This is a UL 2050 certification training presentation that provides detailed information about national industrial security system requirements and standards. The presentation covers key aspects of UL 2050 5th Edition (November 2010) including roles and responsibilities of Cognizant Security Officers (CSO), Alarm Service Companies (ASC), and monitoring stations.
The document outlines specific requirements for security system installations, monitoring procedures, response protocols, and communication channels. Key details include: response time requirements (5-60 minutes depending on investigator type), line security requirements for communication channels, extent of protection requirements (Extent 3, 5, or Complete), alarm monitoring procedures, and certification requirements for National Industrial Monitoring Stations (NIMS). The presentation includes sample alarm system description forms and a map showing UL Certificate Service Territories with regional contact information for the Midwest (Joe Weller), East Coast (Pete Tallman), and Texas area (Nick Mirus).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
© 2011 Underwriters Laboratories Inc.
National Industrial Security Systems (UL 2050) 5th
Edition November 5, 2010
JSAC April 2017
The Origin of the Program
• Purpose
• Partnership
• Flexibility of Application
– Rational
– Cost Effective
– Threat Appropriate
Documents Defining Security
National Industrial Security Systems ,UL 2050 National Industrial Security Systems Program Operating Manual (NISPOM) Director of Central Intelligence Directive 6/9 (DICD 6/9) (Now ICS 705-1) Manual for Physical Security of Sensitive Conventional Arms, Ammunition, and Explosives
(DoD 5100.76-M) Joint Air Force Army Navy Physical Security
Manual 6/9 (JAFAN 6/9)
US Government Representatives
Cognizant Security Office
•Applies when areas being protected are controlled by the Defense Security Service
Cognizant Security Agency
•Applies when areas being protected are controlled by other US Government organizations such as the intelligence community (soon to be known as Accrediting Official-see ICD-705)
Role of the CSO/CSA
• Define the Minimum Features of the IDS
• Provide Prior Approval of Variables
• Approve Security in Depth (SID) where applicable
• Confirm Clearances where Required
• Coordinate with Contractor and Alarm Company on non-technical IDS issues
• Coordinate with UL Representatives
Role of the UL Auditor
National Industrial Security Systems (CRZH)
• To Audit ASC’s that have requested UL Certificates for Compliance with UL 681 & UL 2050
National Industrial Monitoring Station (CRZM)
• To Audit Government Contractors or Central Stations that have established a Listing for Compliance with UL
UL 2050
How Standards are Created
• UL Staff Designated as Primary Engineer
• Work with Key Stakeholders
• Consider Proposed Requirements
How Standards are Maintained
• Input from Key Stakeholders
• UL Develop Proposed Revisions
• Consider Proposals
National Industrial Security Systems
(CRZH)
Who Is Responsible
• 4.3 of UL 2050
• ASC may assign monitoring & investigation but retain responsibility
• ASC may assign installation & service provided they supervise & verify correctness
• ASC may assign maintenance, but only to personnel that work exclusively for the ASC Service Center
Assigning Elements of Service
Alarm Service Company Correctness of Installation
Service & Maintenance Training & Performance of
Monitor & Investigator
Monitoring Government Contractor
Monitoring Station (GCMS) or
National Industrial Monitoring Station or UL Central Station or Law Enforcement
Investigation Government Contractor Investigator or Private Guard &
Government Contractor Rep.
or
Law Enforcement & Government Contractor Rep.
or Government Contractor Rep.
Impact of Security In Depth
Reduces electrical supervision of remote equipment rooms when a GCMS is used
(Does Not Apply When Areas Housing AA&E Are Monitored or DCID applies) Reduces standby power requirements when a GCMS is used
(except SCIF’s and SAPF’s)
Allows the use of an Extent 5 design of protection in closed areas (Does Not Apply to Areas Housing AA&E or When DCID applies)
Features Requiring Prior Approval
Use of Extent 5* vs. Extent 3
• *Extent 5 only applies to the NISPOM
Non Line Security Transmission Use of Data Networks Only Monitoring Alarm & Trouble Signals Monitoring in a Law Enforcement Agency Investigator Response Personnel Response Times beyond 5 or 15 Minutes
Government Contractor Monitoring Station Purpose - to monitor industrial security systems that are installed in the following areas:
• Areas occupied by the government contractor that operates the GCMS
• Areas occupied by a subcontractor
• Areas occupied by other government contractors
The station is verified & receivers are maintained by the ASC
National Industrial Monitoring Station Purpose - to monitor industrial security systems installed in the following areas that are more than 4 hours away from the monitoring station:
–Areas occupied by the government contractor that operates the NIMS
–Areas occupied by a subcontractor
–Areas occupied by other government contractors
Commercial UL Central Stations Provide Monitoring of Alarm System
• (operators & station may have to be cleared) Processing of Signals & Creation of Records Dispatching Investigators Periodic Testing of Communication Links to Investigators
Signal Processing in GCMS, NIMS, or a Central Station
Record each of the following types of signals
• Openings & Closings
• Alarms
• Troubles
Maintain current lists of the following
• Authorized operators of the system
• Personnel to be notified of an alarm
• The FSO/SSO
• Service department personnel in the alarm service company that maintains the system
Law-Enforcement Agency or Public Emergency Center
Requires Prior Approval by CSO/CSA
Monitors System for Alarms & Trouble Conditions
Dispatches Investigators
Receivers are maintained by a UL Listed Alarm Service Company
Alarms & Unauthorized Openings (Sec 12)
Contact-alarmed area Verification-speak to authorized user
•Late or None
- During business hours CALL FSO/SSO
- After business hours DISPATCH
•Timely Verification
- During business hours CALL FSO/SSO
- After business hours REPORT TO FSO/SSO
Follow UP to Alarm Signal
If the system resets in 1 minute
• Dispatch a single investigator who has access to the exterior of alarmed area
• Technician inspects area within 4 hours of facility opening for business
After verification
• When open for business, report to FSO/SSO by voice and in writing
• When closed for business, report to FSO/SSO in writing
Investigators
Government contractor investigators cleared & with unescorted access
Private guards without unescorted access and a representative of the government contractor
On-duty law-enforcement officer and a representative of the government contractor
A representative of the government contractor having authorized access
*Requires Prior Approval by CSO/CSA
Details
If Government Contractor Representatives are used
•3 people shall be on call
•The name & phone number of the FSO/SSO shall be maintained
•The phone numbers shall be verified in writing every 90 days
Response Teams & Times
Primary Investigator Secondary Investigator
Response Times
Government Contractor Investigator
None 5, 15, 20, or 30*
Private Guard (without unescorted access)
Government Contractor
Representative
5, 15, 20, or 30 (Primary), 60 min for
Representative Law Enforcement Government
Contractor Representative
No Time Stated for Primary, 60 Min for Representative
Government Contractor Representative
None 60 Minutes
*Requires prior approval by CSO/CSA
Auditing Alarm Records
Records are held at ASC office or at the Government Contractor office Review is conducted on responses to each individual alarm system The calculation of the percentage of overruns starts at the fifth alarm No arrival results in a cause analysis
Communication Channel Failures
Attempted Compromise (See Sec 13)
• Treated as an Alarm if System is Armed
• Treated as a Trouble if System is Disarmed
Disruption of Channel (See Sec 14)
• Applies when Channel Serves More that 1 System
- Contact Communication Provider
- Contact FSO/SSO
Upon Arrival and Beyond
No Cause Was Found -
• Test and Reset by Investigator
- Checked by service technician within 4 hours of opening of the facility.
• Not Reset by Investigator
- Area check by investigator and service technician dispatched
Trouble Signals & Service Calls
Occupied or Checked Areas Initiate repairs within 4 hours after facility opens if
- Area is occupied by a person with authorized access
OR
- Area is checked by cleared personnel based on
NISPOM
Not Occupied or Checked Areas
• Initiate repairs within 4 hours
Contracts When monitoring and/or investigation is assigned (See 18.1 & 18.2) 30 Day cancellation clause DD254 is required if monitoring or investigation is assigned to a central station AND the NISPOM applies (See 18.3) Contracts do not relieve the Alarm Service Company from keeping the alarm and monitoring systems in compliance (see 18.4) Failure to uphold the contracts – Cancel Certificate (See 18.6)
Training
The ASC is responsible to arrange for and/or verify Training
Training shall be conducted annually or when there is a change
The ASC shall keep a record of the specific training and the name of who was trained.
Conducting a Service Test
During business hours
•Trip a signal at an unoccupied area
- Verification
- Dispatch
After business hours (rarely done)
•Trip a signal with FSO/SSO
• Initiate a telephone test
- Dispatch
Security of Communication Channels
Communication paths from the alarmed area to the monitoring center are as important as the installation
Line Security - The supervision against compromise using 2 way communication May be either Standard or Encrypted
Non-Line Security - (Requires prior approval by CSO/CSA)
The supervision of a single fault condition on the communication path
Exists when there is 1 way communication
Security of Communication Channels
Transmission methods that provide Line Security - 2 Way Radio Frequency Data Networks
Transmission methods that do not provide Line Security -
Digital Communicators Cellular Transmitters* (Some do provide line security-check the Listing) 1 Way Radio Frequency
Requirements for Encryption
Certified by NIST
• At least 128 Bit Encryption
• Complying with FIPS 140-2 OR FIPS-197
Listed by UL as Line Security Equipment
Generally Required by the CSO/CSA When Data Networks are used
Degraded Network
If the network becomes degraded or inoperative, the areas have to be watched or occupied
Service response times and notification in accordance with Sec 14 of UL 2050
Alarm Installations
Installed in Closed Areas, SCIF’s or SAPF’s
• Extent 5 (Only Applies to Closed Areas under the
NISPOM)
• Extent 3
Installed in Vaults or on Container
• Extent Complete
Extent of Protection #3
Area B contact on exterior door 4 step motion
Area A contact on exterior door 4 step motion
Movable Windows
A
B
Using Motion Detection
Extent of Protection #3
Area B contact on exterior door contact 1 window motion to cover door & window glass break on 2 windows
Area A contact on exterior door motion to cover door glass break on 3 windows
Movable Windows
A
B
Using Perimeter Protection
Protection of Containers & Vaults
Extent Partial consists of a contact that is Listed for safe & vault applications on each door. One contact may be used on GSA approved containers.
Extent Complete consists of a contact that is Listed for safe & vault applications on each door.
One contact may be used on GSA approved containers. In addition all exterior surfaces of the vault or container is protected with vibration sensors or proximity detectors.
National Industrial Monitoring Stations (CRZM)
Origin of Category
To develop a means of determining the qualification of a monitoring location that is distant from the protected property
To clarify the responsibility for the continued compliance of the monitoring facility
A Listing is Required When -
The station is not within the 4 hour service territory of the ASC service center to which the certificate was provided
The station is maintained by another ASC service center
Auditing a National Industrial Monitoring Station
The Purpose
An NIMS has been evaluated for compliance with Section 6 & 7 of UL 2050 (when operated by a government contractor) or UL 827 as a Central Station (when operated by an ASC)
The Audit is to verify
• The facility continues to comply
• The staff performs the required tests
• The staff is trained in their duties
The UL Alarm System Description Form
UL Certificate Service Territories for Alarm Systems and Services
ND
MO
AR
NY
AK
HI
WA
CA
NV
OR ID
MT
WY
UT
AZ NM
TX
OK
KS
NE
SD
MN
IA
WI
IL
LA
MS AL GA
FL
SC
NCTN
KY
IN
MI
OH
VA
WV DE
MD
NJ
CT
MA
VT
NH
ME
CO
Puerto Rico
US Virgin Islands
East
West
Midwest
Washington, D.C.
PA
Regional Contacts Mid West: Joe Weller 847 664 2368 East Coast Pete Tallman 631 546 2415
Additional Contact for Texas area is Nick Mirus 972-509-1294
File details come from the government source that posted it. Updated .