Tucson HVAC Elec Sys Upgrade Construction Provisions-Clauses - FINAL.pdf

PDF 637 KB Posted

Attached to
RFP 12905B22R0007 - Amendment 0002 - USDA-ARS-PWA Carl Hayden Bee Research Repair/Replace HVAC/Electrical Components Tucson AZ
Solicitation number
12905B22R0007
Issued by

About this file

This document provides details for a federal construction contract solicitation. The United States Department of Agriculture Agricultural Research Service Pacific West Area is seeking to award a firm fixed-price contract to repair or replace HVAC and electrical components in two buildings at the USDA Carl Hayden Bee Research Center in Tucson, Arizona. The work includes providing all labor, materials, tools, equipment, transportation, and supervision needed to complete the renovation in accordance with applicable building codes. The solicitation will be posted to SAM.gov on or about March 17, 2022 as a 100% small business set-aside for NAICS Code 236220, with a small business size standard of $39.5 million. The estimated value is between $500,000 and $1,000,000. Questions regarding the solicitation should be directed to the point of contact by the specified deadline.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ 1290B22R0007

HVAC/Electrical - Tucson

CONTINUATION OF SF1442

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

Repair/Replace HVAC

Carl Hayden Bee Research Center

Tucson AZ 85719

B.1 PRICE SCHEDULE

(a) Offers will be considered for award on the following Price

Schedule, but no offer will be considered for award on only a part of the Price Schedule.

(b) Offers are subject to the terms and conditions of this solicitation.

(c) Definitions:

a. CLIN – (Contract Line-Item Number)

PRICE SCHEDULE

CLIN Supplies or Service Quantity and Unit of Issue

Unit Price Amount

0001 Repair or replace HVAC and Electrical components in Buildings 107 and 108 of the USDA Carl Hayden Bee Research Center in Tucson Arizona in accordance with the attachments contained within this RFP and incorporated into the final contract.

For the lump sum of $

TOTAL FOR PRICE SCHEDULE: $

B.2 PERIOD OF PERFORMANCE

200 calendar days after the notice to proceed.

B.3 ADDITIONAL INFORMATION

Proposal MUST be received no later than 1:00pm PDT, on 25 April 2022.

Proposal must comply with all RFP instructions and emailed to: Theodore.Blume@usda.gov.

mailto:Theodore.Blume@usda.gov

PROPOSAL MUST BE ANNOTATED AS SUCH AND REFERENCED THE SOLICITATION

NUMBER.

End of Section B

SECTION C – DESCRIPTION/SPECIFICATIONS

1.01 LOCATION

The site of work is located at the USDA, ARS, Carl Hayden Bee Research Center, Tucson, AZ 85719

1.02 PRINCIPAL COMPONENTS OF WORK

See attached specifications table of contents.

1.03 SCOPE OF WORK

See attached specifications.

1.04 DESCRIPTION OF WORK

The United States Department of Agriculture {USDA) Agriculture Research Service (ARS) Pacific West Area intends to issue a Request for Proposals (RFP) to award a firm fixed price construction contract located at the USDA ARS PWA Carl Haden Bee Research Center in Tucson AZ. The intent of this contract is to repair or replace HVAC and Electrical components in Buildings 107 and 108 of the USDA Carl Hayden Bee Research Center in Tucson Arizona.

The completed project will result in conformance to the current edition of applicable local and state building codes. The work includes providing all labor, materials, tools, equipment, supplies, transportation, and supervision needed for the renovation.

1.05 REFERENCES & STANDARDS

All construction shall comply with ARS Facilities Design Standards (ARS Annual 242.1, 5-01- 12), ARS Energy, Water, and Sustainability Policy (ARS Policy & Procedures 134.2, 11-12-13), ARS Energy, Water, and Sustainability Policy Bulletin (ARS Policy & Procedures Bulletin 15- 134.2), governing Building Codes, and all applicable local, regional, State, and Federal regulations. Where one or more Codes or regulations conflict, the more stringent shall apply.

Also reference 01 4200 of the Specifications.

All work to meet all pertinent Unified Facilities Guide Specifications (UFGS). UFGS available at http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs. ARS 242.1M made available upon request.

It shall be the responsibility of the Contractor to complete work in accordance with the manufacturer’s recommendations and Industry Standards. Additional procedures and materials may be required than is indicated herein. If any item specified herein conflicts with the applicable codes and recommendations, the Contractor shall bring it to the attention of the Contracting Officers Representative (COR) or the Onsite Government Representative (OGR) for immediate resolution.

http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs

1.06 BONDING

Bid Guarantee: A bid guarantee is not required for quotes less than $150K.

