TESTS SOO-RFP-9 30 2020.pdf
PDF 835 KB Posted
- Solicitation number
- 72066920R00010
About this file
This is an amendment to a solicitation issued by the U.S. Agency for International Development in Liberia seeking proposals to support the Government of Liberia's educational systems strengthening priorities. Offerors must be qualified U.S. or non-U.S., non-profit or for-profit organizations. The solicitation will follow Full and Open Competition procedures under FAR Parts 6 and 15. The authorized geographic code is 937 and NAICS code is 541990. The period of performance is five years from the award date with an estimated total cost ranging from $20-22 million. Key dates include questions due by October 14th, responses by October 19th, and proposals due by October 30th. Oral presentations will be held from November 9-30th. The amendment provides additional details on the required services and deliverables to transform Liberia's education system including strengthening teacher training institutions, building teaching skills, and improving the enabling environment for instruction.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Issuance Date: September 30, 2020 Questions Due Date/Time: October 14, 2020, 5:00pm Monrovia time Anticipated Date of Response to Questions: October 19, 2020 Proposal Due/Closing Date/Time: October 30, 2020, 5:00pm Monrovia time Oral Presentations: Tentatively from November 9-30, 2020
SUBJECT: REQUEST FOR PROPOSALS (RFP) No.: 72066920R00010 Transforming the
Education System for Teachers and Students in Liberia (TESTS)
The United States Government, represented by the U.S Agency for International Development in Liberia (USAID), is seeking proposals from qualified U.S. or non-U.S., non-profit or for-profit organizations to support the Government of Liberia in its educational systems strengthening priorities. This procurement will be conducted under Full and Open Competition procedures, pursuant to Part 6 and 15 of the Federal Acquisition Regulation (FAR). Authorized Principal Geographic Code for this solicitation is 937 – Default. NAICS Code for this solicitation is 541990
– All Other Professional, Scientific and Technical Services.
USAID anticipates awarding a Cost-Plus-Fixed-Fee completion-type contract for a maximum five
(5) year period of performance as a result of this RFP. USAID also anticipates that the total estimated cost will range between twenty to twenty-two million US dollars (US$20M to $22M.) The TESTS activity covers objectives that are intended to improve the quality of targeted Liberian Early Childhood Education (ECE) and primary teachers’ instructional delivery, strengthen the capacity of selected public, private, and faith-based institutions to train teachers, build critical skills for quality teaching and improve the enabling environment for teaching practice in Liberia.
This solicitation requires the offeror’s proposal to be furnished via an oral presentation. At least two of the proposed key personnel must present the offeror’s technical approach. Section L of the RFP sets forth all instructions for the preparation and submission of required proposal content and the oral presentations. Section M states the criteria by which proposals will be evaluated.
Offerors are responsible for ensuring oral presentations and cost proposals are received at USAID by the due date and time as specified in this cover letter. Failure to comply with the submission date and time will deem any submission unacceptable and it will not be reviewed or evaluated.
USAID expects that offerors will have equal access to all local organizations needed to implement this contract and strongly discourages exclusivity agreements with local/regional organizations as this limits USAID’s ability to receive the best services.
This RFP can be viewed and downloaded from www.fbo.gov. USAID bears no responsibility for data errors resulting from transmission or conversion processes. Further, be aware that amendments to solicitations are usually issued and will be posted on the same website. USAID advises to regularly check the above website for amendments.
Interested firms can register and use the Interested Vendor List (IVL) accessible through this solicitation on www.fbo.gov, so that firms can contact one another for consideration of teaming arrangements and/or small business subcontracting opportunities in response to this solicitation.
USAID encourages the participation to the maximum extent possible of all small business concerns in this activity or as a subcontractor in accordance with FAR Part 19.
Questions and comments related to this RFP must be in writing only and submitted electronically no later than the questions due date/time stated above to Edward S. Lamin, Acquisition and Assistance Specialist, at elamin@usaid.gov, and Ruth Caesar-Hne, Acquisition and Assistance Specialist at rcaesar-hne@usaid.gov. No questions will be accepted after the stated date.
USAID may consolidate response(s) to questions/comments and will post all responses as an amendment to this RFP.
Issuance of this RFP does not obligate the United States Government to make an award, nor does it commit the U.S. Government to pay for any costs incurred in the preparation or submission of proposals. Furthermore, the U.S. Government reserves the right to reject any and all offers, if such action is considered to be in the best interest of the U.S. Government.
Sincerely, Judy J. Webb Supervisory Contracting Officer
Judy Webb Digitally signed by Judy Webb Date: 2020.09.30 07:07:41 -04'00'
SOLICITATION, OFFER AND AWARD 1. THIS CONTRACT IS A RATED ORDER RATING
UNDER DPAS (15 CFR 7900) N/A
PAGE OF PAGES
3 124
2. CONTRACT NUMBER 3. SOLICITATION NUMBER
72066920R00010
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
5. DATE ISSUED
09/29/2020
6. REQUISITION/PURCHASE NUMBER
REQ-669-20-000029
7. ISSUED BY CODE 8. ADDRESS OFFER TO (If other than item 7)
U.S. Agency for International Development c/o U.S. Embassy Monrovia, 502 Benson St. Same as item 7 1000 Monrovia, 10 Liberia
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
9. Sealed offers in original and one electronic copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in See Cover Letter and Section L until 05:00pm local time October 30, 2020 (Hour) (Date)
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR
INFORMATION
CALL:
A. NAME
Edward S. Lamin
B. TELEPHONE (NO COLLECT CALLS) C. E-MAIL ADDRESS
elamin@usaid.gov
AREA CODE
NUMBER
776777000
EXT.
11. TABLE OF CONTENTS
(X) SEC. DESCRIPTION PAGE(S) (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
X A SOLICITATION/CONTRACT FORM 3 X I CONTRACT CLAUSES 69-91
X B SUPPLIES OR SERVICES AND PRICES/COSTS 10-12 PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.
