TRWWTP Lab Remodel Bid Docs.pdf
PDF 796 KB Posted
- Solicitation number
- 2025-8
- Issued by
- Rio Blanco County, Colorado
About this file
This is a comprehensive bid packet for the Telluride Regional Wastewater Treatment Plant Lab Remodel project issued by the Town of Telluride, Colorado. The project involves a renovation and enhancement of the existing laboratory facilities, including reroofing the building, with the goal of improving functionality, safety, workflow efficiency, and regulatory compliance. The lab currently serves as a critical quality control and compliance testing center. The project will be constructed in three phases to ensure continuous operational functions, with a bid submission deadline of October 7, 2025 at 3:00 PM local time. The project timeline includes a pre-bid meeting on September 18, 2025, substantial completion by March 6, 2026, and final completion by March 27, 2026.
The project involves comprehensive laboratory upgrades, including removing outdated infrastructure, installing new flooring, wall partitions, and chemical-resistant coatings, and upgrading laboratory-grade casework from MacBick Labs and Interiors. The casework has already been pre-approved and acquired by the municipality to reduce lead times. The scope includes installing new eye wash and emergency safety shower stations, upgrading HVAC systems with fume hoods, providing dedicated emergency power circuits, and integrating new laboratory lighting. The contractor will be responsible for all permits, compliance with EPA, OSHA, and CDPHE standards, and ensuring all work meets current local, state, and federal regulations. The town reserves the right to alter bid quantities by -25% to +25% at the same unit cost, and the contract will be awarded based on a comprehensive evaluation of the bidder's qualifications, experience, and ability to complete the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID PACKET
Telluride Regional Wastewater Treatment Plant Lab Remodel
Telluride, Colorado
INVITATION FOR BID
Telluride Regional Wastewater Treatment Plant Lab Remodel
Submittal Deadline 3:00 PM Local Time
October 07, 2025
The Town of Telluride is soliciting sealed proposals from qualified vendors for the Telluride Regional Wastewater Treatment Plant Lab Remodel. The Town will accept proposals via email but will not accept proposals via fax. If a hardcopy is submitted, please provide two (2) copies sealed in a manila envelope clearly marked as a proposal for this project and to the attention of Amie Martell, Water/Wastewater Division Manager. All proposals shall be received by the TOWN prior to 3:00 PM local time, Tuesday, October 7, 2025, via hand delivered to the Town of Telluride Regional Wastewater Treatment Plant, 12000 Highway 145, PO Box 2546, Telluride, Colorado 81435; or email to amartell@telluride-co.gov. If emailed, please confirm receipt by requesting a delivery receipt and read receipt.
The Town of Telluride reserves the right to reject any or all Proposals, in part or in whole, or to waive any informalities or technicalities in this Request for Proposal if it is deemed to be in the best interest of the Town to do so.
Proposals received after the due date and time specified above or that are not prepared and filed in accordance with the terms and conditions of this Request for Proposal will not be considered for evaluation or award of the Project.
Please Note: Addenda will be posted on the Rocky Mountain E-Purchasing System (“RMEPS”) at:
http://www.bidnetdirect.com/colorado. Respondent is responsible to ensure addenda issued are acknowledged and responses thereto submitted along with the respective RFP documents. Failure to submit such addenda responses may result in disqualification of the respective Proposal.
The Town of Telluride cannot guarantee accurate information for specifications obtained from any source other than Bidnetdirect.
mailto:amartell@telluride-co.gov http://www.bidnetdirect.com/colorado
Section I
Bidding Documents
Section 00010 − 1
PROJECT SCHEDULE & SUMMARY
Telluride Regional Wastewater Treatment Plant Lab Remodel
Summary of Work
1.1. This initiative encompasses a renovation and enhancement of the current laboratory facilities, in addition to the reroofing of the building at the Telluride Regional Wastewater Treatment Plant. The laboratory currently serves as a critical quality control and compliance testing center for the facility. The remodel aims to enhance functionality, safety, workflow efficiency, and regulatory compliance with updated instrumentation and workspace layout. This renovation will be constructed in three phases to ensure operational functions for the Telluride Regional Wastewater Treatment Plant throughout the remodel.
1.2. This bid proposal includes project plans and construction specifications.
1.3. Copies of the Town’s Construction Specifications can be downloaded from the Town’s website at www.telluride-co.gov.
1.4. Objectives
1.5. Modernize laboratory infrastructure and furnishings
1.6. Improve ergonomics and storage capacity
1.7. Enhance HVAC and ventilation specific to laboratory environments
1.8. Ensure compliance with EPA, OSHA, and CDPHE standards
1.9. Installation of a new EPDM membrane roofing system.
1.10. Integrate updated analytical instrumentation and connectivity
1.11.
1.12. Scope of Work
1.13. Demolition and Preparation
1.14. Remove and dispose of outdated cabinetry, walls, drywall, countertops, sinks, flooring, and work associated with the planned reroof.
