Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
RECAPITALIZE PHASE III, STATION AND ANT BUILDINGS, USCG SECTOR BUFFALO, BUFFALO, NY THIS SOLICITATION IS OPEN TO THE OFFERORS MOVED INTO PHASE II OF THE NMACC III POOL 1 PROCUREMENT
The Proposal Due Date is hereby extended to June 6, 2023
See Continuation Pages
US Coast Guard Facilities Design & Construction Center 5505 Robin Hood Rd Suite K Norfolk, VA 23513
70Z04723R43000005
1 8
04/27/2023
03/23/2023
This amendment is issued to incorporate the following:
I) PROPOSAL DUE DATE IS EXTENDED TO JUNE 6, 2023
II) Factor 4: SAFETY
DELETE in its entirety
REPLACE WITH: Factor 4: SAFETY
Note for JV: the following submittal requirements are required for each entity that is part of the JV. Offeror shall clearly indicate which JV partner will be in charge of the overall Safety program. DART rate shall not be submitted for subcontractors.
a. Submission Requirements: The Offeror shall submit the following information: The Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate for the specified five
(5) Calendar Years (CY), as well as a safety narrative, as described further below. For a partnership or joint venture, the Offeror shall submit separate DART rates for the specified five (5) CY for each contractor who is part of the partnership/joint venture;
however, only one safety narrative is required. Any fatalities experienced within this 5-year timeframe must be explained in detail, to include root cause and corrective actions.
NOTE: DART and Total Recordable Incident Rate (TCR) (TRIR) shall not be submitted for subcontractors
1. DART Rate: Submit five (5) previous complete calendar years’ [CY2021, CY2020, CY2019, CY2018, and CY2017] (CY2022, CY2021, CY 2020, CY2019, and CY 2018) worth of data (not an overall average). If the Offeror has no DART rate, for any year, affirmatively state so and explain why.
a. DART cases include injuries or illnesses resulting in death, days away from work, and/or restricted work or transfer to another job days beyond the day of injury/illness.
b. Calculation of DART rate: Multiply the total number of DART cases by 200,000, and then divide by the number of employee labor hours worked.
𝐃𝐃𝐃𝐃𝐃𝐃𝐃𝐃 𝐃𝐃𝐃𝐃𝐃𝐃𝐑𝐑 =
Number of DART Incidents x 200,000
Total Number of Employee Labor Hours Worked
2. TRIR Rate: Submit five (5) previous complete calendar years’ (CY2022, CY2021, CY
2020, CY2019, and CY 2018) worth of data (not an overall average). If the Offeror has no TRIR rate, for any year, affirmatively state so and explain why.
a. TRIR incidents, according to OSHA, that need to be reported include, but not limited to,
• Anytime that an employee or worker loses consciousness
• If an incident causes a worker to take on light-duty, activity restrictions, or the need to be transferred to other work.
• If an incident causes a worker to take days away from work.
• If the injury requires medical treatment beyond what a first aid kit can address.
• If any other work-related health issue is diagnosed by a medical professional
b. Calculation of TRIR rate: Multiply the total number of incidents by 200,000;
then divide by the number of employee hours worked in a year.
𝐃𝐃𝐃𝐃𝐓𝐓𝐃𝐃 𝐃𝐃𝐃𝐃𝐃𝐃𝐑𝐑 =
Number of TRIR Incidents x 200,000
Total Number of Employee Labor Hours Worked in a Year
3. Technical Approach to Safety: Submit a narrative that addresses the following:
a. Describe the Offeror’s approach to implementing and executing a Safety
Management System (SMS) including Management/Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and Health training, to include the standard(s) used to benchmark the
SMS.
b. Describe the evaluation of subcontractor’s safety performance in the Offeror’s selection process.
c. Describe the processes of how the Offeror will oversee safety compliance of subcontractors at all levels throughout performance of the contract (to include the Offeror’s own in-house workforce).
d. The Technical Approach to Safety narrative shall be limited to two (2) single-sided pages or one double-sided page. Information beyond the referenced page limit will not be considered.
The Government reserves the right to review other available sources (public/Government internal) of information. These may include but are not limited to OSHA data, Contractor Performance Assessment Reporting System (CPARS), etc.
III) Basis of Evaluation
DELETE Factor 4 Basis of Evaluation in its entirety
REPLACE WITH: Non-Price Factor 4: Safety
b. The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The evaluation will collectively consider the DART rate, TRIR rate, Technical Approach to Safety, and other sources of information available to the Government as part of such collective evaluation. The board will evaluate the DART rate to determine if the Offeror has demonstrated a history of safe work practices taking into account any negative trends and extenuating circumstances that impact the rating. The board will evaluate the TRIR rate to determine if the Offeror has demonstrated a history of safety performance and progress.