X C DESCRIPTION/SPECS./WORK STATEMENT 15 X J LIST OF ATTACHMENTS 92
X D PACKAGING AND MARKING 16 PART IV - REPRESENTATIONS AND INSTRUCTIONS
X E INSPECTION AND ACCEPTANCE 17
X K REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS
93 X F DELIVERIES OR PERFORMANCE 18-30
X G CONTRACT ADMINISTRATION DATA 32-36 X L INSTRS., CONDS., AND NOTICES TO OFFERORS 94-110
X H SPECIAL CONTRACT REQUIREMENTS 37-66 X M EVALUATION FACTORS FOR AWARD 118-124
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within 180 calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS(%)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
AMENDMENT NO. DATE AMENDMENT NO. DATE
15A. NAME AND
ADDRESS
OF OFFER-
OR
CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
15B. TELEPHONE NUMBER 15C. CHECK IF REMITTANCE ADDRESS IS
DIFFERENT FROM ABOVE - ENTER SUCH
ADDRESS IN SCHEDULE.
17. SIGNATURE 18. OFFER DATE
AREA CODE NUMBER EXT.
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION:
10 U.S.C. 2304 (c) 41 U.S.C. 253 (c)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
24. ADMINISTERED BY (If other than Item 7) 25. PAYMENT WILL BE MADE BY
Controller’s Office USAID/Liberia, c/o US Embassy 502 Benson Street, 1000 Monrovia 10, Liberia CODE
26. NAME OF CONTRACTING OFFICER (Type or print)
Judy J. Webb
27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice AUTHORIZED FOR LOCAL REPRODUCTION Previous edition is unusable STANDARD FORM 33 (REV. 9-97
Table of Contents
PART I – THE SCHEDULE 10
SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS 10
B.1 PURPOSE 10
B.2 CONTRACT TYPE 10
B.3 ESTIMATED COST, FIXED FEE AND OBLIGATED AMOUNT 10
B.4 BUDGET 10
B.5 INDIRECT COSTS 11
B.6 COST REIMBURSABLE 12
B.7 MULTI YEAR CONTRACT 12
B.8 SCHEDULE - PAYMENT FEE 12
SECTION C – PERFORMANCE WORK STATEMENT 15
SECTION D - PACKAGING AND MARKING 16
D.1 AIDAR 752.7009 MARKING (JAN 1993) 16
D.2 BRANDING STRATEGY, IMPLMENTATION PLAN AND MARKING POLICY 16
D.3 SOCIAL MEDIA AND ONLINE OUTREACH 16
SECTION E - INSPECTION AND ACCEPTANCE 17
E.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE 17
E.2 INSPECTION AND ACCEPTANCE 17
E.3 RESPONSIBLE OFFICIAL 17
E.4 PERFORMANCE STANDARDS 17
SECTION F – DELIVERIES OR PERFORMANCE 18
F.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE 18
F.2 PERIOD OF PERFORMANCE 18
F.3 PLACE OF PERFORMANCE 18
F.4 KEY PERSONNEL 18
F.5 PERFORMANCE STANDARDS AND EVALUATION 19
F.6 REPORTS AND DELIVERABLES 20
F.7 752.242-70 PERIODIC PROGRESS REPORTS (OCT 2007) 29
F.8 ACTIVITY MONITORING AND EVALUATION 29
F.9 AIDAR 752.7005 SUBMISSION REQUIREMENTS FOR DEVELOPMENT
EXPERIENCE DOCUMENTS (SEPTEMBER 2013)
(ClassDeviationOAA-DEV-13- 01c) 30
SECTION G - CONTRACT ADMINISTRATION DATA 32
G.1 AIDAR 752.7003 DOCUMENTATION FOR PAYMENT (NOV 1998) 32
G.2 ADMINISTRATIVE CONTRACTING OFFICE 33
G.3 CONTRACTING OFFICER’S REPRESENTATIVE (COR) 33
G.4 PAYING OFFICE 33
G.5 INVOICES, ACCEPTANCE AND APPROVAL 34
G.6 INVOICING INSTRUCTIONS 34
G.7 ACCOUNTING AND APPROPRIATION DATA 34
G.8 TECHNICAL DIRECTIONS/RELATIONSHIP WITH USAID 34
G.9 CONTRACTOR CONTACT INFORMATION 36
SECTION H- SPECIAL CONTRACT REQUIREMENTS 37
H.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE 37
H.2 AIDAR 752.225-70 SOURCE AND NATIONALITY REQUIREMENTS
(FEB 2012) (Class Deviation No. OAA-DEV-12-01c) 37
H.3 AUTHORIZED GEOGRAPHIC CODE 38
H.4 AIDAR 752.228-70 MEDICAL EVACUATION (MEDEVAC) SERVICES
(JULY 2007) 38
H.5 AIDAR 752.7032 INTERNATIONAL TRAVEL 39
H.6 AIDAR 752.7007 PERSONNEL APPROVALS (JUL 2007) 39
H.7 ADDITIONAL REQUIREMENTS FOR PERSONNEL COMPENSATION 39
H.8 EXECUTIVE ORDER ON TERRORISM FINANCING (FEB 2002) 41
H.9 AIDAR 752.229-71 REPORTING OF FOREIGN TAXES (JULY 2007) 42
H.10 AIDAR 752.228-3 WORKER’S COMPENSATION INSURANCE
(DEFENSE BASE ACT) (DEC 1991) 42
H.11 SUBCONTRACTING PLAN, INDIVIDUAL SUBCONTRACT REPORT (ISR)
AND THE SUMMARY SUBCONTRACT REPORT 44
H.12 CONSENT TO SUBCONTRACT 45
H.13 BUSINESS CLASS TRAVEL 45
H.14 FOREIGN GOVERNMENT DELEGATIONS TO INTERNATIONAL
CONFERENCES (JAN 2002) 45
H.15 NONEXPENDABLE PROPERTY PURCHASES AND INFORMATION
TECHNOLOGY RESOURCES 46
H.16 LOGISTIC SUPPORT 47
H.17 LANGUAGE REQUIREMENTS 47
H.18 AIDAR 752.7101 VOLUNTARY POPULATION PLANNING ACTIVITIES
(JUNE 2008) (AAPD 08-01) 47
H.19 ENVIRONMENTAL COMPLIANCE 48
H.20 DISCLOSURE OF INFORMATION 49
H.21 ORGANIZATIONAL CONFLICTS OF INTEREST: PRECLUSION FROM
FURNISHING CERTAIN SERVICES AND RESTRICTION ON USE OF
INFORMATION (CIB 99-17) 50
H.22 AIDAR 752.222-71 NONDISCRIMINATION (JUN 2012) 51
H.23 AIDAR 752.222-70 USAID DISABILITY POLICY - ACQUISITION (DEC 2004) 51
H.24 ADS 302.3.5.19 USAID-FINANCED THIRD-PARTY WEB SITES (AUG 2013) 51
H.25 AIDAR 752.231-72 CONFERENCE PLANNING AND REQUIRED APPROVALS
(AUG 2013) 53
H.26 ADS 302.3.5.21 SUBMISSION OF DATASETS TO THE DEVELOPMENT DATA
LIBRARY (OCT 2014) 54
H.27 COMPLIANCE WITH THE TRAFFICKING VICTIMS PROTECTION
REAUTHORIZATION ACT 55
H.28 AUTHORIZED WORK WEEK 55
H.29 FAR 52.203-99, PROHIBITION ON CONTRACTING WITH ENTITIES THAT
REQUIRE CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS (APR 2015) 55
H.30 AIDAR 752.7036 USAID IMPLEMENTING PARTNER NOTICES (IPN) PORTAL
FOR ACQUISITION (JULY 2014) 56
H.31 LOGISTIC SUPPORT GOVERNMENT FURNISHED FACILITIES OR PROPERTY 57
H.32 COMPLIANCE WITH SECTION 508 OF THE REHABILITATION ACT OF 1973,
AS AMENDED 58
H.33 ELECTRONIC PAYMENTS SYSTEM 58
H.34 AMMONIUM NITRATE AND CALCIUM AMMONIUM NITRATE RESTRICTION
(SEPTEMBER 2011) (CLASS DEVIATION OAA-DEV-LL-03C, EXPIRATION
DATE SEPTEMBER 8, 2016) 59
H.35 CLOUD COMPUTING (MAY 2016) 59
H.36 AIDAR 752.245-71 TITLE TO AND CARE OF PROPERTY (APR 1984) 65
H.37 FAR 52.203-18, PROHIBITION ON CONTRACTING WITH ENTITIES THAT
REQUIRE CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS-
REPRESENTATION (JAN 2017) 65
H.38 FAR 52.203-18, REPRESENTATION REGARDING CERTAIN
TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR
EQUIPMENT 66
PART II – CONTRACT CLAUSES 69
SECTION I - CONTRACT CLAUSES 69
I.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE 69
I.2 FAR 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (OCT
2015) 75
I.3 FAR 52.217-2 CANCELLATION UNDER MULTI-YEAR CONTRACTS (OCT 1997) 77
I.4 FAR 52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015) 79
I.5 FAR 52.229-8 TAXES – FOREIGN COST-REIMBURSEMENT CONTRACT
(MAR 1990) 85
I.6 FAR 52.243-7 NOTIFICATION OF CHANGES (APR 1984) 85
I.7 AIDAR 752.209-71 ORGANIZATIONAL CONFLICTS OF INTEREST
DISCOVERED AFTER AWARD (JUN 1993) 87
I.8 AIDAR 752.231-71 SALARY SUPPLEMENTS FOR HG EMPLOYEES (MAR 2015) 88
I.9 AIDAR 752.7004 EMERGENCY LOCATOR INFORMATION (JULY 1997) 88
I.10 AIDAR 752.7013 CONTRACTOR-MISSION RELATIONSHIPS (JUN 2018) 88
I.11 AIDAR 752.7034 ACKNOWLEDGMENT AND DISCLAIMER (DEC 1991) 89
I.12 FAR 52.204-1 APPROVAL OF CONTRACT (DEC 1989) 89
I.13 FAR 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015) 90
I.14 FAR 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES
(JUL2014) 90
I.15 52.229-8 TAXES - FOREIGN COST-REIMBURSEMENT CONTRACTS (MAR 1990) 90
I.16 FAR 52.247-67 SUBMISSION OF TRANSPORTATION DOCUMENTS FOR AUDIT
(FEB 2006) 91
PART III - LIST OF DOCUMENTS, EXHIBITS, FORMS AND OTHER ATTACH 92
SECTION J - LIST OF ATTACHMENTS 92
SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS 93
SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS 94
L.1 NOTICE LISTING SOLICITATION PROVISIONS INCORPORATED BY
REFERENCE 94
L.2 FAR 52.216-1 TYPE OF CONTRACT (APR 1984) 95
L.3 FAR 52.233-2 SERVICE OF PROTEST (SEP 2006) 95
L.4 GENERAL INSTRUCTIONS TO OFFERORS 95
L.5 PROPOSAL SUBMISSION/ DELIVERY INSTRUCTIONS 97
L.6 INSTRUCTIONS FOR THE PREPARATION OF VOLUME I – TECHNICAL
PROPOSAL (PHASE I AND PHASE II) 99
L.7 ORAL PRESENTATION INSTRUCTIONS 108
L.8 INSTRUCTIONS FOR THE PREPARATION OF VOLUME II – COST PROPOSAL
[See Section M.3] 110
SECTION M-EVALUATION FACTORS FOR AWARD 118
M.1 GENERAL INFORMATION 118
M.2 TECHNICAL EVALUATION CRITERIA 118
M.3 BUSINESS/ COST PROPOSAL EVALUATION [See Section L.8] 123
M.4 DETERMINATION OF COMPETITIVE RANGE 123
M.5 SOURCE SELECTION 124
ACRONYMS LIST
AMELP Activity Monitoring, Learning, Evaluation, & Plan CDCS Country Development Cooperation Strategy CO Contracting Officer COP Chief of Party COR Contracting Officer’s Representative DOC Development Outreach Communication DPOs Disabled Peoples’ Organizations ECE Early childhood education EMIS Education Management Information GOL Government of Liberia GPE Global Partnership for Education GUC Grant under contract MOE Ministry of Education OSIWA Open Society Initiative for West Africa PWS Performance work statement RTTIs Rural Teacher Training Institutes SEL Social and emotional learning SOO Statement of Objectives TESTS Transforming the Education System for Teachers and
Students in Liberia TBD To be Determined UDL Universal Design for Learning USAID United States Agency for International Development USG United States Government
PART I – THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS
B.1 PURPOSE
The purpose of this contract is to provide the services and deliverables that fall within the Performance Work Statement (PWS) as specified in Section C to implement the Transforming the Education System for Teachers and Students Activity.
B.2 CONTRACT TYPE
This is a Cost-Plus-Fixed-Fee (CPFF) completion-type contract consistent with Federal Acquisition Regulation 16.306(d)(1). For the consideration set forth below, the Contractor must achieve the performance objectives and deliverables or outputs described in Sections C and F, in accordance with performance standards specified in Section E, and otherwise comply with all contract requirements.
B.3 ESTIMATED COST, FIXED FEE AND OBLIGATED AMOUNT
(a) The estimated cost for the performance of the work required hereunder, exclusive of fixed fee is $___________. The fixed fee is $__________. The estimated cost plus fixed fee is $________.
(b) Within the estimated cost plus fixed fee (if any) specified in paragraph (a) above, the amount currently obligated and available for reimbursement of allowable costs incurred by the Contractor (and payment of fee, if any) for performance hereunder is $_________. The Contractor must not exceed the aforesaid obligated amount.
(c) Payment of fixed fee will be made upon receipt of a proper invoice and must directly correspond to the percentage of allowable costs being paid and the fee payment schedule in Section B. In accordance with FAR 52.216-8, Fixed Fee, the Contracting Officer (CO) may withhold an amount not to exceed 15% of the total fixed fee or $100,000, whichever is less, until the required award conditions under the reference clause have been met in order to protect the Government’s interest.
(d) Funds obligated hereunder are anticipated to be sufficient through {TBD based on the date of award}.
B.4 BUDGET
The total cost (stated below) for the budget categories specified below may not be adjusted without a modification to the contract signed by the Contracting Officer. No amounts in excess of the amounts specified for each cost category will be billed against the contract.
SUMMARY BUDGET
CONTRACT LINE ITEM
YEAR 1 YEAR 2 YEAR 3
YEAR 4
YEAR 5 TOTAL
Salaries and Wages
Fringe Benefits
Travel, Transportation & Per Diem Allowances Other Direct Costs (ODCs) Trainings
Equipment and Supplies
Grants Under Contract
Subcontracts Total Direct Cost Indirect Costs Fixed Fee
TOTAL COST-PLUS FIXED
FEE
B.5 INDIRECT COSTS
Pending establishment of revised provisional or final indirect cost rates, allowable indirect costs shall be reimbursed on the basis of the following negotiated provisional or predetermined rates and the appropriate bases for the prime contractor and its major subcontractors (major subcontractor means any contract entered into by a subcontractor to furnish supplies or services for performance of a prime contract and whose proposed cost exceeds 20% or more of the technical effort or will furnish supplies or services for performance of a prime contractor for a key element of the RFP):
Prime:
Description*
Rate Base*** Type Period**
TBD TBD 1/ 1/ 1/
TBD TBD 2/ 2/ 2/
1/ Base of Application:
TBD Type of Rate:
TBD Period: TBD
2/ Base of Application:
TBD Type of Rate TBD Period: TBD Major Subcontractor(s):
Description* Rate Base*** Type Period
TBD TBD 1/ 1/ 1/
TBD TBD 2/ 2/ 2/
1/ Base of Application:
TBD Type of Rate:
TBD Period: TBD
2/ Base of Application:
TBD Type of Rate TBD Period: TBD
* Description or type of rate indicated as a percentage, e.g., G&A ** Period, e.g., CY 2009 *** Base, e.g., Direct Labor for Labor Overhead
B.6 COST REIMBURSABLE
The U.S. dollar costs allowable will be limited to reasonable, allocable and necessary costs determined in accordance with FAR 52.216-7, Allowable Cost and Payment, FAR 52.216-8, Fixed Fee, FAR 52.232-20, “Limitation of Cost” and FAR 52-232-22, “Limitation of Funds,” and AIDAR 752.7003, Documentation for Payment.
B.7 MULTI YEAR CONTRACT
The contract is subject to the requirements of FAR 17.106. However, this is a Cost Plus Fixed Fee type contract where the Contractor is authorized to be reimbursed for all costs which are allowable in accordance with FAR 52.216‐7, “Allowable Costs and Payment.” Therefore, the Contractor will not incur any costs which would have been amortized over the life of the contract should the contract be cancelled in accordance with FAR 52.217‐2. If cancellation under the clause at 52.217- 2, “Cancellation Under Multi-year Contracts” occurs, the Contractor will be paid a cancellation charge not over the cancellation ceiling defined as follows:
Cancellation Dates Cancellation Ceiling Contract Year 1: NA NA NA Contract Year 2: DATE TBD, [Award year + 1 year] Cancellation Ceiling: TBD Contract Year 3: DATE TBD, [Award year + 2 year] Cancellation Ceiling: TBD Contract Year 4: DATE TBD, [Award year + 3 year] Cancellation Ceiling: TBD Contract Year 5: DATE TBD, [Award year + 4 year] Cancellation Ceiling: TBD
B.8 SCHEDULE - PAYMENT FEE
The Contractor may earn and be paid all or a portion of the total fee based on performance under this contract. Payment of the Contractor’s fee is tied to the accomplishment of performance objectives and deliverables in Sections C, D and F that are specified in Table 1 below.
These deliverables and targets will be finalized with the COR. If the Contractor does not reach the deliverables/target, the Contractor will not be paid any of the fees associated with that deliverable/target, as full contract completion will not have been demonstrated.
Pursuant to FAR 16.306(d), the fixed fee payable under this contract will be tied to the execution of tasks and achievement of results per objective outlined in Section C, subject to inspection and acceptance by USAID and in compliance with the terms of the contract. USAID reserves the right to engage a third party to verify results. The Contracting Officer, in consultation with the Contracting Officer’s Representative (COR) and at the request of the Contractor, may modify the fee payment schedule, including deliverables, targets or dates, based upon changes in underlying assumptions, the development context or other extenuating circumstances. Additionally, dates are meant to be illustrative and are flexible within reason, as determined by the COR.
Pursuant to FAR 52.216-8, payment of the fixed fee shall be made as specified in the schedule below. The Contracting Officer reserves the right to withhold up to 15% of the total fixed fee or $100,000, whichever is less, to protect the Government’s interest.
Table 1 – Fee Payment Schedule DELIVERABLE (Indicators/ Targets) DUE DATE PROPOSED
PERCENTAGE OF
FEE
Objective 1 (IR)1.1 Capacity of selected public, private, and faith-based institutions to train primary and ECE teachers strengthened
TBD TBD
Result 1.1.1: Capacity to provide quality teacher training enhanced
TBD TBD
Result 1.1.2: Inclusive education curriculum incorporated into teacher training
TBD TBD
IR 1.1.3: Gender-equitable access to teacher training increased
TBD TBD
Objective 2 TBD TBD IR 2.1 Critical skills built and applied for quality teaching
TBD TBD
Result 2.1.1: Teacher-aspirants’ content knowledge increased
TBD TBD
Result 2.1.2: Teacher-aspirants’ evidence-based pedagogical skills strengthened
TBD TBD
Result 2.1.3: Newly acquired teaching skills applied TBD TBD Objective 3 IR 3: Enabling environment for teaching practice improved
TBD TBD
Result 3.1.1: Consortium of demonstration schools functioning
TBD TBD
Result 3.1.2: Peer support systems strengthened TBD TBD Result 3.1.3: Parents’, caregivers’, and communities’ commitment to ECE and primary education strengthened
TBD TBD
Result 3.1.4: Ministry of Education's capacity strengthened to support quality teaching
TBD TBD
Output 1.1: Teacher training curriculum updated at four to ten teacher training institutions to align with national standards at both the primary and ECE levels.
TBD TBD
Output 1.2: Modules/course offerings addressing disability and inclusive education classroom implemented at four to ten teacher training institutions implement practices at both the primary and ECE levels.
TBD TBD
. Output 1.3.2: Increased female enrollment and graduation rates significantly from baseline levels at the primary education level at four to ten teacher training institutions
TBD
Output 2.1: 80% of TESTS’ primary and ECE-level teacher-aspirants achieved passing grades on critical assessments.
TBD TBD
Output 2.2: 80% of TESTS teacher-aspirants have strengthened pedagogical knowledge and skills, as measured by continuous assessment and observation throughout the life of the TESTS program
TBD TBD
Output 2.3: TESTS’ teacher-aspirants display subject matter knowledge and effective pedagogical skills as measured by observation and assessment of classroom teaching practices.
TBD TBD
Output 3.1: All participating TESTS teacher training institutions have functioning relationships with demonstration schools where teacher-aspirants are carrying out teacher practicum.
TBD TBD
Output 3.2: All participating TESTS training institutions have in place functioning systems that offer peer support to TESTS teacher-aspirants
Output 3.3: Targeted parents, caregivers, and communities increase their participation in activities that are supportive of their children’s education at the ECE and primary levels
Output 3.4: Ministry of Education has access to technical assistance in support of the TESTS program and teacher education in Liberia.
TOTAL FEE PERCENTAGE 100%
Note: This table is an illustrative table. A final fee payment schedule will be negotiated with the Contractor prior to award. Offerors are required to propose percentages of their total proposed fee percentage for each of the above deliverables. Please do not propose actual dollar amounts – only fee percentages.
[END OF SECTION B]
SECTION C – PERFORMANCE WORK STATEMENT
[USAID will insert the Contractor’s Performance Work Statement at award; see Attachment J.1 for the Statement of Objectives that informs the development of Section C.]
[END OF SECTION C]
SECTION D - PACKAGING AND MARKING
D.1 AIDAR 752.7009 MARKING (JAN 1993)
(a) It is USAID policy that USAID-financed commodities and shipping containers, and project construction sites and other project locations be suitably marked with the USAID emblem.
Shipping containers are also to be marked with the last five digits of the USAID financing document number. As a general rule, marking is not required for raw materials shipped in bulk (such as coal, grain, etc.), or for semi-finished products which are not packaged.
(b) Specific guidance on marking requirements should be obtained prior to procurement of commodities to be shipped, and as early as possible for project construction sites and other project locations. This guidance will be provided through the cognizant technical office indicated on the cover page of this contract, or by the Mission Director in the cooperating country to which commodities are being shipped, or in which the project site is located.
(c) Authority to waive marking requirements is vested with the Regional Assistant Administrators, and with Mission Directors.
(d) A copy of any specific marking instructions or waivers from marking requirements is to be sent to the Contracting Officer; the original should be retained by the Contractor.
D.2 BRANDING STRATEGY, IMPLMENTATION PLAN AND MARKING POLICY
The Contractor must comply with the requirements of the policy directives and required procedures outlined in USAID Automated Directive System (ADS) 320.3.2 “Branding and Marking in USAID Direct Contracts” (effective date: 01/08/2007) at https://www.usaid.gov/sites/default/files/documents/1868/320.pdf, and USAID Graphic Standards Manual and Partner Co-Branding Guide, or any successor branding policy.
The Contractor’s Branding Strategy and Implementation Plan dated TBD is hereby incorporated into the contract as Attachment J TBD.
D.3 SOCIAL MEDIA AND ONLINE OUTREACH
Social media is often part of an integrated communications campaign. It should always be used to communicate directly with stakeholders or beneficiaries in host countries. It should never be used to promote a program or contractor. Social media channels may be approved as part of a project’s marking plan in consultation with the CO, COR, and DOC team. To avoid confusion with official USAID social media channels, the USAID logo should not be used as a profile picture. A photo reflective of the project should be used as a profile picture. A USAID-branded photo should be displayed as the banner photo, and acknowledgement of USAID support should appear in the “Profile” or “About” section. For more information, please refer to the USAID Graphic Standards Manual and Partner Co-Branding Guide.
[END OF SECTION D]
SECTION E - INSPECTION AND ACCEPTANCE
E.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE
The following contract clauses pertinent to this section are hereby incorporated by reference (by Citation Number, Title, and Date) in accordance with the clause at FAR "52.252-2 CLAUSES INCORPORATED BY REFERENCE" in Section I of this contract. See http://acquisition.gov/far/index.html for electronic access to the full text of a clause.
FEDERAL ACQUISITION REGULATION (48 CFR Chapter 1)
NUMBER TITLE DATE
52.246-5 INSPECTION OF SERVICES--COST-REIMBURSEMENT APR 1984
E.2 INSPECTION AND ACCEPTANCE
a. USAID inspection and acceptance of services, reports, and other required deliverables or outputs will take place at:
USAID/Liberia 502 Benson Street Monrovia, Liberia
b. USAID reserves the right to inspect and accept any services, reports, and other required deliverables or outputs where the services are performed and where reports and deliverables or outputs are produced or submitted. The Contracting Officer has delegated authority to inspect and accept all services, reports, and required deliverables or outputs to the Contracting Officer’s Technical Representative (COR) listed in Section G.
E.3 RESPONSIBLE OFFICIAL
In accordance with the clauses of this contract entitled “Inspection – Cost – Cost Reimbursement” (FAR 52.246-5), inspection of results or other deliverables required by the contract will be made by the cognizant COR. Acceptance of goods/services and reports or other deliverables by the cognizant COR must form the basis for payments to the contractor, and will form the basis of the contractor’s permanent performance record with regard to this contract.
E.4 PERFORMANCE STANDARDS
USAID will evaluate the Contractor’s performance in accordance with FAR 42.15, corresponding USAID procedures, and the Contractor’s adherence to the annual work plan, reporting against its Performance Monitoring Plan (PMP), and quality of reports described in Section F below. USAID will evaluate the Contractor’s performance during the initial, intermediate, and final periods of the contract in accordance with the Contractor Performance Assessment Reporting System (CPARS).
The Contracting Officer and the COR will jointly conduct the evaluation of the Contractor’s overall performance. This evaluation will form the basis of the Contractor’s permanent performance record under this contract.
[END OF SECTION E]
SECTION F – DELIVERIES OR PERFORMANCE
F.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE
The following contract clauses pertinent to this section are hereby incorporated by reference (by Citation Number, Title, and Date) in accordance with the clause at FAR "52.252-2 CLAUSES INCORPORATED BY REFERENCE" in Section I of this contract. See http://acquisition.gov/far/index.html for electronic access to the full text of a clause.
FEDERAL ACQUISITION REGULATION (48 CFR Chapter 1)
NUMBER TITLE DATE_____
52.242-15 STOP-WORK ORDER APR 1989
52.246-5 INSPECTION OF SERVICES - COST REIMBURSEMENT APR 1984
52.247-34 F.O.B. DESTINATION NOV 1991
F.2 PERIOD OF PERFORMANCE
The period of performance for the contract is five (5) years from the award date. The conditions set forth above are subject to the contractor’s performance and availability of funds.
(a) It is the Contractor's responsibility to ensure that the Contracting Officer’s approved adjustments to the original estimated completion date do not result in costs incurred that exceed the total estimated cost of this contract. Under no circumstances will such adjustments authorize the Contractor to be paid any sum in excess of the contract amount.
(b) Adjustments that will cause the elapsed time for completion of the work to exceed the original estimated completion date by more than 15 calendar days must be approved in advance by the Contracting Officer.
F.3 PLACE OF PERFORMANCE
The place of performance under this contract is Liberia as well as the Contractor’s home-office of record.
F.4 KEY PERSONNEL
The Contractor is allowed to propose key personnel positions (total of 5 positions) that match its own technical approach except the COP must be a key position. Offerors may determine the qualifications of the COP and other key personnel. Upon award, the Contract must furnish such key personnel with the proposed qualifications for full time performance for the term of this contract unless otherwise agreed to by the CO. Failure to provide the key personnel designated may be considered non-performance unless such failure is beyond the control, and through no fault or negligence, of the Contractor.
The Contractor must immediately notify the CO and the COR of any key personnel’s departure and the reasons thereof and propose interim coverage while rectifying the situation. The Contractor will propose a substitute candidate for each vacated position to the CO and the COR along with a budget impact statement in sufficient detail to permit evaluation of the impact on the program. The Contractor must not replace the key personnel without the prior written consent of the COR and prior written approval of the CO, whether provided in advance or by ratification.
The key personnel that the Contractor must furnish for the performance of this contract are as follows:
No. Key Personnel Position 1 Chief of Party (COP)
USAID reserves the right to adjust the level of key personnel during the performance of this contract. The COP and two of the proposed key personnel must be furnished immediately (no later than 30 days after award) with the remaining key personnel no later than 45 days after award.
Key Personnel Qualifications
Chief of Party: 100% Time
Role:
The COP shall:
• Provide overall leadership, management, and strategic technical direction of the entire program, with a focus on achieving results as defined in the contract;
• Lead coordination with implementing partners, teacher training institutions, and the GOL;
• Serve as the principal institutional liaison to USAID/Liberia, public and private sector counterparts, and other donors involved with TESTS;
• Provide technical leadership and counsel on evidence-based pre-service teacher training programs that work within a developing country context;
• Provide leadership in the development and revision of pre-service courses, materials, and processes;
• Research and provide guidance on appropriate university and demonstration school partnerships; and
• Establish close working relationships with relevant private sector and GOL decision-makers to advocate for teacher placement and employment.
ADDITIONAL KEY PERSONNEL POSITIONS - TBD
F.5 PERFORMANCE STANDARDS AND EVALUATION
Evaluation of the Contractor’s overall performance will be conducted jointly by the COR and the Contracting Officer, and will form the basis of the Contractor's permanent performance record with regard to this contract.
The Contractor’s performance information determined to be relevant will be evaluated in accordance with the elements below:
● Technical quality of product or service, including consistency in meeting goals and targets in addition to adherence to the work plan. Cost control, including forecasting costs as well as accuracy in financial reporting, ensuring that unnecessarily expensive technical assistance is not used when lower cost, equally qualified advisors are available, and pacing the expenditure of level of effort such that contract deliverables and outputs can be produced within budget.
● Timeliness of performance, including adherence to contract schedules and other time-sensitive activity conditions, and effectiveness of home and field office management to make prompt decisions and ensure efficient completion of tasks.
● Management or business relations, addressing the history of professional behavior and overall business-like concern for the interests of the customer, including coordination among subcontractors and developing country partners, cooperative attitude in remedying problems, and timely completion of all administrative requirements.
Performance review will be conducted jointly by the COR and will form the basis of the Contractor's permanent performance record with regard to this contract as required in FAR Part
42.15 and AIDAR 742.15.
USAID reserves the right to conduct, and the Contractor must expect and be prepared for, a management and/or financial review and/or audit by USAID (or USAID selected third party) at any time to ensure systems (management, administration, finance, procurement, and program) are in place as per the contract. Such financial reviews/audits will focus on program management and performance, including such factors as cost, timeliness, and accountability; and will include field and home office records pertaining to operations and program activities. The Contractor must cooperate with and contribute to a final management and financial review conducted by USAID prior to program closeout.
USAID will also conduct performance evaluations of the program consistent with the Agency Evaluation Policy. The Contractor must cooperate with and contribute to these reviews and evaluations.
F.6 REPORTS AND DELIVERABLES
a. In addition to the requirements set forth for submission of reports in Sections F, and in accordance with AIDAR 752.242-70, “Periodic Progress Reports,” the Contractor is responsible for submitting the reports, deliverables or outputs as further described below to the COR(referenced in Section G) and obtaining the COR’s approval. Additionally, the Contractor must deliver the results stated in section B.8.
b. The Contractor must submit all written documentation (reports, deliverables, correspondences, information sheets, etc.) to USAID/Liberia in the English language, unless otherwise specified by the COR. In addition to the reports outlined below and those elsewhere specified, the contractor may be required to respond quickly to ad-hoc information requests with short deadlines. The Contractor must submit one hard copy and one electronic copy of each prepared report in accordance with the distribution and submission dates specified in the table below. Planning and reporting must conform to the U.S. Government’s fiscal year (October 1 to September 30). The Contractor will consult the COR on the format and expected content of reports prior to submission.
c. The Contractor must describe accomplishments and difficulties both quantitatively and qualitatively. The Contractor must also explain any anticipated or actual delays and describe the corrective action plans that it will initiate.
d. The Contractor must enter indicator results and target data into the PIDS (Performance
Indicator Database System) managed by the Liberia Strategic Analysis activity or any database system that USAID or the USAID/Liberia Mission uses to monitor program performance. The frequency with which the data shall be entered will be recorded in the performance indicator reference sheet for each indicator in the Activity Monitoring Evaluation and Learning Plan (AMLEP).
REPORTS AND DELIVERABLES
No
Deliverable* Frequency Due Date**
1 COP & 2 other Key Personnel arrived in Liberia
One time 30 Days after award.
Remaining key personnel 45 days after award.
2 Four Year Workplan One time The five year work-plan must be submitted within 30 days after award and must be approved by USAID no later than 60 days after award. COR approval is required.
3 Annual Workplan Annually The Year 1 Annual Work Plan must be submitted within 30 days after award and must be approved by USAID no later than 60 days after award. Subsequent work plans must be submitted by August 1st of each year covering the period from October 1st to September 30th.
COR approval is required
4 Activity Monitoring Evaluation and Learning Plan
(AMELP)
One time The AMELP must be submitted within 30 days after award and must be approved by USAID no later than 60 days after award.
COR approval is required
5 Final Quality Assurance Surveillance Plan
(QASP)
One time No later than 45 days after award.
6 Branding and Marking Plan
One time 30 Days after award
7 Trafficking in Person Compliance Plan
Plan must be available if requested by
USAID
30 Days after award
8 Certification of Trafficking in Person
Annually Contractor must submit to USAID the certification on each year anniversary of the award.
9 One copy of each report and information to the DEC as per AIDAR 752.7005
As required – ongoing throughout the life of the award
Within thirty (30) calendar days of obtaining the COR’s approval and within thirty calendar days after completion of the contract. For more information, please see AIDAR 752.7005.
10 Quarterly Progress Reports
Quarterly Within 15 Days after end of each USG fiscal quarter, 4th quarter reports will be annexed within the annual report. COR approval is required.
11 Performance Indicator Database System Quarterly Data entry (electronic system)
Quarterly Within 20 Days after end of quarter. COR approval is required.
12 Gender and disability inclusion organizational assessment at program start-up
Within 90 Days after the award.
13 Organization Capacity Strengthening Report
Annually Within 15 Days after end of quarter, 4th quarter reports will be annexed within the annual report. COR approval is required.
14 Annual Progress Reports
Annually Within 15 Days after End of Year. COR approval is required.
15 Quarterly Financial Reports
Quarterly Within 30 days after end of quarter. COR approval is required.
16 Quarterly Accruals Quarterly 15 days prior to end of the USG fiscal year quarter. COR approval is required.
17 Technical Materials and Inputs
Ad-hoc Regularly (materials need to be cleared by USAID before finalization). COR approval is required.
18 STTA consultant reports, technical briefs, special and external reports
Ad-hoc Regularly
One week after end of STTA departure from country. COR approval is required.
19 Portfolio Review Presentations
Quarterly Quarterly--15 days after the end of the fiscal year quarter
20 Annual Inventory Reports
Annually Attached to each Annual Performance Report
21 Close-Out and Demobilization Plan
One time 180 days prior to award completion date.
