EXHIBIT_08___Vehicle_Requirement_FO.pdf

PDF 230 KB Posted

Attached to
Fresno, CA and Ogden, UT Consolidated Armed Security Guard Services
Solicitation number
TIRMS-17-R-00010
Issued by

About this file

EXHIBIT 08 - VEHICLE REQUIREMENT

View the file

Other files

File Type Posted
EXHIBIT_12__Physical_Ability_Test_REV1.pdf PDF
TIRMS17R00010-A0001_SF30.pdf PDF
EXHIBIT_11_MEDICAL_QUESTIONNAIRE_REV1.pdf PDF
EXHIBIT_05_Record_of_Training_Completion_FO.pdf PDF
TIRMS17R00010.pdf PDF
01-EXHIBIT_12__Physical_Ability_Test_Information_Sheet_FO.pdf PDF
ATTACH_06_Copy_of_IRS_UT_Seniority_LIST_(1).pdf PDF
Solicitation_Letter.pdf PDF
ATTACH_05_Past_Performance_Questionnarie_form.pdf PDF
EXHIBIT_03_Quality_Assurance_Surveillance_Plan_FO.pdf PDF
ATTACH_04_WAGE_DETERMINATION_UT.pdf PDF
EXHIBIT_02_Rev_1_Post_Hour_Requirements.pdf PDF
Exhibit_03b__Firearms_course_of_fire_FO.pdf PDF
01-EXHIBIT_11__Medical_Questionnaire_-_FINAL_MC.pdf PDF
EXHIBIT_07__Onboarding_Training_Provided_By_The_Government_FO.pdf PDF
ATTACH_03___WAGE_DETERMINATION_CA.pdf PDF
EXHIBIT_09__GSAFORM139_FO.pdf PDF
ATTACH_01_CBA__IRS_CA_2014-2017.pdf PDF
EXHIBIT_09a__Form_139_instructions_FO.pdf PDF
EXHIBIT_01__Post_Locations.pdf PDF
ATTACH_02__CBA_IRS_UT_2014-2017.pdf PDF
EXHIBIT_03a__Criteria_for_Deduction__FO.pdf PDF
Exhibit_04__Firearm_Certification_FO.pdf PDF
01-EXHIBIT_10_Contractor_Post_inspection_form__FO.pdf PDF
ATTACH_07_Copy_of_IRS_UT_Seniority_LIST_(2).pdf PDF
ATTACH_08_Q&A_RESPONSES.pdf PDF
EXHIBIT_06__Training_Requirements_FO.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT 14

CONTRACTOR FURNISHED VEHICLE REQUIREMENTS

1. Equipment: Contractor Furnished Vehicle(s) The Contractor will furnish a vehicle or vehicles, as indicated below, which will be used for patrol at the facility and to transport supervisors in the course of supervision duties and emergency response, as may be necessary. The vehicle(s) will carry distinctive markings of the company, and will be equipped with a rotation emergency roof light in compliance with applicable state and local laws. The vehicle(s) will be available at all times during the life of the contract, and must be replaced immediately by a replacement vehicle if removed from operation for any reason(s). It is the Contractor's responsibility to register, insure, and provide proper maintenance for the vehicle(s). The vehicle(s) will be equipped with a vehicle mounted driver side spot light, 10 – 15 lb. portable dry chemical, ABC extinguisher, installed and maintained in accordance with NFPA 10, Portable Fire Extinguishers. The vehicles will be equipped with a conventional, universal first aid kit with Airway pack, Cling bandages, and a minimum of two bite sticks.

2. Vehicle Requirements

Ogden Locations:

VEHICLE TYPE ESTIMATED

DAILY HOURS

NUMBER OF

DAYS PER WEEK

ESTIMATED

MILES PER DAY

1. Pick Up Truck 24 7 50

2. Pick Up Truck 24 7 50

3. Pick Up Truck 24 7 50

4. Pick Up Truck 24 7 50

Fresno Locations:

VEHICLE TYPE ESTIMATED

DAILY HOURS

NUMBER OF

DAYS PER

WEEK

ESTIMATED

MILES PER DAY

1. Pick Up Truck 24 7 70

2. SUV 24 7 70

3. SEDAN/SUV 24 7 70

4. SEDAN/SUV 24 7 70

File details come from the government source that posted it. Updated .