Telluride WWTP Lab Casework Procurement Scope.pdf
PDF 4 MB Posted
- Solicitation number
- 2025-8
- Issued by
- Rio Blanco County, Colorado
About this file
This document is a detailed proposal from MacBick Labs and Interiors for laboratory furniture and equipment for the Telluride Wastewater Treatment Plant in Telluride, Colorado. The proposal covers the furnishing and installation of new steel laboratory furniture across multiple project phases, with a total quoted price of $94,544.95. The project includes comprehensive laboratory casework, fixtures, sinks, safety stations, workstations, mobile cabinets, fume hoods, and various specialized laboratory equipment. MacBick proposes a 12-week lead time after receipt of purchase order and approved drawings, with the understanding that the longest lead-time item will govern the entire order's ship date.
The proposal includes specific details on equipment configurations, including eight different elevation setups ranging from sink and safety station arrangements to column and storage configurations. The quote covers furniture and equipment at $78,399.49, freight at $3,678.31, and non-union, non-mechanical installation at $12,467.15. MacBick explicitly notes that fume hoods, mechanical connections, and certain other items are specifically excluded from the proposal. The company offers flexibility in installation, allowing the project to be completed in up to three separate phases if needed, and warns that during peak holiday and summer seasons, lead times may increase by 2-4 weeks.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
August 18, 2025
Kyle and Lori, We propose to furnish, fob factory, new MacBick Steel Laboratory Furniture for Telluride Waster Water Treatment Plant as shown in our drawings date 8/4/2025.
This project can be installed in up to three separate phases if needed.
• Furniture & Equipment: $78,399.49
• Freight (FOB Shipping Point): $3,678.31
• Non-Union, Non-Mechanical Installation: $12,467.15
Grand Total: $94,544.95
Lead-times 12 weeks, after receipt of PO and approved drawings are received.
Lead-time noted above once shop drawings are approved, all measurements are verified, and all questions have been answered. At that point the order will be placed into production and with our vendors, and the lead-time begins. Please be aware that the longest lead-time governs ship date of the entire order. During peak holiday and summer season lead-time tends to increase 2-4 weeks.
SCOPE OF WORK AS PART OF LABORATORY
CASEWORK AND FIXTURES THAT HAS BEEN
SEPARATELY PROCURED BY THE OWNER.
Summary of Quoted Items – Telluride Waste Water Project
General Materials
• Spray paint (Snow White enamel)
• Black non-adhesive cove base
• Base molding corner clips
Elevation 1 – Sink & Safety Station Setup
• Pure water deck-mounted faucet
• Pegboard (30" x 30")
• ADA black drop-in sink (A25)
• Research aprons (knee space panel, wall pedestal, support frames, fillers)
• Alpha shelving (standards, brackets, lip shelves)
• Sink cabinet base (36”)
• 1” Kemresin worksurfaces with cutouts, black backsplash
• Barrier-free safety station
• ADA-compliant mixing faucet
Elevation 2 – Hood & Workstations
• Canopy hood (72” x 30” x 18”)
• Premier fume hood with blower (4 ft)
• Spill containment accessory (4 ft)
• Base cabinets (acid-resistant)
• Alpha adjustable table frame (70”)
• Alpha workstation table with Kemresin top (72”)
• Mobile cabinets (1-drawer/door and 4-drawer units)
Elevation 3 – Column & Storage
• EVO column (84” x 30” x 72”) with shelving brackets
• EVO workstation table (72”) with Kemresin top
• Mobile cabinet (1 drawer + 1 right-hand door)
Elevation 4 – Column & Mobile Storage
• EVO column (84” x 30” x 48”) with shelving
• EVO workstation table (48”)
• Mobile cabinet (4-drawer)
Elevation 5 – Larger Column Setup
• EVO column (84” x 30” x 96”) with shelving
• EVO workstation table (96”)
• Mobile cabinets (1 drawer + 1 left-hand door; 4-drawer unit)
Elevation 6 – Wide Column & Cabinets
• EVO column (84” x 36” x 96”) with shelving
• EVO workstation table (96”)
• Mobile cabinets (cupboard with door; 4-drawer unit)
Elevation 7 – Multiple Workstations & Cabinets
• Alpha adjustable table frames (64”)
• Alpha free-standing Kemresin tables (66”)
• EVO column + shelving (96”)
• EVO workstation table (96”)
• Multiple mobile cabinets (cupboards, drawers, and file drawers)
Elevation 8 – Final Column Setup
• EVO column (84” x 30” x 72”) with shelving
• EVO workstation table (72”)
• Mobile cabinet (cupboard with door)
Included:
▪ Non-Mechanical Installation
▪ Freight Charges
▪ Shop Drawings
▪ Project Coordination
All other items are specifically excluded. Including fume hoods and mechanical connections of any kind.
All quotes are subject to possible surcharges from material suppliers and fuel.
Thank you for the opportunity to be of service again. We look forward to working with you on this project and future projects.
If anyone has questions or needs additional clarifications, please let me know. Thank you for the opportunity to do business!
Bud Wittmer
Quote prepared by Bevin Carter, Macalaster Bicknell “MacBick”
ARCHITECT
CONTRACTOR
SHEET INDEX
Field dimensions have been taken
For Internal Use
Color selections have been made For fabrication and installation
Space Reserved for Approval Stamp
Revise and re-submit for approval
Make changes as noted and proceed with fabrication
Select One of the Following Prior to Release
Signature : Date:
Approved, proceed with fabrication
As built drawings
Submittal Date: 07-11-25 Revisions:
OWNER
VICINITY MAP
Project Vendors:
SPECIFICATION SECTIONS
Telluride Wastewater
Telluride, CO
Section 11610 - Laboratory Fume Hoods Section 12345 - Laboratory Casework
Name Address City, CA Zip Contact:
Phone: (___) ___-____ Cell: (___) ___-____ Fax: (___) ___-____ Email: ____@____.com Purchase Order #
Name Address City, CA Zip Phone: (___) ___-____ Fax: (___) ___-____
PROJECT MGR.:
Phone: (___) ___-____ Cell: (___) ___-____ Fax: (___) ___-____ Email: ____@____.com
PROJECT SUPT.:
Phone: (___) ___-____ Cell: (___) ___-____ Fax: (___) ___-____ Email: ____@____.com
Name Address City, CA Zip Contact:
Phone: (___) ___-____ Fax: (___) ___-____ Email: ____@____.com
Sheet # Quantity Description 1 Cover Sheet
N1 thru N5 7 Notes & Schedules F1 & F2 2 Floor Plans E1 thru E8 8 Elevations & Tops H1 thru H2 2 Fume Hood Details
Treatment Plant Bud Wittmer
Director, Design & Construction
724-612-1764, cell bud.wittmer@macbick.com www.macbick.com 1200 Abernathy Rd Ne, , Suite 450, Atlanta, GA 30328 855-460-7817, office
MACBICK PROJECT MANAGER
MacBick PROJECT NUMBER
1) All wall to wall dimensions must be field verified prior to release of casework, tops and fume hoods for fabrication.
2) +- Indicates area of casework to be reduced or increased based on field verified dimensions. MacBick drawings resemble architect's prints.
Cabinet and filler sizes may vary depending on final wall to wall measurements. MacBick requests that during the submittal review, the architect/owner indicate on shop drawings which cabinet(s) should be modified when wall to wall measurements vary from document dimensions. This action will assist MacBick in expediting the ordering of the casework. Please note that cabinet modifications will not be revised until final wall-to-wall measurements are taken.
3) Casework color and work surface color are to be selected prior to release of any material for fabrication.
4) All furring, blocking, backing / in wall backing to be furnished & installed by others, N.I.C..
5) These production drawings are an interpretation of the ideas expressed by the architect. They provide a medium where MacBick may suggest modifications to the architect's drawings. They are also a common language between MacBick, the architect and general contractor.
6) These production drawings are in accordance with our most recent quotation. Should changes be made, we reserve the right to adjust price accordingly.
7) General contractor to verify if finished flooring is to be installed before the casework is installed. If finished flooring is to be installed before the casework, please verify if flooring is flat up to the wall or has a cove up the wall. Provide radius of cove, if applicable.
8) Tables are not anchored to floor. Supplied with adjustable plastic swivel glides. Tables to be assembled and moved into place.
1) Base cove / base molding supplied and installation by Division 09.
2) Plumbing and/or piping items will be supplied and installed by Division 15.
3) Duct work, duct transition and / or exhaust fans will be supplied and installed by Division 15.
4) Electrical and/or wiring items will be provided and supplied and installed by Division 16
Elevation Number Sheet Number
Revision Cloud Designation
Section or Detail Symbol
Elevation & Plan Symbol
Detail Number Sheet Number
A) In order to provide the finest quality casework and furnishings and to assist in proper coordination of casework delivery and installation activity with the other trades on the project, the following criteria has been established and defines the required degree of building readiness to facilitate the start of installation. It is imperative that these guidelines be met in order to minimize, or eliminate the potential damage to casework and equipment prior to acceptance by the end user. Installation firms should utilize this criteria to determine job site readiness during their pre-installation inspections.
B) From the earliest stages, project schedules should take into account the following parameters:
1) The building areas requiring the installation of casework & furnishings are to be dried-in and unexposed to any adverse weather conditions which may damage finished materials.
2) For proper curing of epoxy sealant and adhesives, interior building temperatures are not register below 65 degrees relative humidity.
3) Interior building temperature is not to exceed 80 degrees to avoid undue drying of materials which could cause structural fatigue and damage.
Additionally, frequent or excessive changes in temperature or humidity levels during the course of installation, or once casework and equipment is installed, must be avoided to prevent damage.
4) Moisture levels should never exceed 60% relative humidity.
5) Windows and exterior doors must be installed.
6) All overhead mechanical, electrical, plumbing rough-in work, overhead soffits or ceiling grid (with or without acoustical ceiling) is to be complete prior to delivery of casework
7) Walls/partitions (whether framed, demountable, or masonry) must be in place. It is recommended that all painting be completed prior to delivery of casework and furnishings. Walls/partitions must have a minimum of primer paint applied prior to installation.
8) Wood or metal blocking must be installed in walls prior to delivery of casework.
9) Overhead lighting must be installed and connected prior to installation.
10) Flooring required to be placed under casework and furnishing must be installed prior to installation.
11) All floors must be level within acceptable trade tolerances. Specifically, the floor must be within 1/8" of level per10 foot of run.
a) DIMENSIONS ON SHOP DRAWINGS ARE TAKEN FROM HIGHEST POINT ON FLOOR.
12) In order for delivery of casework and furnishings to take place the following general guidelines must be applicable prior to the shipment of materials:
a) Lockup rooms available
b) Loading dock accessible
c) Entry to elevator free of charge or hoist must be present
d) Unobstructed use of hoisting during delivery and easy distribution of materials must be possible
e) Staging area for materials to be available
f) Areas of installation to be broom clean
g) Minimum trade interference in area of installation.
ER 30
General:
Products:
Materials:
Quality ControlQC
CFOI
OD
OFCI
OFOI
NIC
SIM
REF
OH
EQ
ID
Contractor Furnish Owner Install
Outside Diameter
Opposite Hand
Owner Furnish Contractor Install Owner Furnish Owner Install Not In Contract
Equally Spaced
Reference
Similar
Inside Diameter
Centerline
GA Gauge
RH Right Hand
LH Left hand
UC Under Counter
ADA American Disabilities Act ADJ Adjustable AFF Above Finished Floor
CO Cut-Out
(E) Existing EQ Equipment
MIN
MAX
Minimum Maximum
NTS
DIA
Not To Scale
Diameter
On-CenterOC
CONT Continuous
LF Linear Foot
UNO Unless Noted Otherwise
SF Square Foot
CU Cubic Foot
VIF Verify In Field
Dimensioning:
Equipment:
CIF Cut In Field CO Cutout
Work surface type, see schedule for material.
Indicates utility space, rough- ins to be located in this area.
Indicates rough-in locations above ceiling line.
Work surface height 36" AFF = Stand-up
34" AFF = ADA
30" AFF = Sit-down
FE Finished End/Edge FJ Field Joint
Indicates center line of in-wall backing.
In-wall backing by others
E1
E1
4"
Epoxy ResinER
Distilled Water
Plastic Laminate
Vacuum Natural Gas Compressed Air
Stainless Steel
DI
V G A
PLY
SS
PL
CW Cold Water
H/CW Hot & Cold Water Mixing
EyewashEW
NitrogenNIT
PVC
HDWD
Polyvinyl Chloride
CDA Compressed Dry Air
Hardwood Plywood
Solid PhenolicSP WD Wood
ElectricalE
OxygenOXY
Deionized WaterDW
HW Hot Water
Service Fixtures:
Epoxy Resin, Marine EdgeERM
MacBick General Notes
Project Specific Notes
Building Condition Guidelines
Abbreviations and Symbols
Scope of Includes & Excludes
Work Surface
Constant Air Volume Fume Hood
Knee Space Opening
Peg Board
Paper Towel Dispenser
Variable Air Volume
WKSF
CAV
FH
KS
PB
PTD
VAV
Soap DispenserSD
SinkSK Cup SinkCS
Knee Space PanelKSP
AS Adjustable Shelf
KEWAUNEE STEEL
Color Option Category Name Color Color Code
Cabinets SNOW WHITE 78
Evolution Frames & Tables SNOW WHITE 78
SHEET JOB NO.
DRAFTER
CHECKER
R
EV
IS
IO
N S
SCALE
DATE
Pr oj ec t
Sh ee t T itl e:
JRK
BW
54321 Te llu rid e W as te w at er
Te llu rid e, C o
Tr ea tm en t P la nt
A be rn at hy
R d
N E, S ui te
At la nt a, G
A
5-
0-
, o ffi ce w w .m ac bi ck .c om
N1
None
N ot es , A bb re vi at io ns
S ym bo ls
Sink Schedule Sinks:
Arch.
Ref.
MacBick Ref. Model # Manufacturer Color / Finish Type Sink ID Size Outlet Accessories Cut Out Quantity
A55 A55 Durcon Black Drop-in 25"x15"x5" S03-R U-SS2 Poly Stopper 1
Service Fixture Schedule Water Fixtures:
Arch. Ref. MacBick Ref. Model # Manufacturer Service Description Finish Cut Out Quantity
L414VB-BH L414VB-BH Watersaver Hot/Cold Water Mixing Faucet, Deck Mount, Blade Handles, 6" Swivel Gooseneck, Vacuum Breaker Polished Chrome 13 8"Ø 1
L7833 L7833 Watersaver De-Ionized Water DI Faucet, Deck Mount, Round Nylon Handle, Polypropylene 1"Ø 1
Emergency Fixtures:
SSBF994 SSBF994 Watersaver Safety Station Barrier-Free Safety Station Stainless Steel 1
SHEET JOB NO.
DRAFTER
CHECKER
R
EV
IS
IO
N S
SCALE
DATE
Pr oj ec t
Sh ee t T itl e:
JRK
BW
54321 Te llu rid e W as te w at er
Te llu rid e, C o
Tr ea tm en t P la nt
A be rn at hy
R d
N E, S ui te
At la nt a, G
A
5-
0-
, o w .m ac bi ck .c om
N2
None
Sc he du le s
Butt Splash (Field Applied)
1"
Epoxy Work Surface Edge
1"
Splash As
ShownDrip Groove
8"
8"
8" Machined Bevel , 4" Radius Edge, or
2" Radius Edge
1" Thick Splash Splash Thickness
Work Surface Thickness
1" Thick
Solid Phenolic Work Surface Edge
(**Not Available in Phenolic Resin**)
Splash Edge
Edge as Selected
Solid Phenolic Work Surface Material
Solid Phenolic Toplab Required
Solid Phenolic Athlon Required
**11 4" Thick**
(Standard)
16"
1"
Solid Phenolic Splash Butt - Field Applied (Standard) Coved Splash
1"1 4"
8" Machined Beveled
Edge
4" Radius Machined
Edge
4" Marine Top Dish w/ 14" Radius Edge, w/ Applied Splash Only
Epoxy Resin Splash Butt - Field Applied (Standard)
Field Joint Spacing is not Included in Work Surface Dimensions. Work Surface Manufacturer to Calculate for 18" Field Joint Spacing.
Epoxy Resin Color: Black Onyx
Solid Phenolic Color: Black
Drop in Epoxy Sink Detail
2" Radius
Sink Depth is to the Edge of Drain Hole
4"
.813"
8" Typ. Wall
.313"
8" Radius
Inside Length & Width Dimension Apply at this Point
Drop in Epoxy Sinks Required Cutout as Listed on Sink Schedule
4" Thick Splash
8" Beveled Edge
4" Radius Edge
2" Radius Edge
4" Thick
8" Machined Beveled Edge
4" Radius Machined Edge
Epoxy Resin and Solid Phenolic Compact Work Surface Construction Details and Options
1" 1"1 4" 1
4" Marine Top Dish w/
8" Machine Beveled Edge, w/ Applied Splash Only
SHEET JOB NO.
DRAFTER
CHECKER
R
EV
IS
IO
N S
SCALE
DATE
Pr oj ec t
Sh ee t T itl e:
JRK
BW
54321 Te llu rid e W as te w at er
Te llu rid e, C o
Tr ea tm en t P la nt
A be rn at hy
R d
N E, S ui te
At la nt a, G
A
5-
0-
, o w .m ac bi ck .c om
N3
None
W or k Su rfa ce
D et ai
TAYLOR TX
FACTORY
FACTORY
TAYLOR TX
R1.5000
R1.6250
25.0000
26.6250
15.0000 16.6250
TOP VIEW
4.7500
5.75000.5000 R1.5000
SECTION VIEW
3.5000
3.5000
4° SLOPE
SHEET JOB NO.
DRAFTER
CHECKER
R
EV
IS
IO
N S
SCALE
DATE
Pr oj ec t
Sh ee t T itl e:
JRK
BW
54321 Te llu rid e W as te w at er
Te llu rid e, C o
Tr ea tm en t P la nt
A be rn at hy
R d
N E, S ui te
At la nt a, G
A
5-
0-
, o w .m ac bi ck .c om
N3
None
Si nk s an d Pe g Bo ar ds
SHEET JOB NO.
DRAFTER
CHECKER
R
EV
IS
IO
N S
SCALE
DATE
Pr oj ec t
Sh ee t T itl e:
JRK
BW
54321 Te llu rid e W as te w at er
Te llu rid e, C o
Tr ea tm en t P la nt
A be rn at hy
R d
N E, S ui te
At la nt a, G
A
5-
0-
, o w .m ac bi ck .c om
N4
None
Pl um bi ng
F ix tu re
CHECKER
R
EV
IS
IO
N S
SCALE
DATE
Pr oj ec t
Sh ee t T itl e:
JRK
BW
54321 Te llu rid e W as te w at er
Te llu rid e, C o
Tr ea tm en t P la nt
A be rn at hy
R d
N E, S ui te
At la nt a, G
A
5-
0-
, o w .m ac bi ck .c om
N4
None
Sa fe ty S ta tio n
CHECKER
R
EV
IS
IO
N S
SCALE
DATE
Pr oj ec t
Sh ee t T itl e:
JRK
BW
54321 Te llu rid e W as te w at er
Te llu rid e, C o
Tr ea tm en t P la nt
A be rn at hy
R d
N E, S ui te
At la nt a, G
A
5-
0-
, o w .m ac bi ck .c om
N5
None
C ab in et
H ar dw ar e
Lab
212A
Shower 212C
Bathroom & Shower
214D
Janitor
Toilet
Hall
Hall
Headworks
1.18
A81C010224 A11C322202
A81C010255 A10C3155-00_0
F13M000248-00, 2 F21M1272-00, 2 F63M0272-00, 4
BR
SC
-0
0_
SHEET JOB NO.
DRAFTER
CHECKER
R
EV
IS
IO
N S
SCALE
DATE
Pr oj ec t
Sh ee t T itl e:
JRK
BW
54321 Te llu rid e W as te w at er
Te llu rid e, C o
Tr ea tm en t P la nt
A be rn at hy
R d
N E, S ui te
At la nt a, G
A
5-
0-
, o w .m ac bi ck .c om
F1
1/4"=1'-0"
Fl oo r P la n, O ve ra ll Pa rti al
Lab
212A
Shower 212C
214D
Toilet
Hall
1.18
A81C010224 A11C322202
A81C010255 A10C3155-00_0
F13M000248-00, 2 F21M1272-00, 2 F63M0272-00, 4
BR
SC
-0
0_
SHEET JOB NO.
DRAFTER
CHECKER
R
EV
IS
IO
N S
SCALE
DATE
Pr oj ec t
Sh ee t T itl e:
JRK
BW
54321 Te llu rid e W as te w at er
Te llu rid e, C o
Tr ea tm en t P la nt
A be rn at hy
R d
N E, S ui te
At la nt a, G
A
5-
0-
, o w .m ac bi ck .c om
F2
None
Fl oo r P la n, P ar tia l
E1
LAB 209
Arch Elev. Ref.: 2/A5.0
BR
SC
-0
0_
A10C3155-00_0
F13M000248-00, 2 F21M1272-00, 2 F63M0272-00, 4
31 30
362455
36118
L7833 L414VB-BH
A55 S03-R
Ø13 8Ø3
CUTOUT FOR A DURCON A55
DROP-IN SINK, 25"x15"x5"
PHASE 1
SHEET JOB NO.
DRAFTER
CHECKER
R
EV
IS
IO
N S
SCALE
DATE
Pr oj ec t
Sh ee t T itl e:
JRK
BW
54321 Te llu rid e W as te w at er
Te llu rid e, C o
Tr ea tm en t P la nt
A be rn at hy
R d
N E, S ui te
At la nt a, G
A
5-
0-
, o w .m ac bi ck .c om
E1
1/2"=1'-0"
El ev at io ns a nd T op
BR
SC
-0
0_
BR
SC
-0
0_
48.00
38.10 Interior Width
48 72
149105
E2
LAB 209
Arch Elev. Ref.: 5/A5.0 PHASE 2
SHEET JOB NO.
DRAFTER
CHECKER
R
EV
IS
IO
N S
SCALE
DATE
Pr oj ec t
Sh ee t T itl e:
JRK
BW
54321 Te llu rid e W as te w at er
Te llu rid e, C o
Tr ea tm en t P la nt
A be rn at hy
R d
N E, S ui te
At la nt a, G
A
5-
0-
, o w .m ac bi ck .c om
E2
1/2"=1'-0"
El ev at io ns a nd T
WINDOWWINDOWWINDOW
E3
LAB 209
Arch Elev. Ref.: 6/A5.0
4 741
PHASE 2
SHEET JOB NO.
DRAFTER
CHECKER
R
EV
IS
IO
N S
SCALE
DATE
Pr oj ec t
Sh ee t T itl e:
JRK
BW
54321 Te llu rid e W as te w at er
Te llu rid e, C o
Tr ea tm en t P la nt
A be rn at hy
R d
N E, S ui te
At la nt a, G
A
5-
0-
, o w .m ac bi ck .c om
E3
1/2"=1'-0"
El ev at io ns a nd T
E4
LAB 209
Arch Elev. Ref.: 7/A5.0
51 17 186
PHASE 2
SHEET JOB NO.
DRAFTER
CHECKER
R
EV
IS
IO
N S
SCALE
DATE
Pr oj ec t
Sh ee t T itl e:
JRK
BW
54321 Te llu rid e W as te w at er
Te llu rid e, C o
Tr ea tm en t P la nt
A be rn at hy
R d
N E, S ui te
At la nt a, G
A
5-
0-
, o w .m ac bi ck .c om
E4
1/2"=1'-0"
El ev at io ns a nd T
E5
LAB 209
Arch Elev. Ref.: 8/A5.0
PHASE 2
SHEET JOB NO.
DRAFTER
CHECKER
R
EV
IS
IO
N S
SCALE
DATE
Pr oj ec t
Sh ee t T itl e:
JRK
BW
54321 Te llu rid e W as te w at er
Te llu rid e, C o
Tr ea tm en t P la nt
A be rn at hy
R d
N E, S ui te
At la nt a, G
A
5-
0-
, o w .m ac bi ck .c om
E5
1/2"=1'-0"
El ev at io ns a nd T
E6
LAB 209
Arch Elev. Ref.: 8/A5.0
PHASE 2
SHEET JOB NO.
DRAFTER
CHECKER
R
EV
IS
IO
N S
SCALE
DATE
Pr oj ec t
Sh ee t T itl e:
JRK
BW
54321 Te llu rid e W as te w at er
Te llu rid e, C o
Tr ea tm en t P la nt
A be rn at hy
R d
N E, S ui te
At la nt a, G
A
5-
0-
, o w .m ac bi ck .c om
E6
1/2"=1'-0"
El ev at io ns a nd T
E7
LAB 209
Arch Elev. Ref.: 9/A5.0
4132351
66 6697
PHASE 3
SHEET JOB NO.
DRAFTER
CHECKER
R
EV
IS
IO
N S
SCALE
DATE
Pr oj ec t
Sh ee t T itl e:
JRK
BW
54321 Te llu rid e W as te w at er
Te llu rid e, C o
Tr ea tm en t P la nt
A be rn at hy
R d
N E, S ui te
At la nt a, G
A
5-
0-
, o w .m ac bi ck .c om
E7
1/2"=1'-0"
El ev at io ns a nd T
E8
LAB 209
Arch Elev. Ref.: 4/A5.0
4132351
PHASE 1
SHEET JOB NO.
DRAFTER
CHECKER
R
EV
IS
IO
N S
SCALE
DATE
Pr oj ec t
Sh ee t T itl e:
JRK
BW
54321 Te llu rid e W as te w at er
Te llu rid e, C o
Tr ea tm en t P la nt
A be rn at hy
R d
N E, S ui te
At la nt a, G
A
5-
0-
, o w .m ac bi ck .c om
E8
1/2"=1'-0"
El ev at io ns a nd T
Top View
19.7
16.1
4.0
2.0
18.0
30.0
36.00
8.00
72.00
30.0
8.00
Front View Side View
72.0
21.0
8.0 48.0 8.0
1.0
0.375 x 1.125 long slotted hole typ (4) places
CFM at Static Pressure - Inches H₂O
0.17" 0.24" 0.31" 0.45" 0.49" 0.89" 2.50"
425 550 638 825 850 1275 2550
Ø12.8" I.D.
Exhaust Collar
Baffle
SHEET JOB NO.
DRAFTER
CHECKER
R
EV
IS
IO
N S
SCALE
DATE
Pr oj ec t
Sh ee t T itl e:
JRK
BW
54321 Te llu rid e W as te w at er
Te llu rid e, C o
Tr ea tm en t P la nt
A be rn at hy
R d
N E, S ui te
At la nt a, G
A
5-
0-
, o w .m ac bi ck .c om
H1
None
Fu m e H oo d
D et
TOP VIEW
FRONT VIEW SIDE VIEW
Scaled to fitSCALE:
Date:
Checked By:
Sheet No.
Approved By:
Drawn By:
Drawing #
Rev Date
FU
M E
H O O D S fo r:
100400040
June 2023
I.D.
4" x 7" Junction Box
37.50 Viewing Height
Service Pass-Through
Top Access Panel
Header Corner Post
Sash
Operating Instructions /Access Cover
C. Alumbaugh
LED Light Fixture
Single Point Junction Box
Sash Weight
Sash
Integral Blower
Blower Switch
28.00 Sash
Opening
8.09
Ø10.81
115v Duplex
Light Switch
115v Duplex
R1.00 This Edge Only
48.00
R0.56±0.12 At Top Surface TYP 4 Corners
Ø2.50 Hole TYP-2 Places
3.71 TYP
Ø1.50 Hole TYP-2 Places
3.67
2.44 TYP
2.28
TYP
0.38 TYP-REF
4.94
2.62
4.94
30.00
18.00
16.28 3.71
2.30
31.70
Air Foil 1.25
Baffle
10.32
48.00
38.10 Interior Width 59.00
23.30 Interior Depth
Ø1.00
7.00 Raised Sash
15.70
1.70
Airflow Volumetric Rate (CFM) @ Static Pressure (inches of water)
Nominal Ductwor k Diamete r
Equivale nt
Resistan cet
HP
Face Velocity
(fpm) 100% open
(28") 100 725 @ 0.17" 10" 75 1/3 tIn feet of straight duct
Work Surface (Sold Separately)
WORK SURFACE (Sold Separately) 95004-XX (See General Description) for XX value) Model number varies based on sink location selection
Factory Prepared for Air Flow Monitor/Alarm (Sold Separately)
Factory Prepared for Electrical Receptacles (Two Per Side, Sold Separately)
Factory Prepared for Service Fixtures (Four Per Side, Sold Separately)
SHEET JOB NO.
DRAFTER
CHECKER
R
EV
IS
IO
N S
SCALE
DATE
Pr oj ec t
Sh ee t T itl e:
JRK
BW
54321 Te llu rid e W as te w at er
Te llu rid e, C o
Tr ea tm en t P la nt
A be rn at hy
R d
N E, S ui te
At la nt a, G
A
5-
0-
, o w .m ac bi ck .c om
H2
None
Fu m e H oo d
D et