The document is a Construction Workday Calendar and Weekly Statement of Working Days form from the Town of Manchester Engineering Division in Connecticut. The file contains two primary components: a comprehensive two-year calendar spanning 2022-2023 and a standardized weekly reporting template for tracking construction project working days. The template allows contractors to document daily work conditions, including weather, working/non-working days, project timeline calculations, and progress tracking. It provides a systematic method for recording project duration, extensions, and remaining working days.
The form includes detailed sections for computing project completion dates, with fields for tracking the first working day, specified contract working days, time extensions, non-working days, and project milestones. An example page demonstrates how a contractor (ABC Construction Co.) might complete the form for a street reconstruction project, showing how they record daily work conditions, calculate project timeline adjustments, and document controlling operations such as installation of drainage pipes. The document emphasizes a 15-day window for contractors to contest the accuracy of the statement, ensuring transparency and accountability in project management and timeline reporting.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX
CONSTRUCTION WORKDAY CALENDAR &
WEEKLY STATEMENT OF WORKING DAYS FORM
S M T W T F S S M T W T F S S M T W T F S S M T W T F S
1 1 2 3 4 5 1 2 3 4 5 1 2
2 3 4 5 6 7 8 6 7 8 9 10 11 12 6 7 8 9 10 11 12 3 4 5 6 7 8 9
518 519 520 521 522
9 10 11 12 13 14 15 13 14 15 16 17 18 19 13 14 15 16 17 18 19 10 11 12 13 14 15 16
523 524 525 526
16 17 18 19 20 21 22 20 21 22 23 24 25 26 20 21 22 23 24 25 26 17 18 19 20 21 22 23
527 528 529 530 531
23 24 25 26 27 28 29 27 28 29 30 31 27 28 29 30 31 24 25 26 27 28 29 30
30 31 532 533 534 535 536
S M T W T F S S M T W T F S S M T W T F S S M T W T F S
1 2 3 4 5 6 7 1 2 3 4 1 2 1 2 3 4 5 6
537 538 539 540 541 558 559 560 572 592 593 594 595 596
8 9 10 11 12 13 14 5 6 7 8 9 10 11 3 4 5 6 7 8 9 7 8 9 10 11 12 13
542 543 544 545 546 561 562 563 564 565 573 574 575 576 597 598 599 600 601
15 16 17 18 19 20 21 12 13 14 15 16 17 18 10 11 12 13 14 15 16 14 15 16 17 18 19 20
547 548 549 550 551 566 567 568 569 570 577 578 579 580 581 602 603 604 605 606
22 23 24 25 26 27 28 19 20 21 22 23 24 25 17 18 19 20 21 22 23 21 22 23 24 25 26 27
552 553 554 555 556 571 572 573 574 582 583 584 585 586 607 608 609 610 611
29 30 31 26 27 28 29 30 24 25 26 27 28 29 30 28 29 30 31
557 575 571 571 571 31 587 588 589 590 591 612 613 614
S M T W T F S S M T W T F S S M T W T F S S M T W T F S
1 2 3 2 3 4 5 6 7 8 1 2 3 4 5 1 2 3
615 616 636 637 638 639 640 656 657 658 659
4 5 6 7 8 9 10 9 10 11 12 13 14 15 6 7 8 9 10 11 12 4 5 6 7 8 9 10
617 618 619 620 641 642 643 644 660 661 662 663
11 12 13 14 15 16 17 16 17 18 19 20 21 22 13 14 15 16 17 18 19 11 12 13 14 15 16 17
621 622 623 624 625 645 646 647 648 649 664 665
18 19 20 21 22 23 24 23 24 25 26 27 28 29 20 21 22 23 24 25 26 18 19 20 21 22 23 24
626 627 628 629 630 650 651 652 653 654
25 26 27 28 29 30 1 30 31 27 28 29 30 25 26 27 28 29 30 31
631 632 633 634 635 655
S M T W T F S S M T W T F S S M T W T F S S M T W T F S
1 2 3 4 5 6 7 1 2 3 4 1 2 3 4 2 3 4 5 6 7 8
666 667 668 669
8 9 10 11 12 13 14 5 6 7 8 9 10 11 5 6 7 8 9 10 11 9 10 11 12 13 14 15
670 671 672 673 674
15 16 17 18 19 20 21 12 13 14 15 16 17 18 12 13 14 15 16 17 18 16 17 18 19 20 21 22
675 676 677 678 679
22 23 24 25 26 27 28 19 20 21 22 23 24 25 19 20 21 22 23 24 25 23 24 25 26 27 28 29
680 681 682 683 684
29 30 31 26 27 28 26 27 28 29 30 31 1 30
S M T W T F S S M T W T F S S M T W T F S S M T W T F S
1 2 3 4 5 6 1 2 3 2 3 4 5 6 7 8 1 2 3 4 5
685 686 687 688 689 707 708 728 729 730 731 748 749 750 751
7 8 9 10 11 12 13 4 5 6 7 8 9 10 9 10 11 12 13 14 15 6 7 8 9 10 11 12
690 691 692 693 694 709 710 711 712 713 732 733 734 735 736 752 753 754 755 756
14 15 16 17 18 19 20 11 12 13 14 15 16 17 16 17 18 19 20 21 22 13 14 15 16 17 18 19
695 696 697 698 699 714 715 716 717 718 737 738 739 740 741 757 758 759 760 761
21 22 23 24 25 26 27 18 19 20 21 22 23 24 23 24 25 26 27 28 29 20 21 22 23 24 25 26
700 701 702 703 704 719 720 721 722 742 743 744 745 746 762 763 764 765 766
28 29 30 31 25 26 27 28 29 30 1 30 31 27 28 29 30 31
705 706 723 724 725 726 727 747 767 768 769 770
S M T W T F S S M T W T F S S M T W T F S S M T W T F S
1 2 1 2 3 4 5 6 7 1 2 3 4 1 2
771 791 792 793 794 795 812 813 814
3 4 5 6 7 8 9 8 9 10 11 12 13 14 5 6 7 8 9 10 11 3 4 5 6 7 8 9
772 773 774 775 796 797 798 799 815 816 817 818 819
10 11 12 13 14 15 16 15 16 17 18 19 20 21 12 13 14 15 16 17 18 10 11 12 13 14 15 16
776 777 778 779 780 800 801 802 803 804 566 567 568
17 18 19 20 21 22 23 22 23 24 25 26 27 28 19 20 21 22 23 24 25 17 18 19 20 21 22 23
781 782 783 784 785 805 806 807 808 809
24 25 26 27 28 29 30 29 30 31 26 27 28 29 30 24 25 26 27 28 29 30
786 787 788 789 790 810 811 31
September October November December
January February March April
May June July August
September October November December
January February March April
May June July August
CONTRACTOR: WEEK ENDING:
PROJECT: PROJECT NO.:
Non-Working Working Day
Date Day Weather, Weather Conditions or Other Conditions Working Day Day No Work Done
Monday
Tuesday
Wednesday
Thursday
Friday
Days This Week:
Days Previously Reported:
Total Days to Date:
Time Extension Days Granted This Week:
Reason:
Number of Numbered
Days Day Date
1. First Working Day
2. Working Days Specified in Contract
3. Computed Date for Completion (Line 1 + Line 2)
4. Total Time Extensions Approved to Date
5. Total Non-Working Days to Date
6. Subtotal (Line 4 + Line 5)
7. Extended Date for Completion
8. Revised Working Days for Contract (Line 2 + Line 6)
9. Total Working Days to Date
10. Working Days Remaining (Line 8 - Line 9)
CONTROLLING OPERATIONS:
REMARKS:
CONTRACTOR'S SIGNATURE: DATE:
The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the statement shall be deemed to have been accepted by the contractor as correct.
TOWN OF MANCHESTER ENGINEERING DIVISION
WEEKLY STATEMENT OF WORKING DAYS
Computation of Extended Date for Completion
CONTRACTOR: WEEK ENDING:
ABC CONSTRUCTION Co.
PROJECT: PROJECT NO.:
RECONSTRUCTION OF ANY STREET
Non-Working Working Day
Date Day Weather, Weather Conditions or Other Conditions Working Day Day No Work Done
5/27/2013 Monday HOLIDAY
5/28/2013 Tuesday Sunny X
5/29/2013 Wednesday Sunny X
5/30/2013 Thursday Rain X
5/31/2013 Friday Sunny X
Days This Week: 3 1 0
Days Previously Reported: 26 5 8
Total Days to Date: 29 6 8
Time Extension Days Granted This Week: 0
Reason:
Number of Numbered
Days Day Date
1. First Working Day 10 4/1/2013
2. Working Days Specified in Contract 60
3. Computed Date for Completion (Line 1 + Line 2) 70 6/25/2013
4. Total Time Extensions Approved to Date 4
5. Total Non-Working Days to Date 6
6. Subtotal (Line 4 + Line 5) 10
7. Extended Date for Completion 80 7/10/2013
8. Revised Working Days for Contract (Line 2 + Line 6) 70
9. Total Working Days to Date 29
10. Working Days Remaining (Line 8 - Line 9) 41
CONTROLLING OPERATIONS:
Installation of drainage pipe and associated structures from Sta 0+00 to 2+00.
REMARKS:
CONTRACTOR'S SIGNATURE: DATE:
statement shall be deemed to have been accepted by the contractor as correct.
The Contractor will be allowed fifteen (15) days in which to protest in writing the correctness of the statement; otherwise the
TOWN OF MANCHESTER ENGINEERING DIVISION
WEEKLY STATEMENT OF WORKING DAYS
5/31/2013
2013100
Computation of Extended Date for Completion