Traffic_Control_Plans.pdf
PDF 1 MB Posted
- Solicitation number
- 23/24-26
- Issued by
- Hartford County, Connecticut
About this file
The document is a set of Technical Specifications for Maintenance and Protection of Traffic, developed by the Connecticut Department of Transportation's Bureau of Engineering & Construction. These technical specifications provide detailed traffic control plans for various highway work scenarios, including work in travel lanes, shoulders, and middle of roadways on two-lane highways. The documents include comprehensive diagrams for alternating one-way traffic operations, stop sign control methods, and specific guidance for traffic management during construction projects.
The technical specifications outline precise requirements for traffic signage, including Series 16 signs, regulatory signs, and hand signal methods for uniformed flaggers. Key details include minimum sign face sizes, placement distances, buffer areas, and specific instructions for traffic control in different highway work zones. The plans include provisions for installing warning signs, traffic cones, drums, and portable sign supports, with specific guidance on spacing, positioning, and transitions between work areas. The documents also address fines for road work zones, with a "Road Work Ahead, Fines Doubled" regulatory sign to be used in specified circumstances.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAINTENANCE AND PROTECTION OF TRAFFIC
TECHNICAL SPECIFICATIONS
File details come from the government source that posted it. Updated .