AF66 Roof Repair.pdf
PDF 84 KB Posted
- Attached to
- Base-wide Roof Repair
- Solicitation number
- W50S8U-20-Q-0005
- Issued by
-
Department of the Army National Guard
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bldg 230 Mech Drawings.pdf | ||
| Pre-Bid RFI Basewide Roof Repair 09-09-2020.2.pdf | ||
| 314 Remodel Drawings 2.pdf | ||
| 20-Q-0005-0001 Mod Copy.pdf | ||
| 20-Q-0005 Site Visit Sign In_Redacted.pdf | ||
| Basewide Roof Repair Site Visit Minutes.pdf | ||
| Site Visit Slides Basewide Roof Repair.ppt | PPT presentation | |
| Metal Roof Specification.pdf | ||
| Pre-Bid RFI Basewide Roof Repair 08-31-2020.pdf | ||
| 138FW Safety Accident Prevention Guide_2018.pdf | ||
| ESOH Clause SOW.DOCX | DOCX document | |
| OKANG COVID-19 Site Visit Questionaire.docx | DOCX document | |
| EMS Commitment Statement.docx | DOCX document | |
| Tulsa ANG site Visit Procedures Central Drainage.docx | DOCX document | |
| 20-Q-0005.pdf | ||
| SOW - Basewide roof repair.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO.
XHZG201701492
APPROVED DISAPPROVED
Submittal Schedule - AF Form 66
2 Transfer and Acceptance of DOD Real Property - DD Form 1354
3 Contractor Hazardous Material Identification - SANGB Form 23
4 Solid Waste Recycling and Disposal Reporting Form
Affirmative Procurement Reporting Form
DD Form 1354
Construction Schedule
8 Construction Photos Construction Installation Shop Drawings
Safety Documentation as stated
Schedule of Test and Inspections
Quality Control Plan
Warranties
13 Sealant X
14 Roofing Materials X
PROJECT NO.
XHZG201701492
SH
O
P D
R
AW
IN
G
S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
ER
'S
R
EC
O M
M
EN
D
AT
IO
N
S
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
PROJECT TITLE SOLICITATION/CONTRACT NO.
Basewide Roof Repair
TO BE COMPLETED BY PROJECT ENGINEER
NO. OF COPIES REQUIRED
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL REMARKS
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
PROJECT TITLE SOLICITATION/CONTRACT NO.
Basewide Roof Repair
C
AT
AL
O
G D
AT
A
O
TH
ER
M
AT
ER
IA
L o r
D
AT
A
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
SUBMITTAL
REQUIRED
BY 14 DAYS
AFTER
NTP
DATE RECEIVED
IN
CONTRACTING
DATE TO CIVIL
ENGINEERING
RETURN
SUSPENSION
DATE
FOLLOW-UP
DATE CONTRACTOR NOTIFIED
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
AN
D
C
LO
SE
O
U T
File details come from the government source that posted it. Updated .