Project_Plans.pdf
PDF 15 MB Posted
- Attached to
- Union Pond Dam Spillway Rehabilitation Project
- Solicitation number
- 22/23-76
- Issued by
- Hartford County, Connecticut
About this file
The document is a comprehensive set of project plans for the Union Pond Dam Spillway Rehabilitation Project for the Town of Manchester, Connecticut, prepared by Tighe & Bond engineering firm in April 2023. The project involves a detailed rehabilitation of the existing dam spillway, including demolition of current structures, site preparation, and reconstruction of various dam components such as spillways, training walls, and concrete structures. The plans include 13 detailed sheets covering existing conditions, site preparation, proposed improvements, demolition plans, structural details, and specific construction specifications.
The project plans outline extensive technical requirements for rehabilitating the dam infrastructure, including concrete repairs, erosion and sedimentation control, and specific construction phasing. The drawings provide precise technical details for reconstructing the right and left spillways, dam walls, and outlet structures, with emphasis on addressing deteriorated concrete, implementing erosion control measures, and ensuring structural integrity. Multiple photographs are included to document the current condition of the dam, showing existing concrete damage, spillway configurations, and critical structural elements that require rehabilitation.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OCE2076
| OCE2077 |
| OCE2078 |
| OCE2079 |
| OCE2080 |
| OCE2081 |
| OCE2082 |
| OCE2083 |
| OCE2084 |
| OCE2085 |
| OCE2086 |
| OCE2087 |
| OCE2088 |
File details come from the government source that posted it. Updated .