70Z04723R4300005 AMENDMENT 005.pdf

PDF 2 MB Posted

Attached to
Recapitalize Phase III, Station & ANT Buildings, USCG Sector Buffalo
Solicitation number
70Z04723R43000005
Issued by

View the file

Other files

File Type Posted
70Z04723FPCNI0001_Sector Buffalo.pdf PDF
Price Proposal Form_v3Conformed.docx DOCX document
Amendment 009.pdf PDF
Amendment 008.pdf PDF
Price Proposal Form_v3.docx DOCX document
Amendment 007.pdf PDF
Amend_007_0914405290_C102_DEMO PLAN_AM_007.zip ZIP file
NY20230001_JAN06_2023.pdf PDF
USCG_FY_2023_Subcontracting_Plan_Template.docx DOCX document
Price Proposal Form_v2.docx DOCX document
Amendment 006.pdf PDF
Amendment 005_dwg.zip ZIP file
Amendment 005_pdf.zip ZIP file
ACAD Bulkhead Improvements.zip ZIP file
Amendment 004_SF30.pdf PDF
70Z04723R43000005 Amendment 004.pdf PDF
Amend003 Drawings.zip ZIP file
70Z04723R43000005_AMEND003.pdf PDF
Amendment 002 QandA_reformatted.pdf PDF
70Z04723R43000005_AMEND002.pdf PDF
Rip Rap Site.pdf PDF
Amendment 001_Attachment E File3.zip ZIP file
Amendment 001_Attachment A.zip ZIP file
Amendment 001_Attachment I Real Property PMDS Form.xlsx XLSX spreadsheet
Amendment 001_Attachment B.zip ZIP file
STA Annex.pdf PDF
Amendment 001_Attachment L.zip ZIP file
Amendment 001.pdf PDF
Amendment 001_Attachment C 2017 Sector Buffalo Waterfront Inspection Report.pdf PDF
Amendment 001_Civil dwg.zip ZIP file
New Building Site.pdf PDF
OM3_Station Building.pdf PDF
Amendment 001_Interiors dwg.zip ZIP file
Amendment 001_Attachment D.zip ZIP file
COM Tower.pdf PDF
COMMs Tower.pdf PDF
Fuel Farm.pdf PDF
Google Site Photo.PNG PNG image
ANT Laydown Area.pdf PDF
Amendment 001_Attachment J.zip ZIP file
Amendment 001_Attachment E File2.zip ZIP file
Amendment 001_Attachment E File1.zip ZIP file
Finger Pier Photos.pdf PDF
Boat Basin.pdf PDF
Site Electrical.pdf PDF
Amendment 001_General dwg.zip ZIP file
Amendment 001_Archtecture dwg.zip ZIP file
Attachment J READ-ME.pdf PDF
Price Proposal Form.docx DOCX document
Geotehnical Reports_Parsons 2009 and 2011.pdf PDF
Show 40 more

Latest 50 of 81 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

2. AMENDMENT/MODIFICATION NUMBER

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

RECAPITALIZE PHASE III, STATION AND ANT BUILDINGS, USCG SECTOR BUFFALO, BUFFALO, NY THIS SOLICITATION IS OPEN TO THE OFFERORS MOVED INTO PHASE II OF THE NMACC III POOL 1 PROCUREMENT

See Continuation Page

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

USCG/Facilities Design & Construction Center 5505 Robin Hood Rd Suite K Norfolk, VA 23513

70Z04723R43000005

05/25/2023

03/23/2023

1 15

X

X

PJArgilan Cross-Out

RECAPITALIZED STATION-ANT BUILDINGS, BUFFALO, NY

AMENDMENT 005

SOLICITATION NO. 70Z04723R43000005 IS AMENDED AS FOLLOWS:

I. Task Order Announcement

a. Additional Clauses Video Surveillance Services or Equipment (NOV 2021) The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it "does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument" in paragraph (c)(1) in the provision at 52.204-26, Covered Telecommunications Equipment or Services—Representation, or in paragraph (v)(2)(i) of the provision at 52.212-3, Offeror Representations and Certifications Commercial Products or Commercial Services. The Offeror shall not complete the representation in paragraph (d)(2) of this provision if the Offeror has represented that it "does not use covered telecommunications equipment or services, or any equipment, system, or service that uses covered telecommunications equipment or services" in paragraph (c)(2) of the provision at 52.204-26, or in paragraph (v)(2)(ii) of the provision at 52.212-3.

(a) Definitions. As used in this provision— Backhaul, covered telecommunications equipment or services, critical technology, interconnection arrangements, reasonable inquiry, roaming, and substantial or essential component have the meanings provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

(b) Prohibition.

(1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Nothing in the prohibition shall be construed to—

(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or

(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.

(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract or extending or renewing a contract with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract. Nothing in the prohibition shall be construed to—

(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or

(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.

(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for "covered telecommunications equipment or services".

(d) Representation. The Offeror represents that—

(1) It □ will, □ will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation. The Offeror shall provide the additional disclosure information required at paragraph (e)(1) of this section if the Offeror responds "will" in paragraph (d)(1) of this section; and

(2) After conducting a reasonable inquiry, for purposes of this representation, the Offeror represents that— It □ does, □ does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services. The Offeror shall provide the additional disclosure information required at paragraph (e)(2) of this section if the Offeror responds "does" in paragraph (d)(2) of this section.

(e) Disclosures.

(1) Disclosure for the representation in paragraph (d)(1) of this provision. If the Offeror has responded "will" in the representation in paragraph (d)(1) of this provision, the Offeror shall provide the following information as part of the offer:

(i) For covered equipment— ( A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the original equipment manufacturer (OEM) or a distributor, if known);

(B) A description of all covered telecommunications equipment offered (include brand;

model number, such as OEM number, manufacturer part number, or wholesaler number;

and item description, as applicable); and

(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.

(ii) For covered services—

(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand;

model number, such as OEM number, manufacturer part number, or wholesaler number;

and item description, as applicable); or ( B) If not associated with maintenance, the Product Service Code (PSC) of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.

(2) Disclosure for the representation in paragraph (d)(2) of this provision. If the Offeror has responded "does" in the representation in paragraph (d)(2) of this provision, the Offeror shall provide the following information as part of the offer:

(i) For covered equipment—

(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the OEM or a distributor, if known);

(B) A description of all covered telecommunications equipment offered (include brand;

model number, such as OEM number, manufacturer part number, or wholesaler number;

and item description, as applicable); and

(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.

(ii) For covered services—

(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand;

model number, such as OEM number, manufacturer part number, or wholesaler number;

and item description, as applicable); or

(B) If not associated with maintenance, the PSC of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision. (End of provision)

b. General Requirements

Period of Performance: Delete and replace with following: “Eight Hundred Seventy

(870) calendar days from award for the Base Items and any awarded Option Items.”

c. Task Order Announcement Price Proposal Form

Delete Price Proposal Form in the Solicitation File (end of Task Order Announcement)

d. Proposal Submission Instructions

DELETE: The offeror shall submit information for non-price factors 4 and 5 under Phase II. The offeror shall submit one (1) Non-Price electronic proposal with the following formatting:

• Text pages 8 ½ x 11 format

• 10 point, minimum, Times New Roman font on text pages

• Drawings 11x17 inches

• 9 point, minimum, Times New Roman font on Drawings

REPLACE WITH:

Non-Price Proposal - The offeror shall submit information for non-price factors 4 and 5 under Phase II. The offeror shall submit one (1) Non-Price electronic proposal with the following formatting:

• Text pages 8 ½ x 11 format

• 10 point, minimum, Times New Roman font on text pages

• Drawings 11x17 inches

• 9 point, minimum, Times New Roman font on Drawings

Price Proposal – The offeror shall submit one electronic proposal with the following:

• Price Proposal Form

• Representation in FAR 52.204-24(d)

• Bid Guarantee

• Small Business Subcontracting Plan

Price Proposal may be submitted via email to pamela.j.argilan@uscg.mil with a copy to SMB-SILC-NMACCIII@uscg.mil

e. Section H, Special Contract Requirements, Paragraph H.22 DELETE: Section H, Special Contract Requirements; Paragraph H.22

SUBCONTRACTING PLAN

If the offeror proposing on this solicitation is a large business concern, in accordance with the definition as identified in FAR Clause 52.219-1, “Small Business Program Representations (OCT 2014)”, the firm must submit a small business subcontracting plan in accordance with FAR Clause 52.219-9 “Small Business Subcontracting Plan”. See mailto:pamela.j.argilan@uscg.mil

Section I of the solicitation for the full FAR Clause. Offerors shall submit Small Business Subcontracting Plans with Phase II Proposals. Offers shall submit Small Business Subcontracting Plans with Phase II Proposals. The USCG small business goals for FY23 are as follows:

Category FY 23 Proposed Goals SB Prime 44% 8(a) Prime 10% Non-8(a) SDB Prime

14%

Overall SDB Prime 24% HUBZone Prime 3% SDVOSB Prime 3% VOSB Prime N/A WOSB Prime 5%

REPLACE WITH: Section H, Special Contract Requirements; Paragraph H.22 SMALL

BUSINESS SUBCONTRACTING PLAN

In accordance with FAR 19.7, all other than small businesses shall submit a Small Business Subcontracting Plan (SBSP) for the base contract with their Phase II Price Proposal. The SBSP goals should be consistent with the Coast Guard’s command-wide subcontracting targets shown below. Acceptability of the SBSP will be considered a responsibility matter. The SBSP will not be evaluated or rated by the SSEB but reviewed by a Small Business Professional/Authorized Representative and the Contracting Officer for acceptability. The SBSP shall be negotiated and/or accepted within the time specified by the Contracting Officer. Failure to negotiate an acceptable subcontracting plan within the time limit prescribed by the Contracting Officer will render the offeror ineligible for award of a contract. The SBSP will be incorporated into the resulting base contract.

Coast Guard’s command-wide small business subcontracting targets are shown below.

These may be higher or lower than percentages that would represent realistic, challenging, small business subcontracting goals for this acquisition consistent with efficient and effective performance of the contract. These targets are based on a percentage of total planned subcontracting dollars.

Category FY 23 CG Subcontracting

Goals

SB 43%

SDB 5%

HUBZone 3%

SDVOSB 3%

WOSB 5%

It is the policy of the Government to provide maximum practicable opportunities in its acquisitions to Small Business (SB) concerns, including Historically Underutilized Business Zone Small Business (HUBZone SB), Woman-Owned Small Business (WOSB), Small Disadvantaged Business (SDB), Veteran-Owned Small Business (VOSB), Service-Disabled Veteran-Owned Small Business (SDVOSB), and other small business concerns. Further, it is the policy of the Government that such concerns will have the maximum practicable opportunity to participate in contract performance consistent with its efficient performance.

TASK ORDER ANNOUNCEMENT:

INSERT AFTER PRICE PROPOSAL:

Small Business Subcontracting Plan Submit with your price proposal, a small business subcontracting plan for the base contract which shall include the total contract value (including all option periods), the dollar value and percent of the total subcontracted effort including the effort to LB, SB, SDB, WOSB, VOSB, SDVOSB, and HUBZone firms. If the firm commitments to subcontract exist, list the subcontractors by name. Otherwise, list the type of services to be subcontracted. Sample Small Business Subcontracting Plan attached.

f. Correction to Amendment 004 Amendment Language

Amendment 004 changed Subfactor 5.3 to:

Describe experience with environmental permitting, environmental consultations, and environmental compliance for in-water projects located in tidal waters freshwater locations, wetlands, and Great Lakes Compliance. Include in the description the various environmental agencies you anticipate working with (state and federal) and previous experience the D-B contractor has working with these agencies.

CORRECT TO: Describe experience with environmental permitting, environmental consultations, and environmental compliance for in-water projects located in tidal waters, freshwater locations, wetlands, and Great Lakes Compliance. Include in the description the various environmental agencies you anticipate working with (state and federal) and previous experience the D-B contractor has working with these agencies.

II. SPECIFICATIONS

RFP SPECIFICATION 01800-1.1.1 – Base Bid, (a) Demolition, Item d. (RFI #224, #301, #473, #633, and #634) DELETE: This demolition scope is to be removed from the project, Item d ‘Complete closure of the sewage pump-out services and holding tank.’

RFP SPECIFICATION 01800-1.1.1 – Base Bid, (a) Demolition, Item e. (RFI #49,)

DELETE: This demolition scope is to be removed from the project, Item E ‘Complete demolition/disposal of the Finger Pier.’

RFP SPECIFICATION 01800-1.4.7.2.1 Available Pressure (RFI #107, #191, #265, #508, #591, and #655) ADD: Add the following sentence. ‘Recent hydrant flow test data is not available. For bidding purposes assume a flow rate of 800 gpm.’

RFP SPECIFICATION 01800-1.7.3.3.1 – Suspended Acoustical Tile (SAT) Panel System

(RFI #422, #562)

DELETE: The first sentence.

REPLACE WITH: The following: ‘Provide sound controlling units mechanically mounted on a suspension system for acoustical treatment. Provide sound attenuators over light fixtures, air terminals, and other ceiling penetrations, provide acoustical blanket insulation on top of the ceiling or adjacent partitions to provide lightweight acoustical plenum barriers above partitions as required to achieve specified Ceiling Attenuation Class (CAC) ratings as determined in accordance with ASTM E1414/E1414 and ASTM E413. The minimum CAC rating of the ceiling system shall be 35. The minimum Noise Reduction Coefficient (NRC) rating shall be .55 when tested on mounting type in accordance with ASTM E795.”

DELETE: The second paragraph.

REPLACE WITH: Ceiling Panels: Non-Asbestos, mineral fiber acoustical ceiling panels, featuring a fine-textured, no-directional factory applied finish for increased durability and light reflectance. Panels shall be Fire Rating: Class A 25 or less, sag-resistant, anti-microbial, and recyclable. Panel Size: Nominal 24” by 24”. Light Reflectance: Minimum 0.80. Edge Detail:

Square – lay-in panel (See note below).

ADD: The following paragraph: Suspension System: Provide standard exposed-grid standard with flange suspension system conforming to ASTM C635/C635M for heavy-duty suspension system. Provide surfaces exposed to view of aluminum or steel with a factory-applied white baked enamel finish or cap. Provide wall molding having a flange of not less than 2 inches.

Provide inside and outside corner caps and standard corners. Provide a suspension system with a maximum deflection of 1/360 of the span length capable of supporting the finished ceiling, light fixtures, air diffusers, and accessories as shown.

DELETE: The sentence: ‘1 year warranty. Recycled content greater than or equal to 20%. Light reflectance no less than 80%.’

RETAIN: The edge note.

RFP SPECIFICATION 01800-1.7.7.1.1 – Exterior Fiberglass Reinforced Plastic (FRP) Personnel Doors (RFI# 635)

DELETE: Delete third sentence of specification paragraph saying, ‘Any vision light openings or louvers required shall be installed by the door manufacturer at the time of manufacture.’

REPLACE WITH: ‘Any vision light openings or louvers required can be installed by the door manufacturer at the time of manufacture or work site installed as recommended by the door manufacturer.”

RFP SPECIFICATION 01800-1.7.7.2.1 – Interior Wood Doors (RFI# 636)

DELETE: Delete second sentence of specification paragraph saying, ‘Any vision light openings or louvers required shall be installed by the door manufacturer at the time of manufacture.’

REPLACE WITH: ‘Any vision light openings or louvers required can be installed by the door manufacturer at the time of manufacture or work site installed as recommended by the door manufacturer.”

SPECIFICATION 01800-1.7.7.2.1 – Interior Wood Doors (RFI# 659)

ADD: After the last sentence under that heading add the following sentence: ‘STC rated hollow metal doors with a wood veneer may alternately be used.’

RFP SPECIFICATION 01800-1.8.4.4 (RFI# 146)

DELETE: ‘Whereas the DOR elects to incorporate cast-in-place concrete, pier deck, pile caps, beams, and foundations shall be a minimum 5,000 psi mix designed to either the Durability Requirements of ACI-314 or the current UFC “Marine Concrete” mix suitable for a splash zone seawater environment to achieve a minimum 75-year service life.’

