TOA-Final.pdf

PDF 454 KB Posted

Attached to
Recapitalize Phase III, Station & ANT Buildings, USCG Sector Buffalo
Solicitation number
70Z04723R43000005
Issued by

View the file

Other files

File Type Posted
70Z04723FPCNI0001_Sector Buffalo.pdf PDF
Price Proposal Form_v3Conformed.docx DOCX document
Amendment 009.pdf PDF
Amendment 008.pdf PDF
Price Proposal Form_v3.docx DOCX document
Amendment 007.pdf PDF
Amend_007_0914405290_C102_DEMO PLAN_AM_007.zip ZIP file
NY20230001_JAN06_2023.pdf PDF
USCG_FY_2023_Subcontracting_Plan_Template.docx DOCX document
Price Proposal Form_v2.docx DOCX document
Amendment 006.pdf PDF
Amendment 005_dwg.zip ZIP file
Amendment 005_pdf.zip ZIP file
ACAD Bulkhead Improvements.zip ZIP file
70Z04723R4300005 AMENDMENT 005.pdf PDF
Amendment 004_SF30.pdf PDF
70Z04723R43000005 Amendment 004.pdf PDF
Amend003 Drawings.zip ZIP file
70Z04723R43000005_AMEND003.pdf PDF
Amendment 002 QandA_reformatted.pdf PDF
70Z04723R43000005_AMEND002.pdf PDF
Rip Rap Site.pdf PDF
Amendment 001_Attachment E File3.zip ZIP file
Amendment 001_Attachment A.zip ZIP file
Amendment 001_Attachment I Real Property PMDS Form.xlsx XLSX spreadsheet
Amendment 001_Attachment B.zip ZIP file
STA Annex.pdf PDF
Amendment 001_Attachment L.zip ZIP file
Amendment 001.pdf PDF
Amendment 001_Attachment C 2017 Sector Buffalo Waterfront Inspection Report.pdf PDF
Amendment 001_Civil dwg.zip ZIP file
New Building Site.pdf PDF
OM3_Station Building.pdf PDF
Amendment 001_Interiors dwg.zip ZIP file
Amendment 001_Attachment D.zip ZIP file
COM Tower.pdf PDF
COMMs Tower.pdf PDF
Fuel Farm.pdf PDF
Google Site Photo.PNG PNG image
ANT Laydown Area.pdf PDF
Amendment 001_Attachment J.zip ZIP file
Amendment 001_Attachment E File2.zip ZIP file
Amendment 001_Attachment E File1.zip ZIP file
Finger Pier Photos.pdf PDF
Boat Basin.pdf PDF
Site Electrical.pdf PDF
Amendment 001_General dwg.zip ZIP file
Amendment 001_Archtecture dwg.zip ZIP file
Attachment J READ-ME.pdf PDF
Price Proposal Form.docx DOCX document
Show 40 more

Latest 50 of 81 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FACILITIES DESIGN AND CONSTRUCTION CENTER

5505 ROBIN HOOD RD., SUITE K

NORFOLK, VA 23513

Pamela.j.argilan@uscg.mil

Senior Contracting Officer Strategic Sourcing

(757) 354-9654

NATIONAL MULTIPLE AWARD

CONSTRUCTION CONTRACT (NMACC III)

POOL 1 PHASE II

TASK ORDER ANNOUNCEMENT

70Z04723R43000005

RECAPITALIZE PHASE III, STATIO AND ANT BUILDINGS

USCG SECTOR BUFFALO

BUFFALO, NY

Issued: March 28, 2023 mailto:Pamela.j.argilan@uscg.mil

NOTICE FOR FILING AGENCY PROTESTS

United States Coast Guard Ombudsman Program

It is the policy of the United States Coast Guard (USCG) to issue solicitations and make contract awards in a fair and timely manner. The Ombudsman Program for Agency Protests (OPAP) was established to investigate agency protest issues and resolve them without expensive and time-consuming litigation. OPAP is an independent reviewing authority that is empowered to grant a prevailing protester essentially the same relief as the Government Accountability Office

(GAO).

Interested parties are encouraged to seek resolution of their concerns within the USCG as an Alternative Dispute Resolution (ADR) forum rather than filing a protest with the GAO or some external forum. Interested parties may seek resolution of their concerns informally or opt to file a formal agency protest with the Contracting Officer or Ombudsman.

Informal Forum with the Ombudsman. Interested parties who believe a specific USCG procurement is unfair or otherwise defective should first direct their concerns to the applicable Contracting Officer. If the Contracting Officer is unable to satisfy their concerns, interested parties are encouraged to contact the U.S. Coast Guard Ombudsman for Agency Protests. Under this informal process the agency is not required to suspend contract award performance. Use of an informal forum does not suspend any time requirement for filing a protest with the agency or other forum. In order to ensure a timely response, interested parties should provide the following information to the Ombudsman:

solicitation/contract number, contracting office, Contracting Officer, and solicitation closing date (if applicable).

Formal Agency Protest with the Ombudsman. Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the Contracting Officer through open and frank discussions. If the protester’s concerns are unresolved, an Independent Review is available by the Ombudsman. The protester may file a formal agency protest to either the Contracting Officer or as an alternative to that, the Ombudsman under the OPAP program.

Contract award or performance will be suspended during the protest period unless contract award or performance is justified, in writing, for urgent and compelling reasons or is determined in writing to be in the best interest of the Government. The agency’s goal is to resolve protests in less than 35 calendar days from the date of filing. Protests shall include the information set forth in FAR 33.103(d) (2). If the protester fails to submit the required information, resolution of the protest may be delayed, or the protest may be dismissed. To be timely protests must be filed within the period specified in FAR 33.103(e). Formal protests filed under the OPAP program should be submitted electronically to OPAP@uscg.mil and the Contracting Officer or by hand delivery to the Contracting Officer.

Election of Forum. After an interested party protests a Coast Guard procurement to the Contracting Officer or the Ombudsman, and while the protest is pending, the protester agrees not to file a protest with the GAO or other external forum. If the protest is filed with an external forum, the agency protest will be dismissed.

mailto:OPAP@uscg.mil

I. GENERAL REQUIREMENTS

Title: Recapitalize Phase III, Station and ANT Buildings, USCG Sector Buffalo

Location of the work: U.S. Coast Guard Sector Buffalo, Buffalo, NY.

Project Number: 09-14405290

Specifications: Project 14405290 (provided in electronic format via Contracting Opportunities SAM.gov and DOD Safe)

RFP Drawings: Project 14405290 (provided in electronic format via SAM.gov and DOD Safe/identified as Reference Drawings)

Appendices: Project 14405290 (Various Documents in relation to this project (provided in electronic format via SAM.gov and DOD Safe/identified as Appendices)

Wage Determination: General Decision No. NY20220050 dated 01/13/2023 Building and General Decision No. NY20220001 dated 01/06/2023 Heavy (provided in electronic format via SAM.gov and DOD Safe)

Disclosure of Magnitude: The Government requests Offerors notify the Contracting Officer as soon as practicable if they determine the project cannot be accomplished within the below price limitation. The design and construction costs will be subject to the funds available for this project. The contract price limitation for contract award is approximately $27 Million. Contractors are notified that they are under no obligation to approach this ceiling; however, the Government may not be able to make an award if the dollar amount set for this project is exceeded.

Description of the work:

Base Item 0001: The contractor shall provide all the supervision, labor, tools, equipment, materials, transportation and other services for the demolition/disposal of STA Building (3,382gsf), STA Annex (2,712 gsf), 8-ft tall Communication Tower and Base to include site restoration, complete closure of the sewage pump-out services and holding tank and the finger pier. Project also includes the design and construction of the STA Building and Annex areas pavement to include the Marine Travel Lift Operations pavement; STA-ANT building and required support spaces; finger pier and modifying and improvements to the bulkhead to support the lifting and transporting of the mobile boat lift; and all associated site work.

Option Item 0001: Provide all labor, material, equipment, mobilization, demobilization, permitting, construction support, quality control services, and ancillary items required for the design/construction in accordance with RFP Guide Specifications to restore and improve the rip-rap slope along the Buffalo Harbor (approximately 450-LF).

Option Item 0002: Provide all labor, material, equipment, mobilization, demobilization, permitting, construction support, quality control services, and ancillary items required for design and construct in accordance with RFP Guide Specifications for the complete demolition and disposal of pavements for the ATON Buoy Storage Area and construction of a new ATON buoy storage area (approximately 10,000 SF) concrete hardstand, concrete ramp, and site grading.

