This document is a set of technical drawings and specifications for a security camera installation project at Woodland Elementary School in Portage, Michigan, prepared for Portage Public Schools. The project scope encompasses the installation of security cameras, mounting hardware, and camera licenses for the school's existing Video Management System (VMS). The design includes 16 cameras total: 2 ceiling-mounted cameras (C1-01 and C1-02) and 14 exterior wall or corner-mounted cameras (CE-01 through CE-14) mounted at a height of 10 feet. The exterior cameras utilize the PNM-C32083RVQ model with various mounting accessories, while the ceiling cameras use the PND-A9081RV model. The drawings, issued November 22, 2024, include floor plans for three units (Unit A, Unit B, and Unit C), technology symbols and general notes, camera mounting details, and a comprehensive security camera schedule. Installation must be completed by or overseen by a manufacturer-certified professional in accordance with the specifications detailed in drawings TG 001.54, T 101.54A-C, and T 441.54.

The project specifications require that all cameras be installed with appropriate hangers, fasteners, and safety equipment, including weathertight sealant and surge suppression for exterior units. Prior to network connection, all default usernames and passwords must be changed in coordination with the school district, and cameras must be configured according to the owner's network standards and naming conventions. Installation includes setting initial camera views as defined by a camera coordination spreadsheet with varifocal aiming where necessary, followed by owner sign-off on all camera angles. Each camera must be labeled with identification information visible from the ground, indicating camera number, technology room number, rack designation, and port information. The cabling infrastructure requires a minimum 15-foot service loop prior to termination, with all cabling installed in conduit in exposed areas and cable management systems used elsewhere. The project references existing infrastructure provided by the owner, including network switches, NVRs, and the VMS platform, with the contractor responsible only for cameras, mounting hardware, and associated licenses.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

T O

W E

R P

IN

K

S T

E R

.C O

M

A L

L R

IG

H

T S

R E

S E

R V

E D

DESIGN TEAM

ARCHITECT/ENGINEER

WOODLAND ELEMENTARY SCHOOL -

SECURITY CAMERAS

PORTAGE PUBLIC SCHOOLS

Portage, Michigan

C O

V E

R S

H E

E T

-2

.5

G

.5

W O

O D

L A

N D

E L E

M E

N T

A R

Y S

C H

O O

L

S E

C U

R

IT

Y C

A M

E R

A S

P o rt a g e

M ic h ig a n

P O

R T

A G

E P

U B

L

IC

S C

H O

O L

S

N O

V E

M B

E R

BID DOCUMENTS

DRAWING INDEX

PORTAGE PUBLIC SCHOOLS

1401 WOODLAND DR.

PORTAGE, MI 49024

242 E. KALAMAZOO AVE, SUITE 100

KALAMAZOO, MICHIGAN 49007

PHONE: 269.343.6133

FAX: 269.343.6633

SITE ADDRESS

ISSUED FOR DATE

TECHNOLOGY - GENERAL

TG 001.54 TECHNOLOGY SYMBOLS AND GENERAL NOTES

TECHNOLOGY

T 101.54A FIRST FLOOR TECHNOLOGY PLAN - UNIT A

T 101.54B FIRST FLOOR TECHNOLOGY PLAN - UNIT B

T 101.54C FIRST FLOOR TECHNOLOGY PLAN - UNIT C

T 441.54 CAMERA DETAILS

RELEASE BUTTON

CARD READER - 4 SQ BOX, SG COVER, 3/4" CONDUIT STUB

KEY PAD - 4 SQ BOX, SG COVER, 3/4" CONDUIT STUB

INTERCOM - 4 SQ BOX, SG COVER, 3/4" CONDUIT STUB 40"

40"

40"

SECURITY CAMERA - WALL

SECURITY CAMERA - CEILING

SECURITY CABLING PATHWAY, 4 SQ, SG BRUSH PLATE, 1" CONDUIT STUB

INTERCOM MASTER STATION

LOCKDOWN BUTTON

DURESS ALARM PUSH BUTTON - UNDER DESK

ACCESS CONTROL DETAIL INDICATOR: REFER TO ACCESS

CONTROL DETAILS AND SCHEDULE

16"

ACCESS CONTROL PANEL (REFER TO DETAILS)

CARD READER, MULLION MOUNT, 3/4" CONDUIT STUB 40"

LOCKDOWN STROBE (REFER TO DETAILS)

SECURITY SYMBOLS

RB

CR

KP

IC

SCP

MS

LD

DA

#n

ACP #

CR

M

LS

NOTES:

MOUNT DEVICES AT HEIGHTS INDICATED UNLESS INDICATED

OTHERWISE ON PLANS. HEIGHTS ARE TO BOTTOM OF DEVICE.

DB

ST

DOORBELL, 4 SQ BOX, SG REDUCER, 3/4" CONDUIT STUB

DOORBELL STROBE, 4 SQ BOX, SG REDUCER, 3/4"C STUB

40"

96"

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

T O

W E

R P

IN

K

S T

E R

.C O

M

A L

L R

IG

H

T S

R E

S E

R V

E D

T E

C H

N O

L O

G Y

S Y

M B

O L

S A

N D

G E

N E

R A

L N

O T

E S

-2

.5

T G

.5

W O

O D

L A

N D

E L E

M E

N T

A R

Y S

C H

O O

L

S E

C U

R

IT

Y C

A M

E R

A S

P o rt a g e

M ic h ig a n

P O

R T

A G

E P

U B

L

IC

S C

H O

O L

S

N O

V E

M B

E R

ISSUED FOR DATE

GENERAL NOTES - SECURITY CAMERA

1 INSTALLATION SHALL BE COMPLETED BY OR OVERSEEN BY A MANUFACTURER CERTIFIED

PROFESSIONAL.

2 INSTALL CAMERAS USING ALL APPROPRIATE HANGERS, FASTENERS, ETC. CAMERAS

INSTALLED IN GRID/LAY IN CEILING SHALL HAVE SAFETY WIRE TYING THE CAMERA TO

STRUCTURE ABOVE. EXTERIOR CAMERAS SHALL HAVE WEATHERTIGHT SEALANT AND

SURGE SUPPRESSION INSTALLED. REFER TO CAMERA ROUGH IN DETAILS.

3 PRIOR TO CONNECTION TO OWNER'S NETWORK, DEFAULT USERNAME AND PASSWORD

SHALL BE CHANGED. COORDINATE WITH OWNER FOR DEVICE SPECIFIC USERNAMES

AND PASSWORDS.

4 CAMERA SHALL BE CONFIGURED BASED ON OWNER'S NETWORK CONFIGURATION AND

NAMING STANDARDS. COMPLETE AN IP ADDRESS REQUEST WITH THE OWNER,

COORDINATE NAMING CONFIGURATION BASED ON CAMERA COORDINATION

SPREADSHEET.

5 INSTALL CAMERAS WITH INITIAL VIEW DEFINED BY THE CAMERA COORDINATION

SPREADSHEET OR COVERAGE ANGLES PROVIDED BY ARCHITECT. VARIFOCAL AIMING

WHERE REQUIRED TO OBTAIN INTENDED VIEW SHALL BE COMPLETED.

6 FOLLOWING SETTING THE INITIAL VIEW, COORDINATE AIMING MODIFICATIONS WITH

OWNER AND OBTAIN SIGN OFF PER CAMERA THROUGH THE CAMERA AIMING

COORDINATION SPREADSHEET.

7 CONFIGURE CAMERA TO RECORD TO NVR BASED ON OWNER'S RECORDING

CONFIGURATION STANDARDS. RESOLUTION, FRAMES PER SECOND,

CONTINUOUS/MOTION ACTIVATED RECORDING, ANALYTICS, AND ANY OTHER FEATURES

SHALL BE COORDINATED.

8 LABEL CAMERA HOUSING IN A LOCATION VISIBLE FROM THE GROUND. REFER TO

CAMERA LABELING DETAIL FOR REQUIREMENTS.

9 CAMERA SYMBOLS AND COVERAGE ANGLES SHALL BE SET IN VMS MAPS ONCE OWNER

HAS SIGNED OFF ON VIEWS.

10 THE SCOPE OF WORK FOR THIS PROJECT IS CAMERAS, MOUNTING HARDWARE, AND

CAMERA LICENSES FOR THE EXISTING VMS. CAMERA CABLING, NVRS, AND VMS ARE

ALREADY PROVIDED.

X

24X4824X48 24X42

X

24X48

X

X

X

24X48

X

X

24X42

24X48

X

24X36 24X42

24X48

X

X

24X42

X

24X42

W/D

T S

-A

WAP

SF

C

C

C

SS

SS

A

M

CR

IC

PRJ

A

TS-A

SF

SF

SF

SF

CRCR

CRIC

CR CR

C R

M

C R

C R

FV

H H

HHH

H

H

H

H

H H H

FV

WAP

WAP

WAP

R B

R B

LD

T V

-B T V

-B

FB

A

FB

T V

-B

SF

T V

-B

C

B

B B

B

B

SF

SS

WAP

WAP

D

D

M

CR

M

C R

GBB

T

T

B B

B

SF

H

SS

SS

WAP

WAP

WAP

WAP

W A

P

WAP

WAP

WAP

SE

S E

DB

S T

J

J

J

H

A N

T

A N

T

SF

KK

DO

DO

DODO

DO

DO

DO

DO

TV-B

W A

P

UNIT

A

UNIT

B

UNIT A UNIT C

CE-11

M1 1

+120"

CE-12

M1 1

+120"

CE-13

M1 1

+120"

CE-01

M1 1

+120"

C1-01

I1A 1

C1-02

I1A 1

B1

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

T O

W E

R P

IN

K

S T

E R

.C O

M

A L

L R

IG

H

T S

R E

S E

R V

E D

F

IR

S T

F L

O O

R T

E C

H N

O L O

G Y

P L

A N

U

N

IT

A

-2

.5

T

.5

A

W O

O D

L A

N D

E L E

M E

N T

A R

Y S

C H

O O

L

S E

C U

R

IT

Y C

A M

E R

A S

P o rt a g e

M ic h ig a n

P O

R T

A G

E P

U B

L

IC

S C

H O

O L

S

N O

V E

M B

E R

ISSUED FOR DATE

BULLETIN NO. 1 04/16/2026

1/8" = 1'-0"

FIRST FLOOR TECHNOLOGY PLAN - UNIT A

WOODLAND ELEMENTARY

UNIT A UNIT B

UNIT C

KEY PLAN

SCALE: NO SCALE

W/D

TS-ATV-A

A

HH

WAP

SF C

C

SF SF

C

C

C

SFSF

T S

-A

WAP SF

SF SF

C

C

C

CR

CR

H H

H

H

T S

-A

PRJ

SS

M

CR

CRCR

CR

T V

-A T

S -A

A

A

A

T V

-A T

S -A

A A

WAP

SF

WAP WAP

WAP

WAP

SF SF

SF

SF

HH

H

H

H

H

H

H

H

H

H

HH

FV FV FV FV

FV FV FV FV

H

H

H

FB

A

FB

TV-A

A

TS-A

SF

WAP

WAPSF

TV-B

FB

A

FB

WAP SF

P R

J A

C R

C R

C R

CR

CR

CR

A

B B

SF

SF

T

T

HD HD

HD HD

SF

SF

GBB

SSSS

SS

SS

SS

SS

SF

B

H

S4

T V

-B

SS

SF

WAP

WAP

WAP

WAP

WAP

WAP

WAP

S E

S E

DB

SCR

T V

L E

D

A N

T

SF

B

B

B

B

C

C

C

M

CR

M

C R

DO

DO

CB

CB

CBCB

CB

CB

CB

T V

-B

TV-B

CB

UNIT

A

UNIT

B

U N

IT

B

U N

IT

C

CE-06

M1 1

+120"

CE-07

M1 1

+120"

CE-08

M1 1

+120"

CE-09

M1 1

+120"

CE-10

M1 1

+120"

B1

B1

CE-14

M1 1

+120"

B1

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

T O

W E

R P

IN

K

S T

E R

.C O

M

A L

L R

IG

H

T S

R E

S E

R V

E D

F

IR

S T

F L

O O

R T

E C

H N

O L O

G Y

P L

A N

U

N

IT

B

-2

.5

T

.5

B

W O

O D

L A

N D

E L E

M E

N T

A R

Y S

C H

O O

L

S E

C U

R

IT

Y C

A M

E R

A S

P o rt a g e

M ic h ig a n

P O

R T

A G

E P

U B

L

IC

S C

H O

O L

S

N O

V E

M B

E R

WOODLAND ELEMENTARY

UNIT A UNIT B

UNIT C

KEY PLAN

SCALE: NO SCALE

ISSUED FOR DATE

BULLETIN NO. 1 04/16/2026

1/8" = 1'-0"

FIRST FLOOR TECHNOLOGY PLAN - UNIT B

REF

C

C

C

C

SS

SS

P R

J A

A

WAP

SF

SF

T S

-C

M

CR

IC

CR

WAP

SS

CR

M

CR

CR CR

M

C R

H H

H

H

H

H

H

H

H

H

H

H

H

H H

A

TS-ATV-A

TV-A TS-A

A

A

A

A

A

T V

-A

T V

-A

T V

-A

TV-A

T S

-A

T S

-A

T S

-A

TS-A

WAP

WAP

WAP

WAP

WAP

WAP

SF

SF

SF

SF

SF

SF

H

H

H

H

H

FV FV FV FV

H FV

H H

H H

H

A T

V -A

T S

-A

P R

J A

T S

-A A

M

CR

CR

CR

M

C R

FV

T

HD HD

FB

A

FB

FB

A

FB

FB

A

FB

FB

A

FB

SF

GBB

B

SS

SS

SS

SS

SS

SS SS

SF

SF

SFSF

SF

WAP

TV-B

B

B

B

TV-B

T

FV

T

FV

FV

T

SF

H

H

H

H

WAP

WAP

WAP

WAP

WAP

WAP

S E

H

J J

H

B

C

C

C

C

C

SF

UNIT A UNIT C

U N

IT

B

U N

IT

C

CE-01

M1 1

+120"

CE-02

M1 1

+120"

CE-03

M1 1

+120"

CE-04

M1 1

+120"

CE-05

M1 1

+120"

C1-01

I1A 1

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

T O

W E

R P

IN

K

S T

E R

.C O

M

A L

L R

IG

H

T S

R E

S E

R V

E D

F

IR

S T

F L

O O

R T

E C

H N

O L O

G Y

P L

A N

U

N

IT

C

-2

.5

T

.5

C

W O

O D

L A

N D

E L E

M E

N T

A R

Y S

C H

O O

L

S E

C U

R

IT

Y C

A M

E R

A S

P o rt a g e

M ic h ig a n

P O

R T

A G

E P

U B

L

IC

S C

H O

O L

S

N O

V E

M B

E R

WOODLAND ELEMENTARY

UNIT A UNIT B

UNIT C

KEY PLAN

SCALE: NO SCALE

ISSUED FOR DATE

1/8" = 1'-0"

FIRST FLOOR TECHNOLOGY PLAN - UNIT C

SURFACE CAMERA LABELING CEILING CAMERA LABELING

CAMERA NUMBER - TECH ROOM NUMBER - RACK - PORT

C -1

A

C

A

A100C 2A 14C-1

PRINTED ADHESIVE LABEL ON

HOUSING TO BE READILY

VISIBLE FOR IDENTIFICATION

FROM GROUND.

C-1 - A100C - 2A - 14

PRINTED ADHESIVE LABEL ON

HOUSING TO BE READILY

VISIBLE FOR IDENTIFICATION

FROM GROUND.

CAMERA NUMBER - TECH ROOM NUMBER - RACK - PORT

A100C 2A 14C-1 ---

PENDANT CAMERA LABELING POLE MOUNT CAMERA LABELING

CAMERA NUMBER - TECH ROOM NUMBER - RACK - PORT

C-1 - A100C - 2A - 14

A100C 2A 14C-1

PRINTED ADHESIVE LABEL ON

HOUSING TO BE READILY

VISIBLE FOR IDENTIFICATION

FROM GROUND.

C-1 - A100C - 2A - 14

PRINTED ADHESIVE LABEL ON

HOUSING TO BE READILY

VISIBLE FOR IDENTIFICATION

FROM GROUND.

CAMERA NUMBER - TECH ROOM NUMBER - RACK - PORT

A100C 2A 14C-1 ---

INT. CORNER CAMERA LABELING CORNER MOUNT CAMERA LABELING

CAMERA NUMBER - TECH ROOM NUMBER - RACK - PORT

A100C 2A 14C-1

PRINTED ADHESIVE LABEL ON

HOUSING TO BE READILY

VISIBLE FOR IDENTIFICATION

FROM GROUND.

C-1 - A100C - 2A - 14

C-1 - A100C - 2A - 14

PRINTED ADHESIVE LABEL ON

HOUSING TO BE READILY

VISIBLE FOR IDENTIFICATION

FROM GROUND.

CAMERA NUMBER - TECH ROOM NUMBER - RACK - PORT

A100C 2A 14C-1 ---

CORNER BRACKET

AND FASTENERS

EXTERIOR PENETRATION SHALL BE CONCEALED

BY MOUNTING BRACKET WHERE POSSIBLE. SG

JUNCTION BOX SHALL BE INSTALLED ON

INTERIOR SIDE OF WALL AT DEVICE ELEVATION

OR ABOVE ACCESBILE CEILING IF DEVICE IS

BELOW CEILING HEIGHT.

3/4" LIQUID TIGHT CONDUIT SHALL BE RUN

FROM INTERIOR MOUNTED SG BACKBOX

THROUGH PENETRATION TO CAMERA

MOUNTING BRACKET. PROVIDE 15' SERVICE

LOOP PRIOR TO INTERIOR JB. REFER TO

WAP AND CAMERA CABLE DETAIL AND

CABLE LEGEND FOR CABLING AND

TERMINATION REQUIREMENTS. LABEL WITH

PORT INFORMATION AT TERMINATION.

CAMERA MOUNTING

BRACKET

REFER TO FLOOR PLAN OR

CAMERA SCHEDULE FOR

ELEVATION REQUIREMENTS.

BOTTOM OF DECK

ACCESSIBLE CEILING

EXTERIOR CORNER MOUNT CAMERASCEILING MOUNT CAMERAS

WHEN INSTALLING IN GRID CEILING, CAMERA SHALL

BE CENTERED ON TILE. CAMERA SHALL BE

MOUNTED FLUSH TO SURFACE IN ALL CEILING

TYPES. CAMERA SHALL BE LABELED WITH PORT

INFORMATION. SECURITY CONTRACTOR SHALL

PROVIDE MOUNTING HARDWARE AS NEEDED.

CEILING

IN NON-GRID CEILING, ELECTRICAL CONTRACTOR SHALL

PROVIDE 3/4" FLEX CONDUIT FROM NEAREST CABLE

MANAGMENT SYSTEM TO CEILING PENETRATION, STUBBED

FLUSH. REFER TO PLANS FOR

DATA CABLE ORIGIN

INSTALL CABLING IN CONDUIT IN EXPOSED

AREAS; USE CABLE MANAGEMENT SYSTEMS

ELSEWHERE. PROVIDE 15' SERVICE LOOP

PRIOR TO TERMINATION. AT END OF SERVICE

LOOP, TERMINATE WITH SURFACE BOX AND

PATCH CABLE TO CAMERA HOUSING. REFER TO

WAP AND CAMERA CABLE DETAIL AND CABLE

LEGEND FOR CABLING AND TERMINATION

REQUIREMENTS. LABEL WITH PORT

INFORMATION AT TERMINATION.

FINISHED

FLOOR

OUTSIDE WALL

BOTTOM OF DECK

EXTERIOR SURFACE MOUNT CAMERAS

ACCESSIBLE CEILING

FINISHED

GRADE

3/4" CONDUIT FROM SG BOX

STUBBED INTO ACCESSIBLE CEILING

SPACE FOR SECURITY CABLING; BOX

AND CONDUIT SHALL BE AT DEVICE

ELEVATION UNLESS DEVICE IS BELOW

ACCESSIBLE CEILING

INSTALL CABLING IN CONDUIT IN EXPOSED AREAS; USE

CABLE MANAGEMENT SYSTEMS ELSEWHERE. PROVIDE

15' SERVICE LOOP PRIOR TO TERMINATION.

TERMINATE WITH SURFACE MOUNT BOX AT INTERIOR

JB, PATCH CABLE TO CAMERA HOUSING. REFER TO

WAP AND CAMERA CABLE DETAIL AND CABLE LEGEND

FOR CABLING AND TERMINATION REQUIREMENTS.

LABEL WITH PORT INFORMATION AT TERMINATION.

REFER TO PLANS OR

SECURITY CAMERA SCHEDULE

FOR DEVICE ELEVATION

REQUIREMENTS

CAMERA MOUNTED DIRECTLY TO EXTERIOR WALL.

LABEL PORT INFORMATION ON CAMERA HOUSING.

SG BOX FLUSH ON INTERIOR SIDE

OF PENETRATION

B

B BC 8

B

B

C

S H

E E

T T

IT

L

E

S H

E E

T N

U M

B E

R

O W

N E

R P

R O

J E

C T

T

IT

L E

D A

T E

T O

W E

R P

IN

K

S T

E R

.C O

M

A L

L R

IG

H

T S

R E

S E

R V

E D

C A

M E

R A

D E

T A

IL

S

-2

.5

T

.5

W O

O D

L A

N D

E L E

M E

N T

A R

Y S

C H

O O

L

S E

C U

R

IT

Y C

A M

E R

A S

P o rt a g e

M ic h ig a n

P O

R T

A G

E P

U B

L

IC

S C

H O

O L

S

N O

V E

M B

E R

SCALE: NONE

EXTERIOR CORNER MOUNT CAMERA

SCALE: NONE

TYPICAL SECURITY CAMERA ROUGH-IN - CEILING

SCALE: NONE

TYPICAL SECURITY CAMERA ROUGH-IN - EXTERIOR WALL

ISSUED FOR DATE

BULLETIN NO. 1 04/16/2026

SECURITY CAMERA SCHEDULE

CAMERA NUMBER MAKE/MODEL MOUNTING HEIGHT MOUNTING TYPE EQUIPMENT ACCESSORIES DATA DROPS COMMENTS

C1-01 PND-A9081RV CEILING SBP-160HMW1 + SBP-300CMW 1

C1-02 PND-A9081RV CEILING N/A 1

CE-01 PNM-C32083RVQ 10' - 0" WALL SBP-250WMW + SBP-250C 1

CE-02 PNM-C32083RVQ 10' - 0" CORNER SBP-250WMW + SBP-250C + SBP-156KMW 1

CE-03 PNM-C32083RVQ 10' - 0" CORNER SBP-250WMW + SBP-250C + SBP-156KMW 1

CE-04 PNM-C32083RVQ 10' - 0" CORNER SBP-250WMW + SBP-250C + SBP-156KMW 1

CE-05 PNM-C32083RVQ 10' - 0" CORNER SBP-250WMW + SBP-250C + SBP-156KMW 1

CE-06 PNM-C32083RVQ 10' - 0" WALL SBP-250WMW + SBP-250C 1

CE-07 PNM-C32083RVQ 10' - 0" CORNER SBP-250WMW + SBP-250C + SBP-156KMW 1

CE-08 PNM-C32083RVQ 10' - 0" CORNER SBP-250WMW + SBP-250C + SBP-156KMW 1

CE-09 PNM-C32083RVQ 10' - 0" CORNER SBP-250WMW + SBP-250C + SBP-156KMW 1

CE-10 PNM-C32083RVQ 10' - 0" CORNER SBP-250WMW + SBP-250C + SBP-156KMW 1

CE-11 PNM-C32083RVQ 10' - 0" CORNER SBP-250WMW + SBP-250C + SBP-156KMW 1

CE-12 PNM-C32083RVQ 10' - 0" CORNER SBP-250WMW + SBP-250C + SBP-156KMW 1

CE-13 PNM-C32083RVQ 10' - 0" CORNER SBP-250WMW + SBP-250C + SBP-156KMW 1

CE-14 PNM-C32083RVQ 10' - 0" CORNER SBP-250WMW + SBP-250C + SBP-156KMW 1

SCALE: NONE

INTERIOR SECURITY CAMERA CABLING DETAIL

SCALE: NONE

EXTERIOR SECURITY CAMERA CABLING DETAIL

EXTERIOR CAMERA EQUIPMENT SCHEDULE

KEY # DESCRIPTION MANUFACTURER PART # COMMENTS

1 NETWORK SWITCH PROVIDED BY OWNER PROVIDED BY OWNER

5 PATCH PANEL REFER TO RACK

SCHEDULE

REFER TO RACK

SCHEDULE

6 SURFACE MOUNT BOX REFER TO SCHEDULE REFER TO SCHEDULE

7 ETHERNET SURGE PROECTOR TRIPPLITE B110-SP-POE-1 ONLY NEEDED FOR CAMERAS THAT ARE NOT

MOUNTED DIRECTLY TO BUILDING

8 CAMERA SEE CAMERA SCHEDULE SEE CAMERA SCHEDULE

B PATCH CORD REFER TO SCHEDULE REFER TO SCHEDULE

C CATEGORY CABLE REFER TO SCHEDULE REFER TO SCHEDULE INCLUDE MINIMUM 15FT SERVICE LOOP

INTERIOR CAMERA EQUIPMENT SCHEDULE

KEY # DESCRIPTION MANUFACTURER PART # COMMENTS

1 NETWORK SWITCH PROVIDED BY OWNER PROVIDED BY OWNER

5 PATCH PANEL REFER TO RACK

SCHEDULE

REFER TO RACK

SCHEDULE

6 SURFACE MOUNT BOX REFER TO SCHEDULE REFER TO SCHEDULE

8 CAMERA SEE CAMERA SCHEDULE SEE CAMERA SCHEDULE

B PATCH CORD REFER TO SCHEDULE REFER TO SCHEDULE

C CATEGORY CABLE REFER TO SCHEDULE REFER TO SCHEDULE INCLUDE MINIMUM 15FT SERVICE LOOP

B1

21237.54 PPS WOODLAND - SECURITY CAMERAS - BULLETIN 01.pdf
Sheets
T 101.54A - FIRST FLOOR TECHNOLOGY PLAN - UNIT A
T 101.54B - FIRST FLOOR TECHNOLOGY PLAN - UNIT B
T 441.54 - CAMERA DETAILS
21237.54 PPS WOODLAND - SECURITY CAMERAS.pdf
Sheets
G 001.54 - COVER SHEET
T 101.54A - FIRST FLOOR TECHNOLOGY PLAN - UNIT A
T 101.54B - FIRST FLOOR TECHNOLOGY PLAN - UNIT B
T 101.54C - FIRST FLOOR TECHNOLOGY PLAN - UNIT C
T 441.54 - CAMERA DETAILS
TG 001.54 - TECHNOLOGY SYMBOLS AND GENERAL NOTES

File details come from the government source that posted it. Updated .