If a quote is above $150K, a bid guarantee is required in an amount not less than 20 percent of the proposed price but shall not exceed $3,000,000 (for quotes of $35,000 or more). Failure to furnish the required bid guarantee in the proper form and amount, by the time set for receipt of quotes, shall require rejection of the quote in all cases except those listed in Federal Acquisition Regulation (FAR) 28.101-4. Bid Bonds must be provided using Standard Form 24 (see FAR 28.106-1) electronic versions of Bid Guarantee will be accepted. Individual sureties have to be acceptable to the Contracting Officer (see FAR 28.203) and be accompanied by Standard Form 28 Affidavit of Individual Surety. Other forms of offer security are acceptable as denoted in solicitation provision FAR Part 28.203-2. The cost of a Bid Guarantees will not be reimbursed.

After award, in accordance with Contract Clause 52.228-15, and FAR 28.102, Contractors are reminded that any amount awarded over $35,000.00 shall require a Payment Bond (SF 25A), and awards exceeding $150,000.00 shall require both Payment and Performance Bonds (SF 25).

Payment and Performance bonds are due no later than 10 days after notification of award.

1.07 BIOBASED PRODUCTS REQUIREMENTS

This procurement requires the use of biobased products to the extent that such products are reasonably available, meet agency or relevant industry performance standards, and are reasonably priced. Where available, these products should first be acquired from among qualified products that fall under the umbrella of items designated through the USDA Bio-Preferred SM Program.

The Contractor must comply with the Farm Security and Rural Investment Act of 2002 (FSRIA), 7 U.S.C. 8102; the Food, Conservation and Energy Act of 2008 (FCEA), 7 U.S.C. 8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, “Federal Leadership in Environmental, Energy and Economic Performance,” dated October 5, 2009; EO 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” dated January 24, 2007; and Presidential Memorandum, “Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,” dated February 2012 to provide biobased products.

The Contractor shall utilize products and material made from biobased materials (e.g., biobased greases; biobased hydraulic fluids, biobased absorbents) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user.

All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR).

The following is an example list of products that may be used in this minor construction contract for which biobased products are available and the designated biobased content. The list is not all inclusive. It is desirable that vendors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.

• Adhesive and Mastic Removers – 58 percent

• Asphalt and Tar Removers - 80 percent

• Asphalt Restorers – 68 percent

• Carpet – 7 percent

• Carpet and Upholstery Cleaners – 54 percent and Spot Removers – 7 percent

• Composite Panels – Acoustical – 37 percent; Interior Panels – 55 percent; Plastic Lumber

– 23 percent;

• Structural Interior Panels – 89 percent; Structural Wall Panels – 94 percent and

Countertops and Solid

• Surface -_ 89 percent

• Concrete and Asphalt Cleaners – 70 percent

• Concrete and Asphalt Release Fluids – 87 percent

• Dust Suppressants – 85 percent

• Erosion Control Materials – 77 percent

• Floor Coverings (Non-Carpet) – 91 percent

• General Purpose Cleaners - 54 percent

• Hand Soaps and Cleaners – 64 percent

• Industrial Cleaners – 41 percent

• Insulating Foam – 7 percent

• Leather, Vinyl, and Rubber Care Products – 55 percent

• Paint- Interior Paints and Coatings, Latex – 20 percent and Oil-based – 67 percent

• Paint Removers – 41 percent

• Roof Coatings – 20 percent

• Wastewater Systems Coatings – 47 percent

• Water Tank Coatings – 59 percent

• Wood and Concrete Sealers – Membrane Concrete Sealers- 11 percent and Penetrating

Liquids – 79

• percent

• Wood and Concrete Stains – 39 percent

Reporting is required by Sections 9002 of the Food Conservation and Energy Act of 2008 and the Agricultural Act of 2014. The Contractor shall provide quantities, product types and dollar value of any USDA-designated biobased product purchased by the Contractor. This important data shall be submitted to the COR for the current quarter and current contract year. A brief explanation shall include the methodology used to calculate the dollar value of USDA-designated products used or supplied.

The Contractor should also note that USDA-designated biobased products are available for purchase through the AbilityOne Program (formerly known as the Javits- Wagner-O’Day (JWOD) Program). Under this program, members of organizations including the National Industries for the Blind (NIB) and the National Institute for the Severely Disabled (SourceAmerica) offer products and services that are mandatory by Federal agencies. A search of the AbilityOne Program’s online catalog (www.ability.gov) indicated biobased products that include but are not limited to: cleaners (glass, hand, and multipurpose), graffiti removers, and sorbents.

For more information regarding the Department of Agriculture Biobased Program go to:

http://www.biopreferred.gov.

1.08 PERMITS

Where governing regulations and imposed codes and standards require notices, permits, licenses, inspections, tests, and similar items or actions in order to lawfully proceed with the required work, the Contractor shall obtain items and take those actions in accordance with the regulations of the governing authority. Special authority may be required for remediation and disposal of ACM, Contractor shall confirm this and obtain this authority. The costs of such permits, licenses, inspections, etc., are the obligation of the Contractor.

