This document is a Task Group Instruction (TGI) for replacing the nonskid system on the USS HIGGINS (DDG-76) at a naval facility. The specific work involves replacing 610 square feet of nonskid system on the 01 Level Deck Plating, located between Frames 118 and 209, including vertical surfaces up to 4 inches from the deck. The nonskid application must conform to MIL-PRF-24667, Type V, Composition G.
The work is scheduled from 25 August 2025 to 15 October 2025, with the SRF-JRMC providing supporting services including crane and rigging, utility services (electrical, water, steam), and safety and quality assurance inspections. The TGI is part of a naval maintenance package for the USS HIGGINS, located in Yokosuka, Japan, and is associated with solicitation N6264925RA062, which is specifically targeted at authorized contractors operating in Japan.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6264925RA062-0001.pdf | ||
| N6264925RA062.pdf | ||
| TGI_38KB264506A01_c0v0.pdf | ||
| Att II Price Proposal Form N6264925RA062.xlsx | XLSX spreadsheet | |
| TGI_38KB263401A01_c0v0.pdf | ||
| TGI_38KB264509A01_c0v0.pdf | ||
| TGI_38KB264508A01_c0v0.pdf | ||
| Att IV GFP_GFM listings.xlsx | XLSX spreadsheet | |
| TGI_38KB264503A01_c0v0.pdf | ||
| TGI_38KB264507A01_c0v0.pdf | ||
| Att III Request for Information Form.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
28-APR-2025 0921
20.14.15.2.9020 (September 2024) ICN: 38KB264502 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 01-118-4-L DC A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-76 USS HIGGINS KB2 64511
CU PHASE TITLE: *F/O - REPLACE NONSKID SYSTEM IN 01-118-4-L
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 3
OD01L649
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
NAKAGAWA, DAICHI 231A 3152430969 10-APR-2025
APPROVED BY: CODE: PHONE: DATE:
NANBA, RYOUSUKE 231A 3152436141 11-APR-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
OD01-L649
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE 01-118-4-L 01 U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
645A1102
1. SCOPE/PURPOSE:
1.1 Title: Nonskid System in 01-118-4-L; replace
1.2 Location of Work:
1.2.1 Passage (01-118-4-L)
1.3 Identification:
1.3.1 Quantity (610 SF in total), 01 Level Deck Plating, Frames between 118 and 209, including vertical surface up to height of 4 inches from deck in and around nonskid deck area
Remarks: The area excepts where rubber tile is installed.
1.4 Security Classification: None.
TGI Short Form
28-APR-2025 0921
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB264502 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 01-118-4-L DC A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-76 USS HIGGINS KB2 64511
CU PHASE TITLE: *F/O - REPLACE NONSKID SYSTEM IN 01-118-4-L
FOUO Pg 2 of 3
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1.5 Initial Condition: None.
1.6 Contractor work start date: 25/AUG/2025
1.7 Contractor work completion date: 15/OCT/2025
2. PROCEDURE:
2.1 Accomplish the requirements of 009-32 of Ref. No. One, including Table 2, Line(s) 21, for each area listed in 1.3.1.
Application of nonskid system must conform to MIL-PRF-24667, Type V, Composition G.
2.2 Notes:
2.2.1 Planner: Code 231A D. Nakagawa, 243-0969
2.2.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.2.3 JCN OD01-L649 is related to this TGI.
2.3 Government Furnished Material (GFM): None.
2.4 SRF-JRMC will provide the following service work: (TGI No. 38KB264502S02)
2.4.1 [C740] Crane and crane rigging service.
2.4.2 [X99E] Utility service, electrical.
2.4.3 [X99M] Utility service, including water supply and steam supply.
2.4.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.4.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.4.6 [C133] QA inspection for (G) symbol(s).
28-APR-2025 0921
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KB264502 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 01-118-4-L DC A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-76 USS HIGGINS KB2 64511
CU PHASE TITLE: *F/O - REPLACE NONSKID SYSTEM IN 01-118-4-L
FOUO Pg 3 of 3
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38KB264502 KEY OP: A01
File details come from the government source that posted it. Updated .