TR-2 Goodrich Rigging Demo - Final (Fr1).pdf

PDF 637 KB Posted

Attached to
Auditorium Draperies and Rigging
Solicitation number
RFP GOOD 260000002621 1
Issued by
Genesee County, Michigan

About this file

This is a technical drawing and specifications document for theatrical draperies and rigging updates at Goodrich Area Schools Auditorium in Goodrich, Michigan. The project, identified as AUD2026 with project number 22813, involves the demolition and reconfiguration of existing stage rigging systems to prepare for installation of a Thern "Pilewind" Hoist System. The scope of work includes removal of soft goods, operating lines, tensioners, carriers, scenic track, lighting fixtures, and existing rigging across 16 pipes and 4 leg track systems. Specific tasks involve striking and removing various theatrical equipment for storage or disposal per owner instructions, with conditional work items (Addendum #1 and #2) that may require additional pipe and rigging removal depending on approval status. The drawing was finalized on 9/10/2026 for bidding and installation purposes, with revisions issued on 8/31/2026 and 9/9/2026 for team review.

The document is a schematic drawing prepared by R. Blain Consulting LLC, scaled at 3/8" = 1'-0", detailing the spatial arrangement of theatrical equipment and rigging components within the auditorium. The drawing notes indicate that distances between pipes and stage walls are not to scale and should be verified on-site. No pricing information, contract terms, funding sources, or bid response deadlines are included in this technical specification document, which serves as the basis for contractor estimating and installation planning.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Drawn By: Russ Blain R. Blain Consulting LLC

SCHEDULES & NOTES

7/29/2025 Final Review

SCALE: NTS

GOODRICH AREA

SCHOOLS AUDITORIUM

THEATRICAL DRAPERIES

AND RIGGING UPDATES

Goodrich Area Schools 8029 S Gale Rd.

Goodrich, MI 48438

SHEET

Rigging Demo

DRAWING # TR-2

PROJECT

22813 Overlake Street Saint Clair Shores, MI 48080

(313) 316 – 5639 rblain.com

DRAWN BY:

RUSS BLAIN

R. BLAIN CONSULTING LLC

ISSUE DATE:

8/31/2026

9/9/2026

9/10/2026

ISSUED FOR:

FINAL TEAM

REVIEW

REVISION FOR

FINAL TEM REVIEW

FINAL VERSION

FOR BIDDING AND

INSTALLATION

SCALE: 3/8" = 1'-0"

58'-0"

GENERAL NOTE: Distances from pipes to the up and down stage walls and between pipes is not to scale.

SPECIFIC DEMO NOTES:

1) Remove all soft goods and store or discard as per the Owner's instructions.

2) Remove existing operating line, tensioner, and carriers and store or discard as per the Owner's instructions.

3) Remove scenic track and lighting fixtures and and store as per the Owner's instructions.

4) Remove scenic track and set aside to be rehung on pipe #15 later, as per the Owner's instructions.

5) Strike Pipe and existing rigging to Prep for Thern “Pilewind” Hoist System installation (See Section 11 61 33 Appendix A and Drawing

TR-1).

6) Remove Traveler Track, Pipe, and Existing Rigging and set aside as per the Owner's instructions, to be rehung later downstage of the 4th (Cyc) Electric.

7) If ADDER #1 is approved, remove pipe and existing rigging to prep for Thern “Pilewind” Hoist System installation (See Section 11 61 33 Appendix A and Drawing TR-1). Otherwise, leave the pipe dead-hung in it's existing position.

8) If ADDER #2 is approved, remove pipes and their existing rigging to prep for Thern “Pilewind” Hoist System installation (See Section 11 61 33 Appendix A and Drawing TR-1). Otherwise, leave the pipes dead-hung in their existing position.

9) Remove 4th Leg Tracks and Store as per the Owner's Instructions. and set aside to be rehung on pipe #15 later, as per the Owner's instructions.

PIPE #1: MAIN VALANCE

PIPE #2: MAIN TRAVELER

PIPE #3: 1ST ELECTRIC

PIPE #4: 1ST BORDER

PIPE #5: 1ST SCENIC TRAVELER

PIPE #6: 2ND BORDER

PIPE #7: 2ND ELECTRIC

PIPE #8: MS BLACK TRAVELER

PIPE #9: 2ND SCENIC TRAVELER

PIPE #10: 3RD BORDER

PIPE #12: 4TH BORDER

PIPE #13: 3RD (CYC) ELECTRIC

PIPE #14: US BLACK TRAVELER

PIPE #15: CYCLORAMA

PIPE #16: 4TH SCENIC TRAVELER

1ST LEG TRACKS1

4TH LEG TRACKS9

3RD LEG TRACKS1

2ND LEG TRACKS1

PIPE #11: SCENIC TRAV / 2A ELECTRIC

PROJECT# AUD2026

File details come from the government source that posted it. Updated .