REPLACE WITH: ‘Whereas the DOR elects to incorporate cast-in-place concrete, pier deck, pile caps, beams, and foundations shall be a minimum 5,000 psi mix designed to achieve a minimum 75-year service life.’

RFP SPECIFICATION 01800-1.8.10.3 (RFI# 150)

DELETE: Delete first sentence, ‘Design and construct a single finger pier for the support of a Marine Travel Lift 50 BFM, 110 TN mobile boat hoist.’

REPLACE WITH, ‘Design and construct a single finger pier for the support of a Marine Travel Lift 50 BFM, 110,00 lbs capacity mobile boat hoist.’

RFP SPECIFICATION 01800-1.8.10.4.5 (RFI# 550)

DELETE: Delete last sentence, ‘Additionally, provide HDPE pile wrap protection system around steel piles within the splash and tidal zones. Extend wrap protection 5 feet below MLLW.’

RFP SPECIFICATION 01800-1.8.10.4.6 (RFI# 551)

DELETE: Delete 01800-1.8.10.4.6.

RFP SPECIFICATION 01800-1.8.9 (RFI# 138)

DELETE: Delete ‘The new building shall have an overhead top-running crane runway beams shall be designed in accordance with CMAA 70. Overhead crane runway beams shall be supported by the building columns that support the roof. Columns independent of the building structure are not acceptable. Provide structural steel crane stops at each end of each crane runway beam of sufficient strength to withstand the impact of a fully loaded trolley moving at 50 percent of maximum rated travel speed. Crane runway beams shall be supported on corbels at each column and shall not be connected to each other. Crane runway beams shall be laterally braced at each column. The overhead monorail system shall be designed in accordance with Industry Standards. Refer to Specification 1.7-Architecture.’

REPLACE WITH, ‘‘The new bridge crane, as specified in RFP Specification 01800-1.7.13.2, shall be designed in accordance with CMAA 70. Provide structural steel crane stops at each end of each crane runway beam of sufficient strength to withstand the impact of a fully loaded trolley moving at 50 percent of maximum rated travel speed. The overhead monorail system shall be designed in accordance with Industry Standards. Refer to Specification 1.7- Architecture.’

RFP SPECIFICATION 01800-1.8.10.7 (RFI# 215, #466, #467, #257,)

DELETE: Length: The minimum required length of the finger pier is 115 FT.’

REPLACE WITH, ‘‘Length: The minimum required length of the finger pier is 60 FT.’

RFP SPECIFICATION 01800-1.8.10.12 (RFI# 215, #249)

DELETE: Delete 01800-1.8.10.12.; ‘Protection: Provide end protection to protect against accidental impact from vessels docking. Provide a timber fender system on the north side of the north finger pier.’

RFP SPECIFICATION 01800-1.8.11 – Temporary Mooring (RFI #48, #151, #154, and #446) ADD: Temporary mooring requirements, as follows:

Temporary Mooring

General: The Contractor shall provide and fully assemble in place, a floating pier system that includes float-modules, whaler system, float guide assemblies, and appurtenances with the gangway installed for temporary mooring of two 45 RB-M vessels displaced by the construction of the mobile travel lift finger pier.

Refer to RFP 01800-1.13 for additional electrical and lighting requirements. The Contractor shall remove the temporary mooring, to include, guide piles, electrical and lighting.

Design and Construction: Provide a system of pre-cast, non-prestressed concrete floating pier modules, herein referred to as floating piers.

Design Layout

Provide a layout and arrangement that meets the minimum requirement herein, however, the exact layout shall be determined by the DOR.

Vessel Length Beam

Height Above Water Line

Min.

Mooring Length

Min Mooring Width

Design Draft at Mooring

Weight (lbs)

45’ RB-M 44’ – 11” 13’ – 8” 20’- 1 5/16” 45’ 15’ 40”+ 4’ 36,000

Where necessary, the minimum lateral spacing between 45’-RB-M shall be 7’ – 0”.

All design draft at mooring depths shall be measured at extreme low water.

Length: The minimum required length of the floating pier to support the RB-M 50 FT. This length provides 5 FT clearance from the aft of the vessel to the end of the bulkhead.

Width: The pier shall have a minimum width of 10’-0” in width, measured from interior edge to interior edge.

Slip Width: RB-M slip shall be a minimum of 23-ft in width.

Wave and Current Loads: Wave loads and hydrostatic forces on piers and pile-supported structures shall be in accordance with UFC 4-152-01 Design of Piers and Wharves. For bidding purposes, assume a tidally produced current speed of 0.5 Knot for normal conditions.

Berthing and Energy Forces: The DOR is responsible for the layout and calculation of berthing energy and mooring forces. Calculations shall be based on wind presentation area and “worst case” impact of 2.0 knots perpendicular to pier (See Horizontal Loads in UFC 4-153-01 (3-4)).

Approach Velocity: The vessel’s approach velocity shall be 0.5 Knot at an angle of 15-degrees to the longitudinal axis of the pier.

Tidal Extremes: The gangways, docks, platforms, brows & utility connections shall be designed to accommodate a tidal range from “extreme astronomical low tide” to “extreme high astronomical tide” + 1.0’.

Floating Dock: The floating dock designer is responsible for the design criteria and performance of lifting forces, towing forces and wave forces which may occur during construction and transport of the docks to the site. The designer may use either the Allowable Stress Design or LRFD factored load combinations specified in UFC 4-152-01 applied to the following loads:

Other Design Considerations

1.8.11.15.1 The DOR shall design moorings and cleats to safely resist the nominal loads in load combinations without exceeding the appropriate allowable stresses for the mooring components. Select and outfit the slip with rub rails and fenders to match the energy forces. At a minimum, provide continuous D-fenders suitable for the calculated mooring reactions and berthing energy needs to absorb energy and protect the vessel’s hull from damage during berthing impact and environmental mooring loads. Provide continuous rub strips on the pier ends. Rub strip may be treated timber suitable for seawater immersion or plastic lumber with U/V protection.

1.8.11.15.2 The float pier shall have side mounted pile guide assemblies that permit longitudinal field adjustment of their positions on 4" centers.

1.8.11.15.3 Provide steel or concrete guide piles as necessary to anchor the floating pier. Minimum tip height of the guide piles shall be 6-ft elevation above the Mean High Tide to prevent the piers from floating off of the guide piles. Terminate all pilings at the same height.

1.8.11.15.4 Provide 18-inch cleats at approximately 10 feet on center on sides of the floating pier where vessels are shown to be moored. Exact position and arrangement of the cleats shall be as determined by the DOR.

1.8.11.15.5 Provide ultra-high molecular weight (UHMW) polyethylene rub rail around the pier perimeter at all points where boats may come in contact with the floating pier under normal conditions.

1.8.11.15.6 Piers shall incorporate OSHA required safety ladders and life rings.

Ladder material shall be A316 stainless steel and the bottom rung shall be a minimum of 2’ below water at the highest free-board elevation. Provide life rings and ropes complete with fully enclosed cabinets secured to the deck.

Access Ramp/Gangway: The Contractor shall provide a prefabricated aluminum gangway to access the floating pier.

1.8.11.1.1 Gangways shall have a minimum clear walkway width of 5 ft.

1.8.11.1.2 The DOR shall be responsible for determine the length of gangways. RFP drawings are conceptual and gangway lengths are shown only for representation.

1.8.11.1.3 Gangways shall have continuous handrails that are a minimum of 30 inches above the walking surface, but not to exceed 38 inches. Height of the structural top rail shall be a minimum of 42 inches above the deck surface. Gangway hand rails shall be fully closed pipe and OSHA compliant for rail height, size and extensions.

1.8.11.1.4 Gangway walking surfaces shall be open serrated bar grating.

1.8.11.1.5 Gangway access platform end connections shall allow unrestricted vertical movement through tidal variation. Gangway bearing on floating piers shall be fitted with UHMW polyurethane rollers of adequate bearing area. Gangways shall be fitted with hinged apron plates to assure a safe uniform transition between gangway and deck surfaces. Apron plates will be designed so as to not damage or mar the floating pier surface. Roller guides shall be provided at the bottom of the gangway, to stabilize the gangway and prevent lateral movement. Guides shall be located along the full length of the wear plate.

1.8.11.1.6 Gangway Design Loads: Gangway live loading shall be a uniform live load of 100 psf, plus wet and dry utilities if applicable. Gangway shall include a concentrated 300 lb point load anywhere along the length. Additionally, the gangway end connections at the platform shall be designed to withstand a lateral wind load of 65 psf. Install an aluminum plate consisting of cut out letters and/or numbers identifying the load limit and serial number (if applicable) of the gangway.

1.8.11.1.7 Gangway Design Drawings: Submit gangway design drawings including fabrication, handling and erection information and requirements. Design drawings shall be prepared and stamped by a licensed professional engineer.

RFP SPECIFICATION 01800-1.13.13.11 (RFI#310)

DELETE: Delete entire paragraph

REPLACE WITH: “Electric Vehicle Charging Stations shall conform with CSTO

SILC-CSTO-36-11 31 17 11-02 “Electric Vehicle Support Equipment.”

RFP SPECIFICATION 01800-1.13.18.1 (RFI#92)

DELETE: Provide two (2) shore power connection points for vessels.

REPLACE WITH: Each vessel requires one shore power connection.

RFP SPECIFICATION 01800-1.14.2.1 (RFI#335)

DELETE: Reference to “minimum 480 lines of resolution”

REPLACE WITH: “minimum 1080p resolution.

RFP SPECIFICATION 01800-1.14.2.2 (RFI# 336)

DELETE: Delete ‘Provide all required mounting hardware and accessories required for camera operation including sunshields, fans, etc. Provide wiring and accessory equipment as required for multiple camera display on monitor(s) in the computer server room. Coordinate camera locations and exterior lighting to avoid interference.’

REPLACE WITH, ‘Provide all required mounting hardware and accessories required for camera operation including sunshields, fans, etc. Provide within the Telecommunications Room (See RFP Concept DWG A-101, RM 134), all wiring and accessory equipment, as required, for the multiple camera/monitor displays. Coordinate camera locations and exterior lighting to avoid interference.’

RFP SPECIFICATION 01800-1.16.4.1 (RFI# 338)

DELETE: ‘Follow installation and design practices in referenced documents. In the event the BESEP requirements are more restrictive than the referenced requirements, follow the BESEP requirements.’

III. DRAWINGS:

REPLACE: Architectural drawing A-101 – First Floor RFP Plan Drawing changed to show revised requirements for the two exterior weapons clearing stations at the plan north and east entrances.

Revised drawing shows one chair, outfitting item SE-02 removed from RFP space 116 and 117 to be coordinated with interiors plan.

Revised drawing shows flammable storage cabinet in RFP space 114 to be coordinated with interiors plan.

REPLACE: Interiors drawing I-101 – First Floor Interiors Plan Revised drawing shows changes to outfitting requirement in RFP space 119. Four shelves, Item SH-09, were removed and one Flammable Storage Cabinet, Item SC-14 was added. Outfitting Schedule changed accordingly.

