PRICE PROPOSAL FORM
PROJECT 09-14405290
RECAPITALIZED STATION-ANT BUILDINGS
BUFFALO, NY
IMPORTANT NOTE: Contractors that include language in their proposals containing conditions may be rejected.
BASE ITEM: Provide all services and materials necessary to design and construct in accordance with RFP Guide Specifications to complete the design and build the project entitled, ‘Recapitalize Phase III-Station and ANT Buildings’. The base item scope includes:
(a) Demolition
a. Complete demolition/disposal the Station Building (3,382 GSF).
b. Complete demolition/disposal of the Station Annex (2,712 GSF).
c. Complete demolition/disposal of the 80-ft tall Communication Tower and Base (RPUID 16928), to include site restoration.
d. Complete closure of the sewage pump-out services and holding tank.
e. Complete demolition/disposal of the Finger Pier (RPUID 11508).
(b) Construction
a. Installation of pavements with the Station Building and Station Annex demolition areas. Pavements shall be capable of supporting the Mobile Boat Hoist along all routes to the Station-ANT building and to the Mobile Boat Hoist finger pier.
b. Construction and furnishing of a Station-ANT building(s) and required support spaces/items. This includes all associated site work, to include imported and compacted earth fill to raise the elevation to 582 (NAV 88) within the limits of the Phase III projects area as shown on RFP Drawings. Proposed site work includes changes to existing topography, access roads and parking areas, and potential creation of storm water retention areas.
c. Construct Mobile Boat Hoist Finger PierConstruct Mobile Boat Hoist Finger Pier, to include all piles, pile caps, beams, deck, and fenders, (et al) and modify and/or improvements to the bulkhead to support the lifting and transport of a Mobile Boat Hoist.
| Item |
| Design Price ($) |
| Construction Price ($) |
| Total Item Price ($) |
Demolition Work
Utility/Site Improvements: Include only work beyond 5-ft of the building perimeter.
New Construction and utility/site\work within 5-ft of the building perimeter
Guiding Principles Documentation Allowance
$50,000
Total for BASE ITEM: $
OPTION ITEMS
NMACC Contractors are required to provide pricing for all option items (Option Items 1 through 3). If awarded, options shall be completed within the contract performance period. Options will be considered in accordance with FAR 52.217-4 Evaluation of Options Exercised at Time of Contract Award (JUNE 1988).
OPTION 1- RIP RAP RESTORATION: Provide all services and materials necessary to design and construct in accordance with RFP Guide Specifications to restore and improve the rip-rap slope along the Buffalo Harbor (approximately 450-LF).
| Design Price: | $ | ||
| Construction Price: | $ | ||
| Option Item 1 Total Price: | $ |
OPTION 2 – ATON STORAGE PAD: Provide all services and materials necessary to design and construct in accordance with RFP Guide Specifications for the complete demolition and disposal of pavements for the ATON Buoy Storage Area and construction of a new ATON buoy storage area (approximately 10,000 SF) concrete hardstand, concrete ramp, and site grading.
| Design Price: | $ | ||
| Construction Price: | $ | ||
| Option Item 1 Total Price: | $ |
OPTION 3 – PHASE IV SITE WORK: Provide all services and materials necessary to design and construct in accordance with RFP Guide Specifications to raise the Phase IV project area to elevation to 582 (NAV 88), as shown on RFP Drawings.
| Design Price: | $ | ||
| Construction Price: | $ | ||
| Option Item 1 Total Price: | $ |
AMENDMENTS ACKNOWLEDGED:
| Amendment No. |
| Date |
| Amendment No. |
| Date |
Offeror:
Address:
Phone:
Fax:
Email:
Name:
Signed:
Date: