TSC-Berg Window Repl Addendum 1 with attachments 11-13-2026.pdf
PDF 2 MB Posted
- Attached to
- TSC IFB2027000049
- Solicitation number
- IFB1 GJMA 2027000049 2
- Issued by
- Larimer County, Colorado
About this file
This Addendum No. 1 document modifies the contract requirements for Trinidad State College's Berg Building—Phase 2 Window Replacement project (Project Number 2023-088M22). The project involves the removal and replacement of exterior windows on the first and second floors of the Berg Building, with third-floor and fourth-floor window replacements designated as Add Alternate #1 and Add Alternate #2, respectively. Three boiler room windows from the previous phase are excluded from this work. A mandatory pre-bid walkthrough conference was held on November 9, 2026, with an attendee sign-in list attached to this addendum. Sealed hardcopy bids are due by 3:00 p.m. on November 17, 2026, submitted to Penny Bueno at Trinidad State College, Berg Building Room 109, 600 Prospect Street, Trinidad, Colorado 81082. The project requires expedited window submittal and procurement by mid-December 2026 to utilize expiring project funds. A phased work schedule must be developed in conjunction with the College to maintain continued building operations.
The contractor is responsible for all environmental abatement associated with window removal, including asbestos abatement in accordance with State Regulations, and shall assume potential lead-based paint on windows and sills pending completion of lead-based paint testing. The project is subject to the Buy Clean Colorado Act requirements, mandating that all glass materials meet Global Warming Potential limitations with contractor documentation of compliance. New windows must have a maximum U-value of 0.36 and feature Manko 3345i Series components with specific insulated glass specifications and cove profile exterior muntins. The contractor must comply with Colorado Prevailing Wage requirements and report all wages through the State of Colorado LCP Tracker program. No liquidated damages apply to this contract. The College will coordinate the sidewalk replacement project to avoid conflicts and will direct the salvage and disposal of existing window coverings.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TSC Berg Windows BID SET DRAWINGS.pdf | ||
| Building CO20260001Multi County MOD 1.pdf | ||
| SOC PO TermsConditions 10.10.2023.pdf | ||
| TSC IFB2027000049 AFB-Berg Windows 11.03.26.docx | DOCX document | |
| TSC Berg Windows Project Manual 10-30-2026.pdf | ||
| TSC IFB2027000049 -Berg Windows 11.13.26 - Rev 1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Trinidad State College Addendum No. 1 Berg Building – Window Replacement 11/13/2026 Page 1 of 5
1935 Dominion Way, Suite 202
Colorado Springs, CO 80918
Office: 719.277.7300
ADDENDUM NUMBER 1
PROJECT: TSC Berg Building – Install Boiler System and Upgrade Associated Building
Automation System, Berg, PH 2 (Window Replacement) Project Number: 2023- 088M22
OWNER: Trinidad State College 600 Prospect Street Trinidad, Colorado
The Drawings, Specifications and Contract Documents on the subject project are modified, corrected, supplemented and/or superseded as hereinafter described.
The following additions, deletions, changes and information shall become a part of and modify all work shown or described in the Drawings and Project Manual.
All bidders shall make necessary adjustments in their bid on account of this addendum.
Each and every bidder, subcontractor, and material supplier shall be responsible for reading each item in this addendum to ascertain to what extent and in what manner it affects the work in which they are interested. Each Bidder shall indicate on the Bid Form their acknowledgment of receipt of this addendum document by addendum number and addendum date.
GENERAL
1. The bidders’ walkthrough sign-in list is attached. This was a mandatory pre-bid conference for all prime bidders.
2. It was clarified during the pre-bid walk-through conference on November 9, 2026, that the sealed bids shall be submitted by hardcopy no later than 3:00pm November 17, 2026, to the following address:
Penny Bueno, Berg Building - Room 109 600 Prospect St.
Trinidad State College Trinidad, CO 81082
The Advertisement for Bid will be corrected and reposted on VSS. All references to an electronic (email) bid submission shall be disregarded.
3. During the pre-bid walk-through conference on November 9, 2026. The following items were specifically re-iterated and clarified:
▪ Contractor must develop a phased work schedule in conjunction with Owner to allow for continued business and educational operations within the building and around the perimeter of the building.
11/13/2026 Page 2 of 5
▪ Some project funds expire at end of December 2026, and the purchase of the windows will need to occur by mid-December to use those funds.
Expedited window submittal will be required.
▪ The glass used in this project must meet the Global Warming Potential limitations established within the Buy Clean Colorado Act that is in effect for this project, and involves contractor documentation of the materials supplied.
4. During the pre-bid walk-through conference on November 9, 2026, it was observed that the windows that were installed during the previous phase of this project within the boiler room ended up with the window frame sill being installed at a sill height elevation that was below the interior wood window sill. Upon further review of the conditions and a review of the Bid Set drawings and Specifications, it has been determined that the windows under this current Bid will NOT be a match to the current boiler room windows. Modifications in the specifications and window installation details have been modified as described below to meet the desired installation aesthetic.
QUESTIONS & ANSWERS
5. Q: The windows general notes on A6.01 indicates the U-Value(Factor) for the windows can be up to .36 but after further research the Colorado State standard for U-Factor on windows is .30 or below. Can you please clarify?
A: IECC Table C402.4 specifically indicates that fixed fenestration in climate zone 4B (Las Animas County) can have a maximum U-value of
0.36. This has been through plan review and approved for this project.
6. Q: It says that the Bid Alternates form needs to be included with the submittal.
Need clarification on the windows being replaced. This notice appears to be only for Phase 2 window replacements, and that's far more significant than the 3 replaced in phase 1 during the Boiler System Upgrade. The notice has what looks like this current phase as Add Alts from the original notice. Is there a need to include the add alt form for windows when it seems like this entire phase 2 just wasn't renamed to remove the boiler system from the verbiage? From what I can tell the windows for phase 2 should be the only thing on the base bid and add alts don't exist for this phase. Please clarify.
A: This was discussed during the pre-bid walk-through conference on November 9, 2026. The base bid includes the removal of all exterior windows on the first and second floors of the building (with exception of the three boiler room windows previously replaced). The window replacement on the third floor is Add Alt #1, and the window replacement on the fourth floor is Add Alt #2. This is specifically noted within the project manual in Section 01 23 00, and is indicated on the Bid Alternates form SBP-6.31.
Note: The official name of the project is derived from the funding appropriation that the State approved, which just happens to be within Phase 2 of a Boiler and Controls project that was previously performed. We have included the phrase “(Window Replacement)” to
11/13/2026 Page 3 of 5 the title only as a clarifier as to the intent of work under this portion of the phase 2 appropriation.
7. Q: It doesn't look like there are LD's (Liquidated Damages) on this project.
Please confirm.
A: That is Correct.
8. Q: During the previous phase of this project there was asbestos abatement needed on the 3 windows. In this phase, please clarify if asbestos is present and if so, who is responsible for the abatement? The owner or the contractor?
A: This was discussed during the pre-bid walk-through conference on November 9, 2026. The contractor shall be responsible for all abatement associated with the window removal and disposal in accordance with State Regulations. The project manual contains the Environmental Assessment Report as referenced in Specification Section 00 31 26.
9. Q: Window Coverings
Please verify whether all existing window coverings will need to be removed from the existing windows and reinstalled on the new windows. We observed that some window coverings extend from side to side of the existing openings, while others are mounted directly to the existing windows and just over the glass. In the latter condition, we are unsure whether the existing window coverings will be compatible with the new windows.
A: The Contractor will be responsible to remove all window blinds and shades. The College will direct which shall be salvaged and returned to the College, all others shall be disposed of by the Contractor. This directive modifies current spec section 01 01 17 page 1 work note # 5.
10. Q: Sidewalk Access It was mentioned during the site visit that the sidewalk around the building will be replaced under a separate contract. To complete the window replacement project, we will require access to the sidewalks surrounding the building. Would it be possible to schedule the concrete replacement work after the completion of the window project?
A: The College will coordinate the construction schedules of the two projects to avoid conflicts. It should be noted however that the Contractor under this window replacement project will not be granted uninterrupted use of the entire sidewalk surrounding the Berg Building for the duration of the project, and that this Contractor will need to coordinate its activities that impinge on the use of the sidewalk and/or entries into the building with the College in a manner that will allow continued College operations to the greatest extent feasible.
Additionally, the contractor is advised that there is a segment of sidewalk at the Southeast corner of the building (near the boiler room) which is actually the roof of an underground utility room, and which has limited structural capacity. Contractor shall coordinate with College to assure no excessive equipment weight is applied to this structure.
11/13/2026 Page 4 of 5
11. Q: Prevailing Wage Reporting The contract documents state that the contractor must pay all applicable
Prevailing Wages, Apprenticeship Rates, and Fringe Benefits. Will the contractor also be required to report all wages paid through the State of Colorado LCP Tracker program?
A: YES
12. During the pre-bid walk-through conference on November 9, 2026, the following verbal question was asked:
Q: Is there Lead Paint present on the windows or painted window sills?
A: It doesn’t appear that the current environmental hazards report addresses lead paint. The College will provide pending Lead-Based paint test results to the Awarded contractor. For Bidding purposes, the contractor should assume that painted windows, sills and trim may contain lead-based paints.
PROJECT MANUAL
13. Specification Section 01 11 17, page 1. Work Note 9 shall be modified as indicated below:
9. EXISTING WOOD STOOL – REPAIR ANY SIGNIFICANT CHECKS OR SPLITS
WITH AN APPROPRIATE WOOD REPAIR PUTTY. REFINISH ENTIRE SURFACE
IN-PLACE TO MATCH ORIGINAL FINISH AND COLOR, EITHER CLEAR FINISH
OR PAINTED. ALSO SEE NOTE 2.
14. Specification Section 08 51 13 paragraph 2.2.F “Insulating-Glass Units”, Replace paragraph with the following:
F. Insulating-Glass Units: Factory-assembled units consisting of sealed lites of glass separated by a dehydrated interspace, qualified in accordance with ASTM E2190.
Sealed insulated glass shall meet ASTM E774 Class A. 1” insulated glass unit. 1/4” clear glass at outboard side and 1/4” clear glass at inboard side.
1. Basis of Design: Provide glass material by Guardian (North America) or Vitro as required to meet the Buy Clean Colorado (BCCO) Global Warming Potential (GWP) limitations and the whole-window assembly U-value requirements.
2. Glass: ASTM C1036, Type 1, Class 1, Q3.
a. Tint: Clear.
b. Kind: Fully tempered where indicated on Drawings.
3. Lites: Two per individual unit. See Architectural Drawings.
4. Filling: Fill space between glass lites with air or argon as required to meet the whole-window assembly U-Value of 0.36 maximum.
5. Low-E Coating Vision Glass: ASTM C1376. Unit to have low emissivity film on the second or third face.
6. Acid Etched Coating: Unit to have acid etched coating “Guardian Satin Deco” or approved equal on the 2nd face where indicated on the drawings.
11/13/2026 Page 5 of 5
15. Specification Section 08 51 13 paragraph 2.3.A “Dividers”, Replace paragraph with the following:
A. Dividers (False Muntins): Provide extruded-aluminum divider grids in designs indicated for each sash lite as shown on architectural drawings.
1. Type: Cove profile on the exterior face of the window, and a flat profile applied to the interior face of the window. (No component to be installed within the glass air space.) The interior muntins must align with the exterior muntins.
2. Pattern: As indicated on Drawings.
3. Attachment: Exterior muntin grids shall be applied to the main frame in a manner that allows for thermal expansion without compromising grid appearance or glass replacement. Interior muntins may be adhered to glass if allowed by window manufacturer.
4. Finish: Color to match window frames.
DRAWINGS
16. Sheet A7.02 is re-issued in its entirety. The installation height of new window frame sill and sub-sill/sill starter has been modified to better align with the existing interior wood window stool.
17. Sheet A7.02. We have added some window component identification numbers to the detail drawings. These are component numbers were retrieved from the Manko Window manufacturer’s website and are shown for reference only to define the intended window aesthetic. The Contractor shall verify with the manufacture all actual component numbers for a complete and acceptable window assembly. We have attached the Manko Window manufacturer’s component reference document for descriptions of the individual components.
END OF ADDENDUM NUMBER 1
Attachments: Pre-Bid Conference Sign-in Sheet dated November 9, 2026
Sheet A7.02 Manko Window Mfr’s “Off-Set Fixed Window Details reference document
EXISTING SLOPED
STONEWORK TO
REMAIN
REMOVE ALL WINDOW
ELEMENTS WITHOUT
DAMAGING EXISTING
WINDOW STOOL
REMOVE PORTION OF (E)
WOOD BLOCKING,
COORDINATE WITH (N)
WINDOW SILL
DIMENSIONS, SEE 1/A7.02
EXISTING WALL
FRAMING TO REMAIN
UNDISTURBED.
CONTRACTOR TO REMOVE & ABATE
ALL ASBESTOS CONTAINING
MATERIAL (ACM) WITH THE
EXISTING WINDOW ELEMENTS,
TRIM, AND SEALANT WITHOUT
DAMAGING EXISTING STONEWORK.
ALSO REMOVE & DISPOSE OF ALL
EXISTING STORM WINDOWS
INTERIOR EXTERIOR
CUT (E) STOOL TO
CONFORM W/ NEW
WINDOW SILL DEPTH
DIMENSION
(E) STORM WINDOW TO BE
REMOVED
EXISTING WOOD
STOOL TO REMAIN
ASSUMED (E)
WOOD BLOCKING
(E) STONE MASONRY
(E) STONE SILL
LINE OF (E) LUGGED SILL BEYOND
WHERE OCCURS
(N) WATER REPELLENT ON SILL
(N) LIQUID APPLIED FLASHING
(N) MANUFACTURED WINDOW
FRAME TYP.
COVE MUTTIN TYP.
(N) CONTINUOUS 3 8" MAX
WIDTH SEALANT WITH
BACKER ROD
(E) WOOD STOOL, CUT AS
REQUIRED FOR TIGHT &
CLEAN INSTALLATION
WITH NEW WINDOW. SEE
PROJECT MANUAL FOR
REPAIR/REFINISH REQTS.
INTERIOR EXTERIOR
(E) PLASTER ON LATH
(E) WD TRIM
SHIM SPACE
(N) P.T. WD BLKG
20GA PREFINISHED FLASHING W/
CONT. CLEAT (TO MATCH
WINDOW FRAME COLOR), SEE
DTL. 1/A7.02
ASSUMED (E)
WOOD BLOCKING
ALIGN ALUM WINDOW
SILL RECEIVER WITH
TOP OF STOOL
CONTINUE LIQUID APPLIED
FLASHING AT STONE JAMB TO
THIS HEIGHT BEYOND
16302
10305
10300
10301
841"RECEPTOR"
"OFFSET
FIXED
MULLION"
"OFFSET
FIXED
MULLION"
"SUB-SILL"/
"SILL STARTER"
"RECEPTOR"
"SILL"
(N) WATER REPELLENT
(N) MANUFACTURED
WINDOW FRAME
(E) WOOD STOOL, CUT
AS REQUIRED FOR TIGHT
& CLEAN INSTALLATION
WITH NEW WINDOW. SEE
PROJECT MANUAL FOR
REPAIR/REFINISH REQTS.
8" MAX WIDTH SEALANT
W/ BACKER ROD
(N) LIQUID APPLIED
FLASHING
ASSUMED (E)
WOOD BLOCKING
(N) PRESSURE- TREATED
WOOD BLOCKING
(E) STONE SILL
CONTRACTOR TO
COORDINATE
DIMENSION
20GA PREFINISHED
FLASHING W/ CONT.
CLEAT (TO MATCH
WINDOW FRAME COLOR)
CONTINUE LIQUID
APPLIED FLASHING AT
STONE JAMB TO THIS
HEIGHT BEYOND
DETAILS
A7.02
SHEET NO.:
DATE:
REV:
TR
IN
ID
AD
S
TA
TE
C
O
LL
EG
E
BE
R
G B
U
IL
D
IN
G , P
H
AS
E
W
IN
D O
W R
EP
LA
C
EM
EN
T
10/22/2026
D O
M
IN
IO
N
W
AY
, S U
IT
E
C O
LO
R
AD
O
S
PR
IN
G
S, C
O
PH
O N
E:
9)
-7 ã
H
AL
L
AR
C H
IT
EC
TS
SHEET TITLE:
RE-BID SET
A7.02
EXISTING WOOD WINDOW DEMOLIITION
SCALE: 6" = 1'-0"
A7.02
NEW WINDOW SILL DETAIL
SCALE: 6" = 1'-0"
A7.02
NEW WINDOW SILL FLASHING
SCALE: 12" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
ADDENDUM NO. 1 11/13/2026
AutoCAD SHX Text
AutoCAD SHX Text NOTE: MANKO 3345i SERIES WINDOW COMPONENT PART NUMBERS ARE INDICATED THUSLY XXXXX . THESE ARE INDICATED FOR GENERAL DESIRED PROFILE ONLY AND ARE SUBJECT TO MFR'S VERIFICATION. IT IS THE CONTRACTORS RESPONSIBILITY TO REVIEW THIS INFORMATION WITH THE WINDOW MFR & OBTAIN MFR'S APPROVAL OF THE APPROPRIATE CONFIGURATION.
3345i Series
Offset Fixed Window Details
Table of Contents
Receptors 1
Sill Starter 2
Vertical Mullions 3-4
Panning & Trim 5-7
Optional Snap Trim Anchor Details 8
3345i Receptor-111-01-18
4 1/2" SERIES HISTORICAL
OFFSET FIXED WINDOW SYSTEM
RECEPTOR DETAILS
3345i
SERIES
MANKO
11-01-18 3345i Sill Starter-1
OFFSET FIXED WINDOW SYSTEM
SILL STARTER DETAILS
3345i
3345i Vertical Mullions-111-01-18
OFFSET FIXED WINDOW SYSTEM
VERTICAL MULLION DETAILS
3345i
3345i Vertical Mullions-211-01-18
OFFSET FIXED WINDOW SYSTEM
VERTICAL MULLION DETAILS
3345i
3345i Panning & Trim-111-01-18
INTERIOR
SNAP TRIM
4 1/2" SERIES HISTORICAL
OFFSET FIXED WINDOW SYSTEM
PANNING-TRIM DETAILS
3345i
SERIES
INTERIOR
SNAP TRIM
11-01-18 3345i Panning & Trim-2
INTERIOR
SNAP TRIM
4 1/2" SERIES HISTORICAL
OFFSET FIXED WINDOW SYSTEM
PANNING-TRIM DETAILS
3345i
11-01-18 3345i Panning & Trim-3
OFFSET FIXED WINDOW SYSTEM
PANNING-TRIM DETAILS
3345i
SERIES
INTERIOR
SNAP TRIM
INTERIOR
SNAP TRIM
Historic Grid Profiles-109-01-19
COVE
BEADING
BEVELED
3100i / 3345i
MANKO
HISTORIC GRID PROFILES
5500 Series only
HISTORIC GRID PROFILES
725 Series only 5500 Series only
AutoCAD SHX Text 31023
AutoCAD SHX Text 10024
AutoCAD SHX Text 10023
AutoCAD SHX Text 30023
AutoCAD SHX Text 30024
AutoCAD SHX Text 31024
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
| Sheets and Views |
| A7.02 |
| 1-3345i Receptors |
| 2-3345i Sill Starter |
| 3-3345i Vertical Mullions |
| 3345i Vertical Mullions-1 |
| 3345i Vertical Mullions-2 |
| 4-3345i Panning & Trim |
| 3345i Panning & Trim-1 |
| 3345i Panning & Trim-2 |
| 3345i Panning & Trim-3 |
| 5-Historic Grid Profile (2) |
| Model |