REPLACE: Interiors drawing I-102 –Second Floor Interiors Plan

Revised drawing shows revised sizes of bookcase, Item SC-19 on plan in RFP spaces 225 and

238. Outfitting Schedule changed accordingly.

Revised drawing to show correct tag (SC-25) for weapons storage cabinets in RFP space 244.

Revised drawing to show general note stating that computer keyboards, monitors, shredders, and copy/printers are not outfitting requirements.

REPLACE Drawings C-103 and C-104 (#467, #466, #256, and #257)

a. Delete note ‘Trees to Remain’ from C-103’ Trees are to be removed.

b. Provide Mobile Boat Hoist travel path.

c. Delete call out for Shoreline Stabilization

d. Provide Mobile Boat Hoist travel path.

e. Provides updated layout for new finger pier.

f. Deletes demolition of existing boat dock.

RFI REPONSES: SOLICITATION NO. 70Z04723R43000005 IS AMENDED AS

FOLLOWS:

IV. APPENDICES AND ATTACHMENTS:

RFP SPECIFICATION, APPENDIX E - Industry Standards, Fire Protection Design, Drawings, Civil Drawings, Item (b).

DELETE: Delete ‘MIL-HDBK-1008-B’

REPLACE WITH: ‘the International Fire Code (IFC).’

RFP ATTACHMENT C – CONSTRUCTION RECORDS

g. ADD: ‘Station Annex (PDF)’ construction records

h. ADD: ACAD Bulkhead Improvements_2013

Appendix J - Outfitting Item Information Sheet for Item LE-02 - (Ref: RFI #365) DELETE: The word ‘GAS” from the item description.

Appendix J - Outfitting Item Information Sheet for Item SC-19 - (Ref: RFI #372) ADD: Outfitting Item Information Sheet for SC-19 to Appendix J.

Appendix J - Outfitting Item Information Sheet for Item AR-01

Add: Revised Outfitting Item Information Sheet for the Bullet Trap – Weapons Clearing Station.

Note: Item AR-01 initially added in Amendment 003. The item initially selected did not have the capability of handling armor-piercing rounds which was later discovered to be an ordinance handling requirement. The revised outfitting item meets the requirements.

Appendix F – Individual Space Criteria Sheet for BS-100 Boat Storage Bay - (Ref: RFI #423) DELETE: Under the heading “OH Doors” Delete the first two sentences.

REPLACE WITH: “Overhead Doors: Provide an overhead door at each end of the storage bay.

Each door shall be 14’ wide by 14’-8” high. Two overhead doors total.”

Appendix F – Individual Space Criteria Sheet for RFP Space BS-101 Grounds Maintenance Equipment- (Ref: RFI #424) DELETE: Under the heading “Personnel Doors” Delete the word “exterior’ from the specification.

ADD: In its place, “Boat Storage Bay”.

Appendix F – Individual Space Criteria Sheet for Second Floor Private Offices – RFP Spaces 227, 228, 229, 239, 240, and 241 (Ref: RFI #564) DELETE: Under the heading “RFP Space names ‘Delete: ‘Building Supplies Storage Closet Alpha, RFP space 231, and Building Supplies Storage Closet Alpha, RFP space 232.

REPLACE WITH: ‘Station CO/INC, RFP space 239, Station XO/XPO, RFP space 240, and Station Engineering Petty Office, RFP space 241.’

Appendix F – Individual Space Criteria Sheet for RFP Space 243 Command and Operations Center Toilet - (Ref: RFI #568) DELETE: Under the heading “Floor” Delete ‘Vinyl Composition Tile (VCT)’

REPLACE WITH: ’Luxury Vinyl Sheet flooring or Porcelain Ceramic Tile’

Amendment 005

RFI No.

Date

Submitted Pg Section Paragraph QUESTION GOVERNMENT RESPONSE

POSTED ON

AMEND NO.

1 4/3/2023

221 01900 1.3.1

Please provide the .dwg files referenced for Attachment D to include 49 BUSL Drawing.dwg, 26-TANB Drawing.dwg, 29 RB-S Drawing.dwg and 45 RB-M Drawing.dwg. These files were not included on SAM.Gov. See Amendment Language 001

2 4/3/2023

221 01900 1.3.1

For Attachment E, the files provided in SAM.GOV do not appear to match the listing in this section. We have received BULKHEAD+REHAB+A09-L01015.pdf and RECAP+FACILITIES+A09-L01015.pdf. These two files appear to be fore Phase 1 and Phase 1a. We did not receive the following files from SAM.GOV: Underground Utility Plan (Multi Files), Recap Facilities Phases 1 & 2 (CADD and PDF files), COMMs Tower Foundation Plan (PDF), Fixed Pier Structural Details (PDF). We believe that these files were included in the DODSafe condensed file but not SAM.GOV. We can't confirm ALL, however, based on the file names.

See Amendment Language 001

3 4/3/2023

221 01900 1.3.1

SAM.GOV provided a file named Photos.pdf in which 23 photos were included. We do not have the files listed in this section to include: Site Photo Legend.ppt, Series Location Description Table.xls, and Series 1- 31.pdf (photos). Please provide files or revise this section.

See Amendment Language 001 4 4/3/2023 Please provide electronic files (.dwg, .rvt) for the RFP drawings. See Amendment Language 001

5 4/11/2023 42 HSAR Clauses

HSAR 3052.222-90 Local Hire (USCG). Please confirm that this HSAR is applicable to the seed project.

As the Buffalo, NY unemployment rate is higher than the National Unemployment rate, the clause is applicable to this project 002

6 4/11/2023

94 1.7

1.7.1.1.2 & 1.7.1.1.2.1

Is paragraph 1.7.1.1.2.1 only applicable if concrete panels are selected? The RFP requirement for the inner stud wall is applicable to PIP concrete walls, site-cast tilt-up concrete wall panels, precast concrete wall panels and unit masonry walls which, when constructed, are considered to be concrete walls. 002

7 4/11/2023

94 1.7

1.7.1.1.2 & 1.7.1.1.2.1

A-101 appears to indicate where cold formed / gypsum walls are required on the first floor if concrete masonry units are utilized. Paragraph

1.7.1.1.2.1 suggests that a "stud perimeter wall construction is shown around the perimeter of the multi-story structure on all floor levels". Is the intent of the RFP to require metal stud/ gypsum walls on the perimeter walls of all floors if concrete panels are selected for the envelope?

If an acceptable alternate choice, CIP, precast, or tilt-up concrete construction, is selected for the exterior walls, the entire exterior building envelope including finishes, waterproofing, insulation and installation of utilities must be designed for the material selected. The inner stud wall is an RFP requirement as shown on conceptual floor plans. In those spaces where the inner wall is not shown at the exterior on the drawing, an inner wall or other design solution may be selected to meet the insulation and utility requirements and be in compliant with Electrical Specification section 1.13.2..1.5 which addresses wiring runs.

8 4/12/2023 Geotechnical Please confirm that geotechnical services must be performed by a 3rd party consultant.

RFP Specifications 01800-1.5 do not require the Contractor perform their own Geotechnical borings. 002

9 4/12/2023 Small Business Goals

Per amendment 10 a small business subcontracting plan is required. Is the plan to be based on the total value of the NMACC or the value of the seed project?

Total Value of NMACC should be used for the Small Business Subcontracting Plan

10 4/12/2023 Subfactor 5.3 Environmental Compliance

Sub-factor 5.3 reads "Discussion shall be no more than 5 pages. The drawings do not count towards the page limitation" Should this read that the description for the 3 comparable projects do not count towards the page limitation as there are no drawings requested under this subfactor? See Amendment Language 002

11 4/12/2023 Factor 4 Safety

Factor 4 safety has a note that states "DART and Total Recordable Incident Rate (TCR) shall not be submitted for subcontractors." TCR is not required under submission requirements for this factor under item 1.

Please confirm that we are only to provide DART rates for the previous 5 calendar years per item 1. of Factor 4. See Amendment Language 002

12 4/13/2023

01110-1.19 Section 1.19 requires submission of social security numbers of all on-site personnel to the COR at least 2 weeks in advance. Please confirm that on-site personnel will not be subject to a criminal background investigation.

On-site personnel will not be subject to criminal background checks. 004

PRE-PROPOSAL INQUIRY/REQUEST FOR INFORMATION

REFERENCE

13 4/13/2023

01110

Does the US Coast Guard have any prescriptive project management software applications/requirements that the Contractor will be required to utilize for project correspondence, submittals, RFI's, etc.? If so, please specify.

The Government does not have any prescriptive project management software applications/requirements the contractor must use. 002

14 4/13/2023

01300-1.1.2.4 Please confirm that offerors should not deviate (plus or minus) from the prescriptive room layout and sizes presented in the RFP drawings and Individual Space Criteria Sheets in Appendix F.

The spaces shown on the RFP conceptual plans incorporate CG space allocation requirements and have already been increased or slightly decreased to meet the adjacency, functional requirements, and configurations of the space and the furnishings and equipment layouts shown on the conceptual plans and as described on the supporting Individual Space Criteria Sheets for each space. Proposed room configurations, layouts, sizes and even locations of spaces can vary from those shown on the conceptual drawings but the functionality and inclusion of the specified furnishings and equipment shall be maintained.

15 4/13/2023

01500-1.3

(A) Please confirm that Contractor is required to provice a 160-SF temporary trailer for the exclusive use of the Coast Guard COR/CI per 01500-1.3. (B) Is there a preferred location, or can this trailer be located on Coast Guard property outside the project's limits of disturbance?

(A) Yes, a trailer is required as specified for CG use. (B) No, there is no preferred location.

16 4/13/2023

01500-1.3.2.2

01500-1.3.2.2 says that Contractor may connect to Coast Guard distribution for temporary construction power without charge. Please confirm that the Contractor is not responsible for paying the associated electrical consumption charges.

The Contractor will not be responsible for electrical consumption charges as long as service complies with 1.3.2.2.

17 4/13/2023

01800

Section 01800-1.7.4.1 says that floor finish locations are indicated in the RFP concept plans. Please either confirm that floor finishes must comply with the Appendix F ISCS or provide finish designations on the plans as referenced in 1.7.4.1.

See amendment. Floor finishes are specified in Appendix F ISCS.

18 4/13/2023

Appendix J Should furnishings required under the Outfitting scope of work (as detailed in Appendix J) be priced on GSA schedule or open market?

The Government cannot authorize contractors to purchase off of GSA schedules. Some vendors, as a courtesy, will extend GSA schedule pricing for specific Govt. projects but there is absolutely no guarantee that they will do so. Offerors should base their price on open market.

19 4/13/2023

01802-2.1.1

Sectoin 2.1.1 lists 35%, 65%, final, & corrected design submittals and says that these submittals are required for fast track packages as well.

Please confirm that Fast Track packages can proceed straight to final design submission without separate 35% and 65% submittals.

In the Fast Track process, 35%, 65%., and FINALs are still required with the Fast Track process.

20 4/13/2023

Price Proposal Form Is the $50,000 allowance contained in the Price Proposal Form intended to cover the Guiding Pricinciples documentation, GBI 3rd-party review and certification costs per 01800-1.3.1.1.2, or both?

Per RFP section 01200-3.2.4, the $50,000 figure shall be included in the contractor's schedule of prices for Guiding Principles documentation and will be paid after successful submission of documents to the Green Building Initiative. 003

21 4/13/2023 01110

Please either (A) confirm that there are no project-specific requirements for cybersecurity / hardening; or (B) specify all cybersecurity requirements.

Project Cybersecurity requirements fall within the Telecommunications Specification, Section 01800-1.16 004

22 4/13/2023

Amendment 10

The small business goals referenced in Amendment 10 appear to be signficantly higher than historical averages for this type of project. Will the Small Business Subcontracting plan submitted for the seed project apply only to the seed project, or will it apply to all future task orders within the NMACC as well?

The Small Business Subcontracting Plan will apply to the NMACC III capacity of $4B 002

23 4/13/2023 01800-1.10.2.1

Section 1.10.2.1 instructs Offerors to include a fire pump. Can offerors assume that the electrical service resiliency will permit an electric pump, or should offerors include a diesel fire pump?

No, offerors should not assume that per NFPA 20

24 4/13/2023

01800-1.10.2.1

Section 1.10.2.1 instructs Offerors to include a fire pump, but the RFP plans do not provide a location with sufficient space. Please either (A) identify an area within the building suitable for housing the fire pump and appurtenances; or (B) advise if the fire pump should be housed in a premanufactured housing outside of the building footprint.

The Individual Space Criterial Sheet for the conceptual Mechanical space states that that space is the primary location for 1st floor mechanical equipment including any air compressor and fire suppression equipment . It also states that the space can be subdivided for equipment types as required. Mechanical spaces shown on conceptual plans are not based on specific equipment systems and/or equipment and are entirely subjective. Such space can be enlarged, reduced, separated, subdivided, or reconfigured to meet the requirements of the final design systems equipment and service access requirements.

25 4/13/2023

A-101 RFP plans do not show an exterior door at Electrical room 137. Please either (A) confirm this is acceptable; or (B) confirm that Offerors should reconfigure the floor plan/layout to provide an exterior door.

The RFP conceptual floor plan shows the electrical room access from the building interior from the Fitness Center and indirectly from the exterior through the Mechanical space. Inside access is desirable because of the severe winters in Buffalo. Exterior access is not required but is not precluded either. If the offeror/DOR determines that direct exterior access to the electrical equipment room is beneficial or a required design requirement, they are encouraged to provide that capability. 002

26 4/13/2023

C-103 In order to facilitate accurate and consistent pricing, please provide existing one-line/voltage details for the site electrical tie-in/control point, including location, voltage, quantity and size conduits.

This information isn't available.

27 4/13/2023

01800-1.7.1.1.2

If alternative exterior wall systems are utilized as prescribed in 01800- 1.7.1.1.1, 1.7.1.1.2, please confirm that inner studs are not required at locations shown in the briding docs as exposed CMU (since these rooms will have exposed conduit/piping as currently designed in the RFP plans).

If an acceptable alternate choice, CIP, precast, or tilt-up concrete construction, is selected for the exterior walls, the entire exterior building envelope including finishes, waterproofing, insulation and installation of utilities must be designed for the material selected. The inner stud wall is an RFP requirement as shown on conceptual floor plans. In those spaces where the inner wall is not shown at the exterior on the drawing, an inner wall or other design solution may be selected to meet the insulation and utility requirements and be in compliant with Electrical Specification section 1.13.2..1.5 which addresses wiring runs.

28 4/13/2023

A-201

If alternative exterior wall systems are utilized as prescribed in 01800- 1.7.1.1.1, 1.7.1.1.2, & 1.7.1.1.3, please confirm the offeror may replicate façade details such as the horizontal banding within the materiality of the proposed system.

Exterior design elements within the "materiality" of the selected exterior system are encouraged and expected.

29 4/13/2023 Subfactor 5.3

Subfactor 5.3 says that a NEPA Environmental Assessment has been completed. Can a copy of this be provided to offerors?

RFP 'Attachment B - Environmental' reference documents were provided via Amendment 001. 002

30 4/13/2023 A-101

RFP plans appear to indicate cast-in-place concrete for elevator shaft walls. Can alternative wall assemblies be utilized for the elevator shafts, as determined by the DOR?

Yes.

31 4/13/2023 01110-1.6.1

01110-1.6.1 says Contractor parking and staging areas are indicated, but we do not see this designated on the drawings. Please define limits available for Contractor parking and staging.

See Prior Amendments. RFP Drawings has been updated.

32 4/13/2023

01110-1.10

01110-1.10 says that the Coast Guard and other contractors will be performing work at the project site during the time of this Contract.

Please define all referenced work activities within the limits of the Contract site that will be concurrent with execution of this Contract.

The Contractor should anticipate the Coast Guard may have other contractors on site during the performance period, however, presently there are no known projects that are within the referenced work limits of this project.

33 4/13/2023

01800-1.4.4

Should section 01800-1.4.4 be interpreted as requiring curbing around all sides of all pavements throughout the site area? Or, where deemed appropriate by the DOR, can some pavement edges sheet drain into adjacent landscaping/surface drainage areas?