This is Addendum No. 1 to Request for Proposal No. RFP-17-21 issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration for Design-Build Services related to the DMA-Harrodsburg NGA Solar & Lighting Upgrade Project at the Harrodsburg National Guard Armory-Readiness Center in Mercer County, Kentucky. The addendum, dated July 21, 2020, provides clarifications regarding the facility's electrical infrastructure in response to proposer questions. Key technical specifications include confirmation that the main electrical panel is supplied with 600 amp three-phase four-wire service at 120/240 volts with a wild leg on B-Phase reading 208 volts. The utility interconnection point is located in Room 113 and is accessible only through an exterior door, as depicted on electrical plan sheet B0501 E-2 1110. The addendum confirms that the provided drawings accurately represent the current condition of the electrical system despite some originating from 1970.
The addendum contains no information regarding pricing terms, set-asides, incumbents, funding sources, response deadlines, or other contract award details. It serves solely as a clarification document addressing technical questions from prospective proposers regarding electrical system specifications and documentation accuracy for the solar and lighting upgrade project.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
REQUEST FOR PROPOSAL NO: RFP-17-21
FOR: Design-Build Services DMA-Harrodsburg NGA Solar & Lighting Upgrade Project Harrodsburg National Guard Armory-Readiness Center Mercer County, Kentucky
DATE: July 21, 2020
Addendum No. One (1)
PROPOSER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME
BINDING UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS REQUEST FOR
PROPOSAL.
Item 1. Questions and Answers
Please confirm the utility voltage/phase supplied to this facility? The main panel is 600 amp three phase four wire 120/24 with a wild leg. B-Phase is the wild leg and reads 208.
Please confirm the utility voltage/phase at the grid tie interconnection point. The main panel is 600 amp three phase four wire 120/24 with a wild leg. B-Phase is the wild leg and reads 208.
Where is the utility interconnection (panel physical location) located? The main electrical panel is located in Room 113 and is accessed only through an exterior door. It is shown on the plan sheet titled “B0501 E-2 Electrical Plan z-1110”.
Do the drawings provided show the current condition of electrical system? (Some of the drawings appear to be from 1970) Yes the drawings show the current condition.
End of Addendum No. One (1)
Request for Proposal No. RFP-17-21 For: Design-Build Services
DMA-Harrodsburg NGA Solar & Lighting Upgrade Project
Harrodsburg National Guard Armory- Readiness Center