1.09 WORK MANAGEMENT

The Contractor shall manage the total work effort associated with the services required in each task order to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality control. The Contractor shall provide a staff with the necessary management expertise to assure performance objectives and standards are met.

1.10 SERVICE INTERRUPTIONS/UTILITY OUTAGES

If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the Contracting Officer Representative ten calendar days in advance to allow notification of affected tenants and customers. If the discontinued service is due to an emergency breakdown the Contractor shall notify the Contracting Officer Representative as soon as practicable.

At a minimum, include the location of the outage, utilities being affected, duration of outage and any necessary sketches. Once approved, and prior to beginning work on the utility system requiring shut down, attend a pre-outage coordination meeting with the Contracting Officer to review the scope of work and the lock-out/tag-out procedures for worker protection. No work will be performed on energized electrical circuits unless proof is provided that no other means exist.

1.11 EMPLOYEE REQUIREMENTS

The Contractor shall provide experienced, qualified, and capable personnel to perform the work in this contract. Personnel shall be fully knowledgeable of all safety and environmental requirements associated with the work they perform. Competent personnel shall be provided as required by each contract.

1.12 OSHA COMPLIANCE

Contractor must maintain a workplace and ensure that workplace conditions conform to applicable OSHA standards.

http://www.biopreferred.gov/

1.13 EMPLOYEE CONDUCT/REMOVAL OF EMPLOYEES

Contractor employees and Subcontractor employees shall conduct themselves in a proper, efficient, courteous and businesslike manner.

The Contractor shall remove from the site any individual whose continued employment is deemed by the Contracting Officer to be contrary to the public interest or inconsistent with the best interests of Agricultural Research Service.

1.14 QUALITY CONTROL

The work performed under this contract shall be subject to continuous audit by the COR/OGR.

Quality control is the exclusive responsibility of the Contractor.

1.15 PROTECTION OF WORK AND PROPERTY/SAFETY REQUIREMENTS

The Contractor shall protect the work, the site, and all existing property and structures within the limits of the construction activities or that may be affected thereby until acceptance of the work.

Any damage to property shall be repaired at the Contractor’s expense, to pre-damaged condition.

1.16 TEMPORARY FACILITIES:

Temporary utilities (water and electricity) may be furnished to the Contractor by the Government, if so requested. The Contractor shall maintain and protect all such utilities during the course of construction and shall repair or replace any items damaged through its own negligence.

Should the Contractor require any power or utility shutdowns during construction, the Contractor shall obtain approval for such shutdown from the COR/OGR three working days prior to the need.

1.17 SITE CLEANUP

The construction site shall be kept clean and free of debris at all times. Clearance air and surface samples shall be taken to verify complete remediation of ACM. Restore areas disturbed as nearly as possible to the original appearance and condition. Upon completion of the project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash, and debris resulting from the work to the satisfaction of the COR/OGR.

1.18 FINAL INSPECTION

The Contractor shall notify the Contracting Officer and COR/OGR, in writing, 10 days prior to the date that the project will be ready for final inspection. An inspection of the project will be made by the Contracting Officer and Contractor at a mutually agreed upon time. COR/OGR and the contractor shall compile a “punch list” prior to final acceptance of the installation and submit completed warranty documentation to manufacturer.

1.19 WARRANTY

In addition to any other warranties set out elsewhere in this contract, the Contractor warrants that work performed under this contract conforms to the contract requirements and is free of any defect of equipment, material or design furnished, or workmanship performed by the Contractor or any of his subcontractors or suppliers at any tier. Such warranty shall continue for a period of one year from the date of final acceptance of the project. Under this warranty, the Contractor shall remedy at his own expense any such failure to conform or any such defect. In addition, the Contractor shall remedy at his own expense any damage to Government owned or controlled real or personal property, when that damage is the result of the Contractor's failure to conform to contract requirements or any such defect of equipment, material, workmanship, or design. The Contractor shall also restore any work damaged in fulfilling the terms of this clause. The Contractor's warranty with respect to work repaired or replaced hereunder will run for one year from the date of such repair or replacement.

1.19.1 Submit data concerning the standard one-year warranty for workmanship, including the warranty periods (dates), and warranty contacts with names, addresses and telephone numbers.

1.19.2 Extended Equipment/Product Warranties: Obtain and furnish, to the location personnel, all written warranties for equipment/products that have extended warranties (warranty periods exceeding the standard one-year warranty) furnished under the contract. The warranty period shall begin on the same date as project acceptance and shall continue for the full/product warranty period. The warranties shall be fully executed and delivered to the Contracting Officer prior to final acceptance of the facility.

1.20 ACCEPTANCE

Upon satisfactory submittal of the above documents, the Contracting Officer shall issue to the COR/OGR a recommendation for final acceptance of the project. Minor unfinished items of work may be listed on the certificate and excepted from final acceptance. A sum sufficient to cover the cost of completing these unfinished items of work will be withheld by the Government from the final payment. All other funds including retainage shall be due and payable upon receipt by the COR/OGR of the Contracting Officer's certificate. Upon certification by the Contracting Officer that the items of work have been completed, all monies withheld by the Government shall be due the Contractor.

1.21 SPECIAL CONDITIONS

The following special conditions apply to this requirement:

a. Building to be occupied during construction.

b. Descriptive literature required after award.

c. Equipment guarantees required.

d. There will be no Government Furnished Equipment.

e. Contractor is responsible for all required permits.

f. Operations and Maintenance Manuals required.

g. Contractor to provide any required training.

h. Utilities available: Water, gas, electricity, and sewer.

End of Section C

SECTION D – PACKAGING AND MARKING:

There are no clauses in this section.

END OF SECTION D

SECTION E: INSPECTION AND ACCEPTANCE:

Clause Title Date

52.246-12 Inspection of Construction AUG 1996

AGAR 452.446-70 Inspection and Acceptance FEB 1988

(a) The Contracting Officer or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.

(b) Inspection will be performed at:

USDA-ARS-NWA-Carl Hayden Bee Research Center 2000 E Allen Rd Tucson, AZ 85719

E.1 FINAL INSPECTION

(a) A final inspection shall be made only when all the materials have been furnished, all the work has been performed, and all the construction provided for by the contract has been completed in accordance with the terms, conditions, specifications, and drawings set forth in this contract. If, upon examination by the Contracting Officer, his/her designated representative, and Government inspection personnel, the project is determined not sufficiently completed to have warranted a final inspection, the Contractor may be held financially liable for any additional cost of re-inspection when material and workmanship are not ready at the time specified by the Government for project inspection.

(b) Contractor shall give the Contracting Officer ten (10) calendar days advance notice, in writing, of the date the work will be fully completed and ready for final inspection.

(c) The Contracting Officer will notify the Contractor of any discrepancies and/or omissions noted at the final inspection by providing a "punchlist" as to the discrepancies/omissions, replacement of materials and performance or re-performance of any unsatisfactory work necessary for final acceptance. This notification shall not in any way be deemed an extension of the contract completion date. If all construction required by the contract is found completed and all contractual documents (i.e., payrolls, shop/as-builts/red-line drawings, release from claims, etc.) have been submitted, the Contracting Officer shall notify the Contractor of such in writing by processing the final payment for the project.

(d) Acceptance shall be final and conclusive, except for latent defects, fraud, or such gross mistakes as may amount to fraud, or regarding the Government’s right under any warranty or guarantee.

E.2 FINAL ACCEPTANCE

Upon written notification that all deficiencies identified during the final inspection have been corrected, the Contracting Officer will schedule a final acceptance inspection of the work. If all construction required by the contract is determined to be complete and all requisite contract deliverables (e.g., certified payroll records, as-built drawings, warranty documents, etc.) have been submitted and approved by the Government, the Contracting Officer shall notify the Contractor in writing of such acceptance. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.

End of Section E

SECTION F: DELIVERIES OR PERFORMANCE

52.242-14 Suspension of Work APR 1984

52.211-10 Commencement, Prosecution, and Completion of Work APR 1984 Alternate I The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 10 May 2022. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

End of Section F

SECTION G: CONTRACT ADMINISTRATION DATA

G.1 This contract shall be administered by the USDA/ARS/PWA, Acquisitions, Personal Property and Fleet Section, 800 Buchanan St, Albany, CA 94710

G.2 POST-AWARD CONFERENCE

(a) Prior to the Contractor starting work, a post-award conference (as described in FAR Subpart 42.5), will be convened by the contracting activity or contract administration office. The Contractor's Project Manager shall attend the conference. If the contract involves subcontractors, a representative of each major subcontractor is also required to attend.

(b) The conference will be held at a time/location to be determined.

(c) The Contracting Officer and the Contractor will agree to the date and time of the conference after award of the contract. In event of a conflict in schedules, the Contracting Officer shall establish the date for the conference.

(d)The Contractor shall include any associated costs for attendance at the conference, in its offer.

G.3 AUTHORITIES AND DELEGATIONS

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

The COR will be named at time of award.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract.

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the

COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

G.4 SUBMITTING PAYMENT REQUESTS

Prior to submitting payment request, the contractor needs to obtain COR/OGR and CO signature on form ARS 372 – Contractors Request for Payment Transmittal.

G.5 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS - INVOICE

PROCESSING PLATFORM (IPP)

Payment requests must be submitted electronically through the U.S. Department of the Treasury’s Internet Payment Platform System (IPP). The IPP website address is:

https://www.ipp.gov.

“Payment requests” means any request for contract financing payment or invoicing payment by the Contractor. To constitute a proper invoice, the payment request shall comply with the applicable Prompt Payment clause included in the contract, the clause 52.212-4 Contract Terms and Conditions – Commercial Items included in commercial item contracts, or the requirements identified in FAR 52.232-27, Prompt Payment for Construction Contracts, and include the items listed in paragraphs (a)(2)(i) through (a)(2)(xi) of the clause.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3-5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone

(866) 973-3131.

https://www.ipp.gov/

Invoices shall not include information that would compromise Personally Identifiable Information, such as full social security numbers, dates of birth, etc.

The final invoice shall be submitted and will be approved in accordance with the payment terms and conditions contained in the contract, after all, if any, settlement actions are complete. The contractor must clearly identify the last payment as the “Final Invoice”.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

G.6 INVOICE PREPARATION AND SUBMISSION

Based upon acceptance of required contract deliverables, the contractor shall submit an original invoice to the following email address:

Email: Theodore.Blume@usda.gov

The contractor shall include the following information on each invoice in order to be considered a proper invoice:

1. Name and address of contractor.

2. Invoice number and Invoice date.

3. Contract number.

4. Description of work and period of performance.

5. Name, title, phone number, and complete mailing address of official to whom payment is to be sent.

6. Name, title, phone number, and complete mailing address of person to notify in the event of a defective invoice.

7. Taxpayer Identification Number (TIN) and DUNS Number.

8. Invoices must be submitted along with certified payroll records, Contractor certification, and updated CPM Schedule.

Once the paper invoice has been approved by the Contracting Officer, the Contractor shall submit the invoice electronically through the U.S. Department of Treasury Invoice Processing Platform (IPP) at www.ipp.gov. This is a mandatory requirement.

Upon completion of work and final acceptance has occurred, the contractor’s final invoice shall be marked as “FINAL”.

mailto:Theodore.Blume@usda.gov http://www.ipp.gov/

G.7 CONTRACT CLOSEOUT

(a) Closeout Procedures:

(1) Comply with provisions in conditions of Solicitation/Contract Agreement relating to submittals prior to substantial completion, or Owner's use of completed portions of work.

(2) Provide submittals required by governing authorities.

(b) Cleaning:

(1) Execute cleaning during progress of work and at completion of work.

(2) Reference other specification sections for additional specific work.

(3) Maintain premises and public properties free from accumulations of waste, debris, and rubbish caused by operations.

(4) At completion of work, remove waste materials, rubbish, tools, equipment, machinery, And surplus materials:

a. Clean all sight-exposed surfaces.

b. Leave project clean and ready for occupancy or use.

c. All floors are to be broom and wet mop cleaned.

(5) Areas disturbed during construction operations shall be restored generally to match conditions existing prior to start of work.

(c) Project Record Drawings:

(1) Maintain documents in clean, dry, legible condition.

(2) Make documents available at all times for inspection by COR, CO, and other individuals as may be designated by the CO.

(3) Label each document "Project Record."

(4) Keep record documents current.

(5) Do not conceal work until required information has been recorded.

(6) At completion of work, and before final acceptance, submit as-built drawings in accordance with special contract requirements.

(d) Operating and Maintenance Manuals:

(1) System Demonstration

a. Prior to final inspection demonstrates operation of each system to the COR, CO, and other individuals as may be designated by the CO.

b. Instruct designated Government personnel in operation, adjustment, and maintenance of equipment and systems, using the operation and maintenance data as the basis of instruction.

(2) Warranties and Bonds:

a. Submit warranties and maintenance bonds prior to final application for payment.

1. Submit within ten days after date of substantial completion.

2. For items of work delayed materially beyond date of substantial completion, provide updated submittal within ten days after acceptance, listing date of acceptance as start of warranty period.

G.8 AS-BUILT DRAWINGS

If required by the SOW, on completion of work, one set of paper specifications and one print and one plastic reproducible of each of the contract drawings accompanying those specifications shall be neatly and clearly marked in red to show all variations between the construction actually provided and that indicated or specified and delivered to the CO.

Where a choice of materials and/or methods is permitted, the as-built drawings shall define the construction actually provided. Representation of such variation shall conform to standard drafting practice and include such supplementary notes, legends and details as may be necessary.

The contractor shall stamp the term RECORD DOCUMENTS, date and sign all plastic reproducible, drawings and volumes of marked specifications. Legibility and clear portrayal of the as-built construction and marked prints shall be subject to approval by the Contracting Officer with the recommended approval of the Area Office Engineer.

G.9 RELEASE FROM CLAIMS

The Contractor shall complete and submit a release of all claims against the Government arising under and by virtue of the purchase order, similar to the following with the final invoice/billing request:

For and in consideration for the receipt of final payment in the amount of $___________ under and pursuant to Purchase Order No._____________ , the undersigned hereby releases the Government from any and all obligations whatsoever arising under said purchase order.

Name, Title, and Signature of Contractor DATE

G.10 SUPPLEMENT TO CHANGES CLAUSE

The provisions of the Changes and Changed Conditions Clause (FAR 52.243-5), as applicable, are supplemented as follows:

a) The contractor shall provide an itemized breakdown or take-off for all charges involving an increase or decrease in the contract price. The request shall be in sufficient detail that will enable the Government to determine the reasonableness of the contractor's and subcontractor's cost to do the change. As a minimum, the following shall be shown:

1. Material quantities and unit prices;

2. Labor costs (broken down by trades, hours worked, and hourly rate);

3. Labor burden (Fringe Benefits, Workmen's Compensation, and Public Liability Insurance);

4. Overhead;

5. Profit;

6. FICA, and FUTA employment taxes; and

7. Sales tax (if any).

b) On requests offering a credit for work omitted, deductions for overhead and profit shall also be shown.

c) If the proposed change will result in an increase or decrease in the contract performance period, the contractor shall state the exact number of days involved. If the proposed change is approved and the Government agrees with the increase or decrease in completion time, the completion date will become a part of the contract modification.

d) Following (G.6) is a sample format for showing related costs as a result of a change order. A similar sheet shall accompany each written detailed cost breakdown. The sample format is self-explanatory and clearly shows the method for computing overhead, profit, and other items on proposed changes.

G.11 SUMMARY SHEET FORMAT

DATE

PROJECT LOCATION:

CONTRACT NUMBER CONTRACTOR

CHANGE ORDER NO. DESCRIPTION

PRIME CONTRACTOR'S WORK

1. Direct Materials

2. Sales Tax on Materials

3. Direct Labor

4. Insurance, Taxes, and Fringe Benefits

5. Rental Equipment

6. Sales Tax - Rental Equipment

7. SUBTOTAL (lines 1-6)

8. Overhead

9. SUBTOTAL (add lines 7-8)

% of line 1

% of line 3

% of line 5

% of line 7

SUBCONTRACTOR=S WORK

10. Direct Materials

11. Sales Tax on Materials

12. Direct Labor

13. Insurance, Taxes, and Fringe Benefits

14. Rental Equipment

15. Sales Tax - Rental Equipment

16. SUBTOTAL (lines 10-15)

17. Overhead

18. SUBTOTAL (add lines 16-17)

19. Profit

20. SUBTOTAL (add lines 18-19)

% of line 10

% of line 12

% of line 14

% of line 16

% of line 18

SUMMARY

Estimated time extension (if any and justification):

Signature and Title of Preparer Date

NOTE: THE CUMULATIVE TOTAL FOR OVERHEAD AND PROFIT OF ALL

SUBCONTRACTORS AND THE PRIME CONTRACTOR SHALL NOT EXCEED 30

PERCENT. FOR PRIME CONTRACTORS WORK ONLY, THE CUMULATIVE TOTAL

FOR OVERHEAD AND PROFIT SHALL NOT EXCEED 20 %.

End of Section G

21. Primes Work (from line 9) $

22. Subs Work (from line 20) $

23. SUBTOTAL (add lines 21-22) $

24. Primes Overhead on Sub % of line 16 $

25. Primes Profit % of line 16 $

26. SUBTOTAL (add lines 23-25) $

27. Primes Bond Premium % of line 26 $

28. TOTAL Cost $

SECTION H – Special Contract Requirements

AGAR 452.236-72 Use of Premises NOV 1996 Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on USDA land or lands administered by the USDA, the Contractor shall obtain written permission from the Contracting Officer. A camp is interpreted to include the campsite or trailer parking area of any employee working on the project for the Contractor.

Unless accepted elsewhere in the contract, the Contractor shall (i) provide and maintain sanitation facilities for the workforce at the site and (ii) dispose of solid waste in accordance with applicable Federal, State and local regulations.

AGAR 452.236-75 Maximum Workweek – Construction Schedule NOV 1996 Within 10 (ten) calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following information in writing for approval:

A schedule as required by FAR clause 52.236-15, "Schedules for Construction Contracts" and the hours (including the daily starting and stopping times) and days of the week the Contractor proposes to carry out the work. The maximum workweek that will be approved is 9:00 a.m. to 5:00 p.m., Monday through Friday., excluding Federal holidays.

H.1 MAXIMUM WORKWEEK - CONSTRUCTION SCHEDULE (SUPPLEMENT)

The following applies to all work performed on Government-owned property:

(a) Listed below are official Government holidays:

New Year’s Day January 1* Martin L. King Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Juneteenth Day in June* Independence Day July 4* Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day November 11* Thanksgiving Day Fourth Thursday in November Christmas Day December 25*

*In accordance with Federal regulations, if these holidays fall on a Saturday, the holiday will be observed on Friday, if Sunday, holiday will be observed on Monday.

The contractor will be required to follow Government procedures for any unscheduled shut down of the Government installation due to weather conditions, security, Government identified emergency health and safety evacuation, etc.

(b) SEVERE WEATHER WARNING REQUIREMENTS: When a severe weather warning has been issued for the area in which construction is being performed, the contractor shall immediately take action to tie down, or otherwise secure structures, materials, and equipment on the job site that could become airborne as a result of strong winds, thunderstorms, rain or other weather-related conditions, including protection from extreme or extended periods of cold or heat. These requirements are applicable 24 hours a day, 7 days a week.

(c) WORK OUTSIDE REGULAR HOURS: If the contractor desires to work outside regular hours, or on Saturday, Sunday, or Federal legal holidays, he shall submit a written request to the CO/COR two (2) working days in advance to allow ample time for approval or disapproval and to enable satisfactory arrangements to be made for security, safety, and inspecting the work progress.

In cases where the contractor receives approval to work outside of normal working hours for his convenience, cost incurred by the contractor for overtime and additional cost incurred by the Government for services including inspection costs shall be borne by the contractor.

H.3 KEY PERSONNEL (AGAR 452.237-74 (FEB 1988)

(a) The Contractor shall assign to this contract the following key personnel:

(Title(s)) Name(s):

Site Supervisor __________________________________

(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.

(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the

Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.

H.2 SUBMITTALS AND SHOP DRAWINGS

a. The Contractor shall submit for approval, two (2) copies (minimally) of shop drawings of all manufactured products required in the construction for which such drawings are required. When approved, the Government will forward one set to the Contracting Officer's Representative (COR), one set to the Construction Manager (CM), and one set to the Contractor. If the Contractor requires more than one approved set, additional copies of this document must be forwarded in the number needed.

b. Shop drawings and submittals shall be marked with the Purchase 0rder Number, Project Description, Name of the Contractor, and accompanied by a letter of transmittal. If the shop drawings show variations from the purchase order requirements because of standard shop practice or other reasons, the Contractor shall make specific mention of such variations in his/her letter of transmittal or directly on the drawing/submittal.

c. Approval of shop drawings will be general and will not relieve the Contractor of the responsibility of furnishing material and work required by the purchase order.

d. Shop drawings shall be submitted for approval in ample time to permit checking of the drawings, allow the Contractor to make any corrections and resubmit drawings prior to the time construction is started on work covered by any drawings.

e. non-approval of equipment due to failure to meet specifications or non-approval of the Contractor's drawings due to submission of incomplete or incorrect information shall not be considered as a basis for extension of time for completion of the purchase order.

f. The quantity of shop drawings required may be subject to change due to construction management surveillance needs and/or the complexity of the project. Quantities of shop drawings and submittals will be finalized at the preconstruction conference.

H.3 CHANGE ORDERS OVER $3,000

The Contractor shall submit a written statement to the Contracting Officer of the monetary extent of a claim for equitable adjustment with each request involving an increase or decrease in the purchase order price for any change order. Submit an itemized cost breakdown to show all increases or decreases in order for the Government to properly evaluate the reasonableness of all items. At a minimum, submit the following:

a. Material quantities and unit costs

b. Labor costs broken down by trades, hours to be worked, and hourly rates

c. Rental or operation cost of construction equipment used exclusively on work involved in the change

d. Labor burden (i.e., fringe benefits, Workers Compensation, Insurance, etc.)

e. Overhead

f. Profit

g. FICA and FUTA taxes

h. Sales tax (if any)

H.4 AS-BUILT DRAWINGS AND OPERATIONS AND MAINTENANCE MANUALS

If As-Builts are required by any contractual document(s), upon completion of the Contract, the Contractor shall submit to the Contracting Officer two (2) sets of neatly marked (in red) and labeled "As-Built" drawings and shall also submit three (3) copies of each Operations and Maintenance Manuals for any and all equipment furnished and/or installed by the Contractor under this contract. Final payment shall not be made unless and until such documentation is received and accepted by the Contracting Officer.

H.5 UTILITIES OUTAGE

Any interruption of utilities or services that would interfere with the operation of the facility will be permitted only with prior written approval from the Contracting Officer. Any utilities or service connections made at other than normal working hours will be at no additional cost to the Government. Permission to make such an interruption shall be requested in writing to the Contracting Officer, at least three (3) days prior to the day of interruption. Failure by the Contractor to comply with this requirement will cause the Contractor to be subject to liability for actual damages.

H.6 LIST OF MATERIALS

(a) The Contractor shall submit for approval a complete list, in electronic form, of brands, type, and make of various equipment and materials proposed to be used. If the Contractor fails to submit such a list, or names of equipment which does not comply with the specifications, or if the manufacturers named are unsatisfactory, the Government reserves the right to reject same and to select satisfactory substitute materials. This selection shall be final and finding upon the Contractor, and the work shall be installed on this basis without change in contract price.

(b) In order to properly identify and to prove compliance with the requirements of the specifications, the Contractor shall give the following data for each product included in the list of materials.

• Section heading of the specifications under which material is specified.

• Manufacturer’s name and address.

• Grade, type, trade or catalog number.

• Size, capacity, and other pertinent data.

(c) All materials, fixtures, and equipment furnished and installed under this contract shall be new and of the best quality; shall be standard cataloged products or reputable manufacturers products or of special manufacture, satisfying completely the contract requirements.

(d) Similar items, unless otherwise specified herein or approved by the Contracting Officer, shall be the product of the same manufacturer, and those fulfilling the same requirements as to size and construction shall be identical.

(e) Substitutions and/or Approved Equal: Where particular make, brand or type of material or equipment is mentioned in these specifications, it is to denote quality standard of article desired, but does not restrict contractor to brand specified; however, any substitution must be met with approval of the Contracting Officer. Other products comparable in type, quality, utility, and price are acceptable if approved by the Contracting Officer. Burden of proof of equality shall rest with the Contractor. The Contracting Officer shall be sole judge of paralleled quality.

H.7 COOPERATION WITH OTHER CONTRACTORS

During the period of construction for the work covered by this contract, other contractors performing work for the Government may be operating concurrently at the site. To minimize interference and delay to the construction progress of all concerned, all contractors shall cooperate with each other and coordinate their construction operations to the fullest extent. As far as practicable, all contractors performing work for the Government at the site shall have equal rights to the use of all referenced facilities. In a dispute regarding the use of such facilities, the matter shall be referred to the Contracting Officer.

H.8 PROPERTY DAMAGE LIABILITY INSURANCE

The Contractor shall ensure that the property damage liability insurance policy (or rider) required by FAR 52.228-5, Insurance–-Work on a Government Installation, is in full compliance with all the terms and conditions of this contract. The policy shall not contain any exclusions or exceptions that would limit or adversely affect the Government’s rights and remedies under any other clause in this contract or other Federal regulation or law. Should there be any exclusions or exceptions contained in the policy that limits or adversely affects the Government’s rights, the Contractor shall be responsible for the full amount of any damages that occur to the immediate facilities, adjacent facilities/property, and other Government property under the control of the Contractor due to fraud, negligence, vandalism, willful misconduct, or violation of Federal, state, or local safety regulations, building codes and laws. The Contractor shall have full responsibility and is liable for these facilities and properties until the Government has accepted the contract as being completed in full and a release from claims has been received from the Contractor.

For those areas where the Government has taken "beneficial occupancy" prior to completion and acceptance of the whole contract, the contractor shall not be responsible for those specific areas under Government control, except in such instances where damage occurs to those areas as a result of negligence, fraud, vandalism, willful misconduct, or violation of Federal, state, or local safety regulations, building codes, or laws in those areas under the control of the Contractor.

This liability and responsibility include the activities of all the Contractor’s personnel, their subcontractors and suppliers.

H.9 ENERGY EFFICIENCY

As required in clause 52.223-15 Energy Efficiency in Energy-Consuming Products, the contractor shall only provide products that earn the ENERGY STAR label and meet ENERGY STAR specifications for energy efficiency. The contractor is encouraged to visit http://www.energystar.gov for complete product specifications and updated lists of qualifying products.”

End of Section H

SECTION I – Contract Clauses

52.252-2 Clause Incorporated by Reference FEB 1998 This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address:

http://acquisition.gov

By Reference:

52.202-1 Definitions JUN 2020 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions on Subcontractor Sales to the Government NOV 2021 Alternate I 52.203-7 Anti-Kickback Procedures JUN 2020 52.203-8 Cancellation, Rescission, and Recover of Funds for Illegal MAY 2014 Or Improper Activity 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity MAY 2014 52.203-12 Limitation on Payment to Influence Certain Federal JUN 2020 Transaction 52.203-17 Contractor Employee Whistleblower Rights and JUN 2020 Requirement to Inform Employees of Whistleblower Rights 52.203-19 Prohibition on Requiring Certain Internal Confidentiality JAN 2017 Agreements or Statements 52.204-2 Security Requirements Alternate II (APR 1984) MAR 2021 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber MAY 2011 Content 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier JUN 2020 Subcontract Awards 52.204-13 Systems for Award Management Maintenance OCT 2018 52.204-14 Service Contract Reporting Requirements OCT 2016 52.204-18 Commercial and Government Entity Code AUG 2020 52.204-19 Incorporation by Reference of Representations and DEC 2014 Certifications 52.204-23 Prohibition on Contracting for Hardware, Software, and JUL 2018 Services Developed or Provided by Kaspersky Lab and

Other Covered Entities 52.204-25 Prohibition of Contracting for Certain Telecommunications AUG 2020 And Video Surveillance Services or Equipment http://acquisition.gov/

52.209-6 Protecting the Governments Interest when Subcontracting JUN 2020 With Contractors Debarred, Suspended, or Proposed for

Debarment 52.209-9…