This is a comprehensive construction design document prepared for the Village of Little Chute Community Development and Inspections Department in Wisconsin for the installation of electric vehicle charging infrastructure at a Shell gas station located at 2221 Freedom Road, Little Chute, Wisconsin. The project, managed by Universal EV LLC as developer with Nordic Asia Solutions as engineer and Connect Electrical as contractor, involves the installation of four Tesla V4 Superchargers with NACS and CCS1 connectors via Tesla Magic Dock technology. The scope of work includes converting five existing standard parking stalls into four EV charging stalls (three standard non-accessible and one van-accessible with a five-foot accessible aisle), constructing 118 square feet of concrete pavement with appropriate foundations, installing one 750kVA utility transformer with combined CT and meter socket coordinated with Kaukauna Utilities, installing one 1200A main switchboard, one Tesla V4 Supercharger Power Cabinet (625kVA), installing four EV sign posts with bollard protection, and completing all associated civil and electrical infrastructure per WisDOT standards. The project must maintain the active Shell gas station operations throughout construction with phased work and safe customer access maintained at all times.
All construction work must comply with 2021 International Building Code, 2017 Accessibility Code, 2021 International Fire Code, 2021 International Existing Building Code, 2017 National Electrical Code, Wisconsin Energy Code 2021, and Wisconsin Accessibility Code 2017. The contractor is required to obtain all necessary permits from governing agencies and coordinate with the Village of Little Chute Building Codes Department and Outagamie County Engineer for required inspections. The contractor must verify all plans, existing dimensions, and site conditions before proceeding and immediately notify the engineer of any discrepancies. All equipment must comply with the Build America Buy America Act, and the contractor shall warranty all installed systems for proper operation for not less than one calendar year from the project completion date. Upon completion, the contractor must submit as-built redlines, all brochures, operating and maintenance manuals, catalogs, shop drawings, and other required documents. The contractor must possess a Wisconsin Electrical License and EVITP certification. Post-construction, civil and electrical drawings must be updated to reflect as-built status and submitted to Wisconsin DOT.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IMAGE REFERENCE
AERIAL IMAGERY PROVIDED BY:
SITE
VICINITY MAP DRAWING INDEX PROJECT DESCRIPTION
SITE INFORMATIONAPPLICABLE CODES
CS0.0
C O
VE
R
S H
EE
T
NOTE:
IN THE EVENT OF CONFLICT, THE MOST RESTRICTIVE CODE SHALL PREVAIL.
PERMITTING JURISDICTION:
VILLAGE OF LITTLE CHUTE COMMUNITY DEVELOPMENT AND
INSPECTIONS DEPARTMENT
LATITUDE :
44.29597
LONGITUDE :
-88.31392
SITE COUNTY:
OUTAGAMIE COUNTY
SITE ADDRESS:
2221 FREEDOM RD,
LITTLE CHUTE, WI 54140
CONTRACTOR SHALL COMPLETE INSTALL PER THE SIGNED AND THE SEALED SET OF DRAWINGS.
ANY NECESSARY DEVIATIONS FROM THE DRAWINGS MUST BE SUBMITTED THROUGH AN RFI
REQUEST PROCESS WITH ENGINEERING FOR AN APPROVAL PRIOR TO CONTRACTOR PROCEEDING
WITH A DEVIATION OF THE SIGNED AND SEALED SET OF DRAWINGS.
CONTRACTOR SHALL VERIFY ALL PLANS, EXISTING DIMENSIONS AND CONDITIONS ON THE JOB SITE
THEN IMMEDIATELY NOTIFY THE ENGINEER IN WRITING OF ANY DISCREPANCIES BEFORE
PROCEEDING WITH THE WORK.
CONTRACTOR IS TO VERIFY PRESENCE
AND EXACT LOCATION OF ALL UTILITIES
PRIOR TO CONSTRUCTION.
CAUTION!!
INSTALLATION OF ELECTRIC VEHICLE CHARGING INFRASTRUCTURE
SHELL
SITE
EV LOCATION
SHEET NUMBER SHEET TITLE
CS0.0 COVER SHEET
G1.0 GENERAL NOTES
C0.0 PROPERTY LAYOUT - EXISTING CONDITION
C2.0 CIVIL DETAILS -1
EV1.0 EV CHARGER PLAN
EV2.0 CHARGING STALL SIGNAGE AND BOLLARD LAYOUT
CIVIL DETAILS -2C3.0
THREE LINE DIAGRAM
C1.0 EV INFRASTRUCTURE PLAN
EV3.0
ELECTRICAL DETAILS
NOT TO SCALE
NORTH
GENERAL PLAN DESIGNATION : GENERAL COMMERCIAL
EV5.0
DATASHEETS -1EV6.0
DATASHEETS -2EV7.0
2221 FREEDOM RD,
LITTLE CHUTE, WI 54140
NOT TO SCALE
NORTH
CONTRACTOR NOTES
AERIAL MAP
CODE INSPECTIONS:
OWNER AND/OR CONTRACTOR SHALL COORDINATE CONSTRUCTION ACTIVITIES WITH CITY OF LITTLE CHUTE BUILDING CODES DEPARTMENT AND THE OUTAGAMIE COUNTY ENGINEER AS NECESSARY TO COMPLY WITH ANY AND ALL INSPECTIONS REQUIRED BY FEDERAL, STATE, AND/OR LOCAL CODE AUTHORITIES. IT IS THE RESPONSIBILITY OF THE DEVELOPER TO OBTAIN ALL APPROPRIATE PERMITS FROM ALL THE GOVERNING AGENCIES THAT HAVE JURISDICTION
OVER THE AREA WHERE THE WORK IS PROPOSED TO BE DONE
NOTE: NO CONSTRUCTION PERMITS SHALL
BE ISSUED UNLESS AND UNTIL A PLAN IS
APPROVED BY THE VILLAGE OF LITTLE CHUTE
COMMUNITY DEVELOPMENT AND INSPECTIONS
DEPARTMENT
PERMITS:
IT IS THE RESPONSIBILITY OF THE DEVELOPER/CONTRACTOR TO OBTAIN ALL APPROPRIATE PERMITS FROM ALL THE GOVERNING AGENCIES THAT HAVE JURISDICTION OVER THE AREA WHERE WORK IS PROPOSED TO BE DONE.
OWNER:
SHELL
ENGINEER:
NORDIC ASIA SOLUTIONS
CONTRACTOR:
CONNECT ELECTRICAL
DEVELOPER:
UNIVERSAL EV LLC.
305 W SPRING CREEK PKWY,
SUITE 100 B PLANO, TX 75023
SH
EL
L
F
R
EE
D O
M R
D
LI
TT
LE
C
H U
TE
, W
I 5
0 1 2 3 4 5 6 7 8 9N o.
BY
D
AT
E
IS
SU
E
BL
O C
K
DESIGNED BY:
CHECKED BY:
DRAWN BY:
AD
VP
VP
DOCUMENT DATE: AUG 27, 2026
NORDIC PROJECT ID/R: UNE-26-72/07
SHEET NUMBER
SH
EE
T
TI
TL
E:
3040 78 TH AVENUE SE,
UNIT 1619, MERCER ISLAND, WA 98040
Mob:720 492 2885 | www.nordicasia.net www.nordicasia.net
UNIVERSAL EV LLC
NORDIC ASIA
C0.1 DEMOLITION PLAN
NOTES:
1. THE PLANS PROVIDED ARE DESIGNED FOR CONSTRUCTION. POST COMPLETION OF CONSTRUCTION, DRAWINGS
(CIVIL AND ELECTRICAL) ARE TO BE UPDATED TO REFLECT AS-BUILT STATUS AND SUBMITTED TO WISCONSIN DOT
2. CONTRACTOR MUST REFER TO THE O&M AND COMMISSIONING PLAN DOCUMENTS FROM UNIVERSAL EV FOR
ADDITIONAL CONSTRUCTION-RELATED DETAIL THAT COULD NOT BE INCLUDED IN THESE PLANS.
SYSTEM LABELING DETAILS
EV4.0
C1.1 EXPANDED VIEW OF GRADING PLAN
ALL WORK SHALL COMPLY WITH THE FOLLOWING APPLICABLE CODES:
· 2021 INTERNATIONAL BUILDING CODE
· 2017 ACCESSIBILITY CODE
· 2021 INTERNATIONAL FIRE CODE
· 2021 INTERNATIONAL EXISTING BUILDING CODE
· 2017 NATIONAL ELECTRICAL CODE
· WISCONSIN ENERGY CODE 2021
· WISCONSIN ACCESSIBILITY CODE 2017
THIS PLAN IS DEVELOPED WITH THE INTENT TO PROVIDE PUBLIC ELECTRIC VEHICLE (EV) CHARGING STATIONS IN AN EXISTING PARKING LOT. THE EXTENT OF DESIGN WITHIN THIS CONSTRUCTION DOCUMENT INCLUDES THE EV
CHARGING STATIONS AND THEIR ACCOMPANYING CIVIL AND ELECTRICAL INFRASTRUCTURE.
• DEMOLITION OF EXISTING SURFACES FOR THE INSTALLATION OF EV CHARGERS.
• GRADING OF SURFACES ASSOCIATED WITH EV SERVICE EQUIPMENT TO COMPLY WITH ADA
REQUIREMENTS.
SCOPE OF WORK:
• CONVERTING (5) STANDARD PARKING STALLS TO (3) STANDARD (NON-ACCESSIBLE) EV PARKING STALLS AND
(1) VAN ACCESSIBLE EV PARKING STALL WITH A 5 FOOT ACCESSIBLE AISLE.
• INSTALL (1) UTILITY TRANSFORMER WITH CT & METER SOCKET TO BE COORDINATED WITH UTILITY PROVIDER.
• INSTALL (1) MAIN SWITCHBOARD.
• INSTALL (1) TESLA V4 SUPERCHARGER POWER CABINET.
• INSTALL (4) TESLA V4 SUPERCHARGER.
• INSTALL (4) EV SIGN POSTS.
• CONSTRUCT 118 SQ.FT CONCRETE PAVEMENT.
• CONSTRUCT (4) CONCRETE EV CHARGER FOUNDATIONS.
• CONSTRUCT (1) CONCRETE SWITCHBOARD FOUNDATION.
• CONSTRUCT (1) CONCRETE POWER CABINET FOUNDATION.
• CONSTRUCT (1) CONCRETE TRANSFORMER FOUNDATION.
CIVIL DETAILS -3C4.0
http://www.nordicasia.net
305 W SPRING CREEK PKWY,
SUITE 100 B PLANO, TX 75023
SH
EL
L
F
R
EE
D O
M R
D
LI
TT
LE
C
H U
TE
, W
I 5
0 1 2 3 4 5 6 7 8 9N o.
BY
D
AT
E
IS
SU
E
BL
O C
K
DESIGNED BY:
CHECKED BY:
DRAWN BY:
AD
VP
VP
DOCUMENT DATE: AUG 27, 2026
NORDIC PROJECT ID/R: UNE-26-72/07
SHEET NUMBER
SH
EE
T
TI
TL
E:
3040 78 TH AVENUE SE,
UNIT 1619, MERCER ISLAND, WA 98040
Mob:720 492 2885 | www.nordicasia.net www.nordicasia.net
UNIVERSAL EV LLC
NORDIC ASIA
G1.0
G
EN
ER
AL
N O
TE
S
1. Installation shall comply with all applicable laws, codes, government regulations, utility company requirements, etc. of all authorities having jurisdiction in effect at the time of the building permit.
2. Where conflicts exist between codes, standards or this specification, the higher requirement shall apply.
3. The contractor is solely responsible for the safety of his workers,all construction means, methods,techniques, sequences and procedures for coordinating the work under this contract.
4. Continuously maintain the construction premises in a neat and orderly condition.
Damage to finishes shall be properly restored.
5. EVSE enclosure shall be NEMA rated.
6. EVSE cord length shall not exceed 25'.
7. EVSE charging stations has 4 doors i.e. front, rear, left and right. clear 24” distance on the four sides of a charger to be maintained for air circulation for cooling and opening panel for maintenance.
8. Mechanical and electrical support components, including strut and hardware, shall be hot dipped galvanized or equivalent electroplated finish.
9. All grounded conductors are white and equipment grounding conductors are green or bare per (NEC 200-6 (A), EX 5).
10. Liquid tight flexible metal conduit is generally suitable for installation in wet and dry locations. should it be employed, supports will be no more 12 inches from boxes (junction box, cabinets, or conduit fitting) and no more than 54 inches apart per
NEC.
11. All conductors below 100A shall be copper, unless otherwise noted.
12. In order to provide accessible operation of EVSE, a 3’ by 3’ (minimum) handicapped accessible operating area must be kept clear of vehicles and snow between the nose of the vehicle and the EVSE.
13. Reliable protective grounding must be provided. it is recommended to have separate dedicated ground exclusively for the charger considering the safety aspects. The ground resistance should be less than or equal to 4Ω copper cable of in accordance with NEC shall be used to connect charge housing to external ground.
14. The raceway shall not be less than trade size 1 (nominal 1-inch inside diameter).
The raceway shall originate at the main service or sub-panel and shall terminate into a listed cabinet, box or enclosure in close proximity to the proposed location of the EV space.
15. Location of installation is not located where excessive water run-offs, pooling or flooding may occur.
16. Exterior signs and zoning concerns per site requirements.
FOOTINGS:
Footings shall bear on firm undisturbed material or on engineered fill material. Any unsuitable material shall be removed from the footings excavations and spot reinforced.
Foundation concrete shall be poured the same day excavations are opened, or steps shall be taken to adequately protect the open excavation.
FROST PROTECTION:
The underside of all footings and grade beams subjected to outside weather conditions shall have a minimum cover of 24" from top of finished grade to bottom of footing at any point above the footing, unless otherwise noted. This meets the frost depth of 24 inches as set forth by the Wisconsin Building Code, 2021 edition with latest errata.
SITE PREPARATION:
Prior to construction of any permanent structure, all topsoil and organic material or frozen, wet, soft, loose or undesirable soil shall be stripped from the site.
TYPICAL DETAILS:
Typical details shown herein are provided to illustrate design intent and minimum requirements. The contractor shall be responsible for accommodating specific field conditions while providing for the intent of the typical details.
REBAR CONTINUOUS THRU CORNERS:
All reinforcing steel shall be continuous through corners.
WELDING OF REINFORCEMENT STEEL:
Welding, including tack welding, of reinforcing steel is prohibited, unless weldable rebar is used with approval of engineer.
LAP SPLICES:
All lap splices shall be Class ‘B’ laps of minimum 24-inches in accordance with the requirements of ACI 318 – current edition, unless otherwise noted.
PLACEMENT OF STEEL:
All reinforcement, including dowels, shall be tied in place before placing concrete.
Inserting dowels into the plastic concrete shall not be permitted. Contractor shall furnish additional reinforcing bars as necessary, whether shown in plans or not, to tie all reinforcements in place and to form cages to withstand forces due to placing and consolidation of concrete.
CONCRETE PLACEMENT:
The placement of concrete shall conform to ACI-304R, "Guide for Measuring, Mixing, Transporting and Placing Concrete", unless otherwise noted herein. The sides of all footings and foundation systems shall be formed to the exact dimensions as shown herein. Pouring concrete in trenches using sides of earth as forms is not permitted, except for spread footings.
ADVERSE WEATHER:
Placement of concrete in cold weather shall be in accordance with ACI-306R-88, "Cold Weather Concreting". Placement of concrete in hot weather shall be in accordance with ACI-305R-99, "Hot Weather Concreting".
CHEMICAL ADMIXTURES:
No chemical or mineral admixtures other than those noted herein shall be used in concrete without expressed and written consent by the engineer.
SECURING STEEL REINFORCEMENT:
All steel reinforcement shall be secured in-place prior to placement of concrete.
ELEVATION OF FOOTINGS:
All footings shall bear on solid undisturbed soil of consistent bearing to generally support an allowable bearing pressure of 2000 PSF. Any soft or unsuitable areas of bearing shall be undercut and properly replaced.
DESIGN CONSIDERATIONS:
CONCRETE: f'c = 3500PSI (Curb & Sidewalk) f'c = 4000PSI (Footings/Foundations) (Min. Comp. Strength at 28 days) Air Content = 6% Slump 3 – 5 inches REINF.STEEL: fy = 60KSI (ASTM A615 Grade 60) DESIGN CODE: Wisconsin Building Code, 2021
CONCRETE COVER:
Concrete cover shall be provided for reinforcing steel as outlined below unless noted otherwise:
FOOTINGS: Top: 2" Cover Bottom & Sides: 3" Clear (Unformed)
FORMED WALLS & PIERS: Stirrups: 1-1/2" Clear Reinf. Bars: 1-1/4" Clear
CONTROL JOINTS:
Sidewalks to have construction or control joints not to exceed 5ft apart.
Control joints shall be a min. depth of 25% of slab thickness unless noted otherwise and shall be sawn within 4 to 6 hours of placement of concrete.
SUBGRADE PREPARATION, EXCAVATION AND BACK FILLING:
Where fill is required under slabs, sidewalks, trenches, pavements, etc., fill material shall be compacted Dense Graded Aggregate (DGA).
All subgrade material to be compacted to 95% of its maximum density as measured by the Modified Proctor Method. Use mechanical compactor.
Slab sub base material under concrete shall be 57's crushed stone.
CODE INSPECTIONS:
Owner and/or contractor shall coordinate construction activities with code officials as needed to comply with any and all inspections as deemed necessary by code officials.
NOTES:
• All jobsite activities will be conducted in a safe and orderly manner in compliance with OSHA requirements.
• The jobsite area shall be clearly marked and barricaded with orange barrels, safety cones, and/or caution fence as appropriate.
• All potential erosion shall be controlled in such a manner so as to prevent any displacement of silt to the area adjacent to the project.
• Erosion control shall be properly inspected and maintained during the entirety of the project.
• Contractor shall remove erosion control measures upon completion of project and only after potential for erosion has been eliminated.
• All equipment must comply with Build America Buy America Act (BABA).
WARRANTY AND DELIVERABLES UPON PROJECT COMPLETION:
A. WARRANTY: The contractor shall warranty all of the systems for proper operation installed by the contractor for not less than one calendar year from date of project completion. this completion date shall be set by the architect, engineer deliverables.
B. DELIVERABLES: The contractor shall submit a complete set of as-built redlines, all brochures, operating and maintenance manuals, catalogs, shop drawings, and other documents upon completion of the project.
SAFETY:
A. The general contractor shall be responsible for the safety of work area, adjacent areas and building occupants that are likely to be affected by the work under this contract. work shall conform to all osha requirements and the local jurisdiction.
B. The contractor shall provide portable fire extinguishers with a rating of not less than 2-a:10-b:c and shall be within 25 feet of travel distance to all portions of where the work is being completed during construction.
C. All existing active sewer, water, gas, electric, and other utilities shall be protected at all times, and where required for the proper execution of the work, shall be relocated as directed by the engineer. extreme caution should be used by the contractor when excavating or drilling piers around or near utilities. the contractor shall provide safety training for the working crew. this shall include but not be limited to a) fall protection, b) confined space, c) electrical safety, and d) trenching and excavation.
D. The general contractor shall be responsible for security of the site for the duration of construction until job completion.
SUPERCHARGER NOTES:
1. All conduit shall be furnished and installed by the contractor. All wiring shall be furnished and installed by the contractor. The Tesla signal wire shall be provided by Tesla and installed by the contractor.
2. All bushings and wiring internal of proposed service equipment provided by manufacturer. Any modifications shall require engineering approval prior to any changes being made.
3. All aluminum(Al) conductors to receive anti-oxidation coating during installation. All other conductors are copper unless otherwise noted.
4. The following charging cabinets and the charging posts used on this project comply with the following Standards:
· IEC 61851-23: 2014 / EN 61851-23: 2014
· UL 2202: 2009(R2012)
· CAN CSA C22.2 NO. 107.1-01(R2011)
6. The aforementioned standards identify the requirements met by the equipment, including but not limited to:
· Protection against electric shock
· Overload and short circuit protection
· Fault protection
· Degrees of protection against access to hazardous live parts
· The internal components of the system are proprietary. Any questions concerning actual internal protective devices must be coordinated directly with tesla.
7. Tesla supercharger signal wiring rated 1000V and used for power limited class 1 circuits shall be permitted to run in conduits, cable trays, wire ways, or raceways along with associated DC conductors as allowed per NEC 725.48(B)(1), 300.3(C)(1) and 620.36.
8. Supercharger cabinet ac conductors sized under engineering supervision using thermal modeling software. Specifications about the trenching requirements are shown in the electrical details.
9. For DC runs in excess of 330 feet, contact tesla.
10. Underground conduits shall be schedule 40 PVC or UL listed HDPE. The aboveground portion of an underground/aboveground transition shall be schedule 80 PVC or UL listed HDPE.
11. Aboveground conduits exposed to vehicular or equivalent physical damage shall be RMC. Aboveground conduits not exposed to vehicular or equivalent damage shall be permitted to be EMT.
12. Wire splices are not permitted to extend wire run length. Contractor is responsible for rerunning full length of wire if run length is miscalculated.
13. Special inspection is required for all post-installed concrete anchors.
14. Plant guarantee: contractor shall guarantee all plants for a period of one (1) year from date of project acceptance by the owner.
Contractor is responsible for plant maintenance for the first growing season.
15. If existing grass is damaged/removed during construction, contractor shall apply seed per hydroseed method. Rating of seed shall be per distributor based on species type.
16. Contractor shall match existing landscape; use grass, river rock, mulch etc. To match existing landscape around equipment, unless otherwise noted.
17. Contractor to install weed barrier in front of supercharger cabinets and switchboard. Barrier to extend full width and depth of
NEC required working clearances.
18. For (N) accessible EV charging area(S), contractor to field verify slopes are compliant per accessible stall detail (ref.
architectural or structural sheets). Regrade and add asphalt overlay, new full depth asphalt, and/or asphalt milling if required.
existing spot elevations are approximate per survey data and are to be field verified by contractor.
19. Pad extents and footing to be confirmed by contractor prior to construction.
20. All precast foundations should have 1" separation filled with asphaltic material, between all precast pads and maintenance pads
21. Switchboard dimensions and anchor locations are liable to change. Contractor to verify against vendor final shop drawings.
GENERAL NOTES :
FR
EED
O M
R D
PATRIOT DR
FR
EED
O M
R D
FR
EED
O M
R D
PATRIOT DR
DRIVEW
AY
(APPROX.)
(APPROX.)
(APPR
O
X.)
(APPR
O
X.)
(APPR
O
X.)
DRIVEWAY
D R
IVEW
AY
D R
IVEW
AY
DRIVEWAY
EXISTING
BUILDING
W
ALKW
AY
W
ALKW
AY
W
ALKW
AY
D R
IVEW
AY
EXISTING GAS
PUMP CANOPY
U
E
U
E
OE
OE
OE
O
E
729728
726 727
PROPERTYLINE
PROPERTYLINE
PR
O
PER
TY LIN
E
PR
O
PER
TY LIN
E
PR
O
PER
TY LIN
E
EXISTING LIGHT POLE (TYP)
EXISTING BUILDING
EXISTING CURB RAMP
EXISTING BILLBOARD
EXISTING STORM
WATER INLET
EXISTING GAS STATION
UNDERGROUND FUEL
TANK MAN HOLES
EXISTING BILLBOARD
EXISTING LIGHT POLE
EXISTING LIGHT POLE
EXISTING LIGHT POLE
EXISTING LIGHT POLEEXISTING LIGHT POLE
EXISTING UTILITY POLE
W/ TRANSFORMER EXISTING UTILITY POLE
EXISTING UTILITY POLE
EXISTING DUMPSTER'S
EXISTING STORM
WATER INLET
U E
U E
U E
U
E
U E
U E
N
E
S
W270
350 0 10
4O
170180190
305 W SPRING CREEK PKWY,
SUITE 100 B PLANO, TX 75023
SH
EL
L
F
R
EE
D O
M R
D
LI
TT
LE
C
H U
TE
, W
I 5
0 1 2 3 4 5 6 7 8 9N o.
BY
D
AT
E
IS
SU
E
BL
O C
K
DESIGNED BY:
CHECKED BY:
DRAWN BY:
AD
VP
VP
DOCUMENT DATE: AUG 27, 2026
NORDIC PROJECT ID/R: UNE-26-72/07
SHEET NUMBER
SH
EE
T
TI
TL
E:
3040 78 TH AVENUE SE,
UNIT 1619, MERCER ISLAND, WA 98040
Mob:720 492 2885 | www.nordicasia.net www.nordicasia.net
UNIVERSAL EV LLC
NORDIC ASIA
Scale : N.T.S C0.0
PR
O
PE
R
TY
L
AY
O
U T
EX
IS
TI
N G
C O
N D
IT
IO
N
Note:
Property lines shown are approximate.
LEGEND:
- EXISTING BUILDING
- EXISTING LANDSCAPE AREA
- EXISTING CONCRETE SIDEWALK
- UNDERGROUND ELECTRICUE
- OVERHEAD ELECTRICOE
Total existing parking spaces : 89 (Including ADA) Total existing ADA Aisle : 2 Existing parking space converted for proposed EV charging : 5 (Including ADA) Non-EV Parking Stalls : 84 Proposed Standard (Non-Accessible) EV Stalls : 2 Proposed Van Accessible EV Stall : 1 Proposed Standard Accessible EV Stall : 1 Proposed ADA Aisle : 1
(*) NOTE: REQUIRED PARKING BASED ON REPORT OF 70 HOTEL
SUITES AND MAX ON-SITE STAFF OF 10 PERSONS.
PARKING SUMMARY
(APPROX.)
D R
IVEW
AY
DRIVEWAY
EXISTING
BUILDING
D R
IVEW
AY
O
E
O
E
729728
EXISTING STORM WATER INLET
EXISTING UTILITY POLE W/
TRANSFORMER (TO BE PROTECTED)
EXISTING STORM WATER
INLET (TO BE PROTECTED)
EXISTING LANDSCAPE AREA
EXISTING LANDSCAPE
AREA REMOVAL (551 SQ FT)
(2.89%)
(1.11%)
(4.17%
(3.27%
(0.89%)
(0.89%)
(4.16%
(1.78%)
(1.67%)
(4.22%
(0.44%)
(1.67%)
(3.61%
(0.67%)
(0.56%)
(3.66%
(0.44%)
(0.56%)
(3.61%
(0.55%)
(0.56%)
(3.05%
(0.33%)
(0.56%)
(2.61%
(2.22%
(0.22%)
(0.56%)
(1.94%
(0%)
(0.56%)
EXISTIO
N
G C
O N
C R
ETE SID
EW
ALK
(727.58) (727.66) (727.82) (727.86) (727.92) (727.96) (727.91) (727.88) (727.86) (727.86)
(727.32)
(726.73) (727.21) (7
.5 1)
(727.76)
(727.78)
(727.96) (728.12)
(727.41)
(727.65)
(728.17)
(728.49) (728.35)
(728.50
(728.50) (728.63) (729.43)
(729.57)
(728.17)
(729.08) (730.55)
(730.08)
(730.35)
(730.63) (730.08)
734.36) (730.35)
(729.55) (729.26)
(729.81)
(730.39)
(729.32)
(729.50)
(729.45) (729.47)
(729.43)(729.42)
(729.41)(729.63) (729.44)
(729.48) (729.25)
(729.75)
(729.70)
(729.69)
(729.76)
(729.62) (728.52)
(728.55)
(728.67)
(728.34)
(729.73)
(728.82)
(730.24)
(728.47)
(728.43)
(728.43) (728.28) (727.85) (728.11)
(728.80)
(726.83) (726.91) (727.06) (727.26) (727.31)
(727.36)
(727.41) (727.46)
7'
7'
3'
EXISTING FULL-DEPTH ASPHALT
PAVEMENT TO BE REMOVED (1640 SQ FT)
REMOVED THE EXISTING ASPHALT
PAVEMENT STRIPING (TYP)
EXISTING CONCRETE SIDEWALK
TO BE REMOVED (49 SQ FT)
(727.59)
(726.75)
LO
D
LO
D
LODLOD
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LODLODLODLOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LODLODLODLODLODLOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
3.8'3.9'
37.3'
18.1'
.9
46'
.8
37.3'
10.3'
12.9'
305 W SPRING CREEK PKWY,
SUITE 100 B PLANO, TX 75023
SH
EL
L
F
R
EE
D O
M R
D
LI
TT
LE
C
H U
TE
, W
I 5
0 1 2 3 4 5 6 7 8 9N o.
BY
D
AT
E
IS
SU
E
BL
O C
K
DESIGNED BY:
CHECKED BY:
DRAWN BY:
AD
VP
VP
DOCUMENT DATE: AUG 27, 2026
NORDIC PROJECT ID/R: UNE-26-72/07
SHEET NUMBER
SH
EE
T
TI
TL
E:
3040 78 TH AVENUE SE,
UNIT 1619, MERCER ISLAND, WA 98040
Mob:720 492 2885 | www.nordicasia.net www.nordicasia.net
UNIVERSAL EV LLC
NORDIC ASIA
C0.1
D
EM
O
LI
TI
O
N P
LA
N
SPOT ELEVATION KEY:
(XXX.XX) - EXISTING ELEVATION
- LIMITS OF DISTURBANCE (1798 SF)
DEMOLITION PLAN LEGEND:-
- SAWCUT LINE
LOD
- REFERENCE POINT FOR MEASUREMENT
Sheet size : 24" X 36"
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ANY
AND ALL PERMITS AND SHALL PAY ALL FEES NECESSARY FOR
ENCROACHMENT, GRADING, DEMOLITION, AND DISPOSAL OF SAID
MATERIALS AS REQUIRED BY PRIVATE, LOCAL AND STATE
JURISDICTIONS.
2. ALL DEMOLITION SHALL COMPLY WITH CHAPTER 24 OF THE
INTERNATIONAL FIRE CODE.
3. CONTINUOUS ACCESS SHALL BE MAINTAINED FOR SURROUNDING
PROPERTIES AT ALL TIMES DURING DEMOLITION OF EXISTING
FACILITIES.
4. THE CONTRACTOR SHALL VERIFY AND LOCATE ALL EXISTING ABOVE
AND UNDERGROUND UTILITIES. THE LOCATIONS OF EXISTING
INFRASTRUCTURE DEPICTED IN THIS PLAN ARE APPROXIMATE AND
ARE SHOWN FOR REFERENCE ONLY.
5. THE CONTRACTOR SHALL PERFORM A PRE-CONSTRUCTION SITE
VISUAL INSPECTION TO FAMILIARIZE THEMSELVES WITH EXISTING
CONDITIONS AND THE EXTENT OF DEMOLITION WORK AS SHOWN
ON THE PLANS.
6. EROSION CONTROL MEASURES SHALL BE IMPLEMENTED TO
PREVENT DEBRIS AND UNSUITABLE MATERIALS FROM ENTERING
STORM DRAINS, SANITARY SEWERS AND STREETS.
7. DUST CONTROL MEASURES SHALL BE IMPLEMENTED DURING
DEMOLITION.
8. REMOVAL OF LANDSCAPING SHALL INCLUDE ROOTS AND ORGANIC
MATERIAL.
9. CONTRACTOR TO INSTALL CHAIN LINK FENCE WITH MESH SCREEN
TO PROTECT PUBLIC FROM ENTERING CONSTRUCTION AREA.
10. THE CONTRACTOR SHALL CLEAR THE PROJECT SITE AREA WITHIN
THE CONFINES OF THE SAWCUT LINE. THE CONTRACTOR SHALL
DEMOLISH AND REMOVE FROM THE SITE ANY NOTED EXISTING
UTILITY STRUCTURES, PLANTERS, TREES, AND OTHER SITE
FEATURES, NOTED TO BE REMOVED ON THE DEMOLITION PLAN.
11. REFER TO THE PROPERTY LAYOUT (EXISTING CONDITION) ON
SHEET C0.0 FOR ADDITIONAL DETAILS OF EXISTING STRUCTURES,
ETC., LOCATED WITHIN THE PROJECT AREA. UNLESS OTHERWISE
NOTED, ALL EXISTING STRUCTURES, SLABS, CONCRETE, ASPHALT,
DEBRIS PILES, SIGNS, AND ALL APPURTENANCES SHALL BE
REMOVED FROM THE SITE BY THE CONTRACTOR SHALL BE
PROPERLY DISPOSED OF AS PART OF THIS PLAN. SOME ITEMS TO
BE REMOVED MAY NOT BE DEPICTED ON THE PROPERTY SURVEY. IF
ANY ITEMS ARE IN QUESTION, THE CONTRACTOR SHALL CONTACT
THE OWNER PRIOR TO REMOVAL OF SAID ITEMS.
12. CONTRACTOR TO USE CARE IN HANDLING DEBRIS FROM SITE TO
ENSURE THE SAFETY OF THE PUBLIC. HAUL ROUTE TO BE CLOSELY
MONITORED FOR DEBRIS OR MATERIALS TRACKED ONTO
ADJOINING ROADWAYS, SIDEWALKS, ETC. ROADWAYS AND
WALKWAYS TO BE CLEARED DAILY OR AS NECESSARY TO MAINTAIN
PUBLIC SAFETY.
13. ALL MATERIAL REMOVED FROM THIS SITE BY THE CONTRACTOR
SHALL BE DISPOSED OF BY THE CONTRACTOR IN A LEGAL MANNER.
14. THE CONTRACTOR SHALL RETURN SIDEWALKS, LANDSCAPING,
PLANTERS, IRRIGATION SYSTEMS, AND ANY OTHER FACILITIES
DISTURBED OR OTHERWISE DAMAGED DURING CONSTRUCTION TO
THE SAME OR BETTER CONDITION THAN EXISTED PRIOR TO THE
COMMENCEMENT OF THE WORK.
15. ALL QUANTITIES LISTED ON THIS PLAN ARE FOR THE CONVENIENCE
OF THE CLIENT / CONTRACTOR AND SHALL BE CONSIDERED
APPROXIMATIONS. ACTUAL QUANTITIES FOR BIDDING AND
CONSTRUCTION ARE THE RESPONSIBILITY OF THE CONTRACTOR.
16. UNLESS OTHERWISE NOTED, THE CONTRACTOR SHALL PROTECT
IN-PLACE ALL EXISTING SITE ELEMENTS AND INFRASTRUCTURE
WITHIN THE AREA OF IMPROVEMENTS.
17. ALL DIMENSIONS ARE TO THE FACE OF CURB UNLESS NOTED
OTHERWISE.
18. ALL EXISTING STRIPING AND PAVEMENT MARKINGS OR TEXT WITHIN
THE LIMITS OF THE WORK AREA SHALL BE REMOVED VIA SODIUM
BICARBONATE (SODA) BLASTING. ANY DIRECTIONAL ARROWS, STOP
BARS/TEXT OR CROSSWALKS THAT ARE NOT CORRECTLY LOCATED
OR INCONSISTENT WITH THE DETAILS PROVIDED SHOULD BE
REMOVED. APPLY SEAL COAT TO THE EXTENT THAT THE STRIPING
OR TEXT HAS BEEN REMOVED IN A SINGLE COMPLETE RECTANGLE
TO COVER ALL REMOVED STRIPING. DO NOT APPLY SEAL COAT
OVER EXISTING STRIPING OR CONCRETE. INSTALL NEW STRIPING
AND SIGNAGE AS SHOWN ON THE SITE CONSTRUCTION PLAN.
DEMOLITION NOTES:
CONTRACTOR SHALL VERIFY ALL PLANS, EXISTING DIMENSIONS &
CONDITIONS ON THE JOB SITE & SHALL IMMEDIATELY NOTIFY THE
ENGINEER IN WRITING OF ANY DISCREPANCIES BEFORE PROCEEDING
WITH THE WORK.
EXISTING CONDITIONS NOTES:
FOR THE PURPOSE OF THIS PLAN, THE LIMITS OF DISTURBANCE (LOD) IS
THE BOUNDARY WITHIN WHICH ALL CONSTRUCTION, CLEARING,
EXCAVATION, GRADING, AND RELATED ACTIVITIES SHALL OCCUR.
EXISTING IRRIGATION NOTE:
DIGGERS HOTLINE WISCONSIN UNDERGROUND
(800-242-8511/ 811) (CALL BEFORE YOU DIG)
UNDERGROUND UTILITIES/STRUCTURES WERE NOT LOCATED FOR
PREPARATION OF THIS PLAN. BURIED UTILITIES/STRUCTURES MAY
BE ENCOUNTERED. IDENTIFICATION AND LOCATION OF UTILITIES
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE
CONTRACTOR IS ADVISED THAT HE/SHE MAY CALL 811 (DIGGERS
HOTLINE WISCONSIN UNDERGROUND -FORMERLY B.U.D.) A MINIMUM
OF TWO (2) DAYS AND NO MORE THAN 10 DAYS PRIOR TO
EXCAVATION FOR LOCATION OF UNDERGROUND UTILITIES. THE
CONTRACTOR IS FURTHER ADVISED THAT HE/SHE IS RESPONSIBLE
FOR LOCATION OF ANY AND ALL UNDERGROUND UTILITIES,
INCLUDING THOSE THAT DO NOT SUBSCRIBE AND/OR PARTICIPATE
IN THE 811 SYSTEM.
- FULL DEPTH ASPHALT PAVEMENT REMOVAL (1640 SF)
00 5' 10'
Scale : 1" = 5'
- EXISTING CONCRETE SIDEWALK REMOVAL (49 SF)
N
E
S
W270
350 0 10
4O
170180190
U
E
U
E
O
E
O
E
729728
DRIVEWAY
(727.58) (727.66) (727.82) (727.86) (727.92) (727.96) (727.91) (727.88)
(727.86) (727.86) (727.32)
(726.73) (727.21) (727.51)
(727.23)
(726.16)
(726.29)
(725.91)
(725.94)
(725.66)
(727.41)
(727.65) (727.26)(727.12)
(726.91)
(727.38)
(727.41)
(727.46)
(727.51)
(726.11)
(725.93)
(725.64)
(728.17)
(728.49) (728.35)
(728.50
(728.50) (728.63) (729.43)
(729.57)
(728.17)
(729.08) (730.55)
(730.08)
(730.35)
(730.63) (730.08) 734.36)
(730.35)
(729.55) (729.26)
(729.81)
(730.39)
(729.32)
(729.50)
(729.45) (729.47)
(729.43)(729.42)
(729.41)(729.63) (729.44)
(729.48) (729.25)
(729.75)
(729.70)
(729.69)
(729.76)
(729.62)
(728.52)
(728.55)
(728.67)
(728.34)
(729.73)
(728.82)
(728.43)
(727.65)
(727.63)
(728.43) (728.28) (727.85)(727.63)
(726.39)
(728.80)
PROPOSED ADA PATH
TF:728.23
FG:727.73
EXISTING STORM WATER
INLET (TO BE PROTECTED)
(726.83) (726.91) (727.06) (727.26)
(727.31) (727.36) (727.41) (727.46)
EXISTING BUILDING
7.
4'
4'
4.8'
8.6'
TF:727.82
FG:727.32
3'
U E
U E
U E
U
E
TF:727.82
FG:727.32
3'
EXISTING LIGHT POLE
W/ NEW CAMERA
NO
PARKING
(FS:728.28)
FS:727.90
FS:728.48
FS:728.10
FS:728.53
FS:728.10(FS:727.96)(FS:727.92)
FS:728.15FS:727.76(FS:727.31)(FS:727.26)
4.77%
4.33%
1.90%
1.55%
2.78%
1.89%
(0.44%)
(0.56%)
(3.61%
(3.67%
1.81%
1.90%
1.81%
1.40%
1.00%
0.60%
(2.89%)
(1.11%)
(4.17%
(0.89%)
(0.89%)
(4.16%
(1.78%)
(1.67%)
(4.22%
(0.44%)
(1.67%)
(3.61%
(0.67%)
(0.56%)
(FS:727.88)
(FG:728.25)
FS:729.31
FS:729.31
TC:729.83
TC:729.73
(1.42%)
(7.42%
42.1'
9' 9' 9' 5' 11'
PROPERTY LINE PROPERTY LINE
4.
2'
21'
FS:728.90
FS:728.85
(1.00%)
(1.95%
(727.44)
18'
7'
7'
5.5'4.4'
TF:727.80
FG:727.30
TF:728.02
FG:727.52
TF:729.40
FG:728.90
TF:728.50
FG:728.40
DEMO'ED TRENCH TO BE RESTORED
TO MATCH EXISTING CONDITIONS IN
ALL LOCATIONS (TYP.)
EVCS-1D EVCS-1C EVCS-1B EVCS-1A
CONSTRUCT 1640 SQ FT OF
FULL-DEPTH PROPOSED ASPHALT
PAVEMENT (SEE DETAIL 5 / SH C2.0)
EXISTING UTILITY POLE
W/ TRANSFORMER
(TO BE PROTECTED)
4.
8'
17.1'
.2
(FS:728.10)
10'
(FS:728.73)
(1.81%
(1.70%
11'
FS:728.67
(1.20%)
(727.59)
(726.75)
(FS:728.30)
(FS:728.85)
(FS:728.80)
FS:729.31
FS:729.29
(FS:727.53)
11'
18'
.8
12.9'
37.3'
14.1'
(3.58%)
(4.46%)
2.05%
2.94% 3.63%
3.36%
PROPOSED CONCRETE
PAVEMENT (69 SQFT)
PROPOSED CONCRETE
PAVEMENT (49 SQFT)
(1.00%)(1.00%)
10.8'
.2
16.6'
305 W SPRING CREEK PKWY,
SUITE 100 B PLANO, TX 75023
SH
EL
L
F
R
EE
D O
M R
D
LI
TT
LE
C
H U
TE
, W
I 5
0 1 2 3 4 5 6 7 8 9N o.
BY
D
AT
E
IS
SU
E
BL
O C
K
DESIGNED BY:
CHECKED BY:
DRAWN BY:
AD
VP
VP
DOCUMENT DATE: AUG 27, 2026
NORDIC PROJECT ID/R: UNE-26-72/07
SHEET NUMBER
SH
EE
T
TI
TL
E:
3040 78 TH AVENUE SE,
UNIT 1619, MERCER ISLAND, WA 98040
Mob:720 492 2885 | www.nordicasia.net www.nordicasia.net
UNIVERSAL EV LLC
NORDIC ASIA
C1.0
EV
IN
FR
AS
TR
U
C
TU
R E
PL
AN
N
E
S
W270
350 0 10
4O
170180190
LEGEND & ABBREVIATION:
Sheet size : 24" X 36"
1. THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY
PIPES OR STRUCTURES SHOWN ON THEIR PLANS ARE OBTAINED BY A
SEARCH OF THE AVAILABLE RECORDS. TO THE BEST OF MY
KNOWLEDGE, THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN
ON THESE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE DUE
PRECAUTION. ANY MEASURES TO PROTECT THE UTILITIES AND
STRUCTURES SHOWN AND ANY OTHER LINES OR STRUCTURES NOT
OF RECORD OR NOT SHOWN ON THESE PLANS, AND IS RESPONSIBLE
FOR THE PROTECTION OF, AND ANY DAMAGE TO, THESE LINES OR
STRUCTURES.
2. CONTRACTOR TO VERIFY CLEARANCE AT ALL UTILITY CROSSINGS.
IF INTERFERENCE OCCURS, OTHER THAN NOTED ON PLAN,
CONTRACTOR TO CONTACT DESIGN ENGINEER FOR POSSIBLE
REDESIGN. IF REDESIGN IS UNFEASIBLE, CONTRACTOR TO RELOCATE
UTILITY AT NO EXPENSE TO ENGINEER.
3. THE CONTRACTOR AGREES THAT HE WILL ASSUME SOLE AND
COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE
COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY
OF PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL
APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING
HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY,
AND HOLD THE OWNER AND ENGINEER HARMLESS FROM ANY AND
ALL LIABILITY REAL OR ALLEGED IN CONNECTION WITH THE
PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR
LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR
THE ENGINEER, OR ANY PUBLIC AGENCY.
CIVIL ENGINEER’S NOTICE
TO CONTRACTOR:NEW EV CHARGING STATION SITE PLAN
1. CONTRACTOR TO BORE AND/OR HAND-TRENCH CONDUIT AS
REQUIRED PER NEC.
2. ALL EQUIPMENT SHALL BE INSTALLED PER CLIENT DESIGN
STANDARDS.
3. CONTRACTOR TO RETURN ALL AREAS OF DISTURBANCE BACK TO
EXISTING GRADE AND UP TO OR BETTER THAN EXISTING CONDITIONS.
4. ALL DIMENSIONS ARE TO THE FACE OF CURB UNLESS NOTED
OTHERWISE.
CONSTRUCTION NOTES:
1. CONTRACTOR SHALL TAKE FIELD MEASUREMENTS OR OTHERWISE
ESTABLISH A SURVEY OF THE EXISTING STRIPING IN ALL WORK
AREAS IN ORDER TO ESTABLISH ALL EXISTING PAVEMENT MARKINGS
WITH FULL COORDINATION OF NEW MARKINGS.
2. UNLESS OTHERWISE INDICATED ON THIS PLAN, THE CONTRACTOR
SHALL ESTABLISH PAVEMENT MARKINGS FOR ALL FIRE LANES,
DIRECTIONAL ARROWS, STOP BARS, CURBS, SIDEWALK, LIGHT POLE
BASES, SIGN BASES AND PARKING STALLS TO MATCH THE EXISTING
SITE WITHIN REPAIR LIMITS.
3. CONTRACTOR TO USE APPROPRIATE PAINT COLORS TO MATCH THE
EXISTING FEATURES. ADA BARRIER-FREE AREAS TO COMPLY WITH
ALL LOCAL AND FEDERAL ADA STANDARDS. PAVEMENT MARKINGS
SHALL BE A HIGH QUALITY PAINT RECOMMENDED BY THE PAINT
MANUFACTURER. PAINT COLORS SHALL CLOSELY MATCH THE
FEDERAL STANDARD 595B COLOR NUMBERS AS FOLLOWS:
BLUE—COLOR 15080, WHITE—COLOR 37925, AND YELLOW—COLOR
33538.
4. IN AREAS NOT BEING RESURFACED BUT REQUIRING RESTRIPING,
CONTRACTOR SHALL REMOVE EXISTING STRIPING BY EITHER SAND
BLASTING, WATER BLASTING, OR BY ANOTHER APPROVED METHOD
OF STRIPING REMOVAL. WHERE THE STRIPING REMOVAL CHANGES
THE SURFACE TEXTURE OF THE EXISTING ASPHALT, CONTRACTOR
SHALL SEAL THAT AREA PRIOR TO RESTRIPING. CONTRACTOR TO
SUBMIT STRIPING REMOVAL METHOD TO PROPERTY MANAGER AND
ENGINEER FOR APPROVAL PRIOR TO CONSTRUCTION.
PAVEMENT MARKING NOTES:
2221 FREEDOM RD, LITTLE CHUTE, WI 54140
CONSTRUCTION NOTES:-
NOTES:
• ALL TREES, SIDEWALKS, CURB & FLOW LINES SHALL BE PROTECTED IN PLACE.
• CONTRACTOR SHOULD VERIFY THE EXISTING SPOT ELEVATION AND SLOPES, TO HAVE
POSITIVE DRAINAGE AWAY FROM BUILDING AND EV DEVICES.
• CONTRACTOR TO FIRST INSTALL V4 CABINET AND THEN INSTALL BOLLARDS FOR
PROTECTION ON THE SIDE, AS THE MINIMUM REQUIRED CLEARANCE FOR CONSTRUCTION
OF V4 CABINET IS 36" AND THE MINIMUM REQUIRED CLEARANCE FOR SERVICING IS 18".
- PROPOSED ELEVATIONXXX.XX
- EXISTING ELEVATION(XXX.XX)
- FINISHED SURFACEFS
- TOP OF FOUNDATIONTF
- EXISTING LANDSCAPE
- TOP OF CURBTC
- FINISHED GRADEFG
CONSTRUCT EV CHARGING PER STRUCTURAL/ELECTRICAL PLAN
CONSTRUCT CONCRETE PAD FOR POWER CABINET PER STRUCTURAL/ELECTRICAL PLAN
CONSTRUCT CONCRETE PAD FOR MAIN SWITCHBOARD PER STRUCTURAL/ELECTRICAL PLAN
CONSTRUCT CONCRETE PAD FOR TRANSFORMER WITH CT & METER SOCKET PER STRUCTURAL/ELECTRICAL PLAN
INSTALL EV SIGNBOARD CENTERED IN EACH PARKING SPACE, ALIGNED WITH THE CONCRETE PAD OF EV CHARGERS, PER
DETAIL F ON SHEET EV2.0
INSTALL EV "USE LAST" SIGNBOARD PER DETAIL G ON SHEET EV2.0
PAINT STRIPING ACCESSIBLE PARKING SPOTS PER DETAIL 8 ON SHEET C2.0
INSTALL TRUNCATED DOMES PER CITY OF LITTLE CHUTE STANDARD, PER DETAIL 7 ON SHEET C2.0
PROVIDE 48" X 30" GROUND CLEAR SPACE IN FRONT OF ADA EV CHARGER
INSTALL BOLLARDS IN FRONT OF THE EQUIPMENT, PER DETAIL 10 ON SHEET C2.0.
INSTALL EMERGENCY DISCONNECT SWITCH IN NEARBY THE ADA ACCESS, PER DETAIL E ON SHEET EV2.0
ACCESSIBLE PATH OF TRAVEL SHALL HAVE LESS THAN 2% CROSS SLOPE AND 5% RUNNING SLOPE AT ALL TIMES.
INCLUSIVE OF GUTTER LIP.
CONSTRUCT NEW ASPHALT PAVEMENT, AGGREGATE BASE, AND SUBGRADE TO THE REQUIRED ELEVATIONS TO ACHIEVE THE
PROPOSED SLOPES AND SURFACE ELEVATIONS SHOWN ON THE PLANS. PLACE COMPACTED BASE MATERIAL TO THE
REQUIRED ELEVATION AND INSTALL ASPHALT PER DETAIL 6 ON SHEET C2.0.
REPLACE THE EXISTING LANDSCAPE AREA WITH A 4-INCH-THICK CONCRETE PAD TO CREATE THE REQUIRED ADA-COMPLIANT
LANDING AREA FOR THE EV CHARGER.
EXISTING LANDSCAPE IS REPLACED WITH CONCRETE WHERE THE EQUIPMENT IS MOUNTED.
CONCRETE FOOTING SCHEDULE
ITEM QUANTITY
DIMENSION REINFORCEMENT
(EACH WAY BOTTOM, UNO)
WIDTH LENGTH DEPTH
TRANSFORMER 1 8'-6" 7'-4" 3'-10" 13 X #6 REBAR
MAIN SWITCHBOARD 1 4'-10" 4'-0" 2'-6" 11 X #6 REBAR
POWER CABINET 2 5'-7" 4'-11" 10" 13 X #5 REBAR
EV CHARGER 4 2'-0" 4'-8" 1'-6"
10 X #4 REBAR
4 X #5 REBAR
STRIPING SCHEDULE
ITEM QUANTITY
DIMENSION PROPERTIES
WIDTH LENGTH ON CENTER TYPE COLOR
PAVEMENT STRIPING 3 4" 18'-0" 9'-0" SOLID WHITE— 37925
ADA AISLE 3 4" 20'-0" 11'-0" & 5'-0" SOLID WHITE— 37925
ADA AISLE STRIPING 6 4" 6'-1" 3'-0" SOLID WHITE— 37925
PATH OF TRAVEL 2 8" 41'-7" 4'-0" SOLID WHITE— 37925
PATH OF TRAVEL STRIPING 20 6" 4'-0" 4'-0" SOLID WHITE— 37925
Note: The quantities and dimensions are above mentioned items are nominal and not intended for bidding purposes.
Scale : N.T.S
- PROPOSED ASPHALT PAVEMENT BOUNDARY
- PROPOSED ASPHALT PAVEMENT FILL (1640 SQFT)
- PROPOSED FLOW ARROW (DIRECTION AND SLOPE)## %
- EXISTING FLOW ARROW (DIRECTION AND SLOPE)(## %)
- PROPOSED CONCRETE PAVEMENT (118 SQFT)
NOTE:
1. CONCRETE (CAST-IN-PLACE): ALL CONCRETE WORK SHALL MEET WISDOT
STANDARD SPECS SECTIONS 501 AND 716. PADS, FOOTINGS, AND FOUNDATIONS
TO BE REINFORCED WITH BUY AMERICA CERTIFIED STEEL. MINIMUM COMPRESSIVE
STRENGTH PER DRAWINGS (TYPICALLY 4,000 PSI AT 28 DAYS).
2. ELECTRICAL CONDUIT: CONDUIT SHALL MEET WISDOT SPEC SECTION 652. INSTALL
UNDERGROUND UNLESS NOTED OTHERWISE. SIZE PER NEC AND WISDOT
STANDARDS; MUST BE RATED FOR DIRECT BURIAL.
3. ELECTRICAL WIRING: WIRING SHALL MEET WISDOT SPEC SECTION 655. USE
COPPER, THWN-2 RATED CONDUCTORS. SIZE PER LOAD REQUIREMENTS AND
VOLTAGE DROP CALCULATIONS. INSTALL PER NEC AND WISDOT STANDARDS.
4. SIGNAGE: EV CHARGING SIGNAGE SHALL COMPLY WITH MUTCD AND BE MADE
FROM BUY AMERICA CERTIFIED MATERIALS.
5. PROTECTIVE BOLLARDS: FABRICATE AND INSTALL USING BUY AMERICA CERTIFIED
STEEL.
6. STEEL REINFORCEMENT: ALL REBAR FOR CAST-IN-PLACE CONCRETE SHALL BE
BUY AMERICA CERTIFIED.
PATRIOT DR
DRIVEWAY
PROPOSED ADA PATH
TF:728.23
FG:727.73
EXISTING STORM WATER
INLET (TO BE PROTECTED)
EXISTING
BUILDING
7.
4'
4'
4.8'
8.6'
TF:727.82
FG:727.32
3'
U E
U E
U E
U
E
TF:727.82
FG:727.32 3'
EXISTING LIGHT POLE
W/ NEW CAMERA
NO
PARKING
(FS:728.28)
FS:727.90
FS:728.48
FS:728.10
FS:728.53
FS:728.10 (FS:727.96)
(FS:727.92)
FS:728.15 FS:727.76 (FS:727.31) (FS:727.26)
4.77%
4.33%
1.
1.55%
2.78%
1.
(0.44%)
(0.56%)
(3 .6
1%
(3 .6
7%
1.81%
1.
1.81%
1.
1.00%
0.60%
(FS:727.88)
(FG:728.25)
FS:729.31
FS:729.31
(TC:729.83)
(TC:729.73)
(1.42%)
(7 .4
2%
42.1'
9'9'9'5'11'
PROPERTY LINEPROPERTY LINE
4.
2'
21'
FS:728.90
FS:728.85
(1.00%)
(1 .9
5%
18'
7'
7'
5.5' 4.4'
TF:727.80
FG:727.30
TF:728.02
FG:727.52
TF:729.40
FG:728.90
TF:728.50
FG:728.40
DEMO'ED TRENCH TO BE RESTORED
TO MATCH EXISTING CONDITIONS
IN ALL LOCATIONS (TYP.)
EVCS-1DEVCS-1CEVCS-1BEVCS-1A
CONSTRUCT 1640 SQ FT OF
FULL-DEPTH PROPOSED ASPHALT
PAVEMENT (SEE DETAIL 5 / SH C2.0)
EXISTING UTILITY POLE
W/ TRANSFORMER (TO
BE PROTECTED)
4.
8'
17.1'
.2
(FS:728.10)
10'
(FS:728.73)
(1 .8
1%
(1.70%)
11'
FS:728.67
(1.20%)
(FS:728.30)
(FS:728.85)
(FS:728.80)
FS:729.31
FS:729.29
(FS:727.53)
11'
18'
.8
12.9'
37.3'
14.1'
10.8'
(3.58%)
(4.46%)
2.05%2.94%3.63%
3.36%
3.5'
(1.00%)(1.00%)
PROPOSED CONCRETE
PAVEMENT (49 SQFT)
PROPOSED CONCRETE
PAVEMENT (69 SQFT)
.2
305 W SPRING CREEK PKWY,
SUITE 100 B PLANO, TX 75023
SH
EL
L
F
R
EE
D O
M R
D
LI
TT
LE
C
H U
TE
, W
I 5
0 1 2 3 4 5 6 7 8 9N o.
BY
D
AT
E
IS
SU
E
BL
O C
K
DESIGNED BY:
CHECKED BY:
DRAWN BY:
AD
VP
VP
DOCUMENT DATE: AUG 27, 2026
NORDIC PROJECT ID/R: UNE-26-72/07
SHEET NUMBER
SH
EE
T
TI
TL
E:
3040 78 TH AVENUE SE,
UNIT 1619, MERCER ISLAND, WA 98040
Mob:720 492 2885 | www.nordicasia.net www.nordicasia.net
UNIVERSAL EV LLC
NORDIC ASIA
C1.1
EX
PA
N D
ED
V
IE
W
O F
G R
AD
IN
G P
LA
N
SPOT ELEVATION KEY:
TF - TOP OF FOUNDATION
FS - FINISHED SURFACE
FG - FINISHED GRADE
- PROPOSED ELEVATIONS
GRADING PLAN LEGEND:-
- EXISTING LANDSCAPE AREA FILL
- PROPOSED ASPHALT PAVEMENT BOUNDARY
- PROPOSED ASPHALT PAVEMENT FILL (1640 SQFT)
- PROPOSED FLOW ARROW (DIRECTION AND SLOPE)## %
- EXISTING FLOW ARROW (DIRECTION AND SLOPE)(## %)
- PROPOSED CONCRETE PAVEMENT (118 SQFT)
Sheet size : 24" X 36" Scale : 1" = 5'
00 5' 10'
N
E
S
W270
350 0 10
4O
170180190
60°
4" WHITE PAINT,
60 DEGREES
2'-4" ON CENTER
(20' M
IN
SEE SITE PLA
N
FO
R D
IM
PER PLAN
(5' MIN.)
36"O.C.
M
AX.
NO
PARKING
THE WORDS "NO PARKING"
SHALL BE PAINTED ON THE
GROUND WITHIN THE
ACCESS AISLE. THIS NOTICE
SHALL BE PAINTED IN WHITE
LETTERS NO LESS THAN 12
INCHES HIGH
BT
M e nc b ox
FRONT VIEWSIDE VIEW
MAX 10"
1.
3'
4' 4'
6.
4'
1.
2'
2.2'
1.
3'
4'
1'-1" 4'
2.5'
2.3'
REBOUNDING
BOLLARD
48" X 30"
GROUND SPACE
HANDLE TERMINUS
CABLE TERMINUS
CABLE TERMINUS
HANDLE
EMERGENCY
DISCONNECT BUTTON
(MOUNTED ON POLE)
0.8'
M ax 4'
GROUND
LEVEL
TOP VIEW
SECTION VIEW
CONCRETE
FOUNDATION
DUCTILE IRON
STEEL PIPE
BOLLARD,FILLED
WITH CONCRETE
CAP
CONCRETE
FOUNDATION
BOLLARD
1/2"X9" STEEL
ROD THRU
BOLLARD
3' 2.
7'
3'.3
1.3'
1.
3'Ø
.4'Ø
4" THICK CONCRETE SIDEWALK
WITH 6x6-W1.2xAW1.2 WELDED
WIRE MESH REINFORCEMENT.
2,500 PSI AT 28 DAYS.
PREPARED EARTH SUBGRADE
(COMPACTED TO AT LEAST 95
PERCENT MODIFIED PROCTOR)
VARIES
REFER TO SITE PLAN TACK COAT (INCLUDING VERTICAL FACES)
MATCH EXISTING ASPHALT SURFACE COURSE
REMOVE EXISTING ASPHALT PAVEMENT, AGGREGATE BASE, AND
SUBGRADE MATERIAL TO REQUIRED ELEVATION TO ACHIEVE
PROPOSED SLOPES AND SURFACE ELEVATIONS SHOWN ON PLANS.
PLACE COMPACTED BASE MATERIAL TO REQUIRED ELEVATION AND
PLACE ASPHALT PER CROSS SECTION BELOW.