1. DART Rate: The board will evaluate trends over the last five years considering changes that take it from one risk level (or more) to the next up or down. Negative trends occurring above moderate risk levels require the offeror to provide a detailed explanation that includes any corrective actions taken for improvement.
a. Missing data without an explanation is considered a deficiency.
b. Declining trends that push the risk levels from Moderate Risk (MR) or higher to Low Risk (LR) or Very Low Risk (VLR) would indicate a strength.
c. An increasing DART rate trend could be considered a weakness (i.e. MR or better to High Risk (HR) or Extremely High Risk (EHR)) if an acceptable explanation is not provided for any trends that rise above Moderate.
d. This chart correlates the DART rate to the level of risk:
Risk DART Rate Very Low Risk Less Than 1.0 Low Risk From 1.0 to 1.99 Moderate Risk From 2.0 to 2.99 High Risk From 3.0 to 4.0 Extremely High Risk Greater than 4.0
2. TRIR Rate: The board will evaluate trends over the last five years considering changes that take it from one risk level (or more) to the next up or down. Negative trends occurring above moderate risk levels require the offeror to provide a detailed explanation that includes any corrective actions taken for improvement.
a. Missing data without an explanation is considered a deficiency.
b. Declining trends that push the risk levels from Moderate Risk (MR) or higher to Low Risk (LR) or Very Low Risk (VLR) would indicate a strength.
c. An increasing TRIR rate trend could be considered a weakness (i.e. MR or better to High Risk (HR) or Extremely High Risk (EHR)) if an acceptable explanation is not provided for any trends that rise above Moderate.
d. This chart correlates the TRIR rate to the level of risk:
Risk DART Rate Very Low Risk Less Than 0.9 Low Risk From 1.0 to 1.7 Moderate Risk From 1.8 to 2.6 High Risk From 2.7 to 2.9 Extremely High Risk Greater than 3.0
IV) Sub-Factor 5.3 Environmental Compliance:
DELETE: Note: The drawings do not count toward the Page Limitation
DELETE: The description for (a) should include a description, and location (state) for
(3) comparable projects in which environmental compliance was met while still meeting project construction deadlines REPLACE WITH: The description should include a description, and location (state) for
(3) comparable projects in which environmental compliance was met while still meeting project construction deadlines
V) RFP Section 001800, Paragraph 1.7.4.1:
DELETE: RFP section 001800 paragraph 1.7.4.1 in its entirety.
VI) 01800 Architectural Specification section 1.7.8.2 DELETE: Delete in its entirety the sentence/paragraph under 01800 Architectural Specification section 1.7.8.2 entitled "Mirrors (wall-mounted) in Fitness Center".
REPLACE with the following:
"Provide and install tempered, flat-polished, copper-free, lead-free, low-iron, high definition, minimum 1/4"-thick glass mirrors in Fitness Center RFP space 125. Provide the manufacturer's J-clip retention channel, mirror adhesive, and all other attachment hardware. Location and dimensional requirements are shown in the space on the RFP A- 101 floor plan". (DWC)
VII) RFP Section 01800, Paragraph 1.7.13.1 DELETE in its entirety the paragraphs under 01800 Architectural Specification section
1.7.13.1 entitled " Passenger Elevators".
REPLACE WITH the following:
1.7.13.1.1 Regulatory Requirements:
ASME A17.1 Safety Code for Elevators and Escalators, latest addition or as required by state or local building code. State of New York and local code requirements, if more stringent, must be followed.
Model Building Code NFPA 70 National Electrical Code NFPA 80 Fire Doors and Windows American with Disabilities Act – Accessibility Guidelines (ADAAG)
1.7.13.1.2 Elevator Schedule:
The elevator selected as a basis of design and as shown on the RFP floor plans is a twin-post above-ground 2-stage hydraulic Machine Room Less (MRL) passenger elevator model and type.
Rated Capacity: 3,500 pounds; rated speed: 110 ft/min; operation system as described in text below; travel distance: approximately 14 feet; two landings; 2 front openings.
Cab dimensions (may vary depending on manufacturer/elevator selected for final design) _Clear cab dimensions inside: approximately 6’-8” (80”) wide by 5’-5” (65”) deep;
Inside clear height: approximately 7’-4”; Door clear height;7’-0”.
Hoistway Entrance Size: minimum 3’-6” wide by 7’-0” high.
Door type: One-speed, side opening, RH or LH depending on final design.
Pit depth: minimum 4 feet or depth as required by manufacturer of elevator equipment selected for the final design.
Power characteristics: minimum 208 volts, 3 Phase, 60 Hz.
Seismic Requirements: To be determined by code and design analysis.
Hoistway dimensions: Approximately 8’-4” wide by 6’-11” deep as shown but may vary as required by manufacturer of elevator equipment selected for the final design analysis.
1.7.13.1.3 “Work by Others”:
The contractor shall coordinate and provide all preparatory work for the installation of the elevator in accordance with Model Building Codes and ASME-ANSI A17.1 (Safety Code for Elevators and Escalators), State of New York and local code requirements, if more stringent, must be followed. Such work is typically referred to as “Work by Others” and includes, but is not limited to an elevator hoist beam to be provided at the top of the elevator shaft, clear and plumb hoistway constructed to meet require fire rating, tolerances, and meet bracket support requirements of elevator equipment installation, dry pit with level floor clear of debris, metal pit ladder, light fixture and convenience power outlet in pit with switch located adjacent to the access door, all wire and conduit to run remote from hoistway, telephone line, light fixture, and convenience outlet in hoistway at the landing where the controller is located (Typically 1st landing above the 1st floor), placement of hoistway sills, headers, and frames and construction of front (entry) walls in accordance with elevator manufacturer’s requirements, ground and branch wiring circuits for signals and doors, feeder and branch wiring circuits for car, light, fan and controls and pockets for hall stations.
1.7.13.1.4 Hoistway Equipment:
Cab platform, sling, guide rails, guides, jack unit, automatic self-leveling, wiring, piping and oil required to connect the power unit to the jack unit, motorized oil shut-off valve (for remote operation from controller location, and manual shut-off for pit operation.
