TNC_-_Conceptual_Site_Plan_-_1.8.25.pdf

PDF 272 KB Posted

Attached to
Amphi Housing Resource Center (HRC) Design Build
Solicitation number
260140
Issued by
Pima County, Tucson City, Arizona

About this file

This is a Conceptual Site Plan document prepared by RPM Architectural-Engineering for the City of Tucson's Amphi Housing Resource Center (HRC) Design Build project located at 250 W King Road, Tucson, Arizona. The site plan illustrates the adaptive reuse of Fire Station Eight into a low-barrier shelter facility designed to accommodate 50 to 100 adult bed spaces. The facility layout includes a 8,400 gross square foot dormitory with 100 beds, a 6,400 gross square foot navigation center, a modular restroom building, a two-bin trash enclosure measuring 40 feet by 8 feet, vehicular access with a privacy gate, and landscape features including retained existing trees and a 10-foot setback from the property line. The property is bounded by existing adjacent multi-family residential units, single-family residences, and commercial properties, with an existing concrete masonry unit wall and five-foot sidewalk visible along W King Road. A pre-submittal meeting is scheduled for Wednesday, February 4, 2026, at 8:00 a.m. at the project site, with statements of qualifications due on Thursday, February 19, 2026, at 2:00 p.m. Arizona local time.

The project is estimated at $2,800,000 and is funded through an Economic Development Initiative grant and HUD-related funding sources. The design-build procurement process utilizes a one-step selection method evaluating teams across five criteria: Team Qualifications and Experience (40 points), Technical Approach and Methodology (35 points), Schedule Management (15 points), References and Past Performance (5 points), and Subcontractor Selection Plan (5 points). Contractors must comply with Small Business Enterprise (SBE) and Disadvantaged Business Enterprise (DBE) set-asides, with mandatory compliance to Section 3 of the Housing and Urban Development Act requiring at least 25 percent of labor hours performed by Section 3 workers and 5 percent by Targeted Section 3 workers. Additional requirements include obtaining a City of Tucson Business License, providing performance and payment bonds equal to 100 percent of the negotiated construction value, maintaining specified insurance coverage, and achieving Substantial Completion within an agreed-upon timeframe with liquidated damages assessed for delays. The project scope encompasses comprehensive design and construction services including structural rehabilitation, roofing, electrical and plumbing upgrades, site development, MEP systems design, environmental mitigation for PFAS-impacted soils, and hazardous materials removal.

View the file

Other files

File Type Posted
Amphi_Housing_Resource_Center_(HRC)_Design_Build_(Addendum_#2_Revision).pdf PDF
Amphi_Housing_Resource_Center_(HRC)_Design_Build_(Addendum_#2_Revision).pdf PDF
Amphi_Housing_Resource_Center_(HRC)_Design_Build_(Addendum_#2_Revision).pdf PDF
Amphi_Housing_Resource_Center_(HRC)_Design_Build_(Addendum_#2_Revision).pdf PDF
Amphi_Housing_Resource_Center_(HRC)_Design_Build.pdf PDF
HUD-51915.pdf PDF
HUD-51915.pdf PDF
HUD-51915.pdf PDF
HUD-51915.pdf PDF
HUD-51915.pdf PDF
5370.pdf PDF
5370.pdf PDF
5370.pdf PDF
5370.pdf PDF
5370.pdf PDF
HUD-5369.pdf PDF
HUD-5369.pdf PDF
HUD-5369.pdf PDF
HUD-5369.pdf PDF
HUD-5369.pdf PDF
HUD-SECTION_3_(FY26).pdf PDF
HUD-SECTION_3_(FY26).pdf PDF
HUD-SECTION_3_(FY26).pdf PDF
HUD-SECTION_3_(FY26).pdf PDF
HUD-SECTION_3_(FY26).pdf PDF
Conceptual_Land_Use_Plan.pdf PDF
Conceptual_Land_Use_Plan.pdf PDF
Conceptual_Land_Use_Plan.pdf PDF
Conceptual_Land_Use_Plan.pdf PDF
TNC_-_Conceptual_Site_Plan_-_1.8.25.pdf PDF
Conceptual_Land_Use_Plan.pdf PDF
TNC_-_Conceptual_Site_Plan_-_1.8.25.pdf PDF
TNC_-_Conceptual_Site_Plan_-_1.8.25.pdf PDF
TNC_-_Conceptual_Site_Plan_-_1.8.25.pdf PDF
HUD_SBE_DBE_Provisions_January_2026.pdf PDF
HUD_SBE_DBE_Provisions_January_2026.pdf PDF
HUD_SBE_DBE_Provisions_January_2026.pdf PDF
HUD_SBE_DBE_Provisions_January_2026.pdf PDF
HUD_SBE_DBE_Provisions_January_2026.pdf PDF
Offer_and_Acceptance.pdf PDF
Offer_and_Acceptance.pdf PDF
Offer_and_Acceptance.pdf PDF
Offer_and_Acceptance.pdf PDF
Offer_and_Acceptance.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4 YD

4 YD

DRAWN

PROJECT NUMBER

DATE OF ISSUE

PROJECT TITLE

REGISTRATION

SHEET TITLE

SHEET NUMBER

COPYRIGHT © 2025

1-8-25

RPM

ARCHITECTURAL-ENGINEERING

PROGRAM MANAGEMENT

TU

CS

ON

N

AV

IG

AT

IO

N

CE

NT

ER

0 W

K

IN

G

RD

TU

CS

ON

, A Z

23-103

C O

N C

EP

TU

AL

S

IT

E

PL

AN

RPM-Team

295 MAIN ST, STE. 210

SALINAS, CA 93901

[T] 408.439.3283

CITY OF TUCSON

255 W ALAMEDA ST

TUCSON, AZ 85701

REVISIONS

SITE PLAN 11/16"=1'-0"

(E) ADJACENT MULTI-

FAMILY RESIDENCE

80' x 105'

DORMITORY

100 BEDS

8,400 GSF

NAVIGATION CENTER

6,400 GSF

2-BIN TRASH ENCLOSURE

40'-0" X 8'-0" MODULAR

RESTROOM BUILDING

20'-0" WIDE VEHICULAR

ACCESS PRIVACY GATE

EXISTING TREE-

TO REMAIN, TYP.

EXISTING CMU

WALL, TYP.

PROPERTY LINE

(E) ADJACENT

COMMERCIAL

(E) ADJACENT

SINGLE FAMILY

RESIDENCE

W KING ROAD

N

A1.0

SITE PLAN

EXISTING CMU

WALL, TYP.

EXISTING CMU

WALL, TYP.

EXISTING 5'-0"

SIDEWALK

(E) ADJACENT SINGLE

FAMILY RESIDENCE

AutoCAD SHX Text

10'-0" LANDSCAPE & BUILDING SETBACK

Sheets and Views
Layout1 (2)

File details come from the government source that posted it. Updated .