EXISTING AGGREGATE BASE COURSE MEETING
MATERIAL & COMPACTION REQUIREMENTS - TO
REMAIN. ADD OR REMOVE MATERIAL AS
NECESSARY TO ACHIEVE FINAL PROPOSED GRADES.
MATCH EXISTING ASPHALT SURFACE COURSE
EXISTING SUBGRADE - TO REMAIN
PROPOSED PAVEMENTEXISTING PAVEMENT
2” HMA SURFACE COURSE IL-9.5, MIX D, N50
2-1/4” HMA BINDER COURSE, IL-19, N50
6" COMP. DGA BASE
SAW CUT
0.40 LBS/SY ASPHALT MATERIAL FOR TACK COAT
MATCH EXISTING ASPHALT SURFACE COURSE
REMOVE EXISTING ASPHALT PAVEMENT,
AGGREGATE BASE, AND SUBGRADE MATERIAL
TO REQUIRED ELEVATION TO ACHIEVE
PROPOSED SLOPES AND SURFACE ELEVATIONS
SHOWN ON PLANS. PLACE COMPACTED BASE
MATERIAL TO REQUIRED ELEVATION AND
PLACE ASPHALT PER CROSS SECTION BELOW.
EXISTING DENSE GRADED AGGREGATE BASE
COURSE MEETING MATERIAL & COMPACTION
RATE OF 95% - TO REMAIN. ADD OR REMOVE
MATERIAL AS NECESSARY TO ACHIEVE FINAL
PROPOSED GRADES.
MATCH EXISTING ASPHALT SURFACE COURSE
EXISTING COMP. SOIL SUBGRADE - TO REMAIN
ELEVATION
PLAN
0.90" MIN
0.92" MAX
0.
M
IN
0.
M A
X
2.30" MIN O.C.
2.40" MAX O.C.
2.
M
IN
O
.C
2.
M
A X
O .C
0.45" MIN
0.47" MAX
48" MAX. TO
TOP OF BUTTON
FINISHED GRADE
V4 TESLA
SUPERCHARGER
POST
BUTTON TO
ACTIVATE
MAGIC DOCK
(OPERABLE PART)
(N) LOOP HANDLE
ATTACHMENT
305 W SPRING CREEK PKWY,
SUITE 100 B PLANO, TX 75023
SH
EL
L
F
R
EE
D O
M R
D
LI
TT
LE
C
H U
TE
, W
I 5
0 1 2 3 4 5 6 7 8 9N o.
BY
D
AT
E
IS
SU
E
BL
O C
K
DESIGNED BY:
CHECKED BY:
DRAWN BY:
AD
VP
VP
DOCUMENT DATE: AUG 27, 2026
NORDIC PROJECT ID/R: UNE-26-72/07
SHEET NUMBER
SH
EE
T
TI
TL
E:
3040 78 TH AVENUE SE,
UNIT 1619, MERCER ISLAND, WA 98040
Mob:720 492 2885 | www.nordicasia.net www.nordicasia.net
UNIVERSAL EV LLC
NORDIC ASIA
C2.0
N.T.S.
SCALE 10
N.T.S.
SCALE 8
ACCESSIBILITY EV DETAILS N.T.S.
SCALE 1 OPERABLE PARTS HEIGHT N.T.S.
SCALE 2 ADA ACCESSIBILITY STANDARDS N.T.S.
SCALE 3
PAVEMENT STRIPING DETAILN.T.S.
SCALE 5
SCALE
C
IV
IL
D
ET
AI
LS
FOUNDATION DETAILS-BOLLARD
CONCRETE:
f'c = 3500 PSI
NOTE: BOLLARD TO BE COVERED
WITH SMOOTH UV RESISTANT
YELLOW BOLLARD SLEEVE.
CONCRETE SIDEWALK N.T.S.
SCALE 4 FULL DEPTH ASPHALT PAVEMENT DETAIL N.T.S.
SCALE 7SAWCUT & FULL DEPTH ASPHALT PAVEMENT DETAIL
NOTES:
1. PROPOSED ASPHALT 5.0% MAX. TRANSITION SLOPE TO EXISTING GRADE, UNLESS OTHERWISE SHOWN ON PLANS.
2. CREATE A SMOOTH TRANSITION TO MATCH EXISTING GRADE. SEE PLAN FOR APPROXIMATE REMOVE, REGRADE, AND REPLACE LIMITS.
3. SURFACE COURSE SHALL BE INSTALLED AT THE SAME TIME AS ADJACENT PAVEMENT REPAIR SURFACE COURSES.
4. IF AGGREGATE BASE COURSE IS NOT PRESENT CONTRACTOR TO NOTIFY ENGINEER OF RECORD IMMEDIATELY.
5. THE AGGREGATE BASE COURSE SHALL BE INSPECTED BY THE TESTING AGENCY, OWNER OR DESIGN
CONSULTANT AFTER ASPHALT REMOVAL AND BASE PREPARATION, PRIOR TO ASPHALT REPLACEMENT.
NOT USED
N.T.S.
SCALE 11V4 MAGIC DOCK ACCESSIBILITY DETAIL
N.T.S.
SCALE 6 TRUNCATED DOME
N.T.S.
SCALE 9
N.T.S. 12
NOT USED
6" CONCRETE
PAD (TYP)
FOUNDATION DETAIL - MAIN
SWITCHBOARD
MAIN SWITCHBOARD -
TOP VIEW
FRONT VIEW
SIDE VIEW
MAIN
SWITCHBOARD
MAIN SWITCHBOARD
MAIN SWITCHBOARD
CONCRETE
4000 PSI
CONCRETE
4000 PSI
(6) #6 REBARS @ 10" OC
(5) #6 REBARS @ 10" OC
4 X 4" PVC
CONDUIT FROM CT CABINET
3 X 4" PVC
1 X 1" PVC
CONDUIT TO POWER CABINET
FINISH GRADE
FINISH GRADE
FINISH GRADE
(6) #6 REBARS @ 10" OC
(5) #6 REBARS @ 10" OC
3" CLEAR TYP.
EACH SIDE
(6) #6 REBARS @ 10" OC
(5) #6 REBARS @ 10" OC
1/2" DIAMETER SS THREADED ROD, W/
SIMPSON SET-3G ADHESIVE ANCHOR
SYSTEM WITH 4" MIN. EMBEDMENT INTO
(N) EQUIPMENT SLAB IN ACCORDANCE
WITH ESR-4057 OR APPROVED EQUAL.
DRILL AND SET OF EPOXY ANCHORS SHALL
NOT OCCUR LESS THAN 7 DAYS FROM
POURING CONCRETE.
5.
4'
3.8'
3.8'
3'
.5
2.
5'
4.8'
2' .5
4'
4'
4.8'
.3'
1/2" DIAMETER SS THREADED ROD, W/
SIMPSON SET-3G ADHESIVE ANCHOR
SYSTEM WITH 4" MIN. EMBEDMENT INTO
(N) EQUIPMENT SLAB IN ACCORDANCE
WITH ESR-4057 OR APPROVED EQUAL.
DRILL AND SET OF EPOXY ANCHORS SHALL
NOT OCCUR LESS THAN 7 DAYS FROM
POURING CONCRETE.
(6) #6 REBARS @ 18" OC
(7) #6 REBARS @ 14" OC
FOUNDATION DETAIL - TOP VIEW
TRANSFORMER - TOP VIEW
.3'
SAND
4" PVC - 3' MINIMUM PAST
CONCRETE MARK END
WITH A LATH
10" THICK
CONCRETE PAD
WITH #5 REBARSTEEL 90°
SWEEP
SOIL / DIRT
TOP SOIL
.5
.7
3'
6.4'.5'
.3'
FILLED WITH SAND
62" X 20" OPENING IN
BASEMENT
4" BASEMENT
FLANGE
4" SERVICE
CONDUIT
3ø PRIMARY
TRANSFORMER
.7
.7
3'
FINISH GRADE
(6) #6 REBARS @ 18" OC
(7) #6 REBARS @ 14" OC
TRANSFORMER
CONCRETE
4000 PSI
5' 1.
3'
CONCRETE
4000 PSI
(6) #6 REBARS @ 18" OC
(7) #6 REBARS @ 14" OC
FINISH GRADE
TRANSFORMER
FRONT VIEW
SIDE VIEW
FR
O
N T
TRANSFORMER - SIDE VIEW
FR
O
N T
3'
4 X 4" PVC
CONDUIT TO CT CABINET
.8
.8 ' 7.5'
8.6'
8.6'
7.
5'
8.6'
7.
5' 305 W SPRING CREEK PKWY,
SUITE 100 B PLANO, TX 75023
SH
EL
L
F
R
EE
D O
M R
D
LI
TT
LE
C
H U
TE
, W
I 5
0 1 2 3 4 5 6 7 8 9N o.
BY
D
AT
E
IS
SU
E
BL
O C
K
DESIGNED BY:
CHECKED BY:
DRAWN BY:
AD
VP
VP
DOCUMENT DATE: AUG 27, 2026
NORDIC PROJECT ID/R: UNE-26-72/07
SHEET NUMBER
SH
EE
T
TI
TL
E:
3040 78 TH AVENUE SE,
UNIT 1619, MERCER ISLAND, WA 98040
Mob:720 492 2885 | www.nordicasia.net www.nordicasia.net
UNIVERSAL EV LLC
NORDIC ASIA
C3.0N.T.S.
SCALE A MAIN SWITCHBOARD DETAIL N.T.S.
SCALE BTRANSFORMER DETAIL
C
IV
IL
D
ET
AI
LS
-2
NO
PARKING
REBOUNDING
BOLLARD
ACCESSIBLE VAN EV CHARGE STALL - IBC & ADA
V4 TESLA
SUPERCHARGER POST
WEIGHT: 198 LBS
TESLA SUPERCHARGER HANDLE
(MAX. 48" HEIGHT FOR
ACCESSIBLE CHARGE POSTS)
(4) 1/2" DIA SS HILTI KWIK-BOLT
TZ2 WITH 3.75" MIN. EMBEDMENT
PER ESR-4266, OR (4) 1/2" DIA SS
THREADED ROD WITH HILTI HIT-HY
200 V3 ADHESIVE ANCHOR SYSTEM
WITH 4" EMBEDMENT PER ESR-4868,
OR APPROVED EQUAL.
(10) #4 REBAR @ 10" O.C.