Power Unit: A self-contained oil pumping and control mechanism unit located in the pit consisting of an oil reservoir tank, oil hydraulic pump, electric motor, and electronic oil control mechanism.
1.7.13.1.5 Hoistway Entrances: Doors and Frames:
Provide complete hollow metal type entrances at each hoistway opening. Manufacturer’s standard entrance design consisting of hangers, hanger supports, hanger covers, facia plates (were required), site guards, and necessary hardware. Stainless steel door and frame construction with #4 brushed finish or sating finish. Provide extruded aluminum sills with mill finish.
Integrated Control System:
The elevator controller to be mounted to hoistway entrance above 1st floor landing.
Interlocks: Equip each hoistway entrance with an approved interlock.
1.7.13.1.6 Elevator Car (Cab) Enclosure:
Walls: Reinforced cold-rolled steel constructed of stainless steel with brushed or satin finish.
Canopy: Cold-rolled steel with hinged exit.
Ceiling: Suspended type, LED lighting with translucent diffuser mounted in a metal frame. Frame may be powder coat finish or stainless steel finish.
Cab fronts, return, transom, soffit, and strike finished in brushed or satin stainless steel.
Doors: Horizontal sliding with brushed or satin stainless steel finish and with steel reinforcement for rigidity.
Floor finish: Luxury Vinyl Tile (plank or seamless sheet).
Handrail: Provide 4” flat stainless steel metal bar type on side and rear walls.
Ventilation: Manufacturer’s standard exhaust fan, mounted on the car top.
Protection pads and buttons: Provide optional set of vinyl covered protection pads with metal grommets for securing to the wall mounted pad buttons. Provide pad buttons on cab fronts (inside) and cab walls.
Provide inspection certificate in car, mounted on a cab front wall under acrylic cover with frame made from the same material as the front wall (stainless steel).
Car Top Inspection Station: Provide a car top inspection station giving an elevator inspector complete control of the elevator. The car top inspection station shall be mounted in the door operator assembly.
1.7.13.1.7 Car Operating Station:
Shall contain the devices required for specific operation, mounted in the return, and comply with handicap requirements, feature pushbuttons that illuminate using LEDs for each floor level, emergency buttons and switches per code, and have switches for car lighting.
Provide an emergency communications system with integral phone system.
1,7.13.1.8 Column Mounted Car Riding lantern:
Shall be installed in elevator cab and located in the entrance. The lantern, when illuminated, will indicate the direction of travel. The lantern will illuminate, and a signal will sound when the car arrives at a floor level where it will stop.
1.7.13.1.9 Control Systems:
Controller shall be integrated in a hoistway entrance jamb, should be microprocessor based, software oriented and protected in a NEMA 1 enclosure. Control of the elevator shall be automatic in operation by means of push buttons in the car numbered to correspond to floors served, for registering car stops, and by “up-down” pushbuttons at each landing and “call” push buttons at terminal landings.
1.7.13.1.10 Emergency Power Operation:
Upon loss of the normal power supply, building-supplied standby power should be available on the same wires as the normal power supply. Once the loss of normal power is detected and standby power is available, the elevator is lowered to the 1st floor landing and the doors are opened. After all passengers have exited the elevator, the doors are closed, and the car is shut down. When normal power is restored, the elevator automatically resumes operation.
1.7.13.1.11 Hall Stations:
Buttons shall illuminate to indicate call has been registered at floor for the indicated direction. Provide one pushbutton riser. Provide floor identification jamb pads at each floor. Jamb pads shall comply with Americans with Disabilities (ADA) requirements.
RESPONSES TO QUESTIONS: Due to the Government answering the questions out of order received, henceforth, all questions will be provided in the amendments as an attachment. All questions received by the date of the amendment will be listed either with the answer provided and the associated amendment number or questions not yet answered will be marked “To be answered in future amendment”
See Amendment 002 Attached Q&A.
END OF AMENDMENT
RFI No. Pg Section Paragraph QUESTION
221 01900 1.3.1
Please provide the .dwg files referenced for Attachment D to include 49 BUSL Drawing.dwg, 26- TANB Drawing.dwg, 29 RB-S Drawing.dwg and 45 RB-M Drawing.dwg. These files were not included on SAM.Gov.
221 01900 1.3.1
For Attachment E, the files provided in SAM.GOV do not appear to match the listing in this section. We have received BULKHEAD+REHAB+A09- L01015.pdf and RECAP+FACILITIES+A09- L01015.pdf. These two files appear to be fore Phase 1 and Phase 1a. We did not receive the following files from SAM.GOV: Underground Utility Plan (Multi Files), Recap Facilities Phases 1 & 2 (CADD and PDF files), COMMs Tower Foundation Plan (PDF), Fixed Pier Structural Details (PDF). We believe that these files were included in the DODSafe condensed file but not SAM.GOV. We can't confirm ALL, however, based on the file names.
221 01900 1.3.1
SAM.GOV provided a file named Photos.pdf in which 23 photos were included. We do not have the files listed in this section to include: Site Photo Legend.ppt, Series Location Description Table.xls, and Series 1-31.pdf (photos). Please provide files or revise this section.
Please provide electronic files (.dwg, .rvt) for the RFP drawings.
42 HSAR Clauses
HSAR 3052.222-90 Local Hire (USCG). Please confirm that this HSAR is applicable to the seed project.