Option Item 3: Provide all labor, material, equipment, mobilization, demobilization, permitting, construction support, quality control services, and ancillary items required for design and construct in accordance with RFP

Guide Specifications to raise the Phase IV project area to elevation to 582 (NAV 88), as shown on RFP Drawings.

Period of Performance: Seven Hundred Fifty (750) calendar days from award for the Base Items and any awarded Option Items.

Method of Evaluation of Options: The following Option Clause shall be included in the task order: FAR 52.217- 5 Evaluation of Options. Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s). Option item(s) may be exercised within 60 calendar days of Task Order Award.

Liquidated Damages: Liquidated damages in the amount of $1,001.00 per day will be assessed, if necessary, in accordance with Section F.2 of the contract.

Insurance/Bonds: Please review Section H.3 of the contract for insurance requirements and Section L.18 of the contract for bonding requirements. A bid guarantee is required for this task order.

Utilities: Refer to appropriate Specification Sections.

Electronic Submission of Payment Requests (FSMS Awards):

(a) Definitions. As used in these instructions -

(1) “Payment request” means a bill, voucher, invoice, or request for contract financing payment with associated supporting documentation. The payment request must: comply with the requirements identified in FAR 32.905(b), “Content of Invoices” and the applicable Payment clause included in this contract. In addition, discount offerings and small business status if available shall be stated. If travel was allowable and approved, components in accordance with FAR 31.205-46 shall be provided.

(b) Except as provided in paragraph (c) of this clause, the contractor shall submit payment requests electronically using the Invoice Processing Platform (IPP). Information regarding IPP, including IPP Customer Support contact information, is available at www.ipp.gov or any successor site.

(c) The contractor may submit payment requests using a method other than IPP only when the contracting officer authorizes alternate procedures in writing in accordance with Coast Guard procedures.

(d) If alternate payment procedures are authorized, the contractor shall include a copy of the contracting officer's written authorization with each payment request.

(e) IPP enrollment information is at https://www.uscg.mil/fincen/IPP/.

AUTHORIZED REPRESENTATIVES OF THE CONTRACTING OFFICER

Mr. Eric Hanson is the Contracting Officer's Representative (COR) for the purpose of day-to-day technical administration/inspection of all work under the contract. This includes, but is not limited to, administration of progress, approval of submittals, final inspection and providing technical assistance when required. The contractor is cautioned that in no instance is the above named person authorized to approve any changes which will involve the quantity, quality, price or performance of the contract.

http://www.ipp.gov/ https://www.uscg.mil/fincen/IPP/

The Construction Inspector (To Be Determined) will coordinate with the Contracting Officer’s Representative for the purpose of inspection of work under the contract. The Contractor is cautioned that in no instance is the above named person authorized to approve any changes.

II. CLAUSES

The following BUY AMERICAN Provision and Clause applies in accordance with the thresholds established in the FAR and the NMACC II.

52.225-11 Buy American-Construction Materials under Trade Agreements (Dec 2022)

As prescribed in 25.1102(c), insert the following clause:

Buy American-Construction Materials under Trade Agreements (Dec 2022)

(a) Definitions. As used in this clause—

Caribbean Basin country construction material means a construction material that—

(1) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is–

(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C.40102(4), such as agricultural products and petroleum products.

Component means an article, material, or supply incorporated directly into a construction material.

Construction material means an article, material, or supply brought to the construction site by the Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means—

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material. Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.

Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.

Designated country means any of the following countries:

(1) A World Trade Organization Government Procurement Agreement (WTO GPA) country (Armenia, Aruba, Australia, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Moldova, Montenegro, Netherlands, New Zealand, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan, Ukraine, or United Kingdom);

(2) A Free Trade Agreement (FTA) country (Australia, Bahrain, Chile, Colombia, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Korea (Republic of), Mexico, Morocco, Nicaragua, Oman, Panama, Peru, or Singapore);

(3) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, South Sudan, Tanzania, Timor-Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia); or

(4) A Caribbean Basin country (Antigua and Barbuda, Aruba, Bahamas, Barbados, Belize, Bonaire, British Virgin Islands, Curacao, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saba, St. Kitts and Nevis, St. Lucia, St. Vincent and the Grenadines, Sint Eustatius, Sint Maarten, or Trinidad and Tobago).

Designated country construction material means a construction material that is a WTO GPA country construction material, an FTA country construction material, a least developed country construction material, or a Caribbean Basin country construction material.

Domestic construction material means—

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United States, if—

(A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029.

(B) The construction material is a COTS item; or

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".

Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.

Foreign construction material means a construction material other than a domestic construction material.

Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.

Free Trade Agreement country construction material means a construction material that-

(1) Is wholly the growth, product, or manufacture of a Free Trade Agreement (FTA) country;

or another country, has been substantially transformed in a FTA country into a new and different construction material distinct from the materials from which it was transformed.

Least developed country construction material means a construction material that-

(1) Is wholly the growth, product, or manufacture of a least developed country; or another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.

Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

United States means the 50 States, the District of Columbia, and outlying areas.

WTO GPA country construction material means a construction material that-

(1) Is wholly the growth, product, or manufacture of a WTO GPA country; or another country, has been substantially transformed in a WTO GPA country into a new and different construction material distinct from the materials from which it was transformed.

(b) Construction materials.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C.1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction material, excluding COTS fasteners. (See FAR 12.505(a)(2)). In addition, the Contracting Officer has determined that the WTO GPA and Free Trade Agreements (FTAs) apply to this acquisition. Therefore, the Buy American restrictions are waived for designated country construction materials.

(2) The Contractor shall use only domestic or designated country construction material in performing this contract, except as provided in paragraphs (b)(3) and (b)(4) of this clause.

(3) The requirement in paragraph (b)(2) of this clause does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:

[Contracting Officer to list applicable excepted materials or indicate "none"]

(4) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(3) of this clause if the Government determines that-

(i) The cost of domestic construction material would be unreasonable.

(A) For domestic construction material that is not a critical item or does not contain critical components.

(1) The cost of a particular domestic construction material subject to the restrictions of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;

(2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(4)(i)(A)(1) of this clause.

(3) The procedures in paragraph (b)(4)(i)(A)(2) of this clause will no longer apply as of January 1, 2030.

(B) For domestic construction material that is a critical item or contains critical components.

(1) The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.

(2) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(4)(i)(B)(1) of this clause.

(3) The procedures in paragraph (b)(4)(i)(B)(2) of this clause will no longer apply as of January 1, 2030.

(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1)

(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(4) of this clause shall include adequate information for Government evaluation of the request, including-

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material.

However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(4)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction material description Unit of measure Quantity Price (dollars)* Item 1:

Foreign construction material Domestic construction material Item 2:

Foreign construction material Domestic construction material

[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)].

[ List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. ]

[ Include other applicable supporting information. ]

(End of clause)

FAR 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this Task Order Announcement.

Accordingly, contractors are urged and expected to inspect the site where the work will be performed.

(b) One organized site visit will be scheduled after the release of the Task Order announcement via amendment. Although the site visit IS NOT mandatory, it is highly encouraged that you have your team and any major subcontractors attend the meeting. No other site visits will be allowed.

The clause below is found in the base contracts of the NMACC III and are Incorporated by Reference (IBR) in this Task Order Announcement. The full text of this clause may be accessed electronically at this address: https://www.acquisition.gov.

FAR 52.225-12 Notice of Buy American Requirement – Construction Materials Under Trade Agreements (MAY 2014)

III. Instructions for Submitting Questions Regarding Task Order Announcement: Contractors are requested to review this Task Order Announcement as soon as possible upon receipt. If a contractor has any questions regarding the Task Order Announcement which require an answer from the issuing office, these questions shall be submitted, in writing via email to the Contracting Officer, Pamela J. Argilan referencing section and paragraph of the Task Order Announcement. Email addresses are:

Pamela.j.argilan@uscg.mil and SMB-SILC-NMACCIII@uscg.mil.

Questions shall be received no later than 05/05/2023. Any questions submitted after this date may not be answered.

IV. Proposal Submission Instructions:

The offeror shall submit information for non-price factors 4 and 5 under Phase II. The offeror shall submit one

(1) Non-Price electronic proposal with the following formatting:

• Text pages 8 ½ x 11 format

• 10 point, minimum, Times New Roman font on text pages

• Drawings 11x17 inches

• 9 point, minimum, Times New Roman font on Drawings

The offeror’s proposal must include all data and information required and must be submitted in accordance with these instructions. The offeror shall be compliant with the requirements as stated herein, for non-conformance may result in an unfavorable proposal evaluation.

CLOSING DATE: Submit proposals by Close of Business, Local Norfolk, VA time, on 05/23/2023 to ensure consideration. Proposals submitted after this date may or may not be evaluated at the discretion of the Contracting Officer. The Contracting Officer will consider such factors as whether acceptance will unduly https://www.acquisition.gov/ mailto:SMB-SILC-NMACCIII@uscg.mil delay award or is necessary to increase competition. The Contracting Officer will also consider when e-mails were sent and when the e-mails arrived at the Government point of entry. Agency close of business is presumed to be 4:30 pm local time.

Phase II proposals shall be submitted electronically using DoD Safe.

Offerors must submit all electronic information (questions, site visit names, proposal submissions) electronically to:

A. Primary point of contact: Ms. Pam Argilan at SILC-NMACCIII@uscg.mil “AND” pamela.j.argilan@uscg.mil B. Secondary point of contact: Ms. Malita Smith at SILC-NMACCIII@uscg.mil “AND” malita.m.smith@uscg.mil

The completed proposal(s) shall be submitted using DoDSafe. The technical and price proposal shall be separate attachments. The Contract Specialist will send an invite to submit through DoDSafe within 72 to 48 hours of proposal due date and time. Offerors will be prompted, through a future amendment, to provide a preferred point of contact and email address to be used for the DoDSafe submission. Each electronic submission must be less than 36MB. Proposals must be prepared in accordance with these submission instructions, providing all required information in the format specified. Failure of a proposal to comply with these general submission instructions and the specific submission instructions contained in this task order announcement may be grounds for exclusion of the proposal from further consideration.

The contractor shall be required to respond to its representation in accordance with FAR Provision 52.204-24(d) Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (NOV 2021). Contractors ARE required to include their representation in FAR 52.204-24(d) with the submission of their price proposal by indicating in a statement that “It □ will, □ will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation.”

Failure of a proposal to comply with these general submission instructions and the specific submission instructions contained in this task order announcement may be grounds for exclusion of the proposal from further consideration.

V. AWARD ON INITIAL RESPONSES

The Best Value Tradeoff Process outlined in FAR Subpart 15.101-1 will be utilized. OFFERORS ARE

ADVISED IT IS THE GOVERNMENT’S INTENT TO AWARD WITHOUT DISCUSSIONS OR ANY

CONTACT CONCERNING THE PROPOSALS RECEIVED; HOWEVER, THE GOVERNMENT

RESERVES ITS RIGHT TO CONDUCT DISCUSSIONS. Therefore, proposals should be submitted initially on the most favorable price and technical terms. Offerors should not assume that they will be contacted or afforded the opportunity to qualify, discuss, or revise their proposal. Firms participating in the pre-proposal conference and site visit (if conducted) will not be compensated for their participation.

The Government intends to award one (1) Firm-Fixed-Price (FFP) task order; however, the Government reserves the right to make no award at all.

VI. NON-PRICE FACTORS - The Non-Price Submission shall address the following topics:

mailto:SILC-NMACCIII@uscg.mil mailto:pamela.j.argilan@uscg.mil mailto:SILC-NMACCIII@uscg.mil mailto:malita.m.smith@uscg.mil

Factor 4: SAFETY

Note for JV: the following submittal requirements are required for each entity that is part of the JV. Offeror shall clearly indicate which JV partner will be in charge of the overall Safety program. DART rate shall not be submitted for subcontractors.

a. Submission Requirements: The Offeror shall submit the following information: The Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate for the specified five (5) Calendar Years (CY), as well as a safety narrative, as described further below. For a partnership or joint venture, the Offeror shall submit separate DART rates for the specified five (5) CY for each contractor who is part of the partnership/joint venture; however, only one safety narrative is required. Any fatalities experienced within this 5-year timeframe must be explained in detail, to include root cause and corrective actions.

NOTE: DART and Total Recordable Incident Rate (TCR) shall not be submitted for subcontractors

1. DART Rate: Submit five (5) previous complete calendar years’ [CY2021, CY2020, CY2019, CY2018, and CY2017] worth of data (not an overall average). If the Offeror has no DART rate, for any year, affirmatively state so and explain why.

a. DART cases include injuries or illnesses resulting in death, days away from work, and/or restricted work or transfer to another job days beyond the day of injury/illness.

b. Calculation of DART rate: Multiply the total number of DART cases by 200,000, and then divide by the number of employee labor hours worked.

𝐃𝐃𝐃𝐃𝐃𝐃𝐃𝐃 𝐃𝐃𝐃𝐃𝐃𝐃𝐑𝐑 =

Number of DART Incidents x 200,000

Total Number of Employee Labor Hours Worked

2. Technical Approach to Safety for the Seed Project: Submit a narrative that addresses the following:

a. Describe the Offeror’s approach to implementing and executing a Safety Management System

(SMS) including Management/Leadership involvement, Safety Manager Training, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and Health training, to include the standard(s) used to benchmark the SMS.

b. Describe the evaluation of subcontractor’s safety performance in the Offeror’s selection process.

c. Describe the processes of how the Offeror will oversee safety compliance of subcontractors at all levels throughout performance of the contract (to include the Offeror’s own in-house workforce).

d. The Technical Approach to Safety narrative shall be limited to two (2) single-sided pages or one double-sided page. Information beyond the referenced page limit will not be considered.

Factor 5 Technical Solution

Sub-Factor 5.1 Conceptual Building Design

Page Limit: Discussion shall be no more than 5 pages.

Note: The drawings do not count towards the Page Limitation.

Provide a written narrative on the design concept, providing the design rationale and basis of the proposal.

Discuss what materials, systems (i.e foundation), and technologies you intend to propose for the building(s), highlighting resiliency and sustainability features.

Discuss the resiliency and life cycle cost of the proposed building materials and systems. Preference is for simplicity and minimal maintenance requirements of building systems and materials while also being resilient to the geographic location.

In addition to the narrative, provide conceptual building plans showing layout of all required spaces as well as typical building elevations.

Sub-Factor 5.2 Conceptual Site Design

Page Limit: Discussion shall be no more than 5 pages.

Note: The drawings do not count towards the Page Limitation.

The site portion of the narrative should address site grading (cut/fill considerations and drainage), waterfront finger pier, rip-rap restoration, ATON area, temporary WLB mooring plan, utilities, paving to include the marine travel lift, general vehicle and pedestrian traffic flow, landscaping, and overall site flow.

Discuss how you intend to comply with the storm-water management, including the Energy Independence and Security Act (EISA) Section 438. Indicate what materials, systems, and technologies you intend to incorporate in your overall design. Discuss the resiliency, maintenance required, and durability of your proposed design/systems.

In addition to the narrative, provide a conceptual site plan showing all proposed system and site features.

Sub-factor 5.3 Environmental Compliance

Page Limit: Discussion shall be no more than 5 pages Note: The drawings do not count towards the Page Limitation.

Provide a narrative that addresses the following:

Describe experience with environmental permitting, environmental consultations, and environmental compliance for in-water projects located in tidal waters. Include in the description the various environmental agencies you anticipate working with (state and federal) and previous experience the D-B contractor has working with these agencies.

The description for (a) should include a description, and location (state) for (3) comparable projects in which environmental compliance was met while still meeting project construction deadlines.

The National Environmental Policy Act (NEPA) requires Federal agencies to consider potential environmental consequences of their actions. A NEPA Environmental Assessment (EA) was completed for this project. Discuss how the EA will be incorporated into this project. Discuss environmental constraints, difficulties, and other non-environmental constraints identified by the EA and the technical experience the D-B contractor has in addressing these issues. The narrative should include at what specific stages of design the D-B contractor plans to submit environmental permit applications and consultations. Include in the discussion any potential scheduling challenges and project delays that may be caused by the environmental permitting/consultation process and how the D-B contractor will resolve these scheduling challenges.

Price Proposal:

The Contractor must submit a complete price proposal form at the same time as the technical proposal. Price proposals must be prepared in accordance with the Price Proposal Form. It is imperative that the contractor’s proposed price include the Base Line Items, Option Line Item(s) and the total for all items shown on the attached Price Proposal Form.

Contractors are not required to submit detailed cost or pricing data with their proposals since adequate price competition is anticipated. However, if after review of the price proposals, it is determined that there is not adequate price competition, cost and pricing data will be required. The Contracting Officer reserves the right to require submission of a detailed price breakdown or other additional information from one or more contractors, as required to both ensure that a fair opportunity is offered to all contractors and to also ensure that the price is fair and reasonable.

VI. BASIS OF EVALUATION:

Phase II consists of Factors 4 and 5. Factor 4 (Safety) and Factor 5 (Technical Solution).

In making the best value award decision, among the offerors advanced into Phase II, the government will consider Factors 1-5 and price. Within Factor 1- Corporate Experience, the two (2) sub-factors are of equal importance. Within Factor 5 –Technical Solution, the three (3) sub-factors are of equal importance. The relative order of importance of the non-cost/price evaluation factors is that all the non-price technical factors (Factors 1

- 5) are approximately equal to each other and when combined, are approximately equal to Price.

Non-Price Factor 4: Safety

b. The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The evaluation will collectively consider the DART rate, Technical Approach to Safety, and other sources of information available to the Government as part of such collective evaluation. The board will evaluate the DART rate to determine if the Offeror has demonstrated a history of safe work practices taking into account any negative trends and extenuating circumstances that impact the rating.

1. DART Rate: The board will evaluate trends over the last five years considering changes that take it from one risk level (or more) to the next up or down. Negative trends occurring above moderate risk levels require the offeror to provide a detailed explanation that includes any corrective actions taken for improvement.

a. Missing data without an explanation is considered a deficiency.

b. Declining trends that push the risk levels from Moderate Risk (MR) or higher to Low Risk (LR) or Very Low Risk (VLR) would indicate a strength.

c. An increasing DART rate trend could be considered a weakness (i.e. MR or better to High Risk (HR) or Extremely High Risk EHR)) if an acceptable explanation is not provided for any trends that rise above Moderate.

d. This chart correlates the DART rate to the level of risk:

Risk DART Rate Very Low Risk Less Than 1.0 Low Risk From 1.0 to 1.99 Moderate Risk From 2.0 to 2.99 High Risk From 3.0 to 4.0

Extremely High Risk Greater than 4.0

2. The Technical Approach to Seed Project Safety Narrative. To determine the degree to which the Offeror:

a. Describes a viable SMS that addresses elements; such as Management/Leadership involvement, Safety Manager Training, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS.

b. Describes a methodical process of evaluating subcontractor’s safety performance in their selection process.

c. Describes a logical management plan to hold themselves and their subcontractors accountable for adhering to the safety requirements of the contract.

d. The Technical Approach to Safety narrative shall be limited to two (2) single-sided pages or one

(1) double-sided page. Information on pages beyond this will not be considered.

Non-Price Factor 5: Technical Solution

The contractor’s proposal will be evaluated based upon incorporation of all the specific requirements from the Request for Proposal in response to the submittal requirements for Factor 5 – Technical Solution (including sub-factors 5.1, 5.2, and 5.3). The contractor’s proposal will also be evaluated based on the contractor’s demonstrated understanding of the environmental permitting and mitigation requirements. Contractors will also be evaluated based on the complexity environmental permitting, environmental consultations, and environmental compliance experience for in-water projects and the similarity of the projects in construction scope and challenges to the subject contract.

Higher ratings may be given to contractors that demonstrate proposed building systems and materials that reduce/minimize maintenance (complexity of required maintenance & frequency) and costs (building systems and material maintenance & replacement value) over the life of the building.

Higher ratings may be given to contractors whose proposed conceptual site designs maximize the efficiency of the STA-ANT building and parking layout.

Higher ratings may be given to contractors with experience in environmental permitting, consultations, and compliance within tidal waters, in locations of similar geographic location, and meeting construction deadlines.

Price:

The Government contemplates award of one (1) Firm-Fixed-Price (FFP) task order; however, the Government reserves the right to make no award at all. The Government will evaluate the total price for the basic requirement together with any options. The price shall be evaluated in accordance with FAR 52.217-5, Evaluation of Options (July 1990). Award will be made to the Contractor proposing the best value.

The completed price proposal(s) forms (attached) shall only be submitted to DoDSafe. The Contracting Officer will send an invite to submit through DoDSafe within 48 hours of proposal due date and time. Offerors will be prompted, through a future amendment, to provide a preferred point of contact and email address to be used for the DoDSafe submission. Each electronic submission must be less than 36MB. Proposals must be prepared in accordance with these submission instructions, providing all required information in the format specified.

Failure of a proposal to comply with these general submission instructions and the specific submission instructions contained in this task order announcement may be grounds for exclusion of the proposal from further consideration.

The Government will evaluate the TOTAL EVALUATED PRICE for the Base Items and Option(s). The Offeror’s initial proposal should contain the Offeror’s best terms from a price and non-price standpoint.

The price shall be evaluated in accordance with FAR 52.217-5, Evaluation of Options (July 1990). Option item(s) may be exercised within 60 calendar days of Task Order Award.

Proposal Acceptance Period: The contractor’s proposal must indicate that it is valid for 120 calendar days from the Government’s receipt of offer.

The Best Value Tradeoff Process outlined in FAR 15.101-1 will be utilized. A tradeoff analysis will be conducted between price and non-price factors. As proposals approach equality in the assessment of quality, price will become more important in the tradeoff process.

PRICE PROPOSAL FORM

PROJECT 09-14405290

RECAPIUTALIZED STATION-ANT BUILDINGS

BUFFALO, NY

IMPORTANT NOTE: Contractors that include language in their proposals containing conditions may be rejected.

BASE ITEM: Provide all services and materials necessary to design and construct in accordance with RFP Guide Specifications to complete the design and build the project entitled, ‘Recapitalize Phase III-Station and ANT Buildings’. The base item scope includes:

(a) Demolition

a. Complete demolition/disposal the Station Building (3,382 GSF).

b. Complete demolition/disposal of the Station Annex (2,712 GSF).

c. Complete demolition/disposal of the 80-ft tall Communication Tower and Base (RPUID

16928), to include site restoration.

d. Complete closure of the sewage pump-out services and holding tank.

e. Complete demolition/disposal of the Finger Pier (RPUID 11508).

(b) Construction

a. Installation of pavements with the Station Building and Station Annex demolition areas.

Pavements shall be capable of supporting the Mobile Boat Hoist along all routes to the Station-ANT building and to the Mobile Boat Hoist finger pier.

b. Construction and furnishing of a Station-ANT building(s) and required support spaces/items.

This includes all associated site work, to include imported and compacted earth fill to raise the elevation to 582 (NAV 88) within the limits of the Phase III projects area as shown on RFP Drawings. Proposed site work includes changes to existing topography, access roads and parking areas, and potential creation of storm water retention areas.

c. Construct Mobile Boat Hoist Finger Pier Construct Mobile Boat Hoist Finger Pier, to include all piles, pile caps, beams, deck, and fenders, (et al) and modify and/or improvements to the bulkhead to support the lifting and transport of a Mobile Boat Hoist.

Item Design Price ($) Construction Price ($) Total Item Price ($) Demolition Work

Utility/Site Improvements and New Construction

Total for BASE ITEM: $

OPTION ITEMS

NMACC Contractors are required to provide pricing for all option items (Option Items 1 through 3). If awarded, options shall be completed within the contract performance period. Options will be considered in accordance with FAR 52.217-5 Evaluation of Options.

OPTION 1- RIP RAP RESTORATION: Provide all services and materials necessary to design and construct in accordance with RFP Guide Specifications to restore and improve the rip-rap slope along the Buffalo Harbor (approximately 450-LF).

Design Price: $

Construction Price: $

Option Item 1 Total Price: $

OPTION 2 – ATON STORAGE PAD: Provide all services and materials necessary to design and construct in accordance with RFP Guide Specifications for the complete demolition and disposal of pavements for the ATON Buoy Storage Area and construction of a new ATON buoy storage area (approximately 10,000 SF) concrete hardstand, concrete ramp, and site grading.

Design Price: $

Construction Price: $

Option Item 1 Total Price: $

OPTION 3 – PHASE IV SITE WORK: Provide all services and materials necessary to design and construct in accordance with RFP Guide Specifications to raise the Phase IV project area to elevation to 582 (NAV 88), as shown on RFP Drawings.

Design Price: $

Construction Price: $

Option Item 1 Total Price: $

TOTAL PRICE (Base Item plus All Option Items):

Total Design $

Total Construction $

TOTAL PRICE: $

I. GENERAL REQUIREMENTS
Location of the work: U.S. Coast Guard Sector Buffalo, Buffalo, NY.
Project Number: 09-14405290
Specifications: Project 14405290 (provided in electronic format via Contracting Opportunities SAM.gov and DOD Safe)
RFP Drawings: Project 14405290 (provided in electronic format via SAM.gov and DOD Safe/identified as Reference Drawings)
Appendices: Project 14405290 (Various Documents in relation to this project (provided in electronic format via SAM.gov and DOD Safe/identified as Appendices)
Wage Determination: General Decision No. NY20220050 dated 01/13/2023 Building and General Decision No. NY20220001 dated 01/06/2023 Heavy (provided in electronic format via SAM.gov and DOD Safe)