Technical Exhibit C - As-Builts.pdf

PDF 10 MB Posted

Attached to
REPLACE HVAC UNITS Building 7050 Federal contract opportunity
Solicitation number
W91151-21-B-0003
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

About this file

This federal contract opportunity solicitation seeks to replace HVAC units and upgrade the chilled-water system at Building 7050 for the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood. The purpose of the project is to replace nine existing air handlers with one air-cooled chiller and two pumps, and upgrade other system components including two water-cooled chillers, two cooling towers, and five pumps. The solicitation also requires replacing several existing piping accessories, balancing existing air devices, and modifying existing HVAC controls. Offerors are invited to submit bids in response to solicitation number W91151-21-B-0003 by the specified deadline to perform the work required for upgrading the chilled-water system and replacing HVAC units at the specified Army facility.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Rectangle

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

BRIAN.E.PRESSER

Line

MECHANICAL FLOORPLANN

SCALE: 1/4"=1’

MARK TYPE (GPM)

FLOW

(EER)

EFFIC.

MINIMUM

9.8 54°F 44°F 8937.1

(TONS)

AT 95°

CAPACITY

NOMINAL

AIR COOLED CHILLER SCHEDULE

CH-3

TEMP

WATER

ENTERING

TEMP

WATER

LEAVING

1. THE NEW AIR COOLED CHILLER IS TO SERVE AS THE PRIMARY CHILLER IN LOW LOAD CONDITIONS.

4. PROVIDE CHILLER WITH LONWORKS INTERFACE CARD AND SINGLE POINT POWER CONNECTION.

6. CHILLER TO BE CAPABLE OF OPERATING DOWN TO 10°F AMBIENT.

KEYED NOTES:

GENERAL NOTES:

DDC PANEL WILL BE PROVIDED BY OTHERS.

ENABLE/DISABLE THE CHILLER AND LON WIRING. FINAL TERMINATIONS IN THE

CHILLER AND EXISTING CONTROL PANEL. PROVIDE NEW CONTROL WIRING TO

1. CONTRACTOR TO INSTALL NEW CONTROL WIRING & CONDUIT BETWEEN

P.D. FT. H20

SYSTEM

TOTAL

(PUMP INFO)

ELECTRICAL

460V/3PH

M-101

PIPING.

3. PROVIDE HEAT TRACE AND INSULATION ON EXTERIOR CHILLED WATER

FLOW SWITCH WITH FACTORY INSTALLED POWER AND CONTROL WIRING.

3. PROVIDE CHILLER WITH INTEGRAL PUMP PACKAGE INCLUDING PUMP, TRIPLE-DUTY VALVE, SUCTION DIFFUSER, NEAR NEW CHILLER.

BREAKER IN EXISTING SWITCHGEAR AND PROVIDE NEW SERVICE DISCONNECT

2. PROVIDE NEW ELECTRICAL FROM EXISTING SWITCHGEAR. INSTALL NEW

MECHANICAL ROOM

POINT.

NEW CHILLER (CH-3) AS SHOWN. PROVIDE ISOLATION VALVES AT TIE-IN

CONNECT TO EXISTING CHILLED WATER PIPING AND ROUTE NEW 3" PIPING TO

2. NEW CHILLER TO UTILIZE REFRIGERANT THAT IS IN ACCORDANCE WITH EPA REGULATIONS.

M E

C H

A N

IC

A L F

L O

O R

P L

A N

CENTER BOTH WAYS.

4. CHILLER PAD TO BE 6" DEEP, 3,000 PSI CONCRETE, W/ #3 REBAR 16" ON

SUCTION, LIQUID AND HOT GAS LINES).

5. CHILLER TO UTILIZE 4 STAGES OF COOLING AND HOT GAS BYPASS (INCLUDING ISOLATION VALVES ON THE

7. PROVIDE CHILLER WITH LOUVERED CONDENSER HAIL GUARDS AND FACTORY MOUNTED ELECTRICAL DISCONNECT.

YORK CHILLER

PRESSURE GAUGE

THERMOMETER

10’.

BOTH 3" SUPPLY & RETURN TO BE SUPPORTED TO EXISTING I-BEAMS @ EVERY

GAUGES, (2) ISOLATION VALVES AND (2) FLEXIBLE CONNECTIONS.

CONNECTIONS TO CHILLER, PROVIDE (2) THERMOMETERS, (2) PRESSURE

INSTALL NEW AIR COOLED CHILLER (CH-3) ON NEW HOUSEKEEPING PAD. AT

(CH-1)

CHILLER #1

VFD-CT-2VFD-CT-1

C H

R

6" CHR

6" CHS

6" CHR

6" CHS

3" CHR

3" CHS

WATER PUMPS

CONDENSER

PUMPS

CHILLED WATER

TOWERS

COOLING

SWITCHGEAR

EXISTING

CONTROL PANEL

EXISTING DDC

NEW CHILLER (CH-3)

3" CHR & CHS

(CH-2)

CHILLER #2

3" CHR & CHS

C H

R

C H

S

C H

R

C H

S

3" CHR & CHS

NUMBER

REFERENCE

SHEET

ALL EXISTING CONDITIONS TO BE VERIFIED

BY CONTRACTORS PRIOR TO CONSTRUCTION

Project No.

D a te

M a rk

Bldg. No.

F T

H O

O D T

E X

A S

S A

N T

A F

E E

N G

IN

E E

R D

R

B

L D

G

F O

R T H

O O

D T

E X

A S

P U

B L

IC

W

O R

K S

D

IR

E C

T O

R A

T E O

F

A B C D E F

D a te

D e s c ri p ti o n

DPW

FORT HOOD TEXAS

n oi sivi

D secivreS & gn ir ee ni g n

E

D ir ec to rat eofPublic

W o rk s

P

A L E J

A N

D R

O J

R

AFA900031P

F

IN

A L A

S -B

U

IL

T D

R A

W

IN

G S

C O

N T

R A

C T N

O

W -1

-P -0

B e lt o n T e x a s

W

H w y

(2 -5 f a x

(2 -6 o ff ic e

RECORD DRAWINGS

-2

-2

R E

V

IS

E D T

O S

H O

W A

S B

U

IL

T C

O N

D

IT

IO

N S

FINAL ASBUILT DRAWINGS

P re p a re d B y

P C

M S P

R O J E

C T C

A D M

A N

A G

E M

E N

T S

E R

V

IC

E S L

L C a s b u il t p re p a re d b y

A sp e n A ir In c

A ir C o n d it io n in g

H e a ti n g

R e fr ig e ra ti o n

P lu m b in g

M a y

IN

S

T A

L L C

H

IL

L E

R B

U

IL

D

IN

G