This is a solicitation for a firm fixed price construction contract to repair or replace HVAC and electrical components at two buildings at the USDA Carl Hayden Bee Research Center in Tucson, Arizona. The work includes providing all labor, materials, equipment, transportation, and supervision to complete renovations in compliance with applicable building codes. The requirement is prepared under FAR Part 36 for construction contracts. It will be solicited as a 100% small business set-aside for NAICS 236220 with a size standard of $39.5M. The estimated value is between $500,000 and $1,000,000. The solicitation will be posted to SAM.gov on March 17th, 2022. Interested parties must register in SAM.gov to be eligible for award. Questions may be submitted by email with the reference number 12905B22R0007 by a specified date.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UPUPUPUP

U

S

D

A

-- USDA

NO. DATE BY DESCRIPTION

REVISIONS

Agricultural Research Service

DWG. NO.

SHEET OF

PROJECT MANAGER EPM

DESIGNER

CHECKED BY

DRAWN BY REAL PROPERTY

SAFETY & HEALTH

RPR

SPECIFICATION NO.

DATE

HLA CAROLYN WILLIAMS

LOUVIERE, STRATTON & YOKEL, LLC

8484 GEORGIA AVENUE, SUITE 650, SILVER

SPRING, MD 20910

(301) 588-1500

BURNS & McDONNELL

8201 NORMAN CENTER DR. SUITE 300

BLOOMINGTON, MN 55437

(952) 656-6003

G-001

COVER SHEET

USDA CARL HAYDEN BEE RESEARCH CENTER - TUCSON, AZ

HLA

LEA

LEA

07/13/2021

U.S. DEPARTMENT OF AGRICULTURE

CARL HAYDEN BEE RESEARCH CENTER

AGRICULTURAL RESEARCH SERVICE

PACIFIC WEST AREA

JULY 13, 2021

GENERAL

G-001 COVER SHEET

G-002 ABBREVIATIONS & GENERAL NOTES

ARCHITECTURAL

A-100 BASEMENT DEMOLITION REFLECTED CEILING PLAN

A-110 BASEMENT NEW WORK REFLECTED CEILING PLAN

A-111 GROUND FLOOR NEW WORK REFLECTED CEILING PLAN

A-601 SCHEDULES

MECHANICAL

M-001 MECHANICAL NOTES, LEGEND, SYMBOLS & ABBREVIATIONS

MD100 MECHANICAL DEMOLITION PLAN - BASEMENT

MD101 MECHANICAL DEMOLITION PLAN - FIRST FLOOR

MD200 MECHANICAL PIPING DEMOLITION - BASEMENT

MD201 MECHANICAL PIPING DEMOLITION - FIRST FLOOR

MD202 MECHANICAL ENLARGED PIPING DEMOLITION - FIRST FLOOR

MH100 MECHANICAL PLAN - BASEMENT

MH101 MECHANICAL PLAN - FIRST FLOOR

MP100 MECHANICAL PIPING PLAN - BASEMENT

MP101 MECHANICAL PIPING PLAN - FIRST FLOOR

MP401 MECHANICAL ENLARGED PIPING PLAN - BASEMENT

MP402 MECHANICAL ENLARGED PIPING PLAN - FIRST FLOOR

M-501 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

PLUMBING

P-001 PLUMBING NOTES, LEGEND, SYMBOLS & ABBREVIATIONS

P-101 PLUMBING PLAN - FIRST FLOOR

ELECTRICAL

E-001 ELECTRICAL NOTES AND ABBREVIATIONS

E-002 ELECTRICAL NOTES AND ABBREVIATIONS

ED101 ELECTRICAL FIRST FLOOR DEMOLITION PLAN

ED102 ELECTRICAL BASEMENT DEMOLITION PLAN

ED601 DEMOLITION ONE-LINE DIAGRAM

ED602 DEMOLITION PANELBOARD SCHEDULE

ES100 ELECTRICAL SITE PLAN

E-101 ELECTRICAL FIRST FLOOR PLAN

E-102 ELECTRICAL FIRST FLOOR LABORATORIES PLAN

E-103 ELECTRICAL BASEMENT PLAN

E-104 ELECTRICAL BASEMENT REFLECTED CEILING PLAN

E-105 BUILDING 108 FLOOR PLAN

E-601 ELECTRICAL ONE-LINE DIAGRAM

E-602 ELECTRICAL PANELBOARD SCHEDULES

E-603 ELECTRICAL PANELBOARD SCHEDULES

E-604 BUILDING 108 PANELBOARD SCHEDULES

DRAWING INDEX

SITE PLAN KEY PLANVICINITY MAP SEAL

FINAL SUBMISSION

HVAC AND ELECTRIC MODIFICATIONS

PROJECT LOCATION PROJECT AREA

BLDG 107

BLDG 108

GREENHOUSE

NTSNTS

LSY PROJECT NO. 20037.01

07/13/21 LEA FINAL SUBMISSION

TUCSON, ARIZONA

1. DO NOT START CONSTRUCTION UNTIL ALL REQUIRED PERMIT APPROVALS ARE OBTAINED.

2. VISIT THE SITE PRIOR TO CONSTRUCTION TO VERIFY CONDITIONS RELATING TO CONSTRUCTION. THOROUGHLY EXAMINE AND BE FAMILIAR

WITH THE DRAWINGS, DRAWING NOTES AND SPECIFICATIONS. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING MATERIALS. DO NOT

SCALE THE DRAWINGS.

3. NOTIFY THE PROJECT OFFICER OF ANY DISCREPANCIES, OMISSIONS, OR CONFLICTS IN THE CONSTRUCTION DOCUMENTS.

4. FURNISH AND INSTALL ALL ITEMS SHOWN OR IMPLIED ON THE DRAWINGS UNLESS OTHERWISE NOTED.

5. MAINTAIN THE CONSTRUCTION SITE IN A CLEAN AND ORDERLY MANNER.

6. DIMENSIONS SHOWN ON THE DRAWINGS ARE FROM FINISH FACE OF PARTITION UNLESS OTHERWISE NOTED.

7. INFORMATION CONTAINED IN THESE DRAWINGS IS BASED ON LIMITED FIELD MEASUREMENTS AND MAY REQUIRE ADJUSTMENTS OR

MODIFICATIONS TO CONFIRM WITH EXISTING CONDITIONS. IN CASES WHERE CHANGES IN DETAIL ARE NECESSARY, THESE DRAWINGS SHALL

BE USED TO SHOW DESIGN INTENT ONLY. PERFORM WORK, SHOWN OR IMPLIED, THAT IS NECESSARY TO CARRY OUT THE INTENT OF THE

DRAWINGS AND SPECIFICATIONS OR IS CUSTOMARILY PERFORMED AS IF FULLY AND CORRECTLY SET FORTH AND DESCRIBED IN THE

DRAWINGS AND SPECIFICATIONS.

8. COORDINATE WORK SCHEDULE THROUGH THE EPM. SCHEDULE WORK TO MINIMIZE DISRUPTION TO OCCUPANTS OF THE

BUILDING.

9. PROTECT EXISTING BUILDING ELEMENTS NOT INDICATED FOR REMOVAL FROM DEMOLITION AND CONSTRUCTION ACTIVITIES. DAMAGE

RESULTING FROM CONSTRUCTION ACTIVITIES SHALL BE REPAIRED TO ORIGINAL CONDITION.

10. FILL OPENINGS CREATED BY THE REMOVAL OF DUCTWORK, PIPING DEVICES, ETC. WITH MATERIAL EQUIVALENT TO THE ADJACENT

CONSTRUCTION.

11. ALL PENETRATIONS, BOTH NEW & EXISTING THROUGH FIRE RATED WALLS & FLOOR SLABS SHALL BE PROPERLY SEALED WITH AN APPROVED

& LISTED FIRE STOPPING MATERIAL. SUBMIT MANUFACTURER'S CATALOG DATA & INSTALLATION DETAILS FOR FIRE STOPPING TO THE

EPM FOR REVIEW & APPROVAL BY THE FIRE MARSHAL PRIOR TO INSTALLATION. EXISTING FLOOR SLABS ARE ASSUMED TO

BE XX-HOUR FIRE RATED CONSTRUCTION AND CORRIDOR WALLS ARE ASSUMED TO BE XX-HOUR FIRE RATED CONSTRUCTION.

12. SHUTDOWN OF UTILITIES FOR THE WORK SHALL BE PERFORMED ONLY BY USDA PERSONNEL, AND SHALL BE EXECUTED AFTER REGULAR

WORKING HOURS. REQUESTS FOR UTILITY SHUTDOWNS SHALL BE SUBMITTED TO THE EPM, IN WRITING, TWENTY-ONE (21)

DAYS PRIOR TO THE REQUIRED SHUTDOWN.

13. ON SITE STORAGE IS LIMITED TO THAT AVAILABLE WITHIN THE LIMITS OF CONSTRUCTION.

14. PROVIDE TEMPORARY BUMPERS AND DUST PROTECTION TO PROTECT PUBLIC AREAS FROM CONSTRUCTION ACTIVITIES. TEMPORARY

BARRIERS SHALL BE CONSTRUCTED OF TAPED GYPSUM DRYWALL ON METAL STUDS. IF AN APPROVED SPRINKLER SYSTEM IS NOT INSTALLED

IN ACCORDANCE WITH NFPA 241, SECTION 8.6.2, SEPARATE THE CONSTRUCTION SITE FROM OCCUPIED PORTIONS OF THE STRUCTURES BY

WALLS HAVING A 1-HOUR FIRE RESISTANCE RATING.

15. PERFORM EXCESSIVELY NOISY AND DISRUPTIVE CONSTRUCTION TASKS & UTILITY SHUTDOWNS (AS DEFINED BY THE EPM)

DURING NOISE HOURS (7:00PM - 7:30AM), OR ON WEEKENDS.

16. LAY OUT LOCATION OF ALL PARTITIONS AND BENCHES FOR APPROVAL BY THE EPM PRIOR TO THE ERECTION OF PARTITIONS.

17. CEILING CLOSE-IN, WALL CLOSE-IN, AND FINAL INSPECTION TO BE PERFORMED PRIOR TO OCCUPANCY. COORDINATE SCHEDULING OF

INSPECTIONS WITH CONSTRUCTION WORK.

18. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE WITH ALL DISCIPLINES (FURNITURE, CIT, ETC) AND ALL VENDORS (MAGNET, RF, ETC).

19. CONTRACTOR SHALL ISOLATE CONSTRUCTION AREA FROM OTHER AREAS THROUGHOUT CONSTRUCTION.

GENERAL NOTES:

DETAIL NUMBER

DRAWING NUMBER

WHERE DETAIL IS

DRAWN

SECTION NUMBER

DRAWING NUMBER

WHERE DETAIL IS

DRAWN

ELEVATION NUMBER

DRAWING NUMBER

WHERE ELEVATION IS

DRAWN

REVISION NUMBER

REVISION CLOUD

WALL TYPE NUMBER,

SEE SHT. A-601

DOOR NUMBERROOM NUMBER

X

X

X

X

X

X

X

X X

XXX

XXXXXX

XX WINDOW NUMBER

AFF

X' - X" CEILING HEIGHT

CLAY TILE

TERRAZZO

BRICK

CONCRETE

PRECAST

CONCRETE

PLYWOOD

HARDWOOD

WOOD BLOCKING

SHIM

METAL

GYPSUM BOARD

& PLASTER

INSULATION

BATT

RIGID

ACOUSTICAL

INSULATION

TILE

U

S

D

A

-- USDA

NO. DATE BY DESCRIPTION

REVISIONS

Agricultural Research Service

DWG. NO.

SHEET OF

PROJECT MANAGER EPM

DESIGNER

CHECKED BY

DRAWN BY REAL PROPERTY

SAFETY & HEALTH

RPR

SPECIFICATION NO.

DATE

HLA CAROLYN WILLIAMS

LOUVIERE, STRATTON & YOKEL, LLC

8484 GEORGIA AVENUE, SUITE 650, SILVER

SPRING, MD 20910

(301) 588-1500

BURNS & McDONNELL

8201 NORMAN CENTER DR. SUITE 300

BLOOMINGTON, MN 55437

(952) 656-6003

G-002

ABBREVIATIONS & GENERAL NOTES

USDA CARL HAYDEN BEE RESEARCH CENTER - TUCSON, AZ

HLA

LEA

LEA

07/13/2021

VB VINYL BASE

VCT VINYL COMPOSITION TILE

VEST VESTIBULE

VIF VERIFY IN FIELD

VIN VINYL

VWC VINYL WALL COVERING

W WIDE, WEST

W/ WITH

W/O WITHOUT

WB WHITEBOARD

WD WOOD

WDO WINDOW

WR WATER RESISTANT

LABORATORY ABBREVIATIONS

AL AIR LOCK

BP BACK PANEL

CORR CORROSIVES

CS CUP SINK

CYL CYLINDER

D DATA RECEPTACLE

DCRD DROP CORD

DI DEIONIZED WATER

ES EMERGENCY SHOWER

EW EYE WASH

FLAM FLAMMABLE

FPED FOOT PEDALS

GFI GROUND FAULT INTERRUPTER

HB HIGH BENCH

IVF ILLUMINATED FILM VIEWER

IVT INTRAVENEOUS TRACK

LB LOW BENCH

LN2 LIQUID NITROGEN

MHG MAGNAHELIC GAUGE

N2 GASEOUS NITROGEN

NARC NARCOTICS CABINET

O2 OXYGEN

PPE PERSONAL PROTECTION EQUIPMENT

PTL PASS THROUGH LOCKERS

PWF PURE WATER FIXTURE

RO REVERSE OSMOSIS

SG SPLASH GUARD

SHR SHOWER

UC UNDER COUNTER

VHP VAPROX HYDROGEN PEROXIDE

VPI VISUAL PRESSURE INDICATOR

LABORATORY EQUIPMENT ABBREVIATIONS

ATS ANIMAL TRANSFER STATION

BFLR BOTTLE FILLER

BSC BIOSAFETY CABINET

BSC A2.4 4' CLASS II, TYPE A2 BIOSAFETY CABINET

BSC A2.6 6' CLASS II, TYPE A2 BIOSAFETY CABINET

BSC B2.4 4' CLASS II, TYPE B2 BIOSAFETY CABINET

BSC B2.6 6' CLASS II, TYPE B2 BIOSAFETY CABINET

CFS CHLORINE FLUSH STATION

CIS CHLORINE INJECTION STATION

CRW CAGE @ RACK WASHER

EOXS ETHYLENE OXIDE STERILIZER

FBB FLUIDIZED BED BIOFILTER

ICE ICE MACHINE

INC INCUBATOR

PTC PASS THROUGH CABINET

PTC (V) VENTILATED PASS THROUGH CABINET

STER STERILIZER

LABORATORY UTILITY SERVICE ABBREVIATIONS

A AIR

AGV AIR, GAS, VACUUM

C CARBON

CA COMPRESSED AIR

CO2 CARBON DIOXIDE

CW COLD WATER

G GAS

HW HOT WATER

PW PURIFIED WATER

V VACUUM

HR HOUR

HT HEIGHT

ID INSIDE DIAMETER

INSL INSULATION

INST INSTALL(ATION)

INT INTERIOR

KBT KEYBOARD TRAY

L LENGTH

LB POUND

LG LARGE

LP LOW POINT

LU LEG UNIT

M METER

MAG MAGNETIC

MAT MATERIAL

MAX MAXIMUM

MDF MEDIUM DENSITY FIBERBOARD

MECH MECHANICAL

MED MEDIUM

MET METAL

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MOA MULTI OUTLET ASSEMBLY

MON MONITOR

MR MOISTURE RESISTANT

MTD MOUNTED

MTL METAL

N NITROGEN

N/A NOT APPLICABLE

NIC NOT IN CONTRACT

NO NUMBER

NP NEW PANEL

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OFCI OWNER FURNISHED, CONTRACTOR INSTALLED

OFOI OWNER FURNISHED, OWNER INSTALLED

OH OPPOSITE HAND

ORD OVERFLOW ROOF DRAIN

ORIG ORIGINAL

P POWER RECEPTACLE

PART PARTICLE BOARD

PCST PRECAST

PLAM PLASTIC LAMINATE

PLUMB PLUMBING

PLYWD PLYWOOD

PNL(S) PANEL(S)

PRXR PROXIMITY READER

PT PRESSURE TREATED

PTD PAINT, PAINTED

PTN PARTITION

PWR POWER

RCP REFLECTED CEILING PLAN

REF REFERNECE

REFRIG REFRIGERATOR

REQ REQUIRED

RM ROOM

S SOUTH

SA SOUND ATTENUATION

SAB SOUND ATTENUATION BLANKET

SAL SALVAGE

SCWD SOLID CORE WOOD DOOR

SECT SECTION

SF SQUARE FOOT

SHF SHELF

SHT SHEET

SIM SIMILAR

SK SINK

SM SQUARE METER

SM SMALL

SMR SURFACE MOUNTED RACEWAY

SPEC SPECIFICATION(S)

SQ SQUARE

SS STAINLESS STEEL

STD STANDARD

STDP STAND PIPE

STL STEEL

STOR STORAGE

STR STRUCTURAL, STRUCTURE

SUSP SUSPENDED

SVF SEAMLESS VINYL FLOORING

TB TACK BOARD

TD TRENCH DRAIN

TEMP TEMPORARY

THK THICK

TO TOP OF

TOC TOP OF CURB

TOS TOP OF STEEL

TYP TYPICAL

UNO UNLESS NOTE OTHERWISE

UTY UTILITY

GENERAL ABBREVIATIONS

& AND

ADDN ADDITIONAL

ADMIN ADMINISTRATION

AFF ABOVE FINISHED FLOOR

ALT ALTERNATIVE

ALUM ALUMINUM

AP ACCESS PANEL

APPROX. APPROXIMATE

ARCH ARCHITECTURAL

ARW ACID RESISTANT WASTE

ATC ACOUSTICAL TILE CEILING

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BM BEAM

BO BOTTOM OF

BOT BOTTOM

BRKT BRACKET

C CENTER LINE

CAB CABINET

CFCI CONTRACTOR FURNISHED, CONTRACTOR

INSTALLED

CJ CONTROL JOINT

CLG CEILING

CLR CLEAR

CMU CONCRETE MASONRY UNIT

COL COLUMN

COMP COMPRESSIBLE

CONC CONCRETE

CONST CONSTRUCTION

CONT CONTINUOUS, CONTINUATION

CONTRA CONTRACTOR

CPT CARPET

CT CERAMIC TILE

CTR CENTER

CTRTOP COUNTER TOP

DEMO DEMOLISH, DEMOLITION

DIA DIAMETER

DIM DIMENSION

DMB DRY MARKER BOARD

DN DOWN

DR DOOR

DTL DETAIL

DWG DRAWING(S)

E EAST

EA EACH

EJ EXPANSION JOINT

EL, ELEV ELEVATION

ELEC ELECTRICAL

EP ELECTRICAL PANEL

EQ EQUAL

EQUIP EQUIPMENT

ETR EXISTING TO REMAIN

EWC ELECTRIC WATER COOLER

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION

EXST EXISTING

EXT EXTERIOR

FAAP FIRE ALARM ANNUCIATOR PANEL

FACP FIRE ALARM CONTROL PANEL

FAPS FIRE ALARM PULL STATION

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISHED FLOOR

FHC FIRE HOSE CABINET

FL FLASHING

FLR FLOOR

FP FILLER PANEL

FRT FIRE RETARDENT TREATED

FT FOOT, FEET

GA GAUGE

GALV GALVANIZED

GC GENERAL CONTRACTOR

GFCI GOVERNMENT FURNISHED, CONTRACTOR

INSTALLED

GFGI GOVERNMENT FURNISHED, GOVERNMENT

INSTALLED

GH GROMMET HOLE

GL GLASS

GOV GOVERNMENT

GWB GYPSUM WALL BOARD

GYP BD GYPSUM WALL BOARD

H HIGH

HB HOSE BIB

HC HANDICAP

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE AIR FILTER

HM HOLLOW METAL

HORIZ HORIZONTAL

HP HIGH POINT

ABBREVIATIONS:

L

NOTE: ALL ABBREVIATIONS MAY NOT BE USED SYMBOLS

MATERIALS

DEMO RCP LEGEND:

ATC CLNG, ETR REMOVE ATC CLNG

GWB CLNG, ETR REMOVE GWB

CLNG

LIGHT FIXTURES, ETR

REMOVE LIGHT

FIXTURES, SEE

ELEC

SUPPLY DIFFUSER,

ETR

REMOVE SUPPLY

DIFFUSER, SEE MEP

RETURN REGISTER,

ETR

REMOVE RETURN

REGISTER, SEE MEP

EXHAUST REGISTER,

ETR

REMOVE EXHAUST

REGISTER, SEE MEP

DOWNLIGHT, ETR

REMOVE

DOWNLIGHT, SEE

ELEC

A. REMOVE EXISTING NON-STRUCTURAL ELEMENTS WITHIN THE PROJECT SITE EXCEPT WHERE INDICATED BY NOTE OR SYMBOL AS EXISTING TO

REMAIN. SEE MEP DRAWINGS FOR EXTENT OF MEP DEMOLITION.

B. DEMOLITION DRAWING SHOWS GENERAL EXTENT OF REQUIRED WORK. REMOVE FIXTURES, FITTINGS, DEVICES, ETC. REQUIRED TO PREPARE THE

PROJECT SITE TO RECEIVE NEW WORK. SEE NEW WORK DRAWINGS FOR ADDITIONAL INFORMATION.

C. PERFORM SELECTIVE DEMOLITION FOR WORK SHOWN ELSEWHERE IN THE CONTRACT DOCUMENTS THAT REQUIRES DEMOLITION NOT SHOWN

ON DEMOLITION DRAWINGS. SUCH WORK SHALL INCLUDE, BUT IS NOT LIMITED TO THE FOLLOWING:

1. CORE DRILLING, CONC CUTTING AND REMOVAL OF WALLS AND SLABS AS NECESSARY TO INSTALL MECHANICAL, ELECTRICAL AND

PLUMBING WORK. REFER TO MEP DRAWINGS TO COORDINATE REQUIRED DEMOLITION WORK.

2. REMOVE & REINSTALL SUSPENDED ATC CEILING AS REQUIRED TO PERFORM MEP WORK. SEE MEP DRAWINGS FOR EXTENT OF ABOVE

CEILING WORK.

D. PHASE DEMOLITION AND PROVIDE TEMPORARY FACILITIES AS REQUIRED TO MAINTAIN MEP AND LIFE SAFETY SYSTEMS SERVING OCCUPIED

SPACES IN FULL OPERATING CONDITION. COORDINATE PLAN FOR MAINTENANCE OF THESE SYSTEMS WITH (EPM) ENGINEERING PROJECT

MANAGER.

E. COORDINATE REMOVAL OF TELEPHONES, PA SYSTEMS, INTERCOMS, DATA SYSTEMS, ETC. WITH EPM.

F. MAINTAIN BUILDING IN WEATHER TIGHT CONDITION.

G. PROVIDE TEMPORARY BRACING REQUIRED TO SUPPORT BUILDING ELEMENTS TO REMAIN AND REQUIRED TO MAINTAIN THE PROJECT SITE IN A

SAFE CONDITION.

H. WHERE REMOVAL OF FINISHES IS REQUIRED FROM SURFACES TO REMAIN AS SUBSTRATE FOR NEW FINISHES, USE REMOVAL METHODS WHICH

RESULT IN SUBSTRATE SUITABLE FOR NEW FINISHES.

I. ALL CONSTRUCTION DEBRIS (THIS INCLUDES RECYCLABLE AND NON RECYCLABLE) ARE TO BE RECYCLED THROUGH USDA'S CONSTRUCTION

DEBRIS AND SCRAP METAL DUMPSTERS

J. ALL LOOSE FURNISHINGS AND EQUIPMENT NOT SHOWN TO BE REMOVED SHALL BE TURNED OVER TO USDA. THE USDA'S LOCATION

SUPERVISOR RESERVES THE RIGHT TO SALVAGE ANY ITEM OF EQUIPMENT OR MATERIAL.

K. STORE SALVAGED MATERIALS INTENDED FOR REUSE IN PROJECT AREA AND PROTECT SAME FROM DAMAGE.

L. ALL ITEMS INDICATED WITH A DASHED LINE ARE TO BE REMOVED UNO.

M. MAINTAIN CLEAR ACCESS CORRIDORS TO BUILDING EXITS SERVING OCCUPIED AREAS OUTSIDE AREA OF DEMOLITION AT ALL TIMES.

N. ASBESTOS CONTAINING MATERIAL (ACM) MAY BE PRESENT IN THE FLOOR TILE MASTIC, METAL PARTITIONS, PIPE FITTINGS OF THE HOT, COLD, CHILLED WATER, AND STEAM SYSTEMS INCLUDING CONDENSATE LINES, SUPPLY AND RETURN WATER SYSTEMS PIPING INSULATION, AND HOT

WATER LINES. OTHER HAZARDOUS MATERIALS, INCLUDING BUT NOT LIMITED TO MERCURY RESIDUE IN PLUMBING DRAIN TRAPS, MERCURY IN

FLUORESCENT BULBS, PCB CONTAINING LIGHT BALLASTS, ETC MAY ALSO BE ENCOUNTERED. IF ACM OR OTHER HAZARDOUS MATERIALS ARE

FOUND IN PROJECT AREA & DISTURBED BY CONSTRUCTION ACTIVITIES. STOP WORK IMMEDIATELY & CONTACT USDA LOCATION SUPERVISOR.

GENERAL DEMOLITION NOTES:

1 2 3 4 5 6 7 8 9

A

B

C

D

E

LAB

LAB

STORAGE

019ELECTROPHYSIOLOGY

ADMIN

STORAGE

STORAGE

BREAK

ROOM

STORAGE

STORAGE

012A

LAB

TOILET

STORAGE

STORAGE

VESTIBULE

STAIRWELL

B-3

BOILER

ROOM

B-4

TELEPHONE

B-6

MECHANICAL

ROOM

B-2

FITNESS

ROOM

CORRIDOR

NKEY PLAN: 1/64" = 1'-0"

U

S

D

A

-- USDA

NO. DATE BY DESCRIPTION

REVISIONS

Agricultural Research Service

DWG. NO.

SHEET OF

PROJECT MANAGER EPM

DESIGNER

CHECKED BY

DRAWN BY REAL PROPERTY

SAFETY & HEALTH

RPR

SPECIFICATION NO.

DATE

HLA CAROLYN WILLIAMS

LOUVIERE, STRATTON & YOKEL, LLC

8484 GEORGIA AVENUE, SUITE 650, SILVER

SPRING, MD 20910

(301) 588-1500

BURNS & McDONNELL

8201 NORMAN CENTER DR. SUITE 300

BLOOMINGTON, MN 55437

(952) 656-6003

A-100

BASEMENT DEMOLITION REFLECTED CEILING PLAN

USDA CARL HAYDEN BEE RESEARCH CENTER - TUCSON, AZ

HLA

LEA

LEA

07/13/2021

DEMO RCP KEY NOTES: (TYPICAL )X

X DESIGNATE DEMOLITION ACTIVITY BY ROOM

1/8" = 1'-0"A-100

BASEMENT DEMOLITION RCP31

0'8' 4' 8' 16'

1/8" = 1' - 0"

01 REMOVE EXISTING ATC CEILING AND GRID. REPAIR AND PATCH TO

MATCH WALL AND SLAB WHERE REMOVAL OF CEILING AND GRID

CAUSES DAMAGE.

02 REMOVE EXISTING GYP CEILING AND SUPPORTS. REPAIR AND PATCH

TO MATCH WALL WHERE REMOVAL OF CEILING AND STUDS CAUSES

DAMAGE.

RCP GENERAL NOTES:

A. PROVIDE ACOUSTICAL TILE CEILINGS AS PER MANUFACTURERS RECOMMENDATIONS.

B. WHERE NEW CEILINGS ARE INDICATED, MEASURE EACH CEILING AREA AND ESTABLISH LAYOUTS TO BALANCE BORDER WIDTHS AT OPPOSITE

EDGES OF EACH CEILING. AVOID USE OF LESS THAN HALF THE WIDTH UNITS AT BORDERS, UNLESS NOTED OTHERWISE. SYMMETRICALLY LOCATE

GRID LAYOUTS IN EACH SPACE.

C. SUPPORT CEILING SUSPENSION SYSTEM FROM STRUCTURE ABOVE, NOT FROM DUCTWORK, METAL DECK, EQUIPMENT OR PIPING. SPACE

HANGERS NOT MORE THAN 6" FROM ENDS AND NOT MORE THAN 4'-0" FEET ON CENTERS ON RUNNERS.

D. INSTALL WALL MOLDINGS AT THE PERIMETER OF EACH ACOUSTICAL CEILING AREA AND AT LOCATIONS WHERE EDGES OF UNITS WOULD

OTHERWISE BE EXPOSED.

E. LOCATE SPRINKLER HEADS IN THE MIDDLE OF EACH CEILING PANEL.

F. CENTER ALL DIFFUSERS IN ACOUSTICAL PANELS.

G. THIS DRAWING INDICATES LOCATION OF CEILING MOUNTED AND CEILING PENETRATING ITEMS, FOR ADDITIONAL INFORMATION SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS.

H. IN LABORATORIES, CENTER LIGHT FIXTURES ON EDGE OF BENCH.

I. CEILING GRID SHALL BE CENTERED IN ROOM UNLESS OTHERWISE NOTED.

RCP LEGEND:

ATC CLNG, ETR 2'-0" X 2'-0" ATC

CLNG

GWB CLNG, ETR GWB CLNG

LIGHT FIXTURES, ETR LIGHT FIXTURES,

SEE ELEC

SUPPLY DIFFUSER,

ETR

SUPPLY DIFFUSER,

SEE MEP

RETURN REGISTER,

ETR

RETURN REGISTER,

SEE MEP

EXHAUST REGISTER,

ETR

EXHAUST

REGISTER, SEE MEP

DOWNLIGHT, ETR DOWNLIGHT, SEE

ELEC

1 2 3 4 5 6 7 8 9

A

B

C

D

E

LAB

LAB

STORAGE

ELECTROPHYSIOLOGY

ADMIN

STORAGE

STORAGE

CORRIDOR

BREAK

ROOM

STORAGE

STORAGE

012A

LAB

TOILET

STORAGE

STORAGE

VESTIBULE

STAIRWELL

B-3

BOILER

ROOM

B-4

TELEPHONE

B-6

MECHANICAL

ROOM

B-2

FITNESS

ROOM

NKEY PLAN: 1/64" = 1'-0"

U

S

D

A

-- USDA

NO. DATE BY DESCRIPTION

REVISIONS

Agricultural Research Service

DWG. NO.

SHEET OF

PROJECT MANAGER EPM

DESIGNER

CHECKED BY

DRAWN BY REAL PROPERTY

SAFETY & HEALTH

RPR

SPECIFICATION NO.

DATE

HLA CAROLYN WILLIAMS

LOUVIERE, STRATTON & YOKEL, LLC

8484 GEORGIA AVENUE, SUITE 650, SILVER

SPRING, MD 20910

(301) 588-1500

BURNS & McDONNELL

8201 NORMAN CENTER DR. SUITE 300

BLOOMINGTON, MN 55437

(952) 656-6003

A-110

BASEMENT NEW WORK REFLECTED CEILING PLAN

USDA CARL HAYDEN BEE RESEARCH CENTER - TUCSON, AZ

HLA

LEA

LEA

07/13/2021

1/8" = 1'-0"A-110

BASEMENT NEW WORK RCP31

0'8' 4' 8' 16'

1/8" = 1' - 0"

01 INSTALL NEW ATC CEILING; CENTER GRID ON ROOM. SEE FINISH

SCHEDULE AND SPECIFICATIONS FOR MORE INFORMATION.

02 ALL CEILINGS ARE ETR ON THE GROUND FLOOR; NO CEILINGS WILL BE

DEMOLISHED OR ADDED AS PART OF NEW WORK.

03 INSTALL NEW LIGHT FIXTURE CENTERED ON TILE; SEE E-SERIES

DRAWINGS FOR MORE INFORMATION.

04 INSTALL NEW LIGHT FIXTURE CENTERED ON ROOM; SEE E-SERIES

DRAWINGS FOR MORE INFORMATION.

05 NEW MECHANICAL EQUIPMENT IN CEILING. SEE M-SERIES DRAWINGS

FOR MORE INFORMATION ON RETURN/SUPPLY AIR DUCTS AND

GRILLES, TYP.

KEY NOTES:(TYPICAL )X

X DESIGNATE NEW WORK ACTIVITY BY ROOM

1 2 3 4 5 6 7 8 9

A

B

C

D

E

STAIRWELL

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

STAIRWELL

LIBRARY

BREAK

ROOM

STUDENT

COMPUTER

RM

STUDENT

COMPUTER

RM

LABORATORY

LABORATORY

LABORATORY

LABORATORY

LIBRARY

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

PREPARATION

LABORATORY

LABORATORY

STORAGE

LABORATORY

LABORATORY

LABORATORY

ANNEX

LABORATORY

LABORATORY

GENERAL

OFFICE

OFFICE

DIRECTORS

OFFICE

SECRETARY

OFFICE

VESTIBULE

MEN'S

TOILET

WOMEN'S

TOILET

TOILET

CORRIDOR

LOBBY

C O

R R

ID

O

R

CORRIDOR

C O

R R

ID

O

R

VESTIBULE

TRANSFER

ROOM

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

JANITORS

CLOSET

VESTIBULE

UNISEX

TOILET

05 05

05 05

NKEY PLAN: 1/64" = 1'-0"

RCP GENERAL NOTES:

A. PROVIDE ACOUSTICAL TILE CEILINGS AS PER MANUFACTURERS RECOMMENDATIONS.

B. WHERE NEW CEILINGS ARE INDICATED, MEASURE EACH CEILING AREA AND ESTABLISH LAYOUTS TO BALANCE BORDER WIDTHS AT OPPOSITE

EDGES OF EACH CEILING. AVOID USE OF LESS THAN HALF THE WIDTH UNITS AT BORDERS, UNLESS NOTED OTHERWISE. SYMMETRICALLY LOCATE

GRID LAYOUTS IN EACH SPACE.

C. SUPPORT CEILING SUSPENSION SYSTEM FROM STRUCTURE ABOVE, NOT FROM DUCTWORK, METAL DECK, EQUIPMENT OR PIPING. SPACE

HANGERS NOT MORE THAN 6" FROM ENDS AND NOT MORE THAN 4'-0" FEET ON CENTERS ON RUNNERS.

D. INSTALL WALL MOLDINGS AT THE PERIMETER OF EACH ACOUSTICAL CEILING AREA AND AT LOCATIONS WHERE EDGES OF UNITS WOULD

OTHERWISE BE EXPOSED.

E. LOCATE SPRINKLER HEADS IN THE MIDDLE OF EACH CEILING PANEL.

F. CENTER ALL DIFFUSERS IN ACOUSTICAL PANELS.

G. THIS DRAWING INDICATES LOCATION OF CEILING MOUNTED AND CEILING PENETRATING ITEMS, FOR ADDITIONAL INFORMATION SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS.

H. IN LABORATORIES, CENTER LIGHT FIXTURES ON EDGE OF BENCH.

I. CEILING GRID SHALL BE CENTERED IN ROOM UNLESS OTHERWISE NOTED.

RCP LEGEND:

ATC CLNG, ETR 2'-0" X 2'-0" ATC

CLNG

GWB CLNG, ETR GWB CLNG

LIGHT FIXTURES, ETR LIGHT FIXTURES,

SEE ELEC

SUPPLY DIFFUSER,

ETR

SUPPLY DIFFUSER,

SEE MEP

RETURN REGISTER,

ETR

RETURN REGISTER,

SEE MEP

EXHAUST REGISTER,

ETR

EXHAUST

REGISTER, SEE MEP

DOWNLIGHT, ETR DOWNLIGHT, SEE

ELEC

U

S

D

A

-- USDA

NO. DATE BY DESCRIPTION

REVISIONS

Agricultural Research Service

DWG. NO.

SHEET OF

PROJECT MANAGER EPM

DESIGNER

CHECKED BY

DRAWN BY REAL PROPERTY

SAFETY & HEALTH

RPR

SPECIFICATION NO.

DATE

HLA CAROLYN WILLIAMS

LOUVIERE, STRATTON & YOKEL, LLC

8484 GEORGIA AVENUE, SUITE 650, SILVER

SPRING, MD 20910

(301) 588-1500

BURNS & McDONNELL

8201 NORMAN CENTER DR. SUITE 300

BLOOMINGTON, MN 55437

(952) 656-6003

A-111

GROUND FLOOR NEW WORK REFLECTED CEILING PLAN

USDA CARL HAYDEN BEE RESEARCH CENTER - TUCSON, AZ

HLA

LEA

LEA

07/13/2021

1/8" = 1'-0"A-111

GROUND FLOOR NEW WORK RCP31

0'8' 4' 8' 16'

1/8" = 1' - 0"

KEY NOTES:(TYPICAL )X

X DESIGNATE NEW WORK ACTIVITY BY ROOM

01 INSTALL NEW ATC CEILING; CENTER GRID ON ROOM. SEE FINISH

SCHEDULE AND SPECIFICATIONS FOR MORE INFORMATION.

02 ALL CEILINGS ARE ETR ON THE GROUND FLOOR; NO CEILINGS WILL BE

DEMOLISHED OR ADDED AS PART OF NEW WORK.

03 INSTALL NEW LIGHT FIXTURE CENTERED ON TILE; SEE E-SERIES

DRAWINGS FOR MORE INFORMATION.

04 INSTALL NEW LIGHT FIXTURE CENTERED ON ROOM; SEE E-SERIES

DRAWINGS FOR MORE INFORMATION.

05 NEW MECHANICAL EQUIPMENT IN CEILING. SEE M-SERIES DRAWINGS

FOR MORE INFORMATION ON RETURN/SUPPLY AIR DUCTS AND

GRILLES, TYP.

NA NOT APPLICABLE

ATC-1 ACOUSTICAL TILE CEILING

FINISH LEGEND:

U

S

D

A

-- USDA

NO. DATE BY DESCRIPTION

REVISIONS

Agricultural Research Service

DWG. NO.

SHEET OF

PROJECT MANAGER EPM

DESIGNER

CHECKED BY

DRAWN BY REAL PROPERTY

SAFETY & HEALTH

RPR

SPECIFICATION NO.

DATE

HLA CAROLYN WILLIAMS

LOUVIERE, STRATTON & YOKEL, LLC

8484 GEORGIA AVENUE, SUITE 650, SILVER

SPRING, MD 20910

(301) 588-1500

BURNS & McDONNELL

8201 NORMAN CENTER DR. SUITE 300

BLOOMINGTON, MN 55437

(952) 656-6003

A-601

SCHEDULES

USDA CARL HAYDEN BEE RESEARCH CENTER - TUCSON, AZ

HLA

LEA

LEA

07/13/2021

ROOM NO ROOM NAME AREA BASE WALL FLOOR CEILING COMMENTS

019 STORAGE 51 SF NA NA NA ATC-1 PATCH TO MATCH WALLS AS NECESSARY TO REPAIR DAMAGE FROM DEMOLITION.

020 ELECTROPHYSIOLOGY 345 SF NA NA NA ATC-1 PATCH TO MATCH WALLS AS NECESSARY TO REPAIR DAMAGE FROM DEMOLITION.

021 ADMIN STORAGE 152 SF NA NA NA ATC-1 PATCH TO MATCH WALLS AS NECESSARY TO REPAIR DAMAGE FROM DEMOLITION.

016 STORAGE 140 SF NA NA NA ATC-1 PATCH TO MATCH WALLS AS NECESSARY TO REPAIR DAMAGE FROM DEMOLITION.

011 STORAGE 183 SF NA NA NA ATC-1 PATCH TO MATCH WALLS AS NECESSARY TO REPAIR DAMAGE FROM DEMOLITION.

012A STORAGE 176 SF NA NA NA ATC-1 PATCH TO MATCH WALLS AS NECESSARY TO REPAIR DAMAGE FROM DEMOLITION.

014 STORAGE 93 SF NA NA NA ATC-1 PATCH TO MATCH WALLS AS NECESSARY TO REPAIR DAMAGE FROM DEMOLITION.

ACOUSTICAL TILE CEILING

ARMSTRONG

ATC-1 ULTIMA HIGH NRC. TILE WHITE, GRID: WHITE

ROOM FINISH SCHEDULE

FINISH SCHEDULE

PIPE SYMBOLS

PIPE ELBOW

PIPE DOWN

PIPE UP

PIPE CONTINUATION

HVAC LEGEND

M

CONTROL DAMPER, MOTOR

OPERATED

MANUAL BALANCE DAMPER

BD

BACKDRAFT DAMPER

AD

AD

ACCESS DOOR (AD)

ACCESS PANEL (AP)

S

AD

S

DAMPERS:

FIRE (F) -

SMOKE (S) -

FIRE SMOKE (F/S) -

AD

SECURITY BARS

FLEXIBLE DUCT CONNECTION

RECTANGLUAR ELBOW WITH

TURNING VANES

RECTANGULAR TEE WITH

TURNING VANES

RECTANGULAR RADIUS ELBOW

R RISE IN RESPECT TO AIR-FLOW

D DROP IN RESPECT TO AIR-FLOW

SQUARE OR RECTANGULAR TO

ROUND TRANSITION

SUPPLY AIR OR OUTSIDE AIR

RECTANGULAR DUCT SECTION

RETURN AIR RECTANGULAR

DUCT SECTION

EXHAUST AIR RECTANGULAR

DUCT SECTION

ROUND FLEXIBLE DUCT

(5'-0" MAX LENGTH)

SQUARE OR RECTANGULAR

SUPPLY DIFFUSER

RETURN AIR DIFFUSER

EXHAUST AIR DIFFUSER

T THERMOSTAT

CO2 CARBON DIOXIDE SENSOR

H HUMIDISTAT

LINEAR SLOT DIFFUSER

VAV- VARIABLE AIR VOLUME

TERMINAL BOX

(3'-0") FINNED TUBE RADIATION.

LENGTH OF ELEMENT SHOWN

IN PARENTHESIS

ESS EMERGENCY SHUT-OFF SWITCH

M MOTOR

FCP FAN CONTROL PANEL

AIRFLOW ARROW

BA BREATHING AIR DROP

CA COMPRESSED AIR DROP

SUPPLY AIR OR OUTSIDE AIR

ROUND DUCT SECTION

RETURN AIR ROUND DUCT

SECTION

EXHAUST AIR ROUND DUCT

SECTION

DP DIFFERENTIAL PRESSURE

SENSOR

S STATIC PRESSURE SENSOR

OCC OCCUPANCY SENSOR

ROUND & RECTANGULAR DUCT

TAKEOFF

CO CARBON MONOXIDE SENSOR

PIPE LINE ACCESSORIES

3-WAY VALVE

2-WAY VALVE

ANGLE VALVE

AV

AUTOMATIC AIR VENT

ASSEMBLY

BFP

BACKFLOW PREVENTION

ASSEMBLY

BALANCING VALVE / CIRCUIT

SETTER

BALL VALVE

BLIND FLANGE

BUTTERFLY VALVE

CHECK VALVE

FLEX CONNECTION

FLOW ARROW

FM FLOW METER

GATE VALVE

GLOBE VALVE

HOSE GATE DRAIN VALVE

IF

INSULATING FLANGE

MV

MANUAL AIR VENT ASSEMBLY

- SEE SPECIFICATIONS FOR

APPROPRIATE VALVE TYPE

M METER

M MOTORIZED CONTROL VALVE

OS&Y

OUTSIDE SCREW & YOKE VALVE

PIPE WITH HEAT TRACE

PLUG VALVE

PRESSURE GUAGE

SELF CONTAINED PRESSURE

REDUCING (REGULATING)

VALVE

PUMP

REDUCER (CONCENTRIC)

RELIEF, SAFETY OR THERMAL

RELIEF VALVE

REMOVABLE CAP

REMOVABLE PLUG

S STRAINER

SUCTION DIFFUSER

TEST CONNECTION

THERMOMETER

UNION

Y-TYPE STRAINER

SRC SPRING RETURN CLOSED BALL

VALVE

PIPELINE ABBREVIATIONS

MECHANICAL ABBREVIATIONS GENERAL NOTES:

DETAIL / ENLARGED

CALLOUT SYMBOL

A

M-001

INDICATES

LIMITS OF

DETAIL/SECTION

DETAIL/SECTION

DESIGNATOR

SHEET WHERE

DETAIL/SECTION IS

SHOWN

DETAIL/SECTION TITLE

TITLE

A1

LOCATION WHERE

DETAIL / SECTION

IS SHOWN ON

SHEET

SECTION CUT SYMBOL

A

M-001

INDICATES PERSPECTIVE

AND LIMITS OF SECTION

SECTION

DESIGNATOR

DRAWING WHERE

SECTION IS SHOWN

CONSTRUCTION INTERFACE

DEMOLITION

EXISTING

NEW

EXISTING

(E) EXISTING

NEW

(D) DEMOLITION

AIR DISTRIBUTION DEVICE

IDENTIFICATION

AIR FLOW NECK SIZE

QUANTITY

SYSTEM TYPE SPEC. TYPE

SA-A

(2)175-8Ø

1. LEGEND IS GENERAL IN NATURE AND MAY INDICATE MORE INFORMATION THAN IS APPLICABLE TO PROJECT. SEE PLANS FOR

SPECIFIC SYMBOLS AND ABBREVIATIONS.

2. PROVIDE ALL MATERIALS, VALVES, HANGERS, ETC. AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED, AND AS REQUIRED BY CODE.

3. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS, CONTRACT DOCUMENTS, AND APPLICABLE CODES AND REGULATIONS.

4. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH STRUCTURAL, CIVIL, ELECTRICAL WORK, ETC., SHOWN ON OTHER

CONTRACT DOCUMENT DRAWINGS.

5. UNLESS OTHERWISE INDICATED MAINTAIN A MINIMUM OF 6'-8" CLEARANCE TO UNDERSIDE OF PIPES, CONDUITS, ETC., THROUGHOUT ACCESS ROUTES AND IN MECHANICAL ROOMS.

6. LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS, CONTROLS, AND VALVING.

7. VERIFY DIMENSIONS AND CONNECTION SIZE WITH FURNISHED EQUIPMENT.

8. ALL ELEVATIONS ARE ABOVE FINISHED FLOOR TO BOTTOM OF DUCT, PIPE, OR PIPE INSULATION UNLESS NOTED OTHERWISE.

9. ALL DUCTWORK DIMENSIONS REFER TO INSIDE CLEAR AREA.

10. DUCT STATIC PRESSURE CLASSIFICATION: UNLESS OTHERWISE INDICATED, CONSTRUCT DUCTS ON THE DISCHARGE SIDE OF FANS AND ACU TO HAVE 1.0 IN. W.C. POSITIVE PRESSURE AND DUCTS ON THE INLET SIDE OF EQUIPMENT TO HAVE 1.0 IN. W.C.

NEGATIVE PRESSURE CLASSIFICATIONS. DUCTS ON OUTLET SIDE OF AHU'S SHALL HAVE 3.0 INCH POSITIVE PRESSURE CLASS

DUCT.

11. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR CREATION OF MECHANICAL COORDINATION DRAWINGS BASED ON ACTUAL

FIELD CONDITIONS PRIOR TO DEMOLITION AND NEW WORK.

12. COORDINATE ALL WALL AND ROOF PENETRATIONS WITH STRUCTURAL AND ARCHITECTURAL PLANS.

13. INSTALL TEMPERATURE CONTROLS AT 48" ABOVE FINISHED FLOOR AND COORDINATE WITH OTHER DEVICES LOCATED ON WALLS.

COORDINATE WITH ARCHITECTURAL WALL FINISHES.

14. LABORATORY OCCUPANCY SENSORS SHALL BE PROVIDED BY DIVISION 23. WIRE OCCUPANCY SENSOR BACK TO EXISTING DELTA

CONTROLLER.

15. UNLESS NOTED OTHERWISE, THE MECHANICAL CONTRACTOR SHALL REMOVE FROM THE PROPERTY ALL PIPE AND EQUIPMENT HANGERS, SUPPORTS, STRAPS, STANDS, ETC., ASSOCIATED WITH ANY WORK IDENTIFIED TO BE DEMOLISHED OR REMOVED IN THESE PLANS. THE MECHANICAL CONTRACTOR SHALL PROPERLY DISPOSE OF ALL EQUIPMENT AND MATERIALS PER FEDERAL

AND LOCAL LAWS.

16. CONTRACTOR SHALL AIR BALANCE ALL GRILLES TO CFM'S SHOWN ON PLANS.

17. MOUNT ALL OVERHEAD MECHANICAL EQUIPMENT AND FIXTURES WEIGHING 31 POUNDS OR MORE TO SUPPORTS THAT SHALL RESIST FORCES OF 0.5 TIMES THE EQUIPMENT WEIGHT IN ANY HORIZONTAL DIRECTION AND 1.5 TIMES THE EQUIPMENT WEIGHT IN

THE DOWNWARD DIRECTION.

BLWDN BLOWDOWN

CD CONDENSATE DRAIN

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CR CONDENSATE RETURN

CT CHEMICAL TREATMENT

CTB COOLING TOWER BLOWDOWN

CWR CONDENSER WATER RETURN

CWS CONDENSER WATER SUPPLY

D DEMOLITION

DI DEIONIZED WATER

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

HPS HIGH PRESSURE STEAM

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

LPS LOW PRESSURE STEAM

MPS MEDIUM PRESSURE STEAM

MW MAKEUP WATER (AFTER BACKFLOW

PREVENTER)

N NITROGEN

NG NATURAL GAS

O OXYGEN

PCR PUMPED CONDENSATE RETURN

V VACUUM

IH INFRARED HEATER

IN. W.C INCHES WATER COLUMN

L LOUVER

LAT LEAVING AIR TEMPERATURE

LR LONG RADIUS

LWT LEAVING WATER TEMPERATURE

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAU MAKEUP AIR UNIT

MFR MANUFACTURER

MJ MECHANICAL JOINT

MW MAKE-UP WATER (AFTER BACKFLOW

PREVENTER)

NC NORMALLY CLOSED (FAIL POSITION)

NG NATURAL GAS

NO NORMALLY OPEN (FAIL POSITION)

OA OUTSIDE AIR

OB OPPOSED BLADE

OD OVERFLOW DRAIN

PB PARALLEL BLADE

PCW PROCESS COLD WATER

PFX PLATE AND FRAME HEAT EXCHANGER

PSIA POUNDS PER SQUARE INCH ABSOLUTE

PSIG POUNDS PER SQUARE INCH GAUGE

RA RETURN AIR

RED REDUCER-REDUCING

RG REFRIGERANT HOT GAS DISCHARGE

RL REFRIGERANT LIQUID

RMJ RESTRAINED MECHANICAL JOINT

RS REFRIGERANT SUCTION

SA SUPPLY AIR

SCH SCHEDULE

SCR SPRING RETURN CLOSED

SHR SHORT RADIUS

SP STATIC PRESSURE SENSOR

SR SUPPLY REGISTER

ST STEAM TRAP

STM STEAM

SW SOCKET WELD

TA TRANSFER AIR

TOA TREATED OUTSIDE AIR

TOC TOP OF CONCRETE

TOD TOP OF DUCT

TOS TOP OF STEEL

UH UNIT HEATER

V VENT

VAV VARIABLE AIR VOLUME

VFD VARIABLE FREQUENCY DRIVE

VRF VARIABLE REFRIGERANT FLOW

WB WET BULB

WE WELD END

WN WELD NECK

(D) DEMOLISHED

(E) EXISTING

12"Ø ROUND DUCT DIMENSION

24x12 RECTANGULAR DUCT DIMENSION (INCHES)

ACU AIR CONDITIONING UNIT

AFF ABOVE FINISHED FLOOR

AFMS AIR FLOW MEASURING STATION

AHU AIR HANDLING UNIT

ARF ABOVE RAISED FLOOR

AS AIR SEPARATOR

BBO BOILER BLOW-OFF

BOD BOTTOM OF DUCT

BOP BOTTOM OF PIPE

BP BOOSTER PUMP

BS BRANCH SELECTOR (VRF SYSTEM)

CF CEILING FAN

CFM CUBIC FEET PER MINUTE

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CL CENTER LINE OF PIPE ELEVATION

CONC CONCENTRIC

COND COOLING COIL CONDENSATE DRAIN

CRAC COMPUTER ROOM AIR CONDITIONER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

DB DRY BULB

DH DEHUMIDIFIER

DN DOWN

DRG DIFFUSER, REGISTER, GRILLE

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EF EXHAUST FAN

EG EXHAUST GRILLE

EL ELEVATION

ELL ELBOW

EMCS ENERGY MANAGEMENT CONTROL SYSTEM

ER AUST REGISTER

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

EWT ENTERING WATER TEMPERATURE

FCU FAN COIL UNIT

FD FEEDWATER

FF FLAT FACED

FO FLAT OVAL

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

HWB HEATING HOT WATER BOILER

HWP HEATING HOT WATER PUMP

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

I.E. INVERT ELEVATION

IA INSTRUMENT AIR

U

S

D

A

-- USDA

NO. DATE BY DESCRIPTION

REVISIONS

Agricultural Research Service

DWG. NO.

SHEET OF

PROJECT MANAGER EPM

DESIGNER

CHECKED BY

DRAWN BY REAL PROPERTY

SAFETY & HEALTH

RPR

SPECIFICATION NO.

DATE

R.DARNELL

LOUVIERE, STRATTON & YOKEL, LLC

8484 GEORGIA AVENUE, SUITE 650, SILVER

SPRING, MD 20910

(301) 588-1500

BURNS & McDONNELL

8201 NORMAN CENTER DR. SUITE 500

BLOOMINGTON, MN 55437

(952) 656-6003

FINAL SUBMISSION07/13/21

CAROLYN WILLIAMS

RLP

M-001

MECHANICAL NOTES, LEGEND, SYMBOLS & ABBREVIATIONS

USDA CARL HAYDEN BEE RESEARCH CENTER - TUCSON, AZ

A.GIANPETRO

M.CAIN

R.PEARSON

07/13/2021

3 4 5 6 7 8 9

B

C

D

E

72"x14" (E) RA

42"x14" (E) RA

7"x15" (E) RA

15"x26" (E) RA

10"x7" (E) RA

10"x6" (E) SA

15"x10" (E) SA

24"x13" (E) SA

12"x12" (E) SA

26"x15" (E) RA

26"x15" (E) RA

32"x12" (E) SA

8"x10" (E) SA

14"x10" (E) RA

10"x8" (E) RA

12"x8" (E) RA

15"x26" (E) RA UP

15"x12" (E) SA UP

24"x13" (E) SA UP

26"x15" (E) RA UP8"x10" (E) SA UP

MECHANICAL

ROOM

B-2

BOILER ROOM

B-4

TELEPHONE

B-6

STAIRWELL

B-3

FITNESS ROOM

STORAGE

ADMIN STORAGE

ELECTROPHYSIOLOGY

LAB

STORAGE

LAB

STORAGE

LAB

TOILET

STORAGE

STORAGE

CORRIDOR

BREAK ROOM

STORAGE

012A

VESTIBULE

(D) FCU

18"x18" RA

20"x12"

20"x12"

(D) AC UNIT

"x

(E

R A

(TYP. 11)

24"x20" TA

(D)12"x12"EA

GRILLE SA

CAP 10"x10" OA UP

RA

24"x12" RA

(D) FCU

(D) FCU

(D) FCU

(D) 8x8 EA GRILLE

(D) 8x8 SA GRILLE

(D) 8x8 RA GRILLE

24"x18" (E)

SA GRILLE

(E) 24"x24" RA

24"x24" (E) SA

(D) 12x12 RA GRILLE

48"x12" (E) RA GRILLE

(D) FCU

48"x24" (E) RA GRILLE (TYP 4)15"x26" (E) RA

80"x12" (E) OA

(E) AC-1

(E) AHU-1

(E) AC-2

24"x30" (E) OA

U

S

D

A

-- USDA

NO. DATE BY DESCRIPTION

REVISIONS

Agricultural Research Service

DWG. NO.

SHEET OF

PROJECT MANAGER EPM

DESIGNER

CHECKED BY

DRAWN BY REAL PROPERTY

SAFETY & HEALTH

RPR

SPECIFICATION NO.

DATE

R.DARNELL

LOUVIERE, STRATTON & YOKEL, LLC

8484 GEORGIA AVENUE, SUITE 650, SILVER

SPRING, MD 20910

(301) 588-1500

BURNS & McDONNELL

8201 NORMAN CENTER DR. SUITE 500

BLOOMINGTON, MN 55437

(952) 656-6003

FINAL SUBMISSION07/13/21

CAROLYN WILLIAMS

RLP

MD100

MECHANICAL DEMOLITION PLAN - BASEMENT

USDA CARL HAYDEN BEE RESEARCH CENTER - TUCSON, AZ

A.GIANPETRO

M.CAIN

R.PEARSON

07/13/2021

1/8" = 1'-0"1

MECHANICAL DEMOLITION PLAN -

BASEMENT

GENERAL NOTES:

KEYED NOTES:

1. FOR MECHANICAL GENERAL NOTES AND SYMBOLS,

SEE M-001.

2. CONTRACTOR SHALL FIELD VERIFY EXISTING

UTILITIES (DUCTWORK, PIPING, STRUCTURE,

ELECTRICAL, ETC.) ABOVE CEILING PRIOR TO

DEMOLITION AND NEW WORK TO COORDINATE

FINAL LOCATION OF NEW DUCTWORK, PIPING, AND

EQUIPMENT. NEW ROUTING SHOWN ON PLAN IS

PREFERRED ROUTING ONLY AND MAY BE

RELOCATED TO COORDINATE WITH EXISTING

CONDITIONS. RELOCATING EXISTING OR NEW

DUCTWORK/PIPING/EQUIPMENT FROM WHAT IS

SHOWN SHALL BE A NO-COST CHANGE TO THE

GOVERNMENT.

8'4' 16'0

SCALE: 1/8"=1'-0"

1 DEMOLISH EXISTING HVAC IN THIS ROOM.

2 DEMOLISH FAN COIL UNIT BELOW CEILING AND

ALL ASSOCIATED DUCTWORK, GRILLES, AND

DRAIN PIPING. SEE ARCH DWGS FOR CEILING

PATCHING AND REPAIR.

3 DEMOLISH EXISTING SIDEWALL GRILLES AND

ASSOCIATED DUCTWORK. SEE ARCH DWGS FOR

WALL PATCHING AND REPAIR.

4 DEMOLISH AC UNIT MOUNTED IN WALL. SEE

ARCH DWGS FOR WALL PATCHING AND REPAIR.

DEMOLISH FAN COIL UNIT ABOVE CEILING AND

ALL ASSOCIATED DUCTWORK, GRILLES, AND

DRAIN PIPING.

DEMOLISH FAN COIL UNIT ABOVE CEILING AND

ALL ASSOCIATED DUCTWORK AND DRAIN

PIPING. CEILING MOUNTED DIFFUSERS AND

GRILLES TO REMAIN.

TRUE NORTH

C

D

E

16"x16" (E) EA

16"x16" (E) EA 16"x16" (E) EA

15"x12" (E) SA

30"x10" (E) SA

16"x9" (E) SA

16"x16" (E) RA

14"x16" (E) SA

16"ø (E) RA UP

8"x10" (E) SA24"x16" (E) SA

16"x16" (E) EA

16"ø (E) EA UP

LABORATORY

LABORATORY

LABORATORY

LABORATORY

STUDENT

COMPUTER RM

STUDENT

COMPUTER RM

BREAK ROOM

LABORATORY

LABORATORY

LABORATORY

LABORATORY

STORAGE

LABORATORY

"ø

E

S

A 18"x14" (E) SA

THRU ROOF

(TYP ALL HOODS)

TO FCU-7

ON ROOF

14"x16" (E) SA UP

TO FCU-7 ON

ROOF

24"x24" (E) EA UP

THRU ROOF

24"x13" (E) SA

16"x16" (E) RA DN

THRU FLOOR

16"x16" (E) EA UP

THRU ROOF

16"x16" (E) EA

18"x18" (E) EA 18"x18" (E) EA

16"ø (E) EA UP16"ø (E) EA UP

T T T T T

TTT

LABORATORY

T

28"x14" (E) OA UP

1 1

2 (D) ACU-3

(D) ACU-2

(D) ACU-1

(D) ACU-4

(D) ACU-5

(E) ACU-10 (D) ACU-6

(D) ACU-8

(D) ACU-9

16"x14" (E) OA UP

THRU ROOF TO

REMAIN (TYP ALL)

T

U

S

D

A

-- USDA

NO. DATE BY DESCRIPTION

REVISIONS

Agricultural Research Service

DWG. NO.

SHEET OF

PROJECT MANAGER EPM

DESIGNER

CHECKED BY

DRAWN BY REAL PROPERTY

SAFETY & HEALTH

RPR

SPECIFICATION NO.

DATE

R.DARNELL

LOUVIERE, STRATTON & YOKEL, LLC

8484 GEORGIA AVENUE, SUITE 650, SILVER

SPRING, MD 20910

(301) 588-1500

BURNS & McDONNELL

8201 NORMAN CENTER DR. SUITE 500

BLOOMINGTON, MN 55437

(952) 656-6003

FINAL SUBMISSION07/13/21

CAROLYN WILLIAMS

RLP

MD101

MECHANICAL DEMOLITION PLAN - FIRST FLOOR

USDA CARL HAYDEN BEE RESEARCH CENTER - TUCSON, AZ

A.GIANPETRO

M.CAIN

R.PEARSON

07/13/2021

1/8" = 1'-0"1

MECHANICAL DEMOLITION PLAN - FIRST

FLOOR

GENERAL NOTES:

KEYED NOTES:

8'4' 16'0

SCALE: 1/8"=1'-0"

1 DEMOLISH THERMOSTAT AND CONTROL WIRING.

SEE M-101 FOR NEW WORK.

2 DEMOLISH FAN COIL UNIT IN IT'S ENTIRETY.

DEMOLISH INTAKE DUCTWORK TO 16"X14" UP

AND TEMPORARILY CAP FOR CONNECTION TO

DUCTWORK IN NEW WORK. SEE M-101 FOR NEW

WORK.

3 EXISTING EA DUCTWORK SERVING FUME HOOD

AND LABORATORY TO REMAIN.

1. FOR MECHANICAL GENERAL NOTES AND SYMBOLS,

SEE M-001.

2. CONTRACTOR SHALL FIELD VERIFY EXISTING

UTILITIES (DUCTWORK, PIPING, STRUCTURE,

ELECTRICAL, ETC.) PRIOR TO DEMOLITION AND

NEW WORK TO COORDINATE FINAL LOCATION OF

NEW DUCTWORK, PIPING, AND EQUIPMENT. NEW

ROUTING SHOWN ON PLAN IS PREFERRED

ROUTING ONLY AND MAY BE RELOCATED TO

COORDINATE WITH EXISTING CONDITIONS.

RELOCATING EXISTING OR NEW

DUCTWORK/PIPING/EQUIPMENT FROM WHAT IS

SHOWN SHALL BE A NO-COST CHANGE TO THE

GOVERNMENT.

3 4 5 6 7 8 9

A

B

C

D

E

MECHANICAL

ROOM

B-2

STAIRWELL

B-3

BOILER ROOM

B-4

TELEPHONE

B-6

STORAGE

STORAGE

LAB

TOILET

VESTIBULE

STORAGE

012A

STORAGE

BREAK ROOM

CORRIDOR

LAB

ADMIN STORAGE

021STORAGE

FITNESS ROOM

ELECTROPHYSIOLOGY

LAB

STORAGE

(D) FCU

(D) FCU

(D) FCU

(D) FCU

(D) FCU

(D) FCU

3/4" (E) HWS

1" (E) HWS

1 1/4" (E) HWS

1 1/4" (E) HWS

2" (E) CHWR

3" (E) CHWR

1 1/2" (E) HWR

1 1/2" (E) HWR

2 1/2" (E) CHWR

2" (E) CHWS

2" (E) CHWS

1" (E) CHWR

1" (E) CHWS

1" (E) HWR

1" (E) HWS

1 1/4" (E) HWS UP

2" (E) CHWR UP

2" (E) CHWS UP

1 1/2" (E) HWR UP

1 1/4" (E) HWS UP

U

S

D

A

-- USDA

NO. DATE BY DESCRIPTION

REVISIONS

Agricultural Research Service

DWG. NO.

SHEET OF

PROJECT MANAGER EPM

DESIGNER

CHECKED BY

DRAWN BY REAL PROPERTY

SAFETY & HEALTH

RPR

SPECIFICATION NO.

DATE

R.DARNELL

LOUVIERE, STRATTON & YOKEL, LLC

8484 GEORGIA AVENUE, SUITE 650, SILVER

SPRING, MD 20910

(301) 588-1500

BURNS & McDONNELL

8201 NORMAN CENTER DR. SUITE 500

BLOOMINGTON, MN 55437

(952) 656-6003

FINAL SUBMISSION07/13/21

CAROLYN WILLIAMS

RLP

MD200

MECHANICAL PIPING DEMOLITION - BASEMENT

USDA CARL HAYDEN BEE RESEARCH CENTER - TUCSON, AZ

A.GIANPETRO

R.PEARSON

R.PEARSON

07/13/2021

1/8" = 1'-0"1

MECHANICAL PIPING DEMOLITION -

BASEMENT

GENERAL NOTES:

KEYED NOTES:

1. FOR MECHANICAL GENERAL NOTES AND SYMBOLS,

SEE M-001.

2. CONTRACTOR SHALL FIELD VERIFY EXISTING

UTILITIES (DUCTWORK, PIPING, STRUCTURE,

ELECTRICAL, ETC.) ABOVE CEILING PRIOR TO

DEMOLITION AND NEW WORK TO COORDINATE

FINAL LOCATION OF NEW DUCTWORK, PIPING, AND

EQUIPMENT. NEW ROUTING SHOWN ON PLAN IS

PREFERRED ROUTING ONLY AND MAY BE

RELOCATED TO COORDINATE WITH EXISTING

CONDITIONS. RELOCATING EXISTING OR NEW

DUCTWORK/PIPING/EQUIPMENT FROM WHAT IS

SHOWN SHALL BE A NO-COST CHANGE TO THE

GOVERNMENT.

TRUE NORTH

DEMOLISH EXISTING HVAC IN THIS ROOM AND

CAP PIPING.

DEMOLISH FAN COIL UNIT BELOW CEILING AND

ALL ASSOCIATED PIPING BACK TO MAIN AND

CAP. SEE ARCH DWGS FOR CEILING PATCHING

AND REPAIR. DEMOLISH CONDENSATE DRAIN

PIPING.

DEMOLISH FAN COIL UNIT ABOVE CEILING AND

ALL ASSOCIATED PIPING BACK TO MAIN AND

CAP. DEMOLISH CONDENSATE DRAIN PIPING.

DEMOLISH FAN COIL UNIT ABOVE CEILING.

DEMOLISH UNIT PIPING CONNECTIONS AND

TEMPORARILY CAP PIPING FOR CONNECTION TO

NEW FAN COIL UNIT, ACU-12. DEMOLISH

CONDENSATE DRAIN PIPING.

8'4' 16'0

SCALE: 1/8"=1'-0"

2 3 4 5 6 7 8

C

D

MD202

LABORATORY

LABORATORY

LABORATORY

LABORATORY

STORAGE

LABORATORY

LABORATORY

CORRIDOR

STUDENT

COMPUTER RM

BREAK ROOM

STUDENT

COMPUTER RM

LABORATORY

LABORATORY

LABORATORY

LABORATORY

PREPARATION

TRANSFER ROOM

U

S

D

A

-- USDA

NO. DATE BY DESCRIPTION

REVISIONS

Agricultural Research Service

DWG. NO.

SHEET OF

PROJECT MANAGER EPM

DESIGNER

CHECKED BY

DRAWN BY REAL PROPERTY

SAFETY & HEALTH

RPR

SPECIFICATION NO.

DATE

R.DARNELL

LOUVIERE, STRATTON & YOKEL, LLC

8484 GEORGIA AVENUE, SUITE 650, SILVER

SPRING, MD 20910

(301) 588-1500

BURNS & McDONNELL

8201 NORMAN CENTER DR. SUITE 500

BLOOMINGTON, MN 55437

(952) 656-6003

FINAL SUBMISSION07/13/21

CAROLYN WILLIAMS

RLP

MD201

MECHANICAL PIPING DEMOLITION - FIRST FLOOR

USDA CARL HAYDEN BEE RESEARCH CENTER - TUCSON, AZ

A.GIANPETRO

M.CAIN

R.PEARSON

07/13/2021

GENERAL NOTES:

1/8" = 1'-0"1

MECHANICAL PIPING DEMOLITION - FIRST

FLOOR

8'4' 16'0

SCALE: 1/8"=1'-0"

1. FOR MECHANICAL GENERAL NOTES AND SYMBOLS,

SEE M-001.

2. CONTRACTOR SHALL FIELD VERIFY EXISTING

UTILITIES (DUCTWORK, PIPING, STRUCTURE,

ELECTRICAL, ETC.) PRIOR TO DEMOLITION AND

NEW WORK TO COORDINATE FINAL LOCATION OF

NEW DUCTWORK, PIPING, AND EQUIPMENT. NEW

ROUTING SHOWN ON PLAN IS PREFERRED

ROUTING ONLY AND MAY BE RELOCATED TO

COORDINATE WITH EXISTING CONDITIONS.

RELOCATING EXISTING OR NEW

DUCTWORK/PIPING/EQUIPMENT FROM WHAT IS

SHOWN SHALL BE A NO-COST CHANGE TO THE

4 5 6 7

C

(D) 1/2" HWS

(D) 1/2" HWR

(D) 1" CHWS

(D) 1" CHWR

(D) 1/2" HWS

(D) 1/2" HWR

(D) 1" CHWS

(D) 1" CHWR

(D) ACU-4

(D) 1/2" HWS

(D) 1/2" HWR

(D) 1" CHWS

(D) 1" CHWR

(D) 1/2" HWS

(D) 1/2" HWR

(D) 1" CHWS

(D) 1" CHWR

(D) 1/2" HWS

(D) 1/2" HWR

(D) 1" CHWS

(D) 1" CHWR

(D) 1/2" HWS

(D) 1/2" HWR

(D) 1" CHWS

(D) 1" CHWR

(D) 1/2" HWS

(D) 1/2" HWR

(D) 1" CHWS

(D) 1" CHWR

(D) 1/2" HWS

(D) 1/2" HWR

(D) 1" CHWS

(D) 1" CHWR

1/2" (E) HWS

1/2" (E) HWR

1" (E) CHWS

1" (E) CHWR

1 1

(D) ACU-3(D) ACU-2(D) ACU-1 (D) ACU-5

(D) ACU-6(D) ACU-8(D) ACU-9(E) ACU-10

3/4" (E) HWS UP

(TYP ALL)

3/4" (E) HWR UP

(TYP ALL)

1 1/2" (E) CHWS UP

(TYP ALL)

1 1/2" (E) CHWR UP

(TYP ALL)

LABORATORY

LABORATORY

LABORATORY

LABORATORY

LABORATORY

LABORATORY

ANNEX

LABORATORY

STUDENT

COMPUTER RM

BREAK ROOM

LABORATORY

U

S

D

A

-- USDA

NO. DATE BY DESCRIPTION

REVISIONS

Agricultural Research Service

DWG. NO.

SHEET OF

PROJECT MANAGER EPM

DESIGNER

CHECKED BY

DRAWN BY REAL PROPERTY

SAFETY & HEALTH

RPR

SPECIFICATION NO.

DATE

R.DARNELL

LOUVIERE, STRATTON & YOKEL, LLC

8484 GEORGIA AVENUE, SUITE 650, SILVER

SPRING, MD 20910

(301) 588-1500

BURNS & McDONNELL

8201 NORMAN CENTER DR. SUITE 500

BLOOMINGTON, MN 55437

(952) 656-6003

FINAL SUBMISSION07/13/21

CAROLYN WILLIAMS

RLP

MD202

MECHANICAL ENLARGED PIPING DEMOLITION - FIRST FLOOR

USDA CARL HAYDEN BEE RESEARCH CENTER - TUCSON, AZ

A.GIANPETRO

M.CAIN

R.PEARSON

07/13/2021

GENERAL NOTES:

KEYED NOTES:

1/4" = 1'-0"1

MECHANICAL ENLARGED PIPING

DEMOLITION - FIRST FLOOR

0 2' 4' 8'

SCALE: 1/4" = 1'-0"

1 DEMOLISH CHWS, CHWR, HWS, AND HWR PIPING

AND VALVES BACK TO WALL. PROVIDE NEW

ISOLATION VALVE AND TEMPORARILY CAP FOR

CONNECTION TO NEW WORK. DEMOLISH

CONDENSATE DRAIN PIPING TO FLOOR AND

TEMPORARILY CAP FOR CONNECTION TO NEW

WORK. SEE MP101.

EXISTING CHW AND HHW PIPE RISERS FROM

BASEMENT TO FIRST FLOOR LABS TO REMAIN.

EXISTING TO REMAIN.

1. FOR MECHANICAL GENERAL NOTES AND SYMBOLS,

SEE M-001.

2. CONTRACTOR SHALL FIELD VERIFY EXISTING

UTILITIES (DUCTWORK, PIPING, STRUCTURE,

ELECTRICAL, ETC.) PRIOR TO DEMOLITION AND

NEW WORK TO COORDINATE FINAL LOCATION OF

NEW DUCTWORK, PIPING, AND EQUIPMENT. NEW

ROUTING SHOWN ON PLAN IS PREFERRED

ROUTING ONLY AND MAY BE RELOCATED TO

COORDINATE WITH EXISTING CONDITIONS.

RELOCATING EXISTING OR NEW

DUCTWORK/PIPING/EQUIPMENT FROM WHAT IS

SHOWN SHALL BE A NO-COST CHANGE TO THE

GOVERNMENT.

TRUE NORTH

(TYP)

S D

3 4 5 6 7 8 9

B

C

D

E

72"x14" (E) RA

42"x14" (E) RA

7"x15" (E) RA

15"x26" (E) RA

10"x7" (E) RA

10"x6" (E) SA 15"x10" (E) SA

24"x13" (E) SA

12"x12" (E) SA

26"x15" (E) RA

26"x15" (E) RA

32"x12" (E) SA

8"x10" (E) SA

14"x10" (E) RA

10"x8" (E) RA

12"x8" (E) RA

15"x26" (E) RA UP

15"x12" (E) SA UP

24"x13" (E) SA UP

26"x15" (E) RA UP

8"x10" (E) SA UP

MECHANICAL

ROOM

B-2

BOILER ROOM

B-4

TELEPHONE

B-6

STAIRWELL

B-3

FITNESS ROOM

STORAGE

ADMIN STORAGE

ELECTROPHYSIOLOGY

LAB

STORAGE

LAB

STORAGE

011LAB

TOILET

STORAGE

STORAGE

CORRIDOR

BREAK ROOM

STORAGE

012A

VESTIBULE

"x

(E

R A

T

ACU-11

0-6"ø

(E) SA-A

SA-

265-20"x16"

(TYP 10)

295-8"ø

SA-A

75-6"ø

SA-A

115-6"ø

SA-A

115-6"ø

SA-A

50-6"ø

SA-A

115-6"ø

SA-A

115-6"ø

SA-A

145-6"ø

SA-A

185-6"ø

SA-A

(E) 24"x24" RA

75-6"ø

SA-A

50-6"ø

SA-A

ACU-12

48"x24" (E) RA

(TYP 2)

48"x24" (E) RA

(TYP 2)

10"ø OA

16"x12" RA 16"x12" RA

12"x12" RA

8"x8" RA

"x

R A

8"x8" RA

48"x12" (E) RA

"x

S A

12"x12" RA

8"x8" RA

14"x12" SA

"x

S A

12"x10" SA

20"x12" SA

20"x12" SA DN

12"ø OA

8"x8" SA

8"x8" RA

18"x12" SA

10"x10" SA

10"x10" SA

12"x10" SA

12"x12" RA

16"x12" RA T

VOLUME DAMPER (TYP)

EX

(E) AC-1

(E) AC-2

(E) AHU-1

24"x30" (E) OA

15"x26" (E) RA

80"x12" (E) OA

U

S

D

A

-- USDA

NO. DATE BY DESCRIPTION

REVISIONS

Agricultural Research Service

DWG. NO.

SHEET OF

PROJECT MANAGER EPM

DESIGNER

CHECKED BY

DRAWN BY REAL PROPERTY

SAFETY & HEALTH

RPR

SPECIFICATION NO.

DATE

R.DARNELL

LOUVIERE, STRATTON & YOKEL, LLC

8484 GEORGIA AVENUE, SUITE 650, SILVER

SPRING, MD 20910

(301) 588-1500

BURNS & McDONNELL

8201 NORMAN CENTER DR. SUITE 500

BLOOMINGTON, MN 55437

(952) 656-6003

FINAL SUBMISSION07/13/21

CAROLYN WILLIAMS

RLP

MH100

MECHANICAL PLAN - BASEMENT

USDA CARL HAYDEN BEE RESEARCH CENTER - TUCSON, AZ

A.GIANPETRO

M.CAIN

R.PEARSON

07/13/2021

1/8" = 1'-0"1

MECHANICAL PLAN - BASEMENT

8'4' 16'0

SCALE: 1/8"=1'-0"

GENERAL NOTES: KEYED NOTES:

1. FOR MECHANICAL GENERAL NOTES AND SYMBOLS,

SEE M-001.

2. MAINTAIN ALL MANUFACTURER REQUIRED MINIMUM

UNOBSTRUCTED EQUIPMENT CLEARANCES.

3. CONTRACTOR SHALL FIELD VERIFY EXISTING

UTILITIES (DUCTWORK, PIPING, STRUCTURE,

ELECTRICAL, ETC.) ABOVE CEILING PRIOR TO

DEMOLITION AND NEW WORK TO COORDINATE

FINAL LOCATION OF NEW DUCTWORK, PIPING, AND

EQUIPMENT. NEW ROUTING SHOWN ON PLAN IS

PREFERRED ROUTING ONLY AND MAY BE

RELOCATED TO COORDINATE WITH EXISTING

CONDITIONS. RELOCATING EXISTING OR NEW

DUCTWORK/PIPING/EQUIPMENT FROM WHAT IS

SHOWN SHALL BE A NO-COST CHANGE TO THE

GOVERNMENT.

4. ALL DUCTWORK CONNECTIONS TO FAN POWERED

EQUIPMENT SHALL HAVE A FLEXIBLE DUCT

CONNECTOR. TYPICAL.