(TOP&BOTTOM)
(E) GRADE @ ACCESSIBLE
EV CHARGE POSTS
REBOUNDING
BOLLARD
(4) #5 REBAR @
TOP & BOTTOM
NATIVE SOIL
6" MIN. COMPACTED CLASS
2 AGGREGATE BASE
(N) V4 TESLA
SUPERCHARGER POST
(N) CIP PAD FLUSH
WITH (E) PAVEMENT
NATIVE SOIL
6" MIN. COMPACTED CLASS
2 AGGREGATE BASE
#4 REBAR (TOP&BOTTOM)
18" O.C. @ HORIZONTAL
12" O.C. @ VERTICAL
EXISTING
LANDSCAPE
FRONT VIEW
TOP VIEW
SIDE VIEW
IF ACCESSIBLE ROUTE PASSES
BEHIND THE HEAD OF THE
ACCESSIBLE STALL, ENSURE
MINIMUM 4' CLEAR SPACE AT
BACK OF CHARGE POST, AND
1:48 MAX SLOPE ALL DIRECTIONS
FOR ACCESSIBLE ROUTE AT
HEAD OF STALL
HANDLE TERMINUS
BOLLARD SIGN
30" X 48" CLEAR
FLOOR SPACE
4" WHITE BORDER
AND CROSS
STRIPING, TYP.
5' WIDE ACCESS
AISLE
12" HIGH WHITE
TEXT
1:48 MAX SLOPE ALL DIRECTIONS AT ACCESSIBLE EV
VEHICLE STALL AND ACCESS AISLE
CABLE TERMINUS
(10) #4 REBAR @ 10" O.C.
(TOP&BOTTOM)
(4) #5 REBAR
(TOP&BOTTOM)
18" O.C. @ HORIZONTAL
12" O.C. @ VERTICAL
FOUNDATION DETAIL - TOP VIEW
2.3'
2'
.5 '4" M
IN
2'
.5
1.
5'
6.
4'
2.2'
1.
5'
1'-1" 4'
.3
.3'
.3
.3'
M
IN
11' MIN 5' MIN
.2
HANDLE TERMINUS
CABLE TERMINUS
5'-6"
CABLE TERMINUS
2'
4.7'
.3'
4.7'
7.
5'
3 X 4" PVC
CONDUIT FROM MAIN
SWITCHBOARD
4.6'
3.
9'
5.1'
4.
4'
GROUND LEVEL
GROUND LEVEL
4.9'
5.6'
.8
SIDE VIEW
FRONT VIEW
FOUNDATION DETAIL - TOP VIEW
POWER
CABINET
3.3'
2.8'
.5
3"
POWER CABINET TOP VIEW
FRONT
VIEW
4.7'
.9'
.3
.3
1 X 1" PVC
CONDUIT FROM MAIN
SWITCHBOARD
4 X 4" PVC
CONDUIT TO
EV CHARGER
.8
PROVIDE 6" MIN. FROM
ANCHORS TO
CONDUIT WINDOW
AND PAD EDGE
(6) #5 REBARS
@ 10.5" OC
(7) #5 REBARS @ 10" OC
(6) #5 REBARS
@ 10.5" OC
(7) #5 REBARS
@ 10" OC
CONCRETE 4500 PSI
(6) #5 REBARS @ 10.5" OC
(7) #5 REBARS @ 10" OC
POWER CABINET
ETHERNET CONDUIT
(ETHER-LOOP)
DC POST CONDUIT
(CABINET TO POST)
CABINET ANCHORAGE
LOCATIONS, (TYP. 4)
1/2" DIAMETER SS THREADED ROD, W/
SIMPSON SET-3G ADHESIVE ANCHOR
SYSTEM WITH 4" MIN. EMBEDMENT INTO
(N) EQUIPMENT SLAB IN ACCORDANCE
WITH ESR-4057 OR APPROVED EQUAL.
DRILL AND SET OF EPOXY ANCHORS SHALL
NOT OCCUR LESS THAN 7 DAYS FROM
POURING CONCRETE.
AC CONDUIT
(SWITCHBOARD
TO CABINET)
.6'
.6'
5.6'
4.
9'
.1
10"
12"
MIN.
NOTE: MAX. CONTINUOUS SLAB
LENGTH SHOULD NOT EXCEED
50 FT W/O EXPANSION JOINT
EQUIPMENT PAD & ANCHOR SECTION
6" MIN
EDGE DISTANCE
1/2" DIAMETER SS THREADED ROD, W/
SIMPSON SET-3G ADHESIVE ANCHOR
SYSTEM WITH 4" MIN. EMBEDMENT INTO
(N) EQUIPMENT SLAB IN ACCORDANCE
WITH ESR-4057 OR APPROVED EQUAL.
DRILL AND SET OF EPOXY ANCHORS SHALL
NOT OCCUR LESS THAN 7 DAYS FROM
POURING CONCRETE.
3" MIN.
6" MAX.
FINISHED
GRADE
18"
MIN.
1/2" DIAMETER SS THREADED ROD, W/
SIMPSON SET-3G ADHESIVE ANCHOR
SYSTEM WITH 4" MIN. EMBEDMENT INTO
(N) EQUIPMENT SLAB IN ACCORDANCE
WITH ESR-4057 OR APPROVED EQUAL.
DRILL AND SET OF EPOXY ANCHORS SHALL
NOT OCCUR LESS THAN 7 DAYS FROM
POURING CONCRETE.
IN ORDER TO MAINTAIN POSITIVE DRAINAGE,
TOP OF SLAB SHALL SLOPE BETWEEN 0.5%
AND 2% IN THE DOWNHILL DIRECTION.
12" MIN., 95% RELATIVE COMPACTED
CLASS 2 AGGREGATE BASE
(7) #5 REBARS
@ 10" OC
(6) #5 REBARS
@ 10.5" OC
305 W SPRING CREEK PKWY,
SUITE 100 B PLANO, TX 75023
SH
EL
L
F
R
EE
D O
M R
D
LI
TT
LE
C
H U
TE
, W
I 5
0 1 2 3 4 5 6 7 8 9N o.
BY
D
AT
E
IS
SU
E
BL
O C
K
DESIGNED BY:
CHECKED BY:
DRAWN BY:
AD
VP
VP
DOCUMENT DATE: AUG 27, 2026
NORDIC PROJECT ID/R: UNE-26-72/07
SHEET NUMBER
SH
EE
T
TI
TL
E:
3040 78 TH AVENUE SE,
UNIT 1619, MERCER ISLAND, WA 98040
Mob:720 492 2885 | www.nordicasia.net www.nordicasia.net
UNIVERSAL EV LLC
NORDIC ASIA
C4.0POWER CABINET DETAIL N.T.S.
SCALE C EV CHARGER DETAIL N.T.S.
SCALE D
C
IV
IL
D
ET
AI
LS
-3
NOTE:
1. Charger slab foundation shall be of concrete slab with the dimensions of 4.7' length x 2' width, to accommodate the weight and dimensions of the EV charger base.
2. Each charger should include a QR code for payment and chargers should also include a credit card reader with RFID support for contactless payment.
3. Expansion joint material to be pre-formed with top tear-off for application of SL-2 Elastomeric sealant or approved equal.
PR
O
PER
TY LIN
E
PROPOSED ADA PATH
EXISTING STORM WATER INLET
7.
4'
4'
4.8'
8.6'
3'
U E
U E
U E
U
E
U E
U E
3'
NO
PARKING
42.1'
5'
PR
O
PER
TY LIN
E
PR
O
PER
TY LIN
E
PROPERTY LINE PROPERTY LINE
21.1' 21'
POWER
CABINET
NEW PAD MOUNT
TRANSFORMER
WITH METER
PROTECTION
BOLLARD
EXISTING LIGHT POLE ON CONCRETE
BASE W/ NEW CAMERA
MAIN
SWITCHBOARD
C4.0 C
C3.0 B
C2.0
C3.0 A
USELAST
ELECTRIC VEHICLE
PARKING
9' 9' 9'
' 20
11'
C4.0 D TESLA V4 500 kW
SUPERCHARGER -
1A,1B,1C & 1D
EV2.0
GVAN ACCESSIBLE EV PARKING
SIGN WITH BOLLARDS
EMERGENCY DISCONNECT
SWITCH (MOUNTED ON POLE)EV2.0
E
30"X48" GROUND SPACE
STANDARD EV PARKING
SIGN WITH BOLLARDSEV2.0
F
1.90%
(1.81%)
(1.90%
(1.81%)
1.40%
(1.00%)
(0.60%)
(1.00%)
(1.81%
(1.95%
EXISTING POLE MOUNT
TRANSFORMER
VAN ACCESSIBLE
DEMO'ED TRENCH TO BE RESTORED
TO MATCH EXISTING CONDITIONS
IN ALL LOCATIONS (TYP.)
7'
7'
305 W SPRING CREEK PKWY,
SUITE 100 B PLANO, TX 75023
SH
EL
L
F
R
EE
D O
M R
D
LI
TT
LE
C
H U
TE
, W
I 5
0 1 2 3 4 5 6 7 8 9N o.
BY
D
AT
E
IS
SU
E
BL
O C
K
DESIGNED BY:
CHECKED BY:
DRAWN BY:
AD
VP
VP
DOCUMENT DATE: AUG 27, 2026
NORDIC PROJECT ID/R: UNE-26-72/07
SHEET NUMBER
SH
EE
T
TI
TL
E:
3040 78 TH AVENUE SE,
UNIT 1619, MERCER ISLAND, WA 98040
Mob:720 492 2885 | www.nordicasia.net www.nordicasia.net
UNIVERSAL EV LLC
NORDIC ASIA
Sheet size : 24" X 36" EV1.0
EV
C
H
AR
G
ER
P
LA
N
CHARGING STATION SPECIFICATIONS:
1. Do not let the flammable, explosive or flammable materials, chemicals, flammable vapors, and other dangerous goods close to charging station.
2. No underground utilities are present in the trenching area.
3. Contractor must proceed with caution during EV conduit trenching and follow standard safety and verification procedures
CHARGING STATION SPECIFICATIONS:
CONDUIT ESTIMATE SCHEDULE
ITEM CONDUIT QUANTITY LENGTH
TRANSFORMER TO MAIN SWITCHBOARD 4" PVC 4 4'-0"
MAIN…