94 1.7
1.7.1.1.2
1.7.1.1.2.
Is paragraph 1.7.1.1.2.1 only applicable if concrete panels are selected?
PRE-PROPOSAL INQUIRY/REQUEST FOR INFORMATION
REFERENCE
Amendment 002, Attachment
94 1.7
1.7.1.1.2
1.7.1.1.2.
A-101 appears to indicate where cold formed / gypsum walls are required on the first floor if concrete masonry units are utilized. Paragraph
1.7.1.1.2.1 suggests that a "stud perimeter wall construction is shown around the perimeter of the multi-story structure on all floor levels". Is the intent of the RFP to require metal stud/ gypsum walls on the perimeter walls of all floors if concrete panels are selected for the envelope?
8 Geotechnical Please confirm that geotechnical services must be performed by a 3rd party consultant.
Small Business Goals
Per amendment 10 a small business subcontracting plan is required. Is the plan to be based on the total value of the NMACC or the value of the seed project?
Subfactor 5.3 Environmental Compliance
Sub-factor 5.3 reads "Discussion shall be no more than 5 pages. The drawings do not count towards the page limitation" Should this read that the description for the 3 comparable projects do not count towards the page limitation as there are no drawings requested under this subfactor?
11 Factor 4 Safety
Factor 4 safety has a note that states "DART and Total Recordable Incident Rate (TCR) shall not be submitted for subcontractors." TCR is not required under submission requirements for this factor under item 1. Please confirm that we are only to provide DART rates for the previous 5 calendar years per item
1. of Factor 4.
01110-1.19
Section 1.19 requires submission of social security numbers of all on-site personnel to the COR at least 2 weeks in advance. Please confirm that on-site personnel will not be subject to a criminal background investigation.
01110
Does the US Coast Guard have any prescriptive project management software applications/requirements that the Contractor will be required to utilize for project correspondence, submittals, RFI's, etc.? If so, please specify.
01300-1.1.2.4
Please confirm that offerors should not deviate (plus or minus) from the prescriptive room layout and sizes presented in the RFP drawings and Individual Space Criteria Sheets in Appendix F.
01500-1.3
(A) Please confirm that Contractor is required to provice a 160-SF temporary trailer for the exclusive use of the Coast Guard COR/CI per 01500-1.3. (B) Is there a preferred location, or can this trailer be located on Coast Guard property outside the project's limits of disturbance?
01500-1.3.2.2
01500-1.3.2.2 says that Contractor may connect to Coast Guard distribution for temporary construction power without charge. Please confirm that the Contractor is not responsible for paying the associated electrical consumption charges.
01800
Section 01800-1.7.4.1 says that floor finish locations are indicated in the RFP concept plans. Please either confirm that floor finishes must comply with the Appendix F ISCS or provide finish designations on the plans as referenced in 1.7.4.1.
Appendix J Should furnishings required under the Outfitting scope of work (as detailed in Appendix J) be priced on GSA schedule or open market?
01802-2.1.1
Sectoin 2.1.1 lists 35%, 65%, final, & corrected design submittals and says that these submittals are required for fast track packages as well. Please confirm that Fast Track packages can proceed straight to final design submission without separate 35% and 65% submittals.
Price Proposal Form
Is the $50,000 allowance contained in the Price Proposal Form intended to cover the Guiding Pricinciples documentation, GBI 3rd-party review and certification costs per 01800-1.3.1.1.2, or both?
01110 Please either (A) confirm that there are no project-specific requirements for cybersecurity / hardening; or
(B) specify all cybersecurity requirements.
Amendment 10
The small business goals referenced in Amendment 10 appear to be signficantly higher than historical averages for this type of project. Will the Small Business Subcontracting plan submitted for the seed project apply only to the seed project, or will it apply to all future task orders within the NMACC as well?
01800-1.10.2.1
Section 1.10.2.1 instructs Offerors to include a fire pump. Can offerors assume that the electrical service resiliency will permit an electric pump, or should offerors include a diesel fire pump?
01800-1.10.2.1
Section 1.10.2.1 instructs Offerors to include a fire pump, but the RFP plans do not provide a location with sufficient space. Please either (A) identify an area within the building suitable for housing the fire pump and appurtenances; or (B) advise if the fire pump should be housed in a premanufactured housing outside of the building footprint.
A-101
RFP plans do not show an exterior door at Electrical room 137. Please either (A) confirm this is acceptable; or (B) confirm that Offerors should reconfigure the floor plan/layout to provide an exterior door.
C-103
In order to facilitate accurate and consistent pricing, please provide existing one-line/voltage details for the site electrical tie-in/control point, including location, voltage, quantity and size conduits.
01800-1.7.1.1.2
If alternative exterior wall systems are utilized as prescribed in 01800-1.7.1.1.1, 1.7.1.1.2, please confirm that inner studs are not required at locations shown in the briding docs as exposed CMU (since these rooms will have exposed conduit/piping as currently designed in the RFP plans).
A-201
If alternative exterior wall systems are utilized as prescribed in 01800-1.7.1.1.1, 1.7.1.1.2, & 1.7.1.1.3, please confirm the offeror may replicate façade details such as the horizontal banding within the materiality of the proposed system.
Subfactor 5.3 Subfactor 5.3 says that a NEPA Environmental Assessment has been completed. Can a copy of this be provided to offerors?