5. GENERAL CONTRACTOR SHALL ENGAGE USDA SITE

EXISTING CONTROLS VENDOR TO INTEGRATE NEW

MECHANICAL EQUIPMENT INTO EXISTING DELTA

BACnet CONTROLS SYSTEM WITHIN THE SCOPE OF

THIS PROJECT.

ADVANCED CONTROLS CORPORATION

ATTN: BRIAN GARDNER

520-620-6656 X29

520-591-9349 CELL

BRIANG@ADVANCEDCONTROLS.NET

1 RE-BALANCE EXISTING SUPPLY AIR DIFFUSERS

TO 130 CFM - TYPICAL 10.

2 RE-BALANCE EXISTING SUPPLY AIR DIFFUSERS TO

265 CFM.

NEW 24"x12" RA-B GRILLE LAY-IN GRILLE.

ROUTE EQUIPMENT CONDENSATE DRAIN TO

NEAREST FLOOR SINK IN MECHANICAL ROOM B-2.

MAINTAIN MINIMUM 1% SLOPE ON CONDENSATE

DRAIN PIPING.

OA AND RA DUCTS DOWN TO UNIT

MANUFACTURERS AIR MIXING BOX CONNECTIONS.

MOUNT ACU-11 ON 4" CONCRETE EQUIPMENT PAD.

PROVIDE VIBRATION ISOLATION PADS. MAINTAIN

MINIMUM 37" EQUIPMENT CLEARANCES ON COIL

CONNECTION SIDE OF UNIT.

ABANDON EXISTING RA GRILLE IN CEILING.

TRANSITION NEW RA DUCT TO EXISTING RA

GRILLE CONNECTION SIZE.

FIELD ROUTE NEW INSULATED OA DUCT AND

TERMINATE AT EXISTING INTAKE LOUVER IN

BOILER RM EXTERIOR WALL.

FIELD ROUTE NEW INSULATED OA DUCT TO

EXISTING 80"x12" OA PLENUM IN MECHANICAL

ROOM AND CONNECT.

INSTALL NEW DUCT SMOKE DETECTOR INTO

EXISTING SUPPLY AIR DUCT. INTEGRATE INTO

EXISTING LOCAL FIRE ALARM CONTROL PANEL.

BID OPTION NO. 01:

CONTRACT A CERTIFIED TAB CONTRACTOR TO

PERFORM TESTING, ADJUSTMENTS, AND

BALANCING (TAB) ON EXISTING VAV AIR HANDLING

SYSTEM SERVING THE FIRST FLOOR, EXISTING

CHILLED WATER SYSTEM SERVING THE BUILDING,

AND EXISTING HEATING HOT WATER SYSTEM

SERVING THE BUILDING. THIS IS IN ADDITION TO

THE NEW WORK SHOWN ON THE DRAWINGS.

PROVIDE CERTIFIED TAB REPORTS FOR REVIEW

AND COMMENT. REFER TO 23 05 93 FOR TESTING,

ADJUSTING, AND BALANCING REQUIREMENTS.

(TYP)

TRUE NORTH

4 5

BID OPTION #01

BID OPTION #01

1 2

3 4 5 6 7 8

B

C

D

E

16"x16" (E) EA 16"x16" (E) EA 16"x16" (E) EA

15"x12" (E) SA

30"x10" (E) SA

16"x9" (E) SA

16"x16" (E) RA

14"x16" (E) SA

16"ø (E) RA UP

8"x10" (E) SA24"x16" (E) SA

16"x16" (E) EA

16"ø (E) EA UP

LABORATORY

LABORATORY

LABORATORY

LABORATORY

STUDENT

COMPUTER RM

STUDENT

COMPUTER RM

BREAK ROOM

LABORATORY

LABORATORY

LABORATORY

LABORATORY

STORAGE

LABORATORY

"ø

E

S

A

18"x14" (E) SA

THRU ROOF

(TYP ALL)

THRU ROOF

(TYP ALL HOODS)

TO FCU-7

ON ROOF

14"x16" (E) SA UP

TO (E)ACU-7

ON ROOF

24"x13" (E) SA

16"x16" (E) RA DN

THRU FLOOR

16"x16" (E) EA UP

THRU ROOF

16"x16" (E) EA

18"x18" (E) EA 18"x18" (E) EA

16"ø (E) EA UP16"ø (E) EA UP

T T T T T

TTTT

LABORATORY

T

16"x14" (E) OA UP

28"x14" (E) OA

(E)ACU-10

ACU-1 ACU-2 ACU-3 ACU-4

ACU-5

ACU-6

ACU-8

ACU-9

(TYP) 24"x14" OA UP (TYP)

2 (TYP)

(E) FUME

HOOD (TYP)

20"x14" SA

DPDPDPDP

DP DP DP DP DP DP

TO (E) AC-2

CONTROLLER

TO (E) AC-1

CONTROLLER

OCC OCC OCC OCC

OCCOCCOCCOCCOCCOCC

CAPPED (E) EA UP

TO REMAIN

T

500-20"x14"

SA-C

250-18"x10"

SA-C

U

S

D

A

-- USDA

NO. DATE BY DESCRIPTION

REVISIONS

Agricultural Research Service

DWG. NO.

SHEET OF

PROJECT MANAGER EPM

DESIGNER

CHECKED BY

DRAWN BY REAL PROPERTY

SAFETY & HEALTH

RPR

SPECIFICATION NO.

DATE

R.DARNELL

LOUVIERE, STRATTON & YOKEL, LLC

8484 GEORGIA AVENUE, SUITE 650, SILVER

SPRING, MD 20910

(301) 588-1500

BURNS & McDONNELL

8201 NORMAN CENTER DR. SUITE 500

BLOOMINGTON, MN 55437

(952) 656-6003

FINAL SUBMISSION07/13/21

CAROLYN WILLIAMS

RLP

MH101

MECHANICAL PLAN - FIRST FLOOR

USDA CARL HAYDEN BEE RESEARCH CENTER - TUCSON, AZ

A.GIANPETRO

M.CAIN

R.PEARSON

07/13/2021

1/8" = 1'-0"1

MECHANICAL PLAN - FIRST FLOOR

8'4' 16'0

SCALE: 1/8"=1'-0"

GENERAL NOTES:

KEYED NOTES:

1. FOR MECHANICAL GENERAL NOTES AND SYMBOLS,

SEE M-001.

2. MAINTAIN ALL MANUFACTURER REQUIRED MINIMUM

UNOBSTRUCTED EQUIPMENT CLEARANCES.

3. CONTRACTOR SHALL FIELD VERIFY EXISTING

UTILITIES (DUCTWORK, PIPING, STRUCTURE,

ELECTRICAL, ETC.) ABOVE CEILING PRIOR TO

DEMOLITION AND NEW WORK TO COORDINATE

FINAL LOCATION OF NEW DUCTWORK, PIPING, AND

EQUIPMENT. NEW ROUTING SHOWN ON PLAN IS

PREFERRED ROUTING ONLY AND MAY BE

RELOCATED TO COORDINATE WITH EXISTING

CONDITIONS. RELOCATING EXISTING OR NEW

DUCTWORK/PIPING/EQUIPMENT FROM WHAT IS

SHOWN SHALL BE A NO-COST CHANGE TO THE

GOVERNMENT.

4. ALL DUCTWORK CONNECTIONS TO FAN POWERED

EQUIPMENT SHALL HAVE A FLEXIBLE DUCT

CONNECTOR. TYPICAL.

5. GENERAL CONTRACTOR SHALL ENGAGE USDA SITE

EXISTING CONTROLS VENDOR TO INTEGRATE NEW

MECHANICAL EQUIPMENT INTO EXISTING DELTA

BACnet CONTROLS SYSTEM WITHIN THE SCOPE OF

THIS PROJECT.

ADVANCED CONTROLS CORPORATION

ATTN: BRIAN GARDNER

520-620-6656 X29

520-591-9349 CELL

BRIANG@ADVANCEDCONTROLS.NET

1 NEW 24"x14" OA FROM ACU INLET TO EXISTING 14"x16" OA DUCT UP THROUGH ROOF. PROVIDE

FLEXIBLE DUCT CONNECTION AT UNIT.

2 EXISTING EA DUCTWORK SERVING LABORATORY

AND FUME HOODS TO REMAIN. TYPICAL ALL.

3 EXISTING ACU-7 AT ROOF TO REMAIN.

EXISTING ACU-10 AND DUCTWORK TO REMAIN.

INSTALL AND CONNECT NEW ROOM

THERMOSTAT, OCCUPANCY SENSOR, AND

DIFFERENTIAL PRESSURE SENSOR TO EXISTING

DELTA BACnet CONTROLLER SERVING

LABORATORIES.

PROVIDE WITH MANUFACTURERS AIR MIXING

BOX AND MOTORIZED DAMPERS. RA OPENING IN

BOTTOM CONNECTION. CONNECT NEW 14"x16"

OA DUCT TO END OF MIXING BOX.

BID OPTION NO. 01:

CONTRACT A CERTIFIED TAB CONTRACTOR TO

PERFORM TESTING, ADJUSTMENTS, AND

BALANCING (TAB) ON EXISTING VAV AIR

HANDLING SYSTEM SERVING THE FIRST FLOOR,

EXISTING CHILLED WATER SYSTEM SERVING

THE BUILDING, AND EXISTING HEATING HOT

WATER SYSTEM SERVING THE BUILDING. THIS IS

IN ADDITION TO THE NEW WORK SHOWN ON THE

DRAWINGS. PROVIDE CERTIFIED TAB REPORTS

FOR REVIEW AND COMMENT. REFER TO 23 05 93

FOR TESTING, ADJUSTING, AND BALANCING

REQUIREMENTS.

(TYP)

TRUE NORTH

BID OPTION #01

BID OPTION #01

BID OPTION #01

BID OPTION #01

C

D

E

MP401

MECHANICAL

ROOM

B-2

STAIRWELL

B-3

BOILER ROOM

B-4

TELEPHONE

B-6

STORAGE

STORAGE

LAB

TOILET

VESTIBULE

STORAGE

012A

STORAGE

BREAK ROOM

CORRIDOR

LAB

ADMIN STORAGE

STORAGE

FITNESS ROOM

ELECTROPHYSIOLOGY

LAB

STORAGE

ACU-11

ACU-12

1" (E) CHWR

1" (E) CHWS

1" (E) HWR

1" (E) HWS

MOTORIZED CONTROL

VALVE (TYP)

1" HWS

1" CHWS

1" CHWR

1" HWR

U

S

D

A

-- USDA

NO. DATE BY DESCRIPTION

REVISIONS

Agricultural Research Service

DWG. NO.

SHEET OF

PROJECT MANAGER EPM

DESIGNER

CHECKED BY

DRAWN BY REAL PROPERTY

SAFETY & HEALTH

RPR

SPECIFICATION NO.

DATE

R.DARNELL

LOUVIERE, STRATTON & YOKEL, LLC

8484 GEORGIA AVENUE, SUITE 650, SILVER

SPRING, MD 20910

(301) 588-1500

BURNS & McDONNELL

8201 NORMAN CENTER DR. SUITE 500

BLOOMINGTON, MN 55437

(952) 656-6003

FINAL SUBMISSION07/13/21

CAROLYN WILLIAMS

RLP

MP100

MECHANICAL PIPING PLAN - BASEMENT

USDA CARL HAYDEN BEE RESEARCH CENTER - TUCSON, AZ

A.GIANPETRO

M.CAIN

R.PEARSON

07/13/2021

1/8" = 1'-0"1

MECHANICAL PIPING PLAN - BASEMENT

8'4' 16'0

SCALE:…