This document is a Task Group Instruction (TGI) for deck covering replacement work on the USS HIGGINS (DDG-76), specifically in the Chart Room (04-150-0-C). The work involves removing the existing 100 SF chemical-resistant flooring system and installing a new chemical-resistant flooring system with MIL-PRF-32584, Type IV specifications, featuring a 706 Navy blue color coat with white flake. The project will also address 105 SF of deck plating, including vertical structural surfaces.

The work is scheduled to start on 25 August 2025 and complete by 15 October 2025. The Navy's SRF-JRMC will provide supporting services including crane and rigging, utility services (electrical, air, water, steam), and safety/quality assurance inspections. The TGI notes a potential asbestos hazard and specifies that primer must conform to MIL-PRF-23236, Type V, VI, or VII. The job is part of a larger solicitation (N6264925RA062) for maintenance work on the USS HIGGINS, restricted to authorized sources in Japan.

View the file

Other files

File Type Posted
N6264925RA062.pdf PDF
N6264925RA062-0001.pdf PDF
TGI_38KB263401A01_c0v0.pdf PDF
TGI_38KB264509A01_c0v0.pdf PDF
Att IV GFP_GFM listings.xlsx XLSX spreadsheet
TGI_38KB264503A01_c0v0.pdf PDF
TGI_38KB264507A01_c0v0.pdf PDF
Att III Request for Information Form.pdf PDF
TGI_38KB264502A01_c0v0.pdf PDF
TGI_38KB264506A01_c0v0.pdf PDF
Att II Price Proposal Form N6264925RA062.xlsx XLSX spreadsheet
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

28-APR-2025 0926

20.14.15.2.9020 (September 2024) ICN: 38KB264508 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 04-150-0-C DC A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-76 USS HIGGINS KB2 66311

CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 04-150-0-C

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 3

NN010975

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

NANBA, RYOUSUKE 231A 3152436141 01-APR-2025

APPROVED BY: CODE: PHONE: DATE:

NAKAMURA, YUUJI 231A 3152436041 08-APR-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

NN01-0975

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE 04-150-0-C 04 U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

645A1108

1 SCOPE/PURPOSE:

1.1 Title: Deck Covering in 04-150-0-C; replace

1.2 Location of Work:

1.2.1 Chart Room (04-150-0-C)

1.3 Identification:

1.3.1 Quantity (100 SF), Chemical-Resistant Floorings System [Existing]

1.3.2 Quantity (100 SF), Chemical-Resistant Floorings System

Specification: MIL-PRF-32584, Type IV Color: 706 Navy blue color coat with white flake

1.3.3 Quantity (105 SF), Deck Plating, including vertical structural surface up to height of One inch from complete chemical-

TGI Short Form

28-APR-2025 0926

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB264508 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 04-150-0-C DC A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-76 USS HIGGINS KB2 66311

CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 04-150-0-C

FOUO Pg 2 of 3

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

resistant floorings system level

Remarks: The area excepts where insulation is installed.

1.4 Security Classification:

1.4.1 Spaces - 1.2.1

1.5 Initial Condition:

1.5.1 Potential Asbestos Hazard

1.6 Contractor work start date: 25/AUG/2025

1.7 Contractor work completion date: 15/OCT/2025

2 PROCEDURE:

2.1 Accomplish the requirements of 009-26 of Ref. No. One, including Attachment C, for removal of each existing equipment listed in 1.3.1 and installation of each new equipment listed in 1.3.2.

2.1.1 Accomplish the requirements of 009-32 of Ref. No. One, including Table 3, Line(s) 6, Column(s) A, B, and D, for each area listed in 1.3.3. Primer must conform to MIL-PRF-23236, Type V, VI, or VII.

2.2 Notes:

2.2.1 Planner: Code 231A R. Nanba, 243-6141

2.2.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.2.3 JCN NN01-0975 is related to this TGI.

2.3 Government Furnished Material (GFM): None.

2.4 SRF-JRMC will provide the following service work: (TGI No. 38KB264508S02)

2.4.1 [C740] Crane and crane rigging service.

2.4.2 [X99E] Utility service, electrical.

2.4.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.4.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.4.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.4.6 [C133] QA inspection for (G) symbol(s).

28-APR-2025 0926

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB264508 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 04-150-0-C DC A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-76 USS HIGGINS KB2 66311

CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 04-150-0-C

FOUO Pg 3 of 3

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38KB264508 KEY OP: A01