1st floor diagram with proposed camera sites may 24.pdf

PDF 377 KB Posted

Attached to
Bldg 300 Security and Maintenance
Solicitation number
FA4800-25-Q-S014
Issued by

About this file

This is a building floor plan diagram showing the first floor layout and proposed security camera locations for Building 300 at Langley AFB. The diagram details the placement of security equipment including 4 cameras, keypads, and proximity sensors throughout the facility. The floor plan shows several key areas including a large gymnasium, two kitchen areas, an electrical room, storage space, and multiple office/workstation areas with desk layouts. Security monitoring equipment is concentrated around entrance points, with keypads marked in yellow at 4 locations (Front Exterior, Back Exterior, Side Door, and room 118) and proximity sensors marked in red at 5 interior locations. The monitoring office containing the ACS Controller is indicated by blue circles on the diagram.

The layout appears designed to provide comprehensive security coverage of entry/exit points while maintaining surveillance of key internal areas. The diagram is being used as part of a sources sought notice for security monitoring and maintenance services at this facility, providing potential vendors with detailed information about the security system infrastructure they would be responsible for maintaining and monitoring on a 24/7 basis.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GYM

CR

KITCHEN

ST

O R A G E

EL

EC

TR

IC

A L

KITCHEN

Keypad

Prox. Sensor

1. Front Exterior

2. Back Exterior

3. Side Door

4. 118

5. Front Interior

6. 101A

7. 101B

8. 131A

9. 139

Office for monitoring ACS Controller

Cameras 4 each

Slide 1

File details come from the government source that posted it. Updated .