TGI_38KB264502A01_c0v0.pdf

PDF 139 KB Posted

Attached to
USS HIGGINS (DDG 76) 6J1 SIA Bundle 1 (Yokosuka, JAPAN)
Solicitation number
N6264925RA062
Issued by

About this file

This document is a Task Group Instruction (TGI) for replacing the nonskid system on the USS HIGGINS (DDG-76) at a naval facility. The specific work involves replacing 610 square feet of nonskid system on the 01 Level Deck Plating, located between Frames 118 and 209, including vertical surfaces up to 4 inches from the deck. The nonskid application must conform to MIL-PRF-24667, Type V, Composition G.

The work is scheduled from 25 August 2025 to 15 October 2025, with the SRF-JRMC providing supporting services including crane and rigging, utility services (electrical, water, steam), and safety and quality assurance inspections. The TGI is part of a naval maintenance package for the USS HIGGINS, located in Yokosuka, Japan, and is associated with solicitation N6264925RA062, which is specifically targeted at authorized contractors operating in Japan.

View the file

Other files

File Type Posted
N6264925RA062-0001.pdf PDF
N6264925RA062.pdf PDF
TGI_38KB264506A01_c0v0.pdf PDF
Att II Price Proposal Form N6264925RA062.xlsx XLSX spreadsheet
TGI_38KB263401A01_c0v0.pdf PDF
TGI_38KB264509A01_c0v0.pdf PDF
TGI_38KB264508A01_c0v0.pdf PDF
Att IV GFP_GFM listings.xlsx XLSX spreadsheet
TGI_38KB264503A01_c0v0.pdf PDF
TGI_38KB264507A01_c0v0.pdf PDF
Att III Request for Information Form.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

28-APR-2025 0921

20.14.15.2.9020 (September 2024) ICN: 38KB264502 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 01-118-4-L DC A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-76 USS HIGGINS KB2 64511

CU PHASE TITLE: *F/O - REPLACE NONSKID SYSTEM IN 01-118-4-L

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 3

OD01L649

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

NAKAGAWA, DAICHI 231A 3152430969 10-APR-2025

APPROVED BY: CODE: PHONE: DATE:

NANBA, RYOUSUKE 231A 3152436141 11-APR-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

OD01-L649

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE 01-118-4-L 01 U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

645A1102

1. SCOPE/PURPOSE:

1.1 Title: Nonskid System in 01-118-4-L; replace

1.2 Location of Work:

1.2.1 Passage (01-118-4-L)

1.3 Identification:

1.3.1 Quantity (610 SF in total), 01 Level Deck Plating, Frames between 118 and 209, including vertical surface up to height of 4 inches from deck in and around nonskid deck area

Remarks: The area excepts where rubber tile is installed.

1.4 Security Classification: None.

TGI Short Form

28-APR-2025 0921

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB264502 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 01-118-4-L DC A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-76 USS HIGGINS KB2 64511

CU PHASE TITLE: *F/O - REPLACE NONSKID SYSTEM IN 01-118-4-L

FOUO Pg 2 of 3

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1.5 Initial Condition: None.

1.6 Contractor work start date: 25/AUG/2025

1.7 Contractor work completion date: 15/OCT/2025

2. PROCEDURE:

2.1 Accomplish the requirements of 009-32 of Ref. No. One, including Table 2, Line(s) 21, for each area listed in 1.3.1.

Application of nonskid system must conform to MIL-PRF-24667, Type V, Composition G.

2.2 Notes:

2.2.1 Planner: Code 231A D. Nakagawa, 243-0969

2.2.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.2.3 JCN OD01-L649 is related to this TGI.

2.3 Government Furnished Material (GFM): None.

2.4 SRF-JRMC will provide the following service work: (TGI No. 38KB264502S02)

2.4.1 [C740] Crane and crane rigging service.

2.4.2 [X99E] Utility service, electrical.

2.4.3 [X99M] Utility service, including water supply and steam supply.

2.4.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.4.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.4.6 [C133] QA inspection for (G) symbol(s).

28-APR-2025 0921

20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB264502 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 01-118-4-L DC A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-76 USS HIGGINS KB2 64511

CU PHASE TITLE: *F/O - REPLACE NONSKID SYSTEM IN 01-118-4-L

FOUO Pg 3 of 3

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38KB264502 KEY OP: A01

File details come from the government source that posted it. Updated .