TGI_38KB264506A01_c0v0.pdf

PDF 152 KB Posted

Attached to
USS HIGGINS (DDG 76) 6J1 SIA Bundle 1 (Yokosuka, JAPAN)
Solicitation number
N6264925RA062
Issued by

About this file

This Task Group Instruction (TGI) details a deck covering replacement project for the USS HIGGINS (DDG-76) at a naval facility. The work involves replacing 135 square feet of existing chemical-resistant flooring with a new chemical-resistant flooring system, specified as MIL-PRF-32584, Type IV, in Navy blue color with white flakes. The project also includes preparing 157 square feet of deck plating, with a primer conforming to MIL-PRF-23236.

The contract specifies a work period from 25 August 2025 to 15 October 2025, to be performed at a government facility. SRF-JRMC will provide government-furnished materials and supporting services, including crane rigging, utility services, and safety/quality assurance inspections. The material list includes various pipe insulation items from K-FLEX ECO brand, adhesives, and sealing compounds. The project is part of a naval maintenance package for the USS HIGGINS, located in Yokosuka, Japan, and is intended only for authorized sources able to operate in Japan.

View the file

Other files

File Type Posted
N6264925RA062.pdf PDF
N6264925RA062-0001.pdf PDF
TGI_38KB264503A01_c0v0.pdf PDF
TGI_38KB263401A01_c0v0.pdf PDF
TGI_38KB264509A01_c0v0.pdf PDF
TGI_38KB264508A01_c0v0.pdf PDF
Att IV GFP_GFM listings.xlsx XLSX spreadsheet
TGI_38KB264507A01_c0v0.pdf PDF
Att III Request for Information Form.pdf PDF
TGI_38KB264502A01_c0v0.pdf PDF
Att II Price Proposal Form N6264925RA062.xlsx XLSX spreadsheet
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

28-APR-2025 0924

20.14.15.2.9020 (September 2024) ICN: 38KB264506 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 1-158-1-L DC A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-76 USS HIGGINS KB2 64511

CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 1-158-1-L

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 4

EX01L007

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

KANO, DAISUKE 231A 3152430098 14-APR-2025

APPROVED BY: CODE: PHONE: DATE:

NANBA, RYOUSUKE 231A 3152436141 16-APR-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EX01-L007

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE 1-158-1-L 1 U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

645A1106

1. SCOPE/PURPOSE:

1.1 Title: Deck Covering in 1-158-1-L; replace

1.2 Location of Work:

1.2.1 Passage (1-158-1-L)

1.3 Identification:

1.3.1 Quantity (135 SF), Chemical-Resistant Floorings System [Existing]

1.3.2 Quantity (135 SF), Chemical-Resistant Floorings System

Specification: MIL-PRF-32584, Type IV Color: 706 Navy blue color coat with white flakes

1.3.3 Quantity (157 SF), Deck Plating including vertical structural surface up to height of One inch from complete chemical-

TGI Short Form

28-APR-2025 0924

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB264506 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 1-158-1-L DC A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-76 USS HIGGINS KB2 64511

CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 1-158-1-L

FOUO Pg 2 of 4

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

resistant floorings system level

1.4 Security Classification: None.

1.5 Initial Condition:

1.5.1 Potential Asbestos Hazard

1.6 Contractor work start date: 25/AUG/2025

1.7 Contractor work completion date: 15/OCT/2025

2. PROCEDURE:

2.1 Accomplish the requirements of 009-26 of Ref. No. One, including Attachment C, for removal of each existing equipment listed in 1.3.1 and installation of each new equipment listed in 1.3.2.

2.1.1 Accomplish the requirements of 009-32 of Ref. No. One, including Table 3, Line(s) 6, Column(s) A, B, and D, for each area listed in 1.3.3. Primer must conform to MIL-PRF-23236, Type V, VI, or VII.

2.2 Notes:

2.2.1 Planner: Code 231A D. Kano, 243-0098

Planner: Code 234 M. Hosoda, 243-4572

2.2.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.2.3 JCN EX01-L007 is related to this TGI.

2.3 Government Furnished Material (GFM):

2.3.1 SRF-JRMC will provide GFM listed in the Material List.

2.4 SRF-JRMC will provide the following service work: (TGI No. 38KB264506S02)

2.4.1 [C740] Crane and crane rigging service.

2.4.2 [X99E] Utility service, electrical.

2.4.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.4.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.4.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.4.6 [C133] QA inspection for (G) symbols.

28-APR-2025 0924

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB264506 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 1-158-1-L DC A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-76 USS HIGGINS KB2 64511

CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 1-158-1-L

FOUO Pg 3 of 4

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

400 M INSULATION, INSULATION,

PIPE,

BRAND: K-FLEX ECO,

SPECIFICATION COMPLIANCE:

EB 4013,

FOR SIZE: 3" IPS,

SIZE: 3-1/2"ID X 3/4" THK X 6 FT

LG,

UI: EA/6 FT(ONE CONTINUOUS

LENGTH REQUIRED),

MATL: NON-HALOGEN,

DO NOT CROSS NSN: 5640-01-

607-0098(SIMC: X3),

9B 5640 LL9607846 NA 4 N 51017451 2/EA

401 M INSULATION, INSULATION,

PIPE,

BRAND: K-FLEX ECO,

SPECIFICATION COMPLIANCE:

EB 4013,

FOR SIZE: 4" IPS,

SIZE: 4-1/2" ID X 3/4" THK X 6

FT LG,

UI: EA/6 FT(ONE CONTINUOUS

LENGTH REQUIRED),

MATL: NON-HALOGEN,

9B 5640 LL9607848 NA 4 N 51017452 2/EA

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38KB264506 KEY OP: A01

28-APR-2025 0924

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB264506 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 1-158-1-L DC A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-76 USS HIGGINS KB2 64511

CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 1-158-1-L

FOUO Pg 4 of 4

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

402 M INSULATION, INSULATION,

PIPE,

BRAND: K-FLEX ECO,

SPECIFICATION COMPLIANCE:

EB 4013,

FOR 5" IPS,

SIZE: 5-1/2" ID X 3/4" THK X 6

FT LG,

UI: EA/6 FT(ONE CONTINUOUS

LENGTH REQUIRED),

MATL: NON-HALOGEN,

9B 5640 LL9607849 NA 4 N 51017453 3/EA

403 M INSULATION, INSULATION,

PIPE,

BRAND: K-FLEX ECO,

SPECIFICATION COMPLIANCE:

EB 4013,

FOR SIZE: 6" IPS,

SIZE: 6-5/8" ID X 3/4" THK X 6FT

LG,

UI: EA/6 FT(ONE CONTINUOUS

LENGTH REQUIRED),

MATL: NON-HALOGEN,

9B 5640 LL9607850 NA 4 N 51017454 3/EA

404 M INSULATION, INSULATION,

FLAT SHEET,

BRAND: K-FLEX ECO,

SPECIFICATION COMPLIANCE:

EB 4013,

SIZE: 36" W X 48" L X 3/4" THK,

MATL: NON-HALOGEN,

9B 5640 LL9607854 NA 4 N 51017455 4/SH

405 M ADHESIVE, ADHESIVE FOR

CLOTH

9B 8040 002738708 NA 4 Y 51015130 2/GL

406 M ADHESIVE, ADHESIVE FOR

INSULATION

9B 8040 008419773 NA 4 Y 51015135 4/PT

407 M SEALING COMPOUND, VAPOR

BARRIER

9B 8030 001742588 NA 4 Y 51015138 2/GL

File details come from the government source that posted it. Updated .