A-101
RFP plans appear to indicate cast-in-place concrete for elevator shaft walls. Can alternative wall assemblies be utilized for the elevator shafts, as determined by the DOR?
01110-1.6.1
01110-1.6.1 says Contractor parking and staging areas are indicated, but we do not see this designated on the drawings. Please define limits available for Contractor parking and staging.
01110-1.10
01110-1.10 says that the Coast Guard and other contractors will be performing work at the project site during the time of this Contract. Please define all referenced work activities within the limits of the Contract site that will be concurrent with execution of this Contract.
01800-1.4.4
Should section 01800-1.4.4 be interpreted as requiring curbing around all sides of all pavements throughout the site area? Or, where deemed appropriate by the DOR, can some pavement edges sheet drain into adjacent landscaping/surface drainage areas?
01800-1.6.8.4
Will a water source for landscape establishment be made available to the Contractor at no cost (including consumption charges), as implied in 01800- 1.6.8.4?
01800-1.7.1.6 Section 01800-1.7.1.6 calls for roof flashing and trim to receive a "2-coat/3-coat fluoropolymer" finish. Is the 3rd coat required?
01800-1.7.1.7 Would custom fabricated copings be acceptable in lieu of the pre-fabricated copings specified in 01800- 1.7.1.7?
01800-1.12.1.5
Section 01800-1.12.1.5 specified that the Boat Storage Building shall be ventilated and heated to no less than 55 degrees F, but the Individual Space Criteria Sheets BS101, BS102, BS103, and BS104 specify that they shall be ventilated and heated to no less than 60 degrees F. Please confirm which minimum standard is correct.
1.7.7.5.1
01800-1.7.7.5.1 says that openings labeled "light panels" on the RFP elevations are fixed windows, but
1.7.7.6.1 says these openings are glass block panels.
The ISCS for the BMWB and ANT BMWB call for the light panels to be translucent sandwich panels.
Which material is required for the light panels?
1.7.8.2
Please provide any information required for mirrors at Fitness Center (01800-1.7.8.2 text refers to signage, not mirrors).
Appendix D
Page 2 of Appendix D calls for a LEED Checklist to be incoporated into the project to achieve LEED Certification. Please confirm LEED Certification is not required.
1.13.13.2 01800-1.13.13.2 says no more than 25% of parking spaces shall receive EV charging stations. Is there a minimum quantity of EV charging stations required?
1.13.14.2.4
1.13.14.2.4 mentions lighting for a flagpole. Please specify requirements for the flagpole itself.
A-101
The ISCS for rooms 109 & 110 call for (8) oscillating fans at the BMWB and ANT BMWB, but A-101 only shows (4). How many oscillating fans (total) are required at these two rooms?
1.7.1.5.1
01800-1.7.1.5.1 calls for a concrete roof slab at the BMWB portion of the STA/ANT building. Please confirm that the final structural design of the roof will be determined by the DOR.
01800-1.8.5.2
Specification 01800-1.8.5.2 identifies a Wind Exposure Category of C (assumed). Based on current code, the Wind Exposure Category should be D based on Surface Roughness D for water surfaces.
Please confirm Exposure Category D is applicable for the design of the buildings on this project.
1.13.15.2 Please confirm that the fire pump does not require emergency power (not specified in 01800-1.13.15.2).
1.7.13.1
Please clarify the intent behind the pass key operation of the elevator specified in 01800-
1.7.13.1. If this requires key-card operation, will the
Contractor be responsible for furnishing & installing the card reader system?
C-103
Please provide design criteria for temporary floating mooring dock, including but not limited to: minimum draft, general dimensions, curbing requirements, type of access from the shore and from the vessel, fendering, internal/external pile guides, & mooring/cleat system requirements.
C-103
The width of the berthing basin as presented on C- 101 of the RFP plans (approximately 27') is wider than the span of the 50 BFM travel boat lift (maximum inside curb width 19'-10"). Please advise whether the finger pier should be widened to accommodate the span of the 50 BFM lift, or the finger pier should be relocated to the north or south.
1.1.1.b.c
The RFP calls for potential improvements of the existing bulkhead to support the lifting and transport of the Mobile Boat Hoist. Constructing improvements to the existing bulkhead would have singificant impacts on environmental permitting, construction schedule, and project costs. Please either (A) confirm that improvements to the bulkhead, if required, would be addressed as a differing site condition; or (B) provide detailed structural as-built information for all bulkheads along the boat lift travel path, so that offerors can determine any bulkhead improvements required.
Section IV Proposal Submission Instructions
The only representation & certification requested in the proposal submission instructions is FAR 52.204- 24(d). Please specify any other reps & certs that offerors must submit with the Phase 2 proposal.
C-104
Are there any prescriptive design requirements for the dumpster enclosure (height, finish materials, gate, etc.)?
01500-1.4
Temporary construction fencing enclosing project work areas is not specified in 01500 or shown in the RFP site plans. Given the location of the project work areas, please confirm that the temporary barriers specified in 01500-1.4 will suffice for delineating active construction areas.
C-102
To facilitate accurate pricing, could as-built details be provided to offerors of the existing finger pier to be demolished?
C-104
In reference to drawing C-104 of the RFP drawings, are the parking spaces directly to the west of the “Future Parade Grounds & Parking” in this contract or a future contract?
C-104
Please confirm that the actual location of the Station/ANT and Boat Storage Buildings can be moved from the layout shown on C-104 in order to maximize the efficiency of the space.
1800 1.4.6
In reference to section 01800 1.4.6, there is a website provided to calculate the sea-level change in order to determine the finished floor elevation. It appears this website is for sea-level change and not applicable to a facility on Lake Erie. Please clarify if this is supposed to be used for this pojrect
Section 5.3.1 Environment al Compliance
Section 5.3.1 Environmental Compliance heading identifies Tidal Waters, and the RFP requests previous work experience within Tidal Waters. The project site at the Coast Guard Station in Buffalo, NY is on Lake Erie, which is not typically considered a tidal water. Should the heading be revised to freshwater locations and Great Lakes compliance?”
01800
Section 01800-1.7.7.5.2 calls for window sills at exterior windows, but the ISCS's only mention window sills at the Recreation Room 223. Please confirm that window sills are required at all exterior window locations, typical.
C-104
The stormwater management area shown on C-104 must be enlarged to provide sufficient stormwater treatment. Can the pond be extended to the northeast and/or north (towards the Phase IV POV parking lot)?
C-104
The extent of grading at Phase IV site areas to elevation 582' will be constrained as required to slope the perimeters to the adjacent shoreline and Phase III project site elevations. This means that the bid option scope would consist primarily of filling in Channel 5. Please clarify the extent of Phase IV site area that requires grading to elevation 582'.
C-105
Please specify extent and scope requirements for the waterline replacement referred to in Note 1/C-105 and 01800-1.4.7. What is the purpose for replacement, and to what point should the replacement scope extend?
C-105
Please confirm that the required connection point for the sanitary sewer is the 2" force main line where located by Note 2/C-105 (as opposed to alternate sewer line locations throughout Sector Buffalo).
1.11.8 Please confirm that the new gas line may be polyethylene, as suggested by the reference to polyethylene shutoff valves in section 01800-1.11.8.
1.8.3
01800-1.8.3 mentions a new steel sheet pile bulkhead. Please confirm that this reference is an error and that there is no sheet pile bulkhead work required under this contract.
A-101
Please confirm that Room 242 is the required Communications Center mentioned in 01800-1.16, as no other space appears to be provided for this purpose in the RFP plans.
1.7.1.5.2
Would traditional roof drains be an acceptable alternate to the siphonic roof drainage system specified in section 01800-1.7.1.5.2? We are concerned that the ponding will create freezing issues given the location of the project.
1.13.18.1
RFP section 1.13.18.1 and 1.13.18.3.1 calls out for 100A, 120VAC, 3-Phase shore tie-in connections.
Please verify and confirm the voltages shall be either 208VAC or 240VAC, 3-phase and not 120VAC.
1.13.18.1
(A) Provide electrical as-builts for “Boat maintenance Building” for power tie-in connections to the temporary shore as per RFP Section 1.13.18.1. (B) Is the “boat maintenance building” also referred to as “Metal Boat House?"
1.13.18.3.1
Provide electrical as-builts for “STA ANNEX Building/Station Bldg” for power tie-in connections to the new pier as per RFP section 1.13.18.3.1. The building is located in close proximity to the new pier.
C-104
Section 01800 requires a minimum of 47 parking spaces, but the Conceptual STA/ANT Site Plan, C-104 only shows 32 parking spaces adjacent to the Boat Storage Building. Can the 10 spaces adjacent to the future parade ground be used to meet the parking requirements? If not, where can the additional 15 spaces be located to meet the minimum parking requirement.
01800-1.4.6
Specification 01800-1.4.6 states to account for sea-level change using the US Army Corps of Engineers Sea-Level Change Calculator. Please confirm this requirement and clarify design intent.
1.3.1.1
01800-1.3.1.1 requires compliance with Guiding Principles for Sustainable Federal Buildings and Associated Instructions 2016.” There is a 2020 version of this standard available. Please confirm that the contract requires compliance with the 2016 version.
74 Appendix J Please provide the cutsheet for item DK-06.
75 Appendix J Please provide the cutsheet for item DK-07.
76 Appendix J Please provide the cutsheet for item AC-08.
Appendix J
Item LK-03 Gear Locker is on the Outfitting Tag Info Sheets but we do not find it on the plans.
Please clarify if this item is required and quantity.
Appendix J
Item SH-11 Boltless Luggage Garment Rack is on the Outfitting Tag Info Sheets but we do not find it on the plans. Please clarify if this item is required and quantity.
13 Factor 4
Please clarify what safety staticstics information is to be submitted with Factor 4. The submission requirments only call for DART.
However, the note below the submission requirements references Total Recordable
13 Factor 4
For factor 4, please clarify the five previous calendar years data requested for safety statistics. The TOA states to submit five (5) previous years but does not include CY2022.
3 01110 1.11
Per our conversation with New York State Electric and Gas Corporation , NYSE&G, the primary power infrastructure required to serve this facility can not be priced at this time. Since this project has not been awarded will the Government provide an allowance for all
4 01800 1.13.5
Please confirm that all medium voltage on the base is provided by NYSE&G. This section has requirements for a medium voltage switch which would not be required if this is the case.
9 01800 1.13.13
This sections defines requirements for EV Charging stations, please define quantities required.
12 01800 1.13.14.
2.1
This section has requirements for exterior lighting. Please confirm if there will be a need for new lighting at the existing waterfront locations.
12 01800
1.13.14.
2.4
This section has requirements to illuminate station signs and flag poles. Please confirm if either of these will be required for this project.
12 01800
1.13.14.
2.1
Please confirm if new lights are required on the new finger pier
13 01800 1.13.16
States to provide UPS to provide power to receptacles serving computer servers, telecommunication equipment racks, VTS equipment, workstation and other equipment in the secure area. Please define what is classified as Secure Area for this building.
13 01800 1.13.16
States to provide rack style enclosures for the UPS System. Please confirm that we are to provide UPS rack mount in the Telecommunication Rack and within the Command Center Console, 2200 kW capacity.
14 01800 1.13.18.
States requirements for vessels at the temporary mooring locations. Please confirm quantities of each type of power connections listed as quantities of vessels could not be determined.
14 01800 1.13.18.
States to provide power to the temporary mooring location from the existing Boat Maintance Building. RFP Drawings did not identify a building with this name, please provide location of the Boat Maintance Building.
14 01800 1.13.18.
States to provide power to the temporary mooring location from the existing Boat Maintance Building. NEC 555.35 requires GFPE and GFCI protection for all shore tie receptacles.
Does the existing panel in the Maintance Building have a GFPE protecting the panel or will new GFPE be required for the temporary 100 amp outlets.
14 01800 1.13.18.
3.1
States there are two power shore tie receptacles for each vessel. Please confirm quantities of vessels at the new finger pier that will require this arrangement.
1 01800 1.10
Please confirm that we are to include the cost associated with the survey of the “In-Building” Signal levels associated with Emergency Responder Radio Communications system as required by NFPA 101 and NFPA 72.
01800 1.7.1.5.
Specification 01800.1.7.1.5.2 appears to provide a prescriptive requirement to "Provide a siphonic roof drain system." Siphonic is a specialty system, and holds many benefits when the roof is large and/or when pipe sizes need to be reduced (or run without slope). These systems are usually configured with proprietary software and require exact installation to match the engineering drawings (no room for field modifications without re-engineering). Given the size of the roof, and uniqueness of a siphonic
Multiple
RFP
Attachments
Upon review of the RFP documents, it is evident that AECOM provided AE1 services to support the development of the Final Geotechnical Investigation Report for USCG Sector Buffalo. Due to AECOM’s involvement in the development of the RFP documents, it would appear this represents a conflict of interest. Due to this apparent conflict of interest, AECOM should not be eligible for award of the Buffalo Recapitalize Phase III seed project, under 70Z04721RNMACC03. We request that the USCG review these circumstances and make a formal determination of organizational conflict of interest with the AECOM team. It is respectfully requested that the Coast Guard make a determination regarding potential conflict of interest prior to the proposal due date.
12 TOA
Factor 4 Safety
Factor 4, Safety, Submittal Requirements, 1. DART Rate states "submit five (5) previous complete calendar years’ [CY2021, CY2020, CY2019, CY2018, and CY2017] worth of data... Please clarify whether the five (5) previous complete calendar years’ should include CY2022, CY2021, CY2020, CY2019, and
CY2018.
14 TOA
Price
Proposal
Please clarify the method of Amendment acknowledgement preferred in Phase II. Is an updated SF 1442 or submittal of signed SF 30's desired?
13 TOA
Factor 5
Technical Solution
Sub-Factor 5.1 Conceptual Building Design requires submittal of "conceptual building plans showing layout of all required spaces as well as typical building elevations." Given that the RFP provides a full set of well-developed concept drawings including floor plans and elevations, will the Government please define how the Offerors concept drawings will be evaluated?
14 TOA
Factor 5
Technical Solution
Sub-Factor 5.2 Conceptual Site Design requires submittal of "a conceptual site plan showing all proposed system and site features." Will the Government please define how the site plan will be evaluated?
14 TOA
Factor 5
Technical Solution
Sub-Factor 5.3 Environmental Compliance requires description of "previous experience the D-B contractor has working with these agencies" as well as feature of 3 comparable projects. Typically the Prime Contractors do not self perform the Environmental Compliance scope, therefore, may the Prime Contractor present experience from an Environmental Specialist within this Factor? Please clarify whether this experience will be evaluated equally to experience of the Prime Contractor.
The Space Analysis chart on A-102 lists two urinals at Women's Toilet 235, but urinals are not shown in either room 234 (Men's Toilet) or 235, and the ISCS's do not mention urinals in either of these rooms.
Adding urinals to room 234 would create significant floor plan changes that would impede into other programmed spaces. Please confirm that urinals are not required in either of these rooms.
The site areas adjacent to the proposed ATON storage pad will require additional clearing, re-grading, and topsoil to facilitate permanent vegetation. Please confirm that, as part of the Bid Option, permanent vegetation is required to the limits of demolition shown on C-102.
Manhole covers reviewed at the site visit appeared to be improperly placed/labeled. Please confirm that the southern-most utility line near note 2/C-105 is communications and that the next line to the north is the electrical service.
A-102 Please either confirm that fence repair/replacement is not part of project scope or provide detailed scope requirements and extent of repairs for pricing.
1800 1.8.6.4
This paragraph states "The building Shall be founded on Piles." Is it acceptable for the Contractor to utilize other solutions such as ground improvement if recommended / approved by our Geotechnical Engineer as a viable solution?
Section 01800 1.11.1.2
Regarding type of domestic water heating system that is to be used, is a LCCA required to be performed now or after award. If required now, please provide utility rates for natural gas and electric, energy sources so a LCCA can be performed.
Section 01800
1.4.7.1 and 1.10.2.1
Paragraph 1.4.7.1 indicates available water pressure to the Base is between 65 and 80 psi at the property line. Paragraph 1.10.2.1 indicates for the purpose of Base Bid, contractor shall assume adequate pressure is not available and a fire pump is required. No additional water flow information is included in Section 01800. Please clarify, should paragraph
1.4.7.1 be used to determine if a booster pump is needed for domestic water or should contractor assume a domestic water booster pump is required similar to Paragraph 1.10.2.1.
Drawing A-101 and Section 01800 Paragraph 1.11.3.13
Drawing A-101 indicates emergency drench shower located in 109 Station Boat Maintenance Work Bay.
No additional locations are indicated. Will emergency fixtures be required in 110 ANT Boat Maintenance Work Bay, and in shop and maintenance rooms? If yes, provide type and quantity required.
Drawing A-101 and Appendix F
Please provide the type and quantity of batteries to be charged and stored in Room 122 Battery Maintenance and Storage.
Drawing A-102 and Appendix F
Please confirm that Room 244 Weapons Storage does not need to comply with arms vault construction criteria.
Drawing A-101 Stairway arrangement shown on RFP drawings does not provide at least 50% of the capacity to discharge directly to the exterior, making the arrangement non-compliant with IBC 1028.2. Please confirm that is acceptable to re-arrange the floor plan to comply.
Drawing A-101 and Appendix F
Please provide the quantity and type of material intended to be stored in Room 124 ANT Flammable Storage.
Drawing A-102 and Appendix F
Are the occupants of the Watch Stander Berthing Rooms stationed at the facility for more than 30 days at a time?
Section 01800, para 1.1.2.5
Paragraph 1.1.2.5 states that all building spaces are exempt from ADA and ADAAG requirements, yet some spaces are shown with accessible features.
Please clarify the accessibility requirements for the project, including applicability of IBC Chapter 11 in general and Section 1108 "Dwelling Units and Sleeping Units" in particular.
RFP Guide Specifications, Section 01800 1.12, Paragraph
1.12.1.1 / 1.12.1.2
Section 1.12.1.1 requires a 30% energy reduction when comparing the proposed energy usage relative to a baseline ASHRAE 90.1-2019 energy model.
Section 1.12.1.2 requires that HVAC systems shall be selected on a 40 year life-cycle cost comparison. If the most life-cycle cost effective system does not exceed ASHRAE 90.1-2019 baseline energy savings by 30%, is that system (determined by the life-cycle cost comparison) to be still selected?
RFP Guide Specifications, Section 01800 1.12, Paragraph
1.12.1.2 /
Section 1.12.1.2 and Section 1.12.1.2.1 requires a 40 year life-cycle-cost comparison to determine the HVAC system. Has a life-cycle-cost analysis been done? If yes, please provide this to all bidders.
Appendix D - Basis of Design Narrative / Mechanical Design
The Basis of Mechanical Design Narrative e, requires "Documentation of customer's preference for the HVAC control system." Please provide the customer's preference for the control system manufacturer to be installed.
Section 01800, para 1.1.2.2
Please confirm if the buildings are located inside an installation perimeter as defined by UFC 4-010-01.
Section 01800, para 1.1.2.2
Please confirm if a blast analysis and/or hardening in accordance with UFC 4-010-01 Appendix B is required if conventional construction parameters or conventional construction standoff distances are not met and assuming UFC 4-010-01 Appendix B is determined to be applicable to the project.
Section 01800, para 1.8.5.2
Section 01800, 1.8.5.2 notes that the structural values listed are minimum and shall be increased by the DOR as necessary. Please confirm that the values listed as assumed will be determined by the DOR upon project award based on site criteria and do not need to be considered as minimums.
Section 01800, para 1.8.4.8
Section 01800, 1.8.4.8 notes that structural steel for landside building system shall conform to guides of UFC 3-301-01, Appendix B, B-5.4. Please confirm if this only applies to exposed exterior steel at the landside buildings.
Section 01800, para 1.1.4
Section 01800, section 1.1.4 notes that the latest editions, at the time of bid proposal shall be used, unless noted otherwise. Please confirm that ASCE 7- 16 should be used in conjunction with IBC 2021 (IBC 2021 references ASCE 7-16 and ASCE 7-22 has not yet been adopted by IBC).
IV. Non-Price Factors
Under Factor 4 - Safety paragraph a. it mentions both DART and Total Recordable Indicent Rate (TCR).
The paragraphs following only detail the DART Rate information. Please confirm if both DART Rate and TCR information will be required, and if so, please clarify the requirements for TCR.
IV. Non-Price Factors
Under Factor 4 - Safety, Paragraph 1 DART Rate it says to submit five calendar years [CY2021, CY2020, CY2019, CY2018, CY2017] of data. Please clarify if the 5 calendar years should start with 2022 and go through 2018.
Section 01800 Section 1.18.2.1, please confirm whether the contractor is to provide a qualified archeologist (as defined under 36 CFR 61) to prepare the State Historic Preservation Office/Office of Parks, Recreation and Historic Preservation (SHPO/OPRHP) requested Phase IA archaeological survey within and near the project area.
Section 01800 Please confirm that the USCG will issue a contract modification and schedule extension for the discovery of any archaeological resources within the project area in the Phase IA (Literature Search and…