1.15. Safely disconnect and cap utilities (gas, water, electrical) as necessary
1.16. Abatement procedures as required (e.g., asbestos or lead-based paint, if encountered)
1.17. Construction and Upgrades
1.18. Install new flooring appropriate for chemical resistance and hygiene
1.19. Construct new wall partitions, where necessary, for workspace optimization
1.20. Paint walls with moisture- and chemical-resistant coatings
1.21. Laboratory Infrastructure
1.22. Install new laboratory-grade casework, countertops and sinks
1.23. Casework will be manufactured by Macalaster Bicknell, LLC, doing business as MacBick Labs and Interiors (hereinafter referred to as ‘MacBick’ throughout this RFP).
1.24. Time is of the essence; therefore, the municipality approved the submission of casework and acquired the casework to reduce the lead time from the planned contract award date.
1.25. The Town of Telluride will assign/transfer Casework schedule and management over to the project’s prime contractor once awarded.
1.26. The casework management bid schedule item will be incorporated with the bid tabs for this project.
1.27. Lead-times 12 weeks, after receipt of PO and approved drawings are received.
1.28. Lead-time noted above once shop drawings are approved, all measurements are verified, and all questions have been answered. At that point the order will be placed into production and with our vendors, and the lead-time begins. Please be aware that the longest lead-time governs ship date of the entire order. During peak holiday and summer season lead-time tends to increase 2-4 weeks.
1.29. Proposal and approved shop drawings are included with this bid package.
1.30. Provide and Install eye wash and emergency safety shower stations
1.31. Upgrade HVAC systems, including fume hoods and air filtration
1.32. Provide dedicated emergency power circuits to all identified critical equipment http://www.telluride-co.gov/
1.33. Integrate new laboratory lighting systems suitable for lab environments
1.34. Removal of the existing roof system, with an installation of a new EPDM membrane roofing system
1.35.
1.36. Instrumentation and Utilities
1.37. Provision and installation of lab equipment
1.38. Modify, extend, or replace all mechanical, electrical and plumbing systems associated with the remodel as required to support new equipment and the revised laboratory layout.
1.39. Install additional data ports and integrate with SCADA/IT systems
1.40. Compliance and Testing
1.41. Ensure all work complies with current Local, State & Federal building, fire, and environmental regulations and codes
1.42. Conduct final inspections and functionality testing of systems
1.43. Provide training on new systems where applicable
1.44. Maintain an on-site record of state, local & manufacturer inspections
Schedule:
• Bid Documents Available: Thursday, September 4th, 2025
• Pre-Bid Meeting: Tuesday, September 18th, at 11:00 AM (MST).
o (Virtual and in-person at 12000 Highway 145, Telluride, CO)
• Questions due by: Friday September 26th, 2025
• Bids Due: Tuesday, October 7th, 3 PM (MST), 2025
• Award Contract: October 17th, 2025
• Notice to Proceed: October 20th, 2025
• Substantial Completion: Friday, March 6th,, 2026
• Final Completion: Friday, March 27th,, 2026
• Final Invoice: Friday, April 3rd, 2026
SECTION 00010 ADVERTISEMENT FOR BIDS
OWNER: Town of Telluride
P.O. Box 397
Telluride, CO 81435
The Town of Telluride is soliciting sealed proposals from qualified vendors for the Telluride Regional Wastewater Treatment Plant Lab Remodel. The Town will accept proposals via email but will not accept proposals via fax. If a hardcopy is submitted, please provide two (2) copies sealed in a manila envelope clearly marked as a proposal for this project and to the attention of Amie Martell, Wastewater Treatment Manager. All proposals shall be received by the TOWN prior to 3:00 PM local time, Tuesday, October 7th, 2025, via hand delivered to the Town of Telluride Regional Wastewater Treatment Plant, 12000 Highway 145, PO Box 2546, Telluride, Colorado 81435; or email to amartell@telluride-co.gov. If emailed, please confirm receipt by requesting a delivery receipt and read receipt.
The Town of Telluride reserves the right to reject any or all Proposals, in part or in whole, or to waive any informalities or technicalities in this Request for Proposal if it is deemed to be in the best interest of the Town to do so.
Proposals received after the due date and time specified above or that are not prepared and filed in accordance with the terms and conditions of this Request for Proposal will not be considered for evaluation or award of the Project.
Please Note: Addenda will be posted on the Rocky Mountain E-Purchasing System (“RMEPS”) at:
http://www.bidnetdirect.com/colorado. Respondent is responsible to ensure addenda issued are acknowledged and responses thereto submitted along with the respective RFP documents. Failure to submit such addenda responses may result in disqualification of the respective Proposal
The Town of Telluride cannot guarantee accurate information for specifications obtained from any source other than Bidnetdirect.
Date: September 4th, 2025 SIGNED: Kyle Beck Kyle Beck
TITLE: Public Works Director http://www.bidnetdirect.com/colorado
Section 00020 − 2
SECTION 00020
INVITATION TO BID
Date: September 4th, 2025
Separate sealed bids to complete the Telluride Regional Wastewater Treatment Plant Lab Remodel in Telluride, Colorado, shall be received by the TOWN prior to 3 pm, Tuesday, October 7th at Town of Telluride Regional Wastewater Treatment Plant, 12000 Highway 145, PO Box 2546, Telluride, Colorado 81435; or email to amartell@telluride-co.gov
At said place and time, and promptly thereafter, all Bids that have been duly received will be opened, reviewed, and circulated results within (1) one week. Note that a public bid opening will not be held.
The Contract Documents provide for construction of Telluride’s Regional Wastewater Treatment Plant Lab Remodel. The WORK includes:
1. The renovation and enhancement of the current laboratory facilities, along with the reroofing at the
Telluride Regional Wastewater Treatment Plant. The laboratory currently serves as a critical quality control and compliance testing center for the facility. The remodel aims to enhance functionality, safety, workflow efficiency, and regulatory compliance with updated instrumentation and workspace layout. The replacement of the building existing flat roof weather protectant membrane is primarily over the office space, laboratory and headworks and is being replaced due to resent leaks within the building.
The successful Bidder will be required to furnish a Performance Bond and a Payment Bond guaranteeing faithful performance and the payment of all bills and obligations arising from the performance of the Contract.
No Bid may be withdrawn within a period of thirty (30) days after the date fixed for opening Bids.
The OWNER reserves the right to reject any and all Bids, and to waive any informalities and irregularities therein.
Bid security in the amount of not less than five percent (5%) of the total Bid must accompany each Bid in the form specified in the Instructions to Bidders (Section 00100).
Sales Prohibited / Conflict of Interest: No officer, employee, or their dependent or person residing in and sharing the expenses of their household, shall have a financial interest in the sale to the Town of any real or personal property, equipment, material, supplies, or services. This rule also applies to subcontractors with the Town. This shall not apply to members of any authority, board, committee, or commission of the Town other than the members of the Town Council. Soliciting or accepting any gift, gratuity, favor, entertainment, kickback, or any items of monetary value from any person who has or is seeking to do business with the Town of Telluride is prohibited. Any vendor knowing of this type of activity is encouraged to report in confidence to the Town Attorney or Town manager so the matter can be dealt with.
Selection Criteria: This Invitation to Bid meets the requirements of Telluride’s Municipal Code § 4-6-220 pertaining to Competitive Sealed Bidding. As such, selection shall be made to the responsible firm whose bid is determined in writing to be the most advantageous to the Town, taking into consideration price, and the following selection criteria as set forth at Subsection 4-6-220(f):
1. The ability, capacity and skill of the bidder to perform the contract or provide the service or construction required.
2. Whether the bidder can perform the contract or provide the service or construction promptly, or within the time specified, without delay or interference.
3. The character, integrity, reputation, judgment, experience, and efficiency of the bidder.
4. The quality of performance of previous contracts with the town or services provided to the Town or the quality of previous contracts or services provided to other parties and verified to the Procurement Officer during a check of references.
5. The previous and existing compliance by the bidder with laws and ordinances relating to the contract or service.
Section 00020 − 2
6. The sufficiency of the financial resources and ability of the bidder to perform the contract or provide the service or construction.
7. The quality, availability, and adaptability of the supplies, services, or construction to the particular use required.
8. The bidders demonstrated commitment to the most environmentally sound practices, as well as commitment to the Town’s sustainability goals.
9. The ability of the bidder to provide future maintenance and service for the use of the subject of the contract.
Local preference, as provided in §4-6-210 of the Procurement Code, will be applicable. The Town reserves the right to not select any bidder if they so choose.
Section 00100 − 1
SECTION 00100
INSTRUCTIONS TO BIDDERS
1.0 DEFINED TERMS
Terms used in these Instructions to Bidders are defined in the General Conditions of Agreement. The term “Bidder” means one who submits a Bid to OWNER, as distinct from a sub-bidder, who submits a Bid to Bidder. The term “Successful Bidder” means the lowest qualified, responsible, and responsive Bidder to whom OWNER (on basis of OWNER’S evaluation as hereinafter provided) makes an award. The term “Bidding Documents” includes the Advertisement for Bids (Section 00010), the Invitation to Bid (Section 00020), Instructions to Bidders (Section 00100), the Bid Form (Section 00400), the Bid Bond (Section 00410), the Statement of Contractor’s Qualifications (Section 00420), the Schedule of Major Subcontractors (Section 00430), the Construction Designs and Drawings, and the proposed Contract Documents (including all Addenda issued prior to receipt of Bids).
2.0 COPIES OF BIDDING DOCUMENTS
2.1 Complete sets of Bidding Documents may be obtained at Rocky Mountain E-Purchasing System http://www.bidnetdirect.com/colorado.
2.2 Complete sets of Bidding Documents shall be used in preparing Bids; neither OWNER nor ENGINEER assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.3 The submitted Bid proposal shall include Section 00400 – Bid Form, Section 00410 – Bid Bond, Section 00420 – Statement of Bidder’s Qualifications, and Section 00430 – Schedule of Subcontractors, fully executed.
2.4 OWNER and ENGINEER, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids on the Work and do not confer a license or grant for any other use.
3.0 QUALIFICATION OF BIDDERS
3.1 To demonstrate qualifications to perform the Work, each Bidder must submit with the Bid proposal a written statement of qualifications including financial data, a summary of previous experience, and previous commitments. Each Bid must contain evidence of Bidder’s qualification to do business in the State where the Project is located or covenant to obtain such qualifications prior to award of the contract. Prepare the Statement of Qualifications on the form provided in Section 00420.
3.2 The following factors will be considered to determine the Bidder’s qualifications: Work previously completed by the Bidder and whether the Bidder (a) maintains a permanent place of business, (b) has adequate material, equipment, and experience to do the Work properly and expeditiously, (c) has sufficient resources to complete the project on time or ahead of schedule, (d) has the financial resources to meet all obligations incidental to the Work, and (e) has appropriate technical experience.
3.3 Each Bidder may be required to show that s/he has handled former Work so that no just claims are pending against such Work. No Bid will be accepted from a Bidder who is engaged on any other Work that would impair his ability to perform or finance the Work.
3.4 No Bidder shall be in default on the performance of any other contract with the OWNER or in the payment of any taxes, licenses, or other monies due to the OWNER.
Section 00100 − 2
4.0 EXAMINATION OF CONTRACT DOCUMENTS AND SITE
4.1 It is the responsibility of each Bidder before submitting a Bid to (a) examine the Contract Documents thoroughly, (b) visit the site to familiarize themselves with local conditions that may in a manner affect cost, progress, or performance of the Work, (c) familiarize themselves with federal, state, and local laws, ordinances, rules, and regulations that may in any manner affect cost, progress, or performance of the Work, (d) study and carefully correlate(Bidder’s observations with the Contract Documents, and (e) notify the OWNER of all conflicts, errors or discrepancies in the Contract Documents.
4.2 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of Article 3, that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents and such means, methods, techniques, sequences, or procedures of construction as my be indicated in or required by the Contract Documents, and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.
5.0 INTERPRETATIONS AND ADDENDA
5.1 All questions about the meaning or intent of the Bidding Documents are to be submitted in writing to the OWNER. Interpretation or clarifications considered necessary in response to such questions will be issued only by Addenda. Questions received less than five (5) days prior to the date for opening Bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
5.2 All questions should be directed to the OWNER.
5.3 Addenda may also be issued to modify the Bidding Documents, as deemed advisable by OWNER.
5.4 Addenda will be mailed or delivered to all parties recorded by the OWNER as having received the Bidding Documents.
6.0 BID SECURITY
6.1 Each Bid must be accompanied by Bid Security made payable to “Town of Telluride” in the amount stated in the Invitation to Bid. The required security must be in the form of a certified or bank cashier’s check payable to OWNER or a Bid Bond on the form enclosed herewith. The Bid Bond must be executed by a Surety Company that is authorized to transact business in the State of Colorado and be accepted by the OWNER.
6.2 The Bid Security of the successful Bidder will be retained until such Bidder has executed the
Agreement and furnished the required contract security, whereupon Bid Security will be returned.
If the successful Bidder fails to execute and deliver the Agreement and furnish the required Contract Security with ten (10) days of the Notice of Award, OWNER may annul the Notice of Award and the Bid Security of that Bidder will be forfeit. The Bid Security of other Bidders whom the OWNER believes to have a reasonable chance of receiving the award may be retained by OWNER until the earlier of the seventh (7th) day after the effective date of the Agreement or the thirtieth (30th) day after the Bid Opening, whereupon Bid Security furnished by such Bidders will be returned. Bid Security, with Bids that are not competitive, will be returned within seven (7) days after the Bid Opening.
7.0 CONTRACT TIME
The number of days within which, or the date by which the Work is to be substantially complete and also completed and ready for Final Payment (the CONTRACT TIMES), are set forth in the Agreement (Article 2). The CONTRACTOR will submit a proposed schedule to illustrate how the milestone dates will be met.
Section 00100 − 3
8.0 LIQUIDATED DAMAGES
Provisions for liquidated damages are set forth in the General Conditions of Agreement (Article 9).
9.0 SUBSTITUTE (“OR EQUAL”) MATERIAL AND EQUIPMENT
9.1 The Contract, if awarded, will be on the basis of material and equipment described on the
Drawings or specified in the Specifications without consideration of possible substitute or “or equal” items.
9.2 Whenever it is indicated on the Drawings or specified in the Specifications that a substitute or “or equal” item of materials or equipment may be furnished or used by CONTRACTOR, and is acceptable to OWNER, application for such acceptance will not be considered by OWNER until after the “effective date of the Agreement”. The procedure for submitting any such application by CONTRACTOR and considerations by OWNER are set forth in the General Conditions of Agreement (Article 5).
10.0 SUBCONTRATORS, SUPPLIERS AND OTHERS
10.1 Each Bidder shall submit at the Bid opening to OWNER a list of major subcontractors s/he proposes to use in the Work. Refer to Section 00430 contained within these Bid Documents.
10.2 If OWNER after due investigation has reasonable objection to any proposed Subcontractor, either may, before the Notice of Award is given, request the apparent successful Bidder to submit an acceptable substitute without an increase in Bid price. If the apparent successful Bidder declines to make any substitution, OWNER may award the contract to the next lowest responsible Bidder that proposed to use acceptable subcontractors. Subcontractors, suppliers, and other persons or organizations listed and to whom the OWNER does not make written objection prior to the giving of the Notice of Award will be deemed acceptable the OWNER subject to revocation of such acceptance after the effective date of the Agreement.
10.3 CONTRACTOR shall not be required to employ any subcontractor, supplier or other persons or organizations against which they have reasonable objection. The use of subcontractors listed by the Bidder and accepted by the OWNER prior to the Notice of Award will be required in the performance of the Work. The OWNER will approve any subcontractor changes by the CONTRACTOR before the Work is performed.
11.0 BID FORM
11.1 A separate unbound copy of the Bid Form is enclosed for submission with the Bid.
11.2 Bid Forms must be completed in ink or typed. Totals must be stated in words and numbers; in case of conflict, words will take precedence. Unit prices shall govern over extensions of sums.
11.3 Bids by corporations must be executed in the corporate name by the president or a vice-president
(or other appropriate officer accompanied by evidence of authority to sign) and the corporate seal shall be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown below the corporate name.
11.4 Bids by partnerships must be executed in the partnership name and signed by each partner, his title must appear under his signature, and the official address of the partnership must be shown below the signature.
11.5 Bids by joint venture shall be signed by each participant in the joint venture or by an authorized agent of each participant. The full name of each person or company interested in the Bid shall be listed on the Bid Form. The joint venture companies will designate a person and a single company as the sole / primary responsible party of the Work as outlined in the Agreement.
Section 00100 − 4
11.6 The Bid shall contain an acknowledgment of receipt of all Addenda (the numbers of which must be filled in on the Bid Form).
11.7 No alterations in Bids, or in the printed forms therefore, by erasures, interpolations, or otherwise will be acceptable unless each such alteration is signed or initialed by the Bidder. If initialed, OWNER may require the Bidder to identify any alteration so initialed.
11.8 The address and telephone number for communications regarding the Bid shall be shown.
12.0 BID PRICING
Bids must be priced as set forth in the Bid Form – Section 00400, Article 5 Basis of Bid.
13.0 SUBMISSION OF BIDS
Bids shall be submitted at the time and place indicated in the Invitation to Bid and either provided via email as a .pdf file to amartell@telluride-co.gov with “Telluride Regional Wastewater Treatment Plant Lab Remodel
13.1 ” In the subject line OR enclosed in an opaque sealed envelope marked with the Project Title, name, and address of the Bidder, and accompanied by the Bid Form, Bid Bond, Statement of Bidders Qualifications, and Schedule of Subcontractors.
13.2 Bids shall be deposited at the designated location prior to the time and date for receipt of Bids indicated in the Invitation to Bid, or any extension thereof made by addendum. Bids received after the time and date for receipt of Bids will be returned unopened. Bidder shall assume full responsibility for timely delivery at the location designated for receipt of Bids.
13.3 Oral, telephonic, telegraphic, or facsimile Bids are invalid and will not be considered.
13.4 No Bidder may submit more than one Bid. Multiple Bids under different names will not be accepted from one firm or association.
14.0 MODIFICATION AND WITHDRAWAL OF BIDS
14.1 Bids may be modified or withdrawn by an appropriate document duly executed (in a manner that a Bid must be executed) and delivered to the place where Bids are to be submitted at any time prior to the opening of Bids.
14.2 Bids may also be modified or withdrawn in person by the Bidder, or an authorized representative provided s/he proves their identity and authority at any time prior to the opening of Bids.
14.3 Withdrawn Bids may be resubmitted up to the time designated for receipt of Bids provided that they are then fully in conformance with these Instructions to Bidders.
15.0 OPENING OF BIDS
Bids will be opened and (unless obviously non-responsive) results will be circulated within (1) one week, as indicated in the Invitation to Bid. An abstract of the amounts of the Base Bids and major alternates (if any) will be made available after the opening of Bids.
16.0 BIDS TO REMAIN OPEN SUBJECT TO ACCEPTANCE
All Bids shall remain open for thirty (30) days after the day of the Bids Opening, but OWNER may, in his/her sole discretion, release any Bid and return the Bid Security prior to that date.
17.0 AWARD OF CONTRACT
17.1 OWNER reserves the right to reject any and all Bids, to waive any and all informalities not involving price, time, or changes in the Work, to negotiate contract terms with the Successful
Section 00100 − 5
Bidder, and the right to disregard all nonconforming, nonresponsive, unbalanced or conditional Bids.
Also, OWNER reserves the right to reject the Bid of any Bidder if OWNER believes that it would not be in the best interest of the project to make an award to that bidder, whether because of doubtful financial ability or failure to meet any other pertinent standards or criteria established by OWNER, as stated below. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
17.1.1 The ability, capacity and skill of the bidder to perform the contract or provide the service or construction required.
17.1.2 Whether the bidder can perform the contract or provide the service or construction promptly, or within the time specified, without delay or interference.
17.1.3 The character, integrity, reputation, judgment, experience, and efficiency of the bidder.
17.1.4 The quality of performance of previous contracts with the town or services provided to the Town or the quality of previous contracts or services provided to other parties and verified to the Procurement Officer during a check of references.
17.1.5 The previous and existing compliance by the bidder with laws and ordinances relating to the contract or service.
17.1.6 The sufficiency of the financial resources and ability of the bidder to perform the contract or provide the service or construction.
17.1.7 The quality, availability, and adaptability of the supplies, services, or construction to the particular use required.
17.1.8 The bidders demonstrated commitment to the most environmentally sound practices, as well as its commitment to the Town’s sustainability goals.
17.1.9 The ability of the bidder to provide future maintenance and service for the use of the subject of the contract.
Local preference, as provided in §4-6-210 of the Procurement Code, is applicable.
17.2 In evaluating Bids, OWNER will consider the qualifications of the bidders, the criteria detailed above in accordance with the OWNER’s Procurement Code, whether or not the Bids comply with prescribed requirements, and such alternates unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.
17.3 OWNER may consider the qualification and experience of subcontractors, suppliers, and other persons and organizations proposed for those portions of the Work as to which the identity of subcontractors, suppliers, and other persons and organizations is submitted as requested by OWNER. OWNER also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of material and equipment proposed for incorporation in the Work when such data are required to be submitted prior to the Notice of Award.
17.4 OWNER may conduct such investigations as deemed necessary to assist in the evaluation of any
Bid and to establish the responsibility, qualifications, and financial ability of the Bidder’s proposed subcontractors, suppliers, and other persons and organizations to do the Work in accordance with the Contract Documents to OWNER’S satisfaction within the thirty (30) days allowed in Article 16.0 of the Instructions to Bidders, above.
17.5 If the Contract is to be awarded, it will be awarded to the lowest responsive, responsible, and qualified Bidder whose evaluation by OWNER indicates to OWNER that the award will be in the best interest of the Project. The basis for award shall be the Bid Total for the Schedule.
17.6 If the Contract is to be awarded, OWNER will give the Successful Bidder a Notice of Award as noted in the Project Schedule & Summary or no more than twenty (20) days after the Bid Opening.
Section 00100 − 6
18.0 CONTRACT SECURITY
The General Conditions and the Supplementary Conditions, if issued, set forth OWNER’S requirements as to performance and other bonds. The Successful Bidder must deliver the executed Agreement to the OWNER with the required Contract Security.
19.0 SIGNING OF AGREEMENT
When OWNER gives a Notice of Award to the Successful Bidder, it will be accompanied by two (2) unsigned counterparts of the Agreement with all other written Contract Documents attached. Within seven
(7) days thereafter, CONTRACTOR shall sign and deliver the required number of counterparts of the Agreements and attached documents to OWNER with required Bonds. Within the seven (7) days thereafter, OWNER shall deliver one (1) fully signed counterpart to CONTRACTOR. Each counterpart is to be accompanied by a complete set of the Drawings with appropriate identifications.
20.0 TAXES
OWNER is exempt from Colorado State Sales and Use taxes on materials and equipment to be incorporated in the Work. Said taxes shall not be included in the Contract Price. Reference is made in Article 5.9 of the General Conditions.
21.0 COLLUSIVE OR SHAM BIDS
Any Bid deemed by the OWNER in its sole discretion to be a collusive or sham Bid will be rejected and reported to authorities as such. Bidder’s authorized signature of this Bid assures that such Bid is genuine and is not a collusive or sham Bid. Also, any Bid deemed by the OWNER in its sole discretion to be unbalanced will be rejected.
22.0 BID RESULTS
For information regarding results for individual Bids, send a self-addressed, self-stamped envelope and a Bid tally will be emailed to you. Bid results will be posted in the office of the OWNER no more than seven (7) days after the Bid Opening. Bid results will also be posted on the Town of Telluride website at www.telluride-co.gov.
END OF SECTION
00400-1
SECTION 00400
Bid Form
Project Identification: Telluride Regional Wastewater Treatment Plant Lab Remodel
TABLE OF ARTICLES
Page
Article 1 - Bid Recipient 1 Article 2 - Bidder’s Acknowledgments 1
Article 3 - Bidder’s Representations 1
Article 4 - Further Representations 2 Article 5 - Basis of Bid 3 Article 6 - Time of Completion 6 Article 7 - Attachments to Bid 6 Article 8 - Defined Terms 6 Article 9 - Bid Submittal 7
ARTICLE 1 - BID RECIPIENT
1.1 This Bid Is Submitted To: Town of Telluride
1.2 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in the Bid and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2 - BIDDER’S ACKNOWLEDGMENTS
2.1 Bidder accepts all terms and conditions of the Advertisement for Bids and Instructions to Bidders, including without limitations those dealing with the dispositions of Bid Security. The Bid will remain subject to acceptance for up to thirty (30) days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.
ARTICLE 3 - BIDDER’S REPRESENTATIONS
3.1 In submitting this Bid, Bidder represents that:
A. Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the Bidding Documents, and the following Addenda, receipt of which is hereby acknowledged.
Addendum No. Addendum Date
B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
00400-2
C. Bidder is familiar with and is satisfied as to all federal, state, and local laws and regulations that may affect cost, progress, and performance of the Work.
D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the site designs, and (2) reports and drawings of a Hazard Environmental Condition, if any, which has been identified in the site designs.
E. Bidder has obtained and carefully studied (or accepts the consequences for not doing so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by the Bidder, including applying the specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents to be employed by Bidder, and safety precautions and programs incident thereto.
F. Bidder does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents.
G. Bidder is aware of the general nature of the Work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.
H. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents.
I. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution thereof by Engineer is acceptable to Bidder.
J. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Bid is submitted.
K. Bidder will submit written evidence of its authority to do business in the State where the Project is located not later than the date of its execution of the Agreement.
ARTICLE 4 - FURTHER REPRESENTATIONS
4.1 Bidder further represents that:
A. This Bid is genuine and not made in the interest of or on the behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation.
B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and
D. Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over
Owner.
00400-3
ARTICLE 5 - BASIS OF BID
5.1 Bidder will complete the Work in accordance with the Contract Documents, per plans and specifications, for the following price(s):
Bid Form: Provide pricing in the following schedule of values associated with this bid:
DIV DESCRIPTION VALUE
01 General Conditions $
02 Existing Conditions $
03 Concrete $
04 Masonry $
05 Metals $
06 Wood, Plastics and Composites $
07 Thermal and Moisture Protection $
08 Openings $
09 Finishes $
10 Specialties $
11 Equipment $
12 Furnishings $
22 Plumbing $
23 Heating, Ventilation and Air Conditioning $
26 Electrical $
Total $
A. Bidder acknowledges that estimated quantities are not guaranteed and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Bid items will be based on actual quantities, determined as provided in the Contract Documents.
00400-4
ARTICLE 6 - TIME OF COMPLETION
6.1 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Article 11 of General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.
6.2 Bidder accepts the provisions of the General Conditions as to liquidated damages in the event of failure to complete the work within the Contract Times.
ARTICLE 7 - ATTACHMENTS TO THIS BID
7.1 The following documents are attached to and made a condition of the Bid:
A. Required Bid security in the form of a Bid Bond (Section 00410) or Certified Check (circle type of security provided);
B. Statement of Bidder’s Qualifications; and
C. A Schedule of Subcontractors.
ARTICLE 8 - DEFINED TERMS
8.1 The terms used in this Bid with the initial capital letters have the meanings indicated in the Instructions to
Bidders and the General Conditions.
ARTICLE 9 - BID SUBMITTAL
9.1 This Bid submitted by:
If Bidder is:
An Individual
Name (typed or printed):
By:
(Individual’s signature)
Doing business as:
A Partnership
Partnership Name:
(Signature of general partner -- attach evidence of authority to sign)
A Corporation
Corporation Name:
State of Incorporation:
SEAL,
if required by State
SEAL,
if required by State
00400-5
Type (General Business, Profession, Service, Limited Liability):
(Signature -- attach evidence of authority to sign)
Title:
Attest
(Signature of Corporate Secretary)
Date of Qualification to do business in [State where Project is located] is / /
A Joint Venture
Name of Joint Venture:
First Joint Venture Name:
(Signature of joint venture partner -- attach evidence of authority to sign)
Second Joint Venture Name:
(Signature of joint venture partner -- attach evidence of authority to sign)
(Each joint venturer must sign. The manner of signing for each individual, partnership, and corporation that is party to the venture should be in the manner indicated above.)
Bidder’s Business address:
Business Phone No. ( )
Business FAX No. ( )
Business E-Mail Address
State Contractor License No. . (If applicable)
Employer’s Tax ID No.
SEAL,
if required by State
SEAL,
if required by State
CORPORATE
SEAL,
if required by State
00400-6
Phone and FAX Numbers, and Address for receipt of official communications, if different from Business contact information:
9.2 Bid submitted on , 20 .
Section 00410 − 1
SECTION 00410
BID BOND
Know all persons by these presents: THAT WE, THE UNDERSIGNED AS Principal, and unto the Town of Telluride, Colorado, as OWNER, in the sum of $ for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns.
THE CONDITION of this obligation is such that whereas the Principal has submitted to the Town of Telluride, Colorado, the accompanying Bid and hereby made a part hereof to enter into a construction Agreement for Town of Telluride Project, Telluride Regional Wastewater Treatment Plant Lab Remodel.
NOW THEREFORE,
a. If said Bid shall be rejected, or
b. If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void,; otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liabil8ty of the Surety for any and all claims hereunder shall in not even, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulated, and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension.
Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER.
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this _________, day of , 20 , and such of them as are corporations have caused their corporate seal to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above.
PRINCPAL SURETY
Name:
Address:
ATTEST:
(Seal)
Section 00420 − 1
SECTION 00420
STATEMENT OF CONTRACTOR’S QUALIFICATIONS
All questions must be answered, and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information desired.
1. Name of Contractor:
2. Permanent main office address:
3. When organized:
4. If a corporation, where incorporated:
5. How many years have you been engaged in the contracting business under your present firm or trade name?
6. Contracts on hand: (Schedule these, showing the amount of each contract and the anticipated dates of completion.)
7. General character of Work performed by your company:
8. Have you ever failed to complete any Work awarded to you? (yes/no)
9. Have you ever defaulted on a contract: (yes/no)
If so, where and why?
10. List the projects similar in scope and scale recently completed by your team, stating the approximate cost of each and the month and year completed, location, and type of construction.
11. Background and experience of the principal members of your organization, including officers:
Section 00420 − 2
Section 00420 − 3
12. Credit available:
13. Bank reference:
14. Are you licensed as a General Contractor? (yes/no).
If yes, in what city, county, state?
15. Who are the subcontractors that will do Work under this Contract?
16. Are any lawsuits pending against you or your firm at this time? (yes/no) If yes, provide details.
17. What are the limits of your public liability?
What company?
18. What are your company’s bonding limitations?
19. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Contractor’s Qualifications.
Dated at this day of , 20 .
Name of Contractor
State of )
County of ) being duly sworn deposes and says that they are of (Name of Organization) and that the answers to the foregoing questions and all statement therein contained are true and correct.
Subscribed and sworn to before me this day of 20 .
Notary Public
My commission expires
Section 00430 − 1
SECTION 00430
SCHEDULE OF MAJOR SUBCONTRACTORS
The Contract is based on subcontracting certain major portions of the Work to subcontractors, as listed below.
ITEM SUBCONTRACTOR
Section 00520
SAMPLE Agreement
Between The Town of Telluride, Colorado, And_______________________________
1. Summary of Work
a. This initiative encompasses a renovation and enhancement of the current laboratory facilities, in addition to the reroofing of the building at the Telluride Regional Wastewater Treatment Plant. The laboratory currently serves as a critical quality control and compliance testing center for the facility. The remodel aims to enhance functionality, safety, workflow efficiency, and regulatory compliance with updated instrumentation and workspace layout. This renovation will be constructed in three phases to ensure operational functions for the Telluride Regional Wastewater Treatment Plant throughout the remodel.
b. This bid proposal includes project plans and construction specifications.
2. Copies of the Town’s Construction Specifications can be downloaded from the Town’s website at www.telluride-co.gov.
3. Scope of Work
a. Demolition and Preparation
i. Remove and dispose of outdated cabinetry, walls, drywall, countertops, sinks, flooring, and work associated with the planned reroof.
ii. Safely disconnect and cap utilities (gas, water, electrical) as necessary
iii. Abatement procedures as required (e.g., asbestos or lead-based paint, if encountered)
iv. Construction and Upgrades
v. Install new flooring appropriate for chemical resistance and hygiene
vi. Construct new wall partitions, where necessary, for workspace optimization
vii. Paint walls with moisture- and chemical-resistant coatings
b. Laboratory Infrastructure
i. Install new laboratory-grade casework, countertops and sinks
1. Casework will be manufactured by Macalaster Bicknell, LLC, doing business as
MacBick Labs and Interiors (hereinafter referred to as ‘MacBick’ throughout this RFP).
a. Time is of the essence; therefore, the municipality approved the submission of casework and acquired the casework to reduce the lead time from the planned contract award date.
b. The Town of Telluride will assign/transfer Casework schedule and management over to the project’s prime contractor once awarded.
i. The casework management bid schedule item will be incorporated with the bid tabs for this project.
c. Lead-times 12 weeks, after receipt of PO and approved drawings are received.
d. Lead-time noted above once shop drawings are approved, all measurements are verified, and all questions have been answered. At that point the order will be placed into production and with our vendors, and the lead-time begins. Please be aware that the longest lead-time governs ship date of the entire order.
During peak holiday and summer season lead-time tends to increase 2-4 weeks.
e. Proposal and approved shop drawings are included with this bid package.
ii. Provide and Install eye wash and emergency safety shower stations
iii. Upgrade HVAC systems, including fume hoods and air filtration
iv. Provide dedicated emergency power circuits to all identified critical equipment
v. Integrate new laboratory lighting systems suitable for lab environments
vi. Removal of the existing roof system, with an installation of a new EPDM membrane roofing system
c. Instrumentation and Utilities
i. Provision and installation of lab equipment
ii. Modify, extend, or replace all mechanical, electrical and plumbing systems associated with the remodel as required to support new equipment and the revised laboratory layout.
iii. Install additional data ports and integrate with SCADA/IT systems
d. Compliance and Testing
i. Ensure all work complies with current Local, State & Federal building, fire, and environmental regulations and codes
ii. Conduct final inspections and functionality testing of systems
iii. Provide training on new systems where applicable
iv. Maintain an on-site record of state, local & manufacturer inspections
CONTRACT TIMES
o Substantial Completion: Friday, March 6th, 2026 o Final Completion: Friday, March 27, 2026 o Final Invoice: Friday, April 3rd, 2026
2. COMPENSATION.
2.1. The Town shall pay Contractor for services under this Agreement an amount, not to exceed ZERO
DOLLARS ($0,000.00). Such amount shall be inclusive of all costs of whatsoever nature associated with Contractor's efforts as defined in the scope of services, including but not limited to salaries, benefits, expenses, overhead, administration, and profits.
2.2. The scope of services and payment therefore shall only be changed by a properly authorized amendment to this Agreement. No Town employee has the authority to bind the Town with regard to any payment for any services that exceeds the amount payable under the terms of this Agreement.
2.3. Contractor shall submit monthly invoices to the Town. The Town shall pay invoices within thirty (30) days of receipt unless the work, services and/or documentation are unsatisfactory. The invoice shall document the percentage of each work task completed.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .