This is a Rigging Plan drawing for the Goodrich Area Schools Auditorium theatrical draperies and rigging updates project located at 8029 S Gale Rd. in Goodrich, Michigan. The plan, drawn by Russ Blain of R. Blain Consulting LLC and issued for final bidding on September 10, 2026, specifies the installation and repositioning of 16 theatrical pipes and associated rigging systems throughout the auditorium. The base bid scope includes installing new operating lines, tensioners, and carriers; installing new soft goods; resetting border trim per owner instructions; and installing a Thern "Pilewind" Hoist System on one designated pipe. The project also includes two optional additive items: ADDER #1 for installing an additional hoist system on one pipe, and ADDER #2 for installing hoist systems on two additional pipes. As part of the base bid, contractors must also install previously removed scenic track and pipe systems in designated locations. The plan details pipe configurations including main valance, traveler, electric, border, scenic traveler, black traveler, and cyclorama pipes with specific spacing and trim requirements.

The drawing indicates that detailed specifications for the Thern "Pilewind" Hoist System installation are contained in Section 11 61 33 Appendix A and Drawing TR-1. Pipes without approved additive items are to remain dead-hung in their existing positions. The plan was subject to multiple revisions between August 31, 2026 and September 10, 2026 for final team review before being released for bidding and installation. The project is identified as PROJECT #AUD2026 with the consulting firm contact located at Overlake Street, Saint Clair Shores, Michigan.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Drawn By: Russ Blain R. Blain Consulting LLC

SCHEDULES & NOTES

7/29/2025 Final Review

SCALE: NTS

GOODRICH AREA

SCHOOLS AUDITORIUM

THEATRICAL DRAPERIES

AND RIGGING UPDATES

Goodrich Area Schools 8029 S Gale Rd.

Goodrich, MI 48438

SHEET

Rigging Plan

DRAWING # TR-3

PROJECT

22813 Overlake Street Saint Clair Shores, MI 48080

(313) 316 – 5639 rblain.com

DRAWN BY:

RUSS BLAIN

R. BLAIN CONSULTING LLC

ISSUE DATE:

8/31/2026

9/3/2026

9/9/2026

9/10/2026

ISSUED FOR:

FINAL TEAM

REVIEW

REVISION FOR

FINAL TEAM

REVIEW

REVISION FOR

FINAL TEAM

REVIEW

FINAL VERSION

FOR BIDDING AND

INSTALLATION

SCALE: 3/8" = 1'-0"

29'-0"

PIPE #1: MAIN VALANCE

PIPE #2: MAIN TRAVELER

PIPE #3: 1ST ELECTRIC

1ST LEG TRACKS

PIPE #4: 1ST BORDER

PIPE #5: 1ST SCENIC TRAVELER

PIPE #6: 2ND BORDER

PIPE #7: 2ND ELECTRIC

PIPE #8: MS BLACK TRAVELER

PIPE #9: 2ND SCENIC TRAVELER

PIPE #10: 3RD BORDER

PIPE #11: 3RD ELECTRIC

PIPE #12: 4TH BORDER

PIPE #13: US BLACK TRAVELER

PIPE #14: 4TH (CYC) ELECTRIC

PIPE #15: 3RD SCENIC TRACK

PIPE #16: CYCLORAMA

GENERAL NOTE: Distances from pipes to the up and down stage walls and between pipes is not to scale.

SPECIFIC PLAN NOTES:

1) Install new operating line, tensioner, and carriers.

2) Install new soft goods.

3) Reset border trim as per Owner's instructions.

4) As part of the Base Bid, install a Thern “Pilewind” Hoist System (See Section 11 61 33 Appendix A and Drawing TR-1).

5) If ADDER #1 is approved, install a Thern “Pilewind” Hoist System on this pipe (See Section 11 61 33 Appendix A and Drawing TR-1). Otherwise, leave the pipe dead-hung in it's existing position.

6) If ADDER #2 is approved, install a Thern “Pilewind” Hoist System on these two pipes (See Section 11 61 33 Appendix A and Drawing TR-1). Otherwise, leave the pipes dead-hung in their existing positions.

7) Install scenic track previously removed from Pipe #16.

8) As part of the Base Bid, install the pipe and Traveler Track previously removed from it's position upstage of the CYC Electric, in the space formerly occupied by the "4th Leg Tracks.

3RD LEG TRACKS2

2ND LEG TRACKS2

PROJECT# AUD2026