Traffic_Signal_Controller_Cabinets.pdf

PDF 670 KB Posted

Attached to
Traffic Signal Controller Cabinets
Solicitation number
IFB-26-0038
Issued by
Maricopa County, Phoenix City, Arizona

About this file

This is an Invitation for Bid (IFB-26-0038) issued by the City of Phoenix Finance Central Procurement Division for Traffic Signal Controller Cabinets. The solicitation seeks to establish a contract for providing two distinct types of traffic signal control cabinets: NEMA TS2 Type 1 Traffic Control Cabinets and Advanced Transportation Controller (ATC) Cabinets. The City anticipates purchasing approximately 100 cabinets annually, with an estimated contract term of five years commencing on or about March 1, 2025. Key dates include a pre-offer conference on October 17, 2025, written inquiries due by October 24, 2025, and response submissions due by November 7, 2025 at 2:00 pm. The cabinets must meet specific technical standards, including compliance with NEMA TS2, ATC 5301, and other industry regulations, and will be used to support the city's traffic signal infrastructure.

The pricing proposal includes comprehensive line-item pricing for both cabinet types, with detailed components such as ventilation fans, power panels, breakers, relays, and additional ancillary equipment. Pricing is structured on a per-unit basis with an estimated annual quantity of 100 cabinets. The contract includes provisions for five-year warranty coverage, with prices firm for the first two years and potential annual adjustments thereafter. Contractors must provide detailed documentation, including technical literature, product brochures, and comprehensive operating manuals. The City reserves the right to adjust quantities, add or delete items, and requires vendors to be registered in the City's Procurement Portal. Non-warranty repair services are also included, with hourly labor rates to be specified by bidders.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION FOR BID

IFB-26-0038

TRAFFIC SIGNAL CONTROLLER CABINETS

CITY OF PHOENIX

FINANCE CENTRAL PROCUREMENT

251 W WASHINGTON ST.

PHOENIX, AZ

85003

RELEASE DATE: October 10, 2025

DEADLINE FOR QUESTIONS: October 24, 2025

RESPONSE DEADLINE: November 7, 2025, 2:00 pm

City of Phoenix

INVITATION FOR BID

IFB-26-0038

Traffic Signal Controller Cabinets

1. INTRODUCTION

2. INSTRUCTIONS

3. SCOPE OF WORK

4. EVALUATION PROCESS

5. STANDARD TERMS AND CONDITIONS

6. SPECIAL TERMS AND CONDITIONS

7. DEFENSE AND INDEMNIFICATION

8. INSURANCE REQUIREMENTS

9. SUBMITTALS

10. PRICING PROPOSAL

Attachments:

A - Acceptance of Offer Form 2025

Invitation For Bid #IFB-26-0038 Title: Traffic Signal Controller Cabinets

1. Introduction

1.1. Contact Information

Daniel Han

Finance Central Procurement

Email: daniel.han@phoenix.gov

Phone: (602) 262-4439

1.2. Schedule of Events

The City reserves the right to change dates, times, and locations, as necessary. The City does not always hold a Pre-Offer Conference or Site Visit. All times in the Schedule of Events are

Local Phoenix, AZ Time.

To request a reasonable accommodation or alternative format for any public meeting, please contact the Procurement Officer (Daniel Han) at (602) 262-4439/Voice or 711/TTY, or daniel.han@phoenix.gov, no later than two (2) weeks prior to the meeting.

Solicitation Issue Date: October 10, 2025

Pre-Offer Conference (Non-Mandatory): October 17, 2025, 11:00am

Join from the meeting link:

https://cityofphoenix.webex.com/cityofphoen ix/j.php?MTID=mfa0bad432fbade781a985a

931a80fb60

Join by meeting number:

Meeting number (access code): 2336 816

Meeting password: vGkYPj9Ym86

Written Inquiries Due Date: October 24, 2025, 2:00pm

Offer Due Date: November 7, 2025, 2:00pm https://cityofphoenix.webex.com/cityofphoenix/j.php?MTID=mfa0bad432fbade781a985a931a80fb60

2. Instructions

2.1. Preparation of Offer

All forms provided must be completed and submitted with the Offer. The signed and completed

Conflict of Interest and Transparency form must be included or your Offer may be deemed non-responsive.

It is permissible to copy Submittal forms if necessary. Erasures, interlineations, or other modifications of the Offer must be initialed in original ink by the authorized person signing the

Offer. No offer will be altered, amended or withdrawn after the specified offer due date and time.

The City is not responsible for Offeror’s errors or omissions.

All time periods stated as a number of days will be calendar days.

It is the responsibility of all Offerors to examine the entire solicitation and seek clarification of any requirement that may not be clear and to check all responses for accuracy before submitting an offer. Negligence in preparing an offer confers no right of withdrawal after due date and time. Offerors are strongly encouraged to:

A. Consider applicable laws and/or economic conditions that may affect cost, progress, performance, or furnishing of the products or services.

B. Study and carefully correlate Offeror’s knowledge and observations with the solicitation and other related data.

C. Promptly notify the City of all conflicts, errors, ambiguities, or discrepancies that Offeror has discovered in or between the solicitation and other related documents.

D. The City does not reimburse the cost of developing, presenting or providing any response to this solicitation. Offers submitted for consideration should be prepared simply and economically, providing adequate information in a straightforward and concise manner. The Offeror is responsible for all costs incurred in responding to this solicitation. All materials and documents submitted in response to this solicitation become the property of the City and will not be returned.

E. Offerors are reminded that the specifications stated in the solicitation are the minimum level required and that offers submitted must be for products or services that meet or exceed the minimum level of all features specifically listed in this solicitation. Offers offering less than any minimum specifications or criteria specified are not responsive and should not be submitted.

F. Offer responses submitted for products considered by the seller to be acceptable alternates to the brand names or manufacturer’s catalog references specified herein must be submitted with technical literature and/or detailed product brochures for the

City’s use to evaluate the products offered. Offers submitted without this product information may be considered as non-responsive and rejected. The City will be the sole judge as to the acceptability of alternate products offered.

G. Prices will be submitted on a per unit basis by line item, when applicable. In the event of a disparity between the unit price and extended price, the unit price will prevail unless obviously in error.

2.2. Fixed Offer Price Period

All offers shall be firm and fixed for a period of 180 calendar days from the solicitation opening date.

2.3. Delivery

Delivery is an important consideration and will be a factor in determining the award. A delivery time after receipt of order (ARO) must be stated in definite terms. Should there be variations in delivery times by item, the submittal should be clear concerning these variations.

2.4. Obtaining a Copy of the Solicitation and Addenda

Interested Offerors may download the complete solicitation and addenda from the City's

Procurement Portal: https://procurement.opengov.com/portal/phoenix/projects/177084. Any interested Offerors without internet access may obtain this solicitation by calling the

Procurement Officer or picking up a copy during regular business hours at the City of Phoenix, Finance Department, Central Procurement Division, 251 W Washington Street, 8th Floor, Phoenix, AZ. It is the Offeror’s responsibility to check the City's Procurement Portal, read the entire solicitation, and verify all required information is submitted with their Offer.

2.5. Exceptions

Offeror must not take any exceptions to any terms, conditions or material requirements of this solicitation. Offers submitted with exceptions may be deemed non-responsive and disqualified from further consideration in the City’s sole discretion. Offerors must conform to all the requirements specified in the solicitation. The City encourages Offerors to send inquiries to the

Procurement Officer rather than including exceptions in their Offer.

2.6. Inquiries

All questions that arise relating to this solicitation should be directed via City’s Procurement

Portal and must be received by the due date indicated in the Schedule of Events. The City will not consider questions received after the deadline.

No informal contact initiated by Offerors on the proposed service will be allowed with members of City’s staff from date of distribution of this solicitation until after city council awards the contract. All questions concerning or issues related to this solicitation must be presented in writing.

The Procurement Officer will answer written inquiries in an addendum and publish any addenda on the City’s Procurement Portal.

2.7. Addenda

The City of Phoenix will not be responsible for any oral instructions made by any employees or officers of the City of Phoenix regarding this solicitation. Any changes will be in the form of an https://procurement.opengov.com/portal/phoenix/projects/177084 addendum. The Offeror must acknowledge receipt of any/all addenda through the City's

Procurement Portal.

2.8. Licenses

If required by law for the operation of the business or work related to this Offer, Offeror must possess all valid certifications and/or licenses as required by federal, state or local laws at the time of submittal.

2.9. Certifications

By signature in the Offer section of the Offer and Acceptance page(s), Offeror certifies:

• The submission of the Offer did not involve collusion or other anti-competitive practices.

• The Offeror must not discriminate against any employee, or applicant for employment in violation of Federal or State Law.

• The Offeror has not given, offered to give, nor intends to give at any time hereafter, any economic opportunity, future employment, gift, loan, gratuity, special discount, trip, favor, or service to a public servant in connection with the submitted Offer.

2.10. Submission of Offer

Offers must be in possession of the Department on or prior to the exact time and date indicated in the Schedule of Events. Late offers will not be considered. The prevailing clock will be the

City Department’s clock.

Offers should be submitted electronically via the City’s Procurement Portal by clicking on “Draft

Response” via https://procurement.opengov.com/portal/phoenix/projects/177084. Offerors that are unable to submit electronically should contact the Procurement Officer to discuss the logistics of hard copy submittals. Offerors must be registered with OpenGov by signing up via https://procurement.opengov.com/signup. Vendor training guides can be found at: https://opengov.my.site.com/support/s/article/ca6d1285-1e48-4a21-bb0d-715edb7794ed

Any original documents (such as bonds, guaranties, powers of attorney), if required by the solicitation, must be separately delivered to and received by the City on or prior to the exact time and date indicated in the Schedule of Events, with a clear indication of the Offer for which it is attributed.

It is the responsibility of the Offeror to ensure that the Offer is timely and to confirm that there are no technical reasons that any offer submitted electronically may be delayed. The date and time on the upload as received/stamped by the City’s Procurement Portal will provide proof of submission and verification whether the Offer was received on or prior to the exact time and date indicated in the Schedule of Events.

For assistance with submittals, vendors are welcome to use the OpenGov support chat (blue chat bubble in the bottom right corner) to connect with a member of OpenGov's support team who will be able to assist you with your submission.

Please DO NOT submit links to Google Docs, Dropbox Paper, or similar services. Your offer may be deemed non-responsive if your offer is supplied utilizing these services.

https://procurement.opengov.com/portal/phoenix/projects/177084 https://procurement.opengov.com/signup https://opengov.my.site.com/support/s/article/ca6d1285-1e48-4a21-bb0d-715edb7794ed

2.11. Withdrawal of Offer

At any time prior to the solicitation due date and time, an Offeror (or designated representative) may withdraw the Offer by clicking “Unsubmit Response” on the Offer submission via the City’s

Procurement Portal.

2.12. Offer Results

Offers will be opened on the offer due date, time and location indicated in the Schedule of

Events, at which time the name of each Offeror, and the prices may be read. Offers and other information received in response to the solicitation will be shown only to authorized City personnel having a legitimate interest in them or persons assisting the City in the evaluation.

Offers are not available for public inspection until after the City has posted the award recommendation on the City's Procurement Portal.

The City will post a preliminary offer tabulation on the City's Procurement Portal:

https://procurement.opengov.com/portal/phoenix/projects/177084 within five business days of the offer opening. The City will post the information on the preliminary tabulation as it was read during the offer opening. The City makes no guarantee as to the accuracy of any information on the preliminary tabulation. Once the City has evaluated the offers, the City will post an award recommendation on the City's Procurement Portal. By signing and submitting its Offer, each

Offeror agrees that this posting of the award recommendation to the City's Procurement Portal effectively serves as the Offeror’s receipt of that notice of award recommendation. The City has no obligation to provide any further notification to unsuccessful Offerors.

2.13. Pre-Award Qualifications

Offeror must have been in operation a minimum of five years. The Offeror’s normal business activity during the past five years will have been for providing the goods or services in this solicitation.

2.14. Certificates of Insurance

Upon notification of a recommended award, the Offeror will have 14 calendar days to submit a complete certificate of insurance in the minimum amounts and the coverages as required in the

Insurance Requirements of this solicitation. Insurance requirements are non-negotiable.

2.15. Award of Contract

Unless otherwise indicated, award(s) will be made to responsive, responsible Offeror(s) who are regularly established in the service, or providing the goods, contained in this solicitation and who have demonstrated the ability to perform in an acceptable manner.

A. Factors that may be considered by the City include:

1. Technical capability of the Offeror to accomplish the scope of work required in the

Solicitation. This may include performance history on past and current government or industrial contracts; and,

2. Demonstrated availability of the necessary manpower (both supervisory and operational personnel) and necessary equipment to accomplish the scope of work in the Solicitation; and, https://procurement.opengov.com/portal/phoenix/projects/177084

3. Safety record; and,

4. Offeror history of complaints and termination for convenience or cause.

B. Notwithstanding any other provision of this solicitation, the City reserves the right to: (1) waive any immaterial defect or informality; or (2) reject any or all offers or portions thereof; or (3) reissue a solicitation.

C. A response to a solicitation is an offer to contract with the City based upon the terms, conditions, and specifications contained in the City’s solicitation. Offers do not become contracts until they are executed by the Chief Procurement Officer or Department

Director. A contract has its inception in the award, eliminating a formal signing of a separate contract. For that reason, all of the terms, conditions and specifications of the procurement contract are contained in the solicitation, and in any addendum or contract amendment.

2.16. Solicitation Transparency Policy

Commencing on the date and time a solicitation is published, potential or actual Offerors or respondents (including their representatives) shall only discuss matters associated with the solicitation with the Mayor, any members of City Council, the City Manager, any Deputy City

Manager, or any department director directly associated with the solicitation (including in each case their assigned staff, except for the designated Procurement Officer) at a public meeting, posted under Arizona Statutes, until the resulting contract(s) are awarded to all offers or responses are rejected and the solicitation is cancelled without any announcement by the

Procurement Officer of the City’s intent to reissue the same or similar solicitation.

As long as the solicitation is not discussed, Offerors may continue to conduct business with the

City and discuss business that is unrelated to the solicitation with the City staff. Offerors may not discuss the solicitation with any City employees or evaluation panel members.

Offerors may discuss their proposal or the solicitation with the Mayor or one or more members of the Phoenix City Council, provided such meetings are scheduled through the Procurement

Officer, and are posted as open meetings with the City Clerk at least 24 hours prior to the scheduled meetings. The City Clerk will be responsible for posting the meetings. The posted notice shall identify the participants and the subject matter, as well as invite the public to participate.

With respect to the selection of the successful Offerors, the City Manager and/or City Manager's

Office will continue the past practice of exerting no undue influence on the process. In all solicitations of bids and proposals, any direction on the selection from the City Manager and/or

City Manager's Office and Department Head (or representative) to the proposal review panel or selecting authority must be provided in writing to all prospective Offerors.

This policy is intended to create a level playing field for all Offerors, assure that contracts are awarded in public, and protect the integrity of the selection process. OFFERORS THAT

VIOLATE THIS POLICY SHALL BE DISQUALIFIED. After official Notice is received by the City for disqualification, the Offeror may follow the Protest process, unless the Solicitation is cancelled without notice of intent to re-issue.

“To discuss” means any contact by the Offeror, regardless of whether the City responds to the contact. Offerors that violate this policy will be disqualified until the resulting contract(s) are awarded, or all offers or responses are rejected and the solicitation is cancelled without any announcement by the Procurement Officer of the City’s intent to reissue the same or a similar solicitation. The City interprets the policy as continuing through a cancellation of a solicitation until Council award of the contract, as long as the City cancels with a statement that the City will rebid the solicitation.

2.17. Protest Process

Offeror may protest the contents of a solicitation no later than seven days before the solicitation deadline when the protest is based on an apparent alleged mistake, impropriety or defect in the solicitation. Protests filed regarding the solicitation may be addressed by an amendment to the solicitation or denied by the City. If denied, the opening and award will proceed unless the City determines that it is in the City’s best interests to set new deadlines, amend the solicitation, cancel or re-bid.

Therefore, unless otherwise notified by a formal amendment, the Protester must adhere to all solicitation dates and deadlines, including timely filing of an offer, regardless of filing a protest.

Offeror may protest an adverse determination issued by the City regarding responsibility and responsiveness, within seven days of the date the Offeror was notified of the adverse determination.

Offeror may protest an award recommendation if the Offeror can establish that it had a substantial chance of being awarded the contract and will be harmed by the recommended award. The City will post recommendations on the City’s Procurement Portal to award the contract(s) to an Offeror(s). Offeror must submit award protests within seven days after the posting of the award recommendation, with exceptions only for good cause shown, within the

City’s full and final discretion.

All protests will be in writing, filed with the Procurement Officer identified in the solicitation and include the following:

• Identification of the solicitation number;

• The name, address and telephone number of the protester;

• A detailed statement describing the legal and factual grounds for the protest, including copies of relevant documents;

• The form of relief requested; and

• The signature of the protester or its authorized representative.

The Procurement Officer will render a written decision within a reasonable period after the protest is filed. The City will not request City Council authorization to award the contract until the protest process is complete. All protests and appeals must be submitted in accordance with the

City’s Procurement Code, (Phoenix City Code, Ch. 43) and any protests or appeals not submitted within the time requirements will not be considered. Protests must be filed with the

Procurement Officer.

2.18. Public Record

All Offers submitted in response to this solicitation will become the property of the City and become a matter of public record available for review pursuant to Arizona State law. If an

Offeror believes that a specific section of its Offer response is confidential, the Offeror will isolate the pages marked confidential in a specific and clearly labeled section of its Offer response. An Offeror may request specific information contained within its Offer is treated by the

Procurement Officer as confidential provided the Offeror clearly labels the information

“confidential.” To the extent necessary for the evaluation process, information marked as

“confidential” will not be treated as confidential. Once the procurement file becomes available for public inspection, the Procurement Officer will not make any information identified by the

Offerors as “confidential” available to the public unless necessary to support the evaluation process or if specifically requested in accordance with applicable public records law. When a public records request for such information is received, the Procurement Officer will notify the

Offeror in writing of any request to view any portion of its Offer marked “confidential.” The

Offeror will have the time set forth in the notice to obtain a court order enjoining such disclosure.

If the Offeror does not provide the Procurement Officer with a court order enjoining release of the information during the designated time, the Procurement Officer will make the information requested available for inspection.

2.19. Right to Disqualify

The City reserves the right to disqualify any Offeror who fails to provide information or data requested or who provides materially inaccurate or misleading information or data. The City further reserves the right to disqualify any Offeror on the basis of any real or apparent conflict of interest that is disclosed by the Offer submitted or any other data or information available to the

City. This disqualification is at the sole discretion of the City. By submission of a solicitation response, the Offeror waives any right to object now or at any future time, before any agency or body including, but not limited to, the City Council of the City or any court as to the exercise by the City of such right to disqualify or as to any disqualification by reason of real or apparent conflict of interest determined by the City. The City reserves the right to replace the disqualified

Offeror.

2.20. Contract Award

In accordance with the City of Phoenix Code, Chapter 43, Section 43-12, Competitive Sealed

Bidding, award(s) shall be made to the lowest responsive and responsible offeror(s) whose offer conforms in all material respects to the requirements set forth in this solicitation. The City reserves the right to award a contract by individual line items, by group, all or none, or any other combination most advantageous to the City. The City reserves the right to award multiple contracts.

2.21. Determining Responsiveness and Responsibility

Offers will be reviewed for documentation of any required minimum qualifications, and completeness and compliance with the solicitation requirements. The City reserves sole discretion to determine responsiveness and responsibility.

Responsiveness: Nonresponsive Offers will not be considered in the evaluation process. The solicitation states criteria that determine responsiveness, and the solicitation includes terms and conditions that if included or excluded from Offers will render an Offer nonresponsive.

Responsibility: To obtain true economy, the City must conduct solicitations to minimize the possibility of a subsequent default by the Offeror, late deliveries, or other unsatisfactory performance that may result in additional administrative costs. It is important that the Offeror be a responsible Offeror. Responsibility includes the Offeror’s integrity, skill, capacity, experience, and facilities for conducting the work to be performed.

2.22. Equal Low Offer

Contract award will be made by putting the names of the tied vendors in a cup for a blind drawing limited to those bidders with tied offers. If time permits, the offerors involved will be given an opportunity to attend the drawing. The drawing will be witnessed by at least three persons, and the contract file will contain the names and addresses of the witnesses.

3. Scope of Work

3.1. Objective

The City of Phoenix (City) is seeking Contractor(s) to provide traffic signal control cabinets on an as-needed basis.

The traffic signal controller cabinets, controllers, malfunction management units (MMU), bus interface units (BIU), and loop detectors and ramp pluggers will be installed by the City of

Phoenix.

3.2. General Requirements

A. The Traffic Signal Control Cabinets assemblies covered under this specification shall meet the functional, structural, and operational needs of the City. This includes two distinct cabinet types:

1. Cabinet A - National Electrical Manufacturers Association (NEMA) TS2 Type 1

Traffic Control Cabinet

2. Cabinet B - Advanced Transportation Controller (ATC) Cabinet

B. All cabinet assemblies shall be fully compatible with the City's existing system infrastructure, including but not limited to:

1. Signal controllers

2. Software applications

3. Telemetry systems

4. Field hardware components.

C. All cabinets shall be furnished and assembled in accordance with the latest applicable standards for each cabinet type:

1. Cabinet A - NEMA TS2 Type 1

a. Shall conform to the most recent version of:

i. NEMA TS2-2021, Traffic Controller Assemblies with NTCIP Requirements.

I. https://www.nema.org/Standards/view/Traffic-Controller-Assemblies-with-

NTCIP-Requirements-Version-03-07

ii. 2023 National Electrical Code (NEC)

b. Collectively referred to as the NEMA TS2 Standard, unless otherwise modified by these specifications.

2. Cabinet B - Advanced Transportation Controller (ATC)

a. Shall meet the latest requirements from recognized industry standards, including:

https://www.nema.org/Standards/view/Traffic-Controller-Assemblies-with-NTCIP-Requirements-Version-03-07 https://www.nema.org/Standards/view/Traffic-Controller-Assemblies-with-NTCIP-Requirements-Version-03-07

i. ATC 5301 - Cabinet structure, layout, and safety

I. https://www.ite.org/technical-resources/standards/its-cabinet/version-2/

ii. ATC 5201 - Controller hardware and software

I. https://www.ite.org/technical-resources/standards/atc-controller/version-

06b/

iii. ATC 5401 - API/software communication standards

I. https://www.ite.org/technical-resources/standards/atc-api/

iv. NTCIP 1202 (latest version) - Signal controller communication

I. https://www.ite.org/technical-resources/topics/standards/ntcip-1202-v04-actuated-signal-control-asc/

v. 2023 NEC (National Electrical Code) - Electrical safety and installation

I. https://www.nfpa.org/

D. All cabinet assemblies shall be manufactured in accordance with IPC-A-610 Class I standards (IPC Standards | electronics.org) for electronic assemblies. This includes workmanship, soldering, and component placement requirements suitable for dedicated service electronics. These criteria—referred to as the IPC Class I Standard — shall apply unless otherwise modified by these specifications.

1. The Contractor shall provide documentation confirming that the cabinet manufacturer's production staff are trained and certified in IPC-A-610 Class I standards for electronic assembly.

2. To support quality assurance and field operations, a locally based, factory-certified technician shall be available to provide technical assistance, troubleshooting, and on-site support as needed.

E. Cabinet Design

1. Cabinet A (NEMA TS2 Type 1):

a. Shall be designed for TS2 Type 1 operation, utilizing serial communication via

SDLC and BIUs. The cabinet shall be pre-wired to support a minimum of sixteen phases, including vehicle, pedestrian, and overlap movements. It shall include a

16-channel detector rack and be compatible with NEMA TS2 controllers and

MMUs.

2. Cabinet B (ATC Cabinet):

a. Shall be designed to support ATC 5301 Cabinet architecture and be pre-wired for a minimum of sixteen phases, with capacity for expansion. The Cabinet shall support high-density load switches, modular detector inputs, and advanced diagnostics. It must be fully compatible with ATC controllers and NTCIP https://www.ite.org/technical-resources/standards/its-cabinet/version-2/ https://www.ite.org/technical-resources/standards/atc-controller/version-06b/ https://www.ite.org/technical-resources/standards/atc-controller/version-06b/ https://www.ite.org/technical-resources/standards/atc-api/ https://www.ite.org/technical-resources/topics/standards/ntcip-1202-v04-actuated-signal-control-asc/ https://www.ite.org/technical-resources/topics/standards/ntcip-1202-v04-actuated-signal-control-asc/ https://www.nfpa.org/ https://www.electronics.org/ipc-standards protocols, and provide enhanced safety, scalability, and open-architecture flexibility.

F. All cabinets shall use the same equipment, materials, and features, including brand and model, as provided in the Pricing Proposal.

G. The Contractor shall maintain current ISO 90001:2015 certification for the cabinet manufacturer.

1. This certification must be issued by an accredited body and demonstrate compliance with internationally recognized quality management system standards.

H. Cabinet Submission and Identification

1. Prior to the first delivery of each type of cabinet under this contract, the Contractor shall provide one fully assembled and supplied cabinet for inspection and testing by the City. The submittal cabinet shall include all standard components, internal wiring, labeling, and documentation representative of the final production configuration. The purpose of this submittal is to verify compliance with all specified requirements prior to authorization of subsequent deliveries. Ten business days will be allowed for this process for each type of cabinet.

2. The delivered cabinet shall be labeled with a unique, documented sequence number, permanently affixed inside, to enable accurate tracking, assignment, and identification of its field installation location.

3.3. Repairs

A. Once a cabinet assembly has been deployed in the field, and if quality control issues arise, it may not be practical to remove the cabinet for off-site diagnosis or repair. The

Contractor shall:

1. Be responsible for on-site field repairs as determined by the the City's Street

Transportation (Department) Contract Representative.

2. Provide a local, factory-certified technician upon request by the City to perform diagnostics and warranty repairs during the warranty period.

B. Cabinet Operating in Safe Normal Operational Mode

1. If the cabinet is operating in Safe Operational mode, the Contractor shall:

a. Perform all warranty repairs on-site.

b. Be responsible for:

i. All labor and materials associated with troubleshooting and repair or replacement.

ii. Coordinating with City Contract Representative for access and scheduling.

C. Cabinet Fault Mode

1. If the cabinet cannot be placed in a Safe Normal Operational Mode and must be replaced immediately:

a. The City will proceed with cabinet replacement to restore intersection operation.

b. The Contractor shall be responsible for:

i. All costs related to troubleshooting, repair, and/or full cabinet replacement.

ii. Coordinating with City Contract Representative and emergency response teams.

I. In the event of an emergency cabinet replacement, the City of Phoenix

Signal Shop shall serve as the designated emergency response team responsible for coordinating and executing the replacement.

3.4. Return Material Authorization (RMA) Process

A. To ensure timely and traceable resolution of defective or non-conforming cabinet assemblies, the following RMA process shall apply:

1. RMA Requests

a. The City will notify the Contractor in writing of any defective or non-compliant cabinet or component.

b. Within two business days, the Contractor will issue an RMA number and provide the City with return instructions, including shipping address and contact information.

2. Packaging and Transport

a. The Contractor shall coordinate pickup or provide prepaid shipping labels for return of the defective item(s).

b. The City shall securely package all items being returned to to prevent damage during transit.

c. The City shall not be responsible for damage incurred during shipping.

3. Evaluation and Resolution

a. Upon receipt, the Contractor shall inspect and evaluate the returned item within seven business days.

b. The Contractor shall provide a written report detailing the root cause of the issue, the corrective action to be taken, and a resolution timeline.

i. The Contractor shall remain responsible throughout the corrective process, including any delays due to part availability, vendor coordination, or other dependencies. If replacement components are required, the contractor shall include estimated delivery dates and installation schedules in the report to ensure transparency.

c. If the item is deemed defective under Warranty, the Contractor shall repair or replace it at no cost to the City.

4. Replacement and Turnaround

a. Replacement units shall be delivered within 10 business days of RMA evaluation, unless otherwise agreed upon in writing.

b. If expedited replacement is required due to operational impact, upon the City's request, the Contractor shall prioritize delivery and may be subject to liquidated damages if delayed.

5. RMA Tracking and Documentation

a. The Contractor shall maintain a log of all RMA transactions, including dates, serial numbers, failure descriptions, and resolution actions.

b. A copy of the RMA log shall be submitted to the City upon request.

6. Contractor-Provided Repair Process

a. As part of the RMA process, the Contractor shall:

i. Provide a quote outlining the repair services for product not covered under warranty.

I. Clearly identify pricing for:

I. Diagnostic evaluations

II. Common part replacements

III. On-site service visits

IV. Expedited or emergency repairs

II. The quote shall only contain parts and the hourly fee provided in the

Contractor's Pricing Proposal.

b. Ensure all non-warranty repairs are pre-approved by the City prior to performing work.

3.5. Pricing

A. The Contractor shall ensure that pricing for items quoted throughout the life of the contract are in accordance with the Contractor's Pricing Proposal.

3.6. Cabinet A - NEMA TS2 Type 1 Traffic Control - Cabinet Design

A. The traffic signal cabinet shall comply with the environmental and operational requirements specified in the NEMA TS2 Standard and IPC Class 2 workmanship criteria. It shall be UL listed to UL 508A and rated for Type 3R enclosures. The cabinet design shall incorporate features that provide reasonable protection against vandalism and unauthorized access.

B. TThe cabinet shall provide ample interior space to accommodate all required traffic signal equipment, wiring, and accessories without overcrowding or compromising accessibility. Unless otherwise specified, the cabinet shall conform to the City’s P44 standard base cabinet, with minimum dimensions of 44 inches wide, 24 inches deep, and 52 inches high. To accommodate varying field conditions, intersection layouts, and deployment scenarios, alternate NEMA cabinet sizes may be accepted, including but not limited to:

1. 30"W x 19"D x 51"H – Pole mount

2. 36"W x 24"D x 52"H – base mount

3. 46"W x 24"D x 52"H – base mount

4. 48"W x 24"D x 52"H – base mount

C. The cabinet shall be constructed from Type 5052-H32 aluminum with a minimum wall thickness of 0.1245 inches. All seams shall be continuously welded to ensure structural integrity and environmental protection.

1. The exterior surface shall be finished with a white powder coat, while the interior shall retain a natural aluminum finish. Surfaces shall be smooth and free from visible marks, scratches, or manufacturing defects.

2. All external hardware, including hinges, handles, and fasteners, shall be mad of stainless steel to resist corrosion and ensure long-term durability.

D. On the top of the cabinet, a one-inch slope toward the rear shall be incorporated to prevent rain accumulation. A rain channel shall be incorporated into the main door opening to prevent liquids from entering the enclosure. The cabinet shall be equipped with two aluminum lifting brackets capable of supporting the cabinet during installation and recovery. The top two corners of the bracket shall be dog eared or sheared off at a

45-degree angle, ¾ of an inch from the corner in both directions. All exposed edges above the cabinet shall be smoothed to eliminate sharp edges.

E. An exhaust plenum with a vent screen into the roof of the cabinet shall be included.

Perforations in the vent screen shall not exceed 0.125 inches in diameter.

F. A louvered air entrance shall be equipped at the lower section of the cabinet door. The air inlet shall be large enough to allow sufficient air flow per the rated fan capacity.

Louvers must satisfy the NEMA rod entry test for Type 3R ventilated enclosures. A replaceable air filter shall be housed behind the door vents. The air filter shall be a 16-inch x 12-inch x 1-inch, single piece, disposable pleated filter. The filter filtration area shall cover the vent opening area. The filter resident in its shell shall be held firmly in place with a bottom bracket and a spring loaded upper clamp. No incoming air shall bypass the filter. The bottom filter bracket shall be angled in a way to accept filters of various thickness, as not all air filters are precisely one inch in thickness. The bottom filter bracket shall be formed into a waterproof sump with drain holes to the outside housing.

3.7. Cabinet A - NEMA TS2 Type 1 Traffic Control - Cabinet Door

A. The cabinet door opening shall be a minimum of 80 percent of the front surface of the cabinet. The main door and police door-in-door shall each close against a weatherproof and dust-proof, closed-cell neoprene gasket seal. The gasket material for the main door shall be a minimum of 0.188 inches thick by 1.00 inch wide. The gasket material for the police door shall be a minimum of 0.188 inches thick by 0.500 inches wide. The gaskets shall be permanently bonded to the cabinet.

B. The main door shall be equipped with a three-point latching mechanism. The upper and lower locking points of the latching mechanism shall each have a pair of nylon rollers.

The handle on the main door shall utilize a shank of stainless steel 3/4 inches minimum diameter. The handle shall include a hasp for the attachment of an optional padlock. The cabinet door handle may turn either clockwise or counterclockwise to open, and shall not extend outwards past the edge of the door at any time. Position the lock assembly so the key will not cause any interference with the handle, or a person’s hand on the handle, when opening the cabinet door.

C. The main door shall include a solid stainless steel rod stop and catch mechanism capable of rigidly holding the door open at approximately 90, 120, and 180 degrees under windy conditions. The operator must be able to engage and disengage the catch with a shoed or booted foot.

D. The main door hinge shall be a one-piece, continuous piano hinge with a minimum 0.25 inch stainless steel pin running the entire length of the right side of the door (right-handed). Attach the hinge in such a manner that no rivets or bolts are exposed.

E. The main door shall be equipped with a brass Corbin tumbler lock No. 2, or approved equal, a swing away dust cap, and minimum two keys shall be provided. The police door-in-door shall be equipped with a standard police lock and two keys.

F. The door shall be electrically bonded to the rest of the cabinet with a braided copper grounding conductor. The length of the grounding conductor shall allow the door to swing fully open, without using the stop bar, without stretching or breaking the grounding conductor. The grounding conductor shall not interfere with normal door operation.

G. The cabinet shall have two door-actuated, hermetically sealed, micro switches. One switch shall be wired to allow for and send a signal to the controller sufficient for the controller to log an alarm (door open alarm). The second switch shall be wired to an LED cabinet lighting system allowing for shelf, field terminal, and documentation illumination.

3.8. Cabinet A - NEMA TS2 Type 1 Traffic Control - Cabinet

Shelves/Mounting

A. Each cabinet shall include a minimum of three vertical “C” channels mounted on each interior side wall. These channels shall be compatible with Unistrut-style spring nuts or studs.

1. The channels shall accommodate spring mounted nuts or studs. All mounting channels and rails shall extend to within 7 inches of the top and bottom of the cabinets and shall be of sufficient strength to rigidly hold specified shelves and equipment. Sidewall rail spacing shall be between 7 and 8 inches center-to-center.

Rear wall rail spacing shall be between 18 and 19 inches center-to-center.

B. Provide two full-width, 11-inch deep, fully adjustable, perforated aluminum shelves to support the controller and other equipment. Mount the lower shelf at a height above the bottom of the cabinet such that the shelf and attached drawer does not interfere with the ability to tilt the terminal facility forward on its hinges for maintenance purposes. Mount the top shelf at least 13 inches above the surface of the lower shelf.

C. The loop detector racks and other auxiliary equipment shall be located on the top shelf.

The controller and MMU shall be located on the lower shelf. The power supply may be mounted on either shelf.

D. Provide an under-shelf drawer under the lower shelf. The drawer shall be approximately

24 inches wide and the full depth of the shelf. The drawer shall operate easily and smoothly, and shall have a stop to prevent inadvertently pulling the drawer out of its support. Design the stop to allow purposeful complete removal of the drawer without the use of tools.

3.9. Cabinet A - NEMA TS2 Type 1 Traffic Control - Auxiliary Cabinet Equipment

A. The cabinet shall have two thermostatically (adjustable between 55-160 degrees

Fahrenheit) controlled ventilation fans in the top of the cabinet plenum. Each fan shall have a finger guard installed. Each fan’s free delivery airflow shall be equal to or greater than 100 cubic feet per minute. The magnetic field of the fan motors shall not affect the performance of control equipment. The fan bearings shall operate freely. The fan plates shall be removable with the use of simple hand tools for serviceability. The fan units shall be corrosion resistant. The fans shall be fused.

B. Resealable print pouche shall be mounted to the door of the cabinet. The pouch shall be able to accommodate one complete set of folded cabinet prints.

C. A minimum of two sets of complete and accurate cabinet drawings shall be supplied with each cabinet, including detector amplifier jumper schematic. A single digital copy (i.e., PDF) of all new revisions shall be provided to the Traffic Signal Shop upon delivery of revised cabinets.

3.10. Cabinet A - NEMA TS2 Type 1 Traffic Control - Terminals and Facilities

A. The terminal facility panel shall be constructed from 5052-H32 brushed aluminum of

0.125 inches minimum thickness and formed so as to eliminate any flexing when plug-in components are installed.

B. The bottom of the terminal facility shall be mounted a minimum of nine inches from the bottom of the cabinet. Hinge the terminal facility at the bottom to allow easy access with simple tools to all wiring on the rear of the panel. It shall not be necessary to remove the lower shelf, the shelf drawer, or any shelf-mounted equipment to hinge down the terminal facility. Provide sufficient slack in the load bay wiring to allow for dropping the load bay.

C. The terminal facility shall be fully wired with 16 load switch sockets: eight phases of vehicular, four phases of pedestrian, and four phases of overlap operation; eight flash transfer relay sockets; one flasher socket; and two terminal facility BIU rack slots. The use of printed circuit boards is not acceptable on the terminal facility, except printed circuit boards are acceptable for the BIU interface with the load bay. Position the 16 load switch sockets in two horizontal rows of eight sockets each. Support the load switches and flasher by a bracket or shelf extending at least three inches from the terminal facility.

D. Label all terminals, load switches, and flash transfer relay sockets. Label reference designators by silk-screening on the front and rear of the terminal facility to match drawing designations. Socket pins shall be marked for reference on the rear of the panel.

E. Provide two each 16-channel, 8-position, TS2 detector racks, each with an integrally mounted BIU mounting. Racks shall be addressable. Power each detector rack by the cabinet power supply. Fasten the loop detector racks towards the left side of the top shelf.

F. For BIU rack connectors, pre-wired address pins, or jumper plugs corresponding to the requirements of the NEMA TS2 Standard shall be provided. The address pins or jumper plugs shall control the BIU mode of operation. BIUs shall be capable of being interchanged with no additional programming.

G. For the terminal facility, all field wires shall be contained within one or two rows of horizontally mounted Marathon heavy duty terminal blocks or approved equal. All field output circuits shall be terminated on a non-fused terminal block with a minimum rating of 10 amps. Use mechanical connector lugs rated for copper wire.

H. All field input/output (I/O) terminals shall be identified by permanent alphanumeric labels.

All labels shall use standard nomenclature per the NEMA TS2 Standard. As a minimum, Terminals shall be provided for the input/output signals listed in NEMA TS2 5.3.1.2

Table 5-3 for configuration 1 and the following:

1. FunctionPurposeBIUSignalAlarm 1Cabinet door Open223BAlarm 2Battery

Backup On117AAlarm 3Battery Backup Low117BAlarm 4Spare 2220AAlarm

5Spare 3220BAlarm 6TBC ONLINE121AAlarm 7TBC AUX1114AAlarm 8TBC

AUX2114BAlarm 9TBC AUX3214A

I. All field flash sequence programming at the field terminals shall be able to be accomplished with the use of only a screwdriver.

J. Field terminal blocks shall be wired to use four positions per vehicle or overlap phase

(green, yellow, red, flash).

K. One RC network shall be wired in parallel with each group of three flash-transfer relays and any other relay coils.

L. All logic-level, NEMA-controller and MMU input and output terminations on the terminal facility shall be permanently labeled. Cabinet drawings shall identify the function of each terminal position and be shown in the run position.

M. Terminal blocks for DC signal interfacing shall have a number 6-32 x 7/32-inch screw as minimum. Functions to be terminated shall be as specified in the listing of Input/ Output

Terminals in Section 5 of the NEMA TS2-2021 Standard.

N. Any exposed terminals or switch solder points shall be covered with a non-flexible, non-conductive shield to prevent accidental contact. The covers shall hinge out of the way in the open position.

O. The back side of all solder mounted sockets (BIU and detector cards) shall be silicon sealed to prevent short-circuiting.

3.11. Cabinet A - NEMA TS2 Type 1 Traffic Control - Vehicle Detection

A. A minimum of two loop detector racks shall be provided in each cabinet. Each detector rack shall support up to 16 channels of loop detection (either eight 2 channel detectors or four 4-channel detectors), two 2-channel preemption devices and one BIU.

B. Each cabinet shall have a minimum of two detector interface panels for the purpose of connecting field loops and Loop Detector Racks. One 16-position interface panel shall be provided for a 16-channel rack. The interface panel shall be secured to a mounting plate and attached to the left wall of the cabinet.

C. Each interface panel shall allow for the connection of 16 independent field loops. A ground bus terminal shall be provided between each loop pair terminal to provide a termination for the loop lead-in cable ground wire.

3.12. Cabinet A - NEMA TS2 Type 1 Traffic Control - Conductors and Cables

A. All conductors in the cabinet shall be copper 22 AWG or larger.

1. All 14 AWG and smaller wires shall conform to MIL-W-16878/1, Type B/N, rated at

600V, constructed of 19-strand tinned copper and insulated with polyvinyl chloride to a minimum of 0.010 inches with a clear nylon jacket. These wires shall be rated for continuous operation at 105°C.

2. Wires sized 12 AWG and larger shall be UL listed THHN/THWN rated at 600V, with

PVC insulation of minimum 0.020 inches thickness, a clear nylon jacketed, and a temperature rating of 90°C.

B. The Length of all controllers and MMU cables shall be sufficient to allow the units to be placed on either cabinet shelf while remaining fully operational. Cable routes shall not restrict to other components or interfere with ventilation, diagnostics or maintenance procedures.

C. Connecting cables shall be sleeved in a braided nylon mesh. The use of exposed tie-wraps and interwoven cables are unacceptable.

D. All terminals and facilities configurations shall be provided with BIU wiring assignments consistent with NEMA TS2 – 2021 specifications.

E. All terminals and facilities configurations shall be provided with sufficient SDLC RS-485

Port 1 communication cables to allow full capabilities of that cabinet. Each communication cable connector shall be a 15-pin metal shell D subminiature type. The cable shall be a shielded cable suitable for RS-485 communications.

F. Two surface-mounted 6-port terminal blocks with pre-wired SDLC connecting cables shall be included in the cabinet.

G. All connecting cables and wire runs shall be secured by mechanical clamps. Stick-on type clamps are not acceptable.

H. The terminal facility shall be pre-wired for Type 16 MMU.

I. All wiring shall be neat in appearance. Excess cable shall be stowed behind the terminal facility or below the shelves in order to allow easy access to the terminal facility and cabinet components. All cabinet wiring shall be continuous from its point of origin to its termination point. Butt type connections/splices are not acceptable.

J. The grounding system in the cabinet shall be wired into three separate circuits: AC

Neutral, Earth Ground, and Logic Ground.

K. All pedestrian pushbutton inputs from the field to the controller shall be opto-isolated through the BIU and operate at 12 VAC.

L. All wire, size 16 AWG or smaller, at solder joints shall be hooked or looped around the eyelet or terminal block post prior to soldering to ensure circuit integrity. Lap joint soldering is not acceptable.

3.13. Cabinet A -…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .