Tulsa ANG site Visit Procedures Central Drainage.docx
DOCX document 12 KB Posted
- Attached to
- Base-wide Roof Repair
- Solicitation number
- W50S8U-20-Q-0005
- Issued by
-
Department of the Army National Guard
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bldg 230 Mech Drawings.pdf | ||
| Pre-Bid RFI Basewide Roof Repair 09-09-2020.2.pdf | ||
| 314 Remodel Drawings 2.pdf | ||
| 20-Q-0005-0001 Mod Copy.pdf | ||
| 20-Q-0005 Site Visit Sign In_Redacted.pdf | ||
| Basewide Roof Repair Site Visit Minutes.pdf | ||
| Site Visit Slides Basewide Roof Repair.ppt | PPT presentation | |
| Metal Roof Specification.pdf | ||
| Pre-Bid RFI Basewide Roof Repair 08-31-2020.pdf | ||
| 138FW Safety Accident Prevention Guide_2018.pdf | ||
| ESOH Clause SOW.DOCX | DOCX document | |
| OKANG COVID-19 Site Visit Questionaire.docx | DOCX document | |
| EMS Commitment Statement.docx | DOCX document | |
| AF66 Roof Repair.pdf | ||
| 20-Q-0005.pdf | ||
| SOW - Basewide roof repair.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tulsa ANG Site Visit Procedures Roof Repair Before entering the installation All contractors will be required to wear a mask.
Contractors will bring their own ladders and/or OSHA approved safety harnesses if they will be climbing onto the roofs.
All contractors will be required to fill out and sign the OKANG COVID-19 Site Visit Questionnaire.
All Contractors will be required to have their temperature taken.
After all the above is completed the site visit will proceed to the CE classroom for a short PowerPoint presentation by contracting and CE.
Following the PowerPoint presentation the site visit will take place walking across the base.
Attendees then will exit the base following the building visits.
File details come from the government source that posted it. Updated .