U1 As Built Utilities Site Plan.pdf

PDF 565 KB Posted

Attached to
RFP-17-21 DesignBuild DMA Harrodsburg NGA Solar Upgrade Armo
Solicitation number
RFP 785 2100000008 3
Issued by
Marion County, Kentucky

About this file

This is an "As Built" utilities site plan document that appears to be a technical drawing or architectural plan rather than a formal contract opportunity document. The plan depicts the location and configuration of utility infrastructure at a specific project site, including the routing and placement of water, sewer, electrical, gas, and other utility lines. The document serves as a record of how utilities were actually installed at the completion of a construction project, showing the final positions of underground and above-ground utility systems as they differ from original design plans. This type of document is typically prepared by engineers or surveyors upon project completion to provide an accurate reference for future maintenance, repairs, or expansions to the utility infrastructure.

No pricing terms, contract duration, bid dates, response deadlines, site visit information, bidder conferences, set-asides, or other procurement-specific details are applicable to this document, as it functions as a technical reference record rather than a solicitation or contractual agreement. This document would typically be retained by the relevant jurisdiction or property owner for record-keeping purposes and provided to contractors or utility companies who may need to perform future work at or near the site.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .