Harrodsburg Electric Bill_KU.pdf

PDF 54 KB Posted

Attached to
RFP-17-21 DesignBuild DMA Harrodsburg NGA Solar Upgrade Armo
Solicitation number
RFP 785 2100000008 3
Issued by
Marion County, Kentucky

About this file

This is an electric utility bill issued by Kentucky Utilities Company (KU) to the Harrodsburg Armory, located at 500 Tapp Road, Harrodsburg, Kentucky. The bill was mailed on December 10, 2019, for the billing period ending December 9, 2019, and covers general service three-phase electrical consumption at the facility. The service address is registered under the Harrodsburg Armory Admin Services Division in Frankfort, Kentucky.

The bill reflects total charges of $1,385.03, comprised of $1,325.39 in current electric charges and $59.64 in taxes and fees, with a due date of January 8, 2020. The electrical usage for the 33-day billing period totaled 11,520 kilowatt-hours, calculated from an actual meter reading of 2,484 kWh on December 9, 2019, compared to 2,196 kWh on November 6, 2019. The rate structure includes a basic service charge of $54.78, an energy charge of $1,311.21 at $0.11382 per kWh, a fuel adjustment credit of $78.34, an electric demand side management charge of $2.19, and an environmental surcharge of $35.55. Additional charges include a school tax of $39.76 and a Harrodsburg franchise fee of $19.88. A late payment charge of $41.55 would be assessed if payment is not received by the due date. Average daily electric usage for the billing period was 349.09 kWh, compared to 458.75 kWh during the same period in the previous year, reflecting lower consumption despite a higher average temperature.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mailed 12/10/19 for Account # 3000-0387-0361

AMOUNT DUE

$1,385.03

DUE DATE

1/8/20

Account Name: HARRODSBURG ARMORY

Service Address:

500 Tapp Rd

HARRODSBURG KY

Online Payments:

lge-ku.com

Customer Service:

(800) 383-5582

M-F, 8am-6pm ET

Walk-in Center:

198 W. Broadway

Danville, KY 40422

M-F, 9am-5pm ET

Next read will occur 1/9/20 - 1/13/20 (Meter Read Portion 07 )

BILLING PERIOD AT-A-GLANCE

THIS YEAR LAST YEAR

Average Temperature 42 ° 39 °

Number of Days Billed 33 32

Avg. Electric Charges per Day $40.16 $43.79

Avg. Electric Usage per Day (kWh) 349.09 458.75

3000-03

87-0361

BILLING SUMMARY

Previous Balance 1,181.94

Payment(s) Received -1,181.94

Balance as of 12/9/19 $0.00

Current Electric Charges 1,325.39

Current Taxes and Fees 59.64

Total Current Charges as of 12/9/19 $1,385.03

Total Amount Due $1,385.03

CURRENT

BILLING

PERIOD

MONTHLY USAGE ELECTRIC (kWh)

A V

E R

A G

E

DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

2018 2019 u

39 ° 43 ° 36 ° 39 ° 50 ° 62 ° 70 ° 76 ° 78 ° 77 ° 76 ° 55 ° 42 ° u

43.79 41.35 49.13 54.30 28.08 36.27 53.91 53.68 62.11 60.15 58.14 40.39 40.16

02 0300003870361 0000000142658 00000138503 000000 000000 18

PO Box 9001954

Louisville, KY 40290-1954

Account # 3000-0387-0361

Service Address: 500 Tapp Rd

HARRODSBURG ARMORY

ADMIN SERVICES DIV

100 MINUTEMAN PKWY BLDG 162

FRANKFORT , KY 40601 -6120

#214312891 2#

Amount Due 1/8/20 $1,385.03

After Due Date, Pay this Amount : $1,426.58

WinterCare Donation:

Total Amount Enclosed:

Please return only this portion with your payment. Make checks payable to KU and write your account number on your check.

http://www.lge-ku.com

Account # 3000-0387-0361

OFFICE USE ONLY:

MRU 07 2111 90 , G000000

P1181.94

PF: Y eB: P

CURRENT USAGE

ELECTRIC

Meter Reading Information Meter # 2411436

Actual (R) kWh Reading on 12/9/19

Actual (R) kWh Reading on 11/6/19

Actual (R) kW Reading on 12/9/19

0.8649

Current kWh Usage

Meter Multiplier

Demand

34.6

Metered kWh Usage

11520

CURRENT CHARGES

ELECTRIC Rate: General Service Three Phase

Basic Service Charge ($1.66 x 33 Days)

54.78

Energy Charge ($0.11382 x 11,520 kWh)

1,311.21

Electric DSM ($0.00019 x 11,520 kWh)

2.19

Fuel Adjustment ($-0.00680 x 11,520 kWh)

-78.34

Environmental Surcharge (3.33% x ($1,368.18 - $300.56))

35.55

Total Charges

$1,325.39

Taxes & Fees

Rate Increase For School Tax (3.00% x $1,325.39) 39.76

Franchise Fee-Harrodsburg (1.50% x $1,325.39) 19.88

Total Taxes and Fees $59.64

BILLING INFORMATION

Environmental Surcharge

Rate GS Environmental Surcharge Calculation: The fuel cost of $300.56 included in the Energy Charge and the Fuel Adjustment line items were deducted from the Electric Charges before multiplying the Billing Factor of 3.33 %.

Late Payment Charge

Late Charge to be Assessed After Due Date $41.55

Explanation of Meter Reading Codes

Meter Read Codes: R - Actual Read; V - Verified Read; E - Estimated Read; S - Self Read

Rate Schedules

For a copy of your rate schedule, visit lge-ku.com /rates or call our Customer Service Department.

xxx

KU matches customers’ donations to the WinterCare Energy Assistance Fund. Make your donation TODAY!

lge-ku.com

HELP KEEP THE

HEAT ON

http://www.lge-ku.com/rates

File details come from the government source that posted it. Updated .