0 1 2 3 4 5 6 7 8 9N o.

BY

D

AT

E

IS

SU

E

BL

O C

K

DESIGNED BY:

CHECKED BY:

DRAWN BY:

AD

VP

VP

DOCUMENT DATE: AUG 27, 2026

NORDIC PROJECT ID/R: UNE-26-72/07

SHEET NUMBER

SH

EE

T

TI

TL

E:

3040 78 TH AVENUE SE,

UNIT 1619, MERCER ISLAND, WA 98040

Mob:720 492 2885 | www.nordicasia.net www.nordicasia.net

UNIVERSAL EV LLC

NORDIC ASIA

Sheet size : 24" X 36" EV1.0

EV

C

H

AR

G

ER

P

LA

N

CHARGING STATION SPECIFICATIONS:

1. Do not let the flammable, explosive or flammable materials, chemicals, flammable vapors, and other dangerous goods close to charging station.

2. No underground utilities are present in the trenching area.

3. Contractor must proceed with caution during EV conduit trenching and follow standard safety and verification procedures

CHARGING STATION SPECIFICATIONS:

CONDUIT ESTIMATE SCHEDULE

ITEM CONDUIT QUANTITY LENGTH

TRANSFORMER TO MAIN SWITCHBOARD 4" PVC 4 4'-0"

MAIN…