22 Final Activity Report One time Submitted 30 days prior to completion date and must be approved no later than 60 days after the completion date. This is in line with AIDAR 752.7005
**The quarters refer to USAID’s fiscal year: Oct 1 – Dec 31, Jan 1 – Mar 31, April 1 – Jun 30 and Jul 1 – Sept 30
INITIAL DELIVERABLES
1. Key Personnel In Country: The COP and two key positions (to preferably include a key position with responsibility for Operations) must be furnished immediately (within 30 days after award) with the remaining key personnel within 45 days after award.
2. Five Year Work Plan: The five year work plan provides a timeline initiation and completion of all tasks. It outlines tasks, proposed travel and STTA, cost/budget per task, deliverables, due dates, responsible Contractor parties, USAID teams, and additional resources required to complete the tasks. This document will be reviewed periodically to respond to emerging issues and revised accordingly in collaboration with the Contracting Officer’s Representative (COR).
3. Annual Work Plan: The work plan will include proposed activities, timeframe for the implementation of activities (costed), proposed travel and STTA, and a detailed budget.
The work plan will be developed in-country by the Contractor and in cooperation with USAID/Liberia and the Government of Liberia, Ministry of Education. The Contractor must submit significant changes/revisions to the work plan to the designated Contract Officer’s Representative, as necessary and required. All significant changes and revisions to the work plan must be approved by the Contracting Officer Representative. Work plans must be finalized within 5 working days after receiving USAID’s comments. The Annual Monitoring, Evaluation and Learning Plan-Indicator and Progress Table should be an annex to the Annual Work Plan and must be updated accordingly. Additionally, the work plan should detail:
● Any subcontracts to be carried-out;
● Any resource leveraging planned with public and private partners;
● Details of collaboration with GOL and other major partners;
● Detailed budget tied to the US Government’s fiscal year (Oct 1 – Sept 30).
● Activity-based budget tied to proposed activities so USAID can understand the level of resources dedicated to key program activities;
● Environmental compliance status.
4. Activity Monitoring, Evaluation, and Learning Plan (AMELP): The COR will review, collaborate on any necessary changes, and provide final approval of the plan. After approval, USAID expects the Activity Monitoring Plan to evolve based on the adaptive management approach. It is important that these plans clearly detail how the partner will monitor performance as well as programmatic and operational context. The Monitoring, Evaluation, and Learning Plan must be developed in accordance with ADS 201. The Monitoring Plan will be reviewed regularly to confirm compliance with USAID requirements. The AMELP must comply with USAID ADS Chapter 203 series, Assessing and Learning on AMELP for monitoring results and data quality. The Contractor shall apply the USAID criteria for selecting performance indicators – that is, that they be direct, objective, practical, adequate, management useful, reflect progress toward achieving results, and attributable to USAID.
Monitoring data will be used to inform management decisions, resource allocation and to assess where changes to activities may be required to help better ensure that the desired impact will be achieved. Performance reports submitted by the Contractor must be focused on reporting progress against the approved AMELP. Key components of the monitoring plan typically include:
● The activity’s monitoring approach, including relevant performance indicators of activity outputs and outcomes, including value for money analysis;
● Monitoring for any evaluation triggers that should be communicated to the relevant stakeholders; and
● Estimated resources for these monitoring activities that are a part of the implementing partner’s budget.
As part of the monitoring, the plan must include a Performance Management Task Schedule that includes portfolio reviews, data quality assessment and reporting schedules. The plan should also outline and indicate the adaptive management approach and indicators to monitor and respond to course correction needs.
USAID will determine with the Contractor the list of standard and development objective impact indicators that the Contractor must include in the AMELP and report on in performance reports.
5. Final Quality Assurance Surveillance Plan Approved by USAID: The Contractor must develop a Quality Assurance Surveillance Plan (QASP) which outlines a surveillance schedule and clearly describes the surveillance methods to be used. The purpose of the QASP is for USAID to better understand the Contractor’s internal monitoring system to ensure timely and quality products and services. Further, the QASP will identify what an acceptable quality level is for each deliverable. The QASP is distinct from the AMELP or COR oversight, rather it is a demonstration of how the Contractor will manage their performance, efficient financial expenditure and risk through the life of the contract. The plan must include roles and responsibilities for surveillance throughout the duration of the contract. The QASP must align with the PWS and focus on the quality and timeliness of the output to be delivered and not just on the steps required or procedures used to provide the service. The plan must provide for prevention and ready detection of any challenges, and for timely and positive corrective action.
PERIODIC PROGRESS REPORTS AND DELIVERABLES
6. Quarterly Progress Reports: Reports will provide a project overview, executive summary that covers key results and achievements during the reporting period as well as major problems encountered, and lessons learned. They will also provide an update on activity implementation that includes a detailed progress narrative and implementation challenges and opportunities including: indicator update; discussion of partnerships, collaboration, and/or knowledge sharing with stakeholders including civil society, private sector, and other development partners; discussion of management and administrative issues, such as constraints and critical issues, personnel changes, proposed adaptations of the activity, and award modifications and amendments (completed and expected). Lastly, the report will lay out major activities planned for the next quarter. The contractor will submit three success stories per quarter that will tell the story of the achievements throughout the period of performance. The success stories will describe major accomplishments and will include pictures.
7. Performance Indicator Database System Quarterly Data entry (electronic system)
The contractor will be required to submit quarter data into an electronic system (PIDS) that is managed by a third-party contractor. Data submitted within the system is utilized to report to Congress on an annual basis.
Gender and disability inclusion organizational assessment report
8. Gender and disability inclusion organizational assessment report at the start of the program to gauge the baseline status of teacher training institutions’ programs and resources
Annual organization capacity strengthening report
9. Assessments and individualized education plans for teacher-aspirants reports and recommendations
Annual Progress Report
10. The fourth quarterly report serves as the annual report to USAID. The annual report must cover the concluding year and will include a discussion, supported with auditable quantitative and qualitative evidence, of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .