TO - 1 Dixie_R4_PlantingIDIQ_DetailedInformationSheet.pdf

PDF 136 KB Posted

Attached to
Region 4 Intermountain Region USFS Tree Planting IDIQ
Solicitation number
1284LM22R0004
Issued by

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Li n e It em

Su b

/P ay

It em

U n it N o

A re a N am e

B o u n d ar y

M ar ki n g

A cr es

P le an ti n g

Se as o n

W al k-in

D is ta n ce

Sl o p e

A sp ec t

El ev at io n R an ge

Sp ec ie s, Sp ec if ic at io n s

Q u an ti ty

P la n t

Ty p e

A ve ra ge

T P

A o r

TP

A

R an ge

Sp ac in g o r

Sp ac in g

R an ge

G ro u p

/C lu m p

Si ze

In te rs p ac e

Si ze

To o l

P ro te ct io n

Sc al p in g

C le ar in g

A rt if ic ia l

Sh ad e/ A

D C

Tr ee

D ip

Notes

Type Year (ft) Type Size (MTR) (ft) (units) Type

Priority and

Distance

(units)

(inches) Species Distance

(units) Yes/No

References (see below): 1 2 3 4 5 6 7 8 9 10

1 RTRT 1

Shingle Fire

Planting Flagging 150

April-

June n/a PIPO 2022 0-20% 7,300-7,700 PIPO FT128 n/a 48,623.000 PIPO 250 13' X 13'

Hoed ad

18" X

18" No No

Total: 150 48,623.000

References:

Code Name Description Code Name Description Code Name Description

1 See Contract maps for Locations 5 TH Top Height 7 SMO Staionary Materail Only

2 S Spring RL Root/Plug Length PESO Plant Existing Shade Only

F Fall ST Stationary Material First, then Transportable Shade

3 LAOC Western larch STO Stationary Material First, then Transportable Shade, Plant in Open Last

PIAL Whitebark pine 6 REG Regular Spacing STP Stationary Material or Transportable Shade (Planter Discretion)

PIEN Engelmann spruce VDP Varable Density STPO Stationary Matererial or Transportable Shade (Planter Discretion), then Plant in Open

PICO Lodgepole Pine GCP Group/Clump Planting 8 SM Stationary Material First

PIPO Ponderosa Pine MTR Per Thousand Tree SMO Stationary Material First, then Plant in Open

PSME Douglas-fir I Interplanting 9 S Scalping Specifications (add details here)

PHSTP Per Hour/Specialized Tree Planting C Clearing Specificatoins (add details here)

10 RT Rigid Tubes

FN Flexible Netting

4 B Bareroot RN Rigid Netting

C Container

Highlighted cells - fill in when completing task order. Fill-in appropriate units

Unit Identification

Task Order No.:

Site Prep

Shingle Fire 2022 Tree Planting Detailed Information Sheet Task Order

Info Stand Description Planting Stock Identification Planting Requirements

Stock

Contract No.: 1284LM22R0004

Shade Minimum Acceptable

Seedlings and Trees

File details come from the government source that posted it. Updated .