Preventive Maintenance
Item No DESCRIPTION Units EA
PM
Visits
Preventive Maintenance as prescribed in TE 2 and TE 3
1 ED Walk-in Refrigerator/Freezer 42 EA 2
2 FB VRV Unit Water Chiller 13 EA 2
3 FC Air Conditioning System up to 30 KW incl. Filters, Cond. Units 55 EA 2
4 FF Air Conditioner (window type) including Filters 18 EA 2
5 FG Air Conditioner (split type) including Filters 154 EA 2
6 FL Room Fan 593 EA 1
7 FR Ventilation Exhaust System incl. Air Filter 283 EA 2
8 FS Ventilation Exhaust System incl. Exhaust Hoods, Fans and Grease Filter 209 EA 2
9 FU Ventilation System w/Heat 145 EA 2
10 GL Decalcifying System 26 EA 4
11 HD Gas Burner System 15 EA 1
12 HY Motor Driven Sliding Door 221 EA 2
13 HZ Drop Arm System 27 EA 2
14 JK Emergency Light Equipment 99 EA 1
15 JM Emergency Power Unit 37 EA 1
16 KF Food Court Vent. Exhaust Systems 4 EA 12
17 LL Air Compressor 49 EA 1
18 LT Crane Hoist 49 EA 4
19 LU Elevator System 20 EA 4
20 QP Washer (commercial) 10 EA 2
21 QR Dryer (commercial) 21 EA 2
22 RB Grounding / Lighting 29 EA 1
23 SB Generator Test Run 33 EA 12
24 SC Water Treatment Plant 22 EA 12
25 SS Ducts (meter ea) 3258 EA 1
26 TQ Retractable Bollard System 20 EA 4
27 UB Flue Gas and Electrical System for Roof Windows 181 EA 1
28 UC UPS uninterruptible Power Supply System 13 EA 1
29 CK Dispenser Drinking Water 56 EA 2
30 HS Helicopter Service Stations 24 EA 1
31 QS Gas Distrobution Network Maintenance 1 EA 2
32 FP Forced Air oil fired Burner (Boiler System up to 50kW on/off controlled) 2 EA 1
33 FP Forced Air oil fired Burner (Boiler System over 50kW with two stage contr 2 EA 1
34 FP Forced Air oil fired Burner (air heating boiler with two stage control) 1 EA 1
35 PT Forced Air natural gas fired burner (air heating boiler with two stage contr 3 EA 1
36 PT Forced Air natural gas fired burner (air heating boiler with Modular contro 2 EA 1
37 PT Forced Air natural gas fired burner (air heating boiler wall mounted) 2 EA 1
38 KV Boiler Plant Pressure equalization control 8 EA 1
Contract Ansbach
OMA Basic Period: 1 June 2021 - 31 May 2022
39 TW Boiler Plant de-aeration control 2 EA 1
40 SE Smokestack installation and personal safety equipment 1 EA 1
41 CG CO-Generator BHKW 1 EA 4
42 PL Industrial Plotter 5 EA 1
43 LZ Laser Plotter 1 EA 1
AFH Basic Period: 1 June 2021 - 31 May 2022
Preventive Maintenance
Item No DESCRIPTION Units EA
PM
Visits
Preventive Maintenance as prescribed in TE 2 and TE 3
1 HY Motor Driven Sliding Door 108 EA 1 2 JK Emergency Light Equipment 42 EA 1 3 SS Ducts (meter ea) 1750 EA 1 4 FU Ventilation System w/Heat 108 EA 2 5 HD Gas Burner System 108 EA 1 6 FS Ventilation Exhaust System incl. Exhaust Hoods, Fans and Grease Filter 120 EA 2 7 FP Forced Air oil fired Boiler System up to 50kW on/off controlled 2 EA 1 8 FP Forced Air oil fired Boiler System over 50kW with two stage control 1 EA 1 9 QS Gas Distro Network Maintenance Urlas 2 EA 1
Preventive Maintenance
Item No DESCRIPTION Units EA
PM
Visits
Preventive Maintenance as prescribed in TE 2 and TE 3
1 ED Walk-in Refrigerator/Freezer 42 EA 2
2 FB VRV Unit Water Chiller 13 EA 2
3 FC Air Conditioning System up to 30 KW incl. Filters, Cond. Units 55 EA 2
4 FF Air Conditioner (window type) including Filters 18 EA 2
5 FG Air Conditioner (split type) including Filters 154 EA 2
6 FL Room Fan 593 EA 1
7 FR Ventilation Exhaust System incl. Air Filter 283 EA 2
8 FS Ventilation Exhaust System incl. Exhaust Hoods, Fans and Grease Filter 209 EA 2
9 FU Ventilation System w/Heat 145 EA 2
10 GL Decalcifying System 26 EA 4
11 HD Gas Burner System 15 EA 1
12 HY Motor Driven Sliding Door 221 EA 2
13 HZ Drop Arm System 27 EA 2
14 JK Emergency Light Equipment 99 EA 1
15 JM Emergency Power Unit 37 EA 1
16 KF Food Court Vent. Exhaust Systems 4 EA 12
17 LL Air Compressor 49 EA 1
18 LT Crane Hoist 49 EA 4
19 LU Elevator System 20 EA 4
OMA Option 1 Period: 1 June 2022 - 31 May 2023
20 QP Washer (commercial) 10 EA 2
21 QR Dryer (commercial) 21 EA 2
22 RB Grounding / Lighting 29 EA 1
23 SB Generator Test Run 33 EA 12
24 SC Water Treatment Plant 22 EA 12
25 SS Ducts (meter ea) 3258 EA 1
26 TQ Retractable Bollard System 20 EA 4
27 UB Flue Gas and Electrical System for Roof Windows 181 EA 1
28 UC UPS uninterruptible Power Supply System 13 EA 1
29 CK Dispenser Drinking Water 56 EA 2
30 HS Helicopter Service Stations 24 EA 1
31 QS Gas Distrobution Network Maintenance 1 EA 2
32 FP Forced Air oil fired Burner (Boiler System up to 50kW on/off controlled) 2 EA 1
33 FP Forced Air oil fired Burner (Boiler System over 50kW with two stage contr 2 EA 1
34 FP Forced Air oil fired Burner (air heating boiler with two stage control) 1 EA 1
35 PT Forced Air natural gas fired burner (air heating boiler with two stage contr 3 EA 1
36 PT Forced Air natural gas fired burner (air heating boiler with Modular contro 2 EA 1
37 PT Forced Air natural gas fired burner (air heating boiler wall mounted) 2 EA 1
38 KV Boiler Plant Pressure equalization control 8 EA 1
39 TW Boiler Plant de-aeration control 2 EA 1
40 SE Smokestack installation and personal safety equipment 1 EA 1
41 CG CO-Generator BHKW 1 EA 4
42 PL Industrial Plotter 5 EA 1
43 LZ Laser Plotter 1 EA 1
AFH Option 1 Period: 1 June 2022 - 31 May 2023
Preventive Maintenance
Item No DESCRIPTION Units EA
PM
Visits
Preventive Maintenance as prescribed in TE 2 and TE 3
1 HY Motor Driven Sliding Door 108 EA 1 2 JK Emergency Light Equipment 42 EA 1 3 SS Ducts (meter ea) 1750 EA 1 4 FU Ventilation System w/Heat 108 EA 2 5 HD Gas Burner System 108 EA 1 6 FS Ventilation Exhaust System incl. Exhaust Hoods, Fans and Grease Filter 120 EA 2 7 FP Forced Air oil fired Boiler System up to 50kW on/off controlled 2 EA 1 8 FP Forced Air oil fired Boiler System over 50kW with two stage control 1 EA 1 9 QS Gas Distro Network Maintenance Urlas 2 EA 1
Preventive Maintenance
Item No DESCRIPTION Units EA
PM
Visits
OMA Option 2 Period: 1 June 2023 - 31 May 2024
Preventive Maintenance as prescribed in TE 2 and TE 3
1 ED Walk-in Refrigerator/Freezer 42 EA 2
2 FB VRV Unit Water Chiller 13 EA 2
3 FC Air Conditioning System up to 30 KW incl. Filters, Cond. Units 55 EA 2
4 FF Air Conditioner (window type) including Filters 18 EA 2
5 FG Air Conditioner (split type) including Filters 154 EA 2
6 FL Room Fan 593 EA 1
7 FR Ventilation Exhaust System incl. Air Filter 283 EA 2
8 FS Ventilation Exhaust System incl. Exhaust Hoods, Fans and Grease Filter 209 EA 2
9 FU Ventilation System w/Heat 145 EA 2 10 GL Decalcifying System 26 EA 4
11 HD Gas Burner System 15 EA 1
12 HY Motor Driven Sliding Door 221 EA 2
13 HZ Drop Arm System 27 EA 2
14 JK Emergency Light Equipment 99 EA 1
15 JM Emergency Power Unit 37 EA 1
16 KF Food Court Vent. Exhaust Systems 4 EA 12
17 LL Air Compressor 49 EA 1
18 LT Crane Hoist 49 EA 4
19 LU Elevator System 20 EA 4
20 QP Washer (commercial) 10 EA 2
21 QR Dryer (commercial) 21 EA 2
22 RB Grounding / Lighting 29 EA 1
23 SB Generator Test Run 33 EA 12
24 SC Water Treatment Plant 22 EA 12
25 SS Ducts (meter ea) 3258 EA 1
26 TQ Retractable Bollard System 20 EA 4
27 UB Flue Gas and Electrical System for Roof Windows 181 EA 1
28 UC UPS uninterruptible Power Supply System 13 EA 1
29 CK Dispenser Drinking Water 56 EA 2
30 HS Helicopter Service Stations 24 EA 1
31 QS Gas Distrobution Network Maintenance 1 EA 2
32 FP Forced Air oil fired Burner (Boiler System up to 50kW on/off controlled) 2 EA 1
33 FP Forced Air oil fired Burner (Boiler System over 50kW with two stage contr 2 EA 1
34 FP Forced Air oil fired Burner (air heating boiler with two stage control) 1 EA 1
35 PT Forced Air natural gas fired burner (air heating boiler with two stage contr 3 EA 1
36 PT Forced Air natural gas fired burner (air heating boiler with Modular contro 2 EA 1
37 PT Forced Air natural gas fired burner (air heating boiler wall mounted) 2 EA 1
38 KV Boiler Plant Pressure equalization control 8 EA 1
39 TW Boiler Plant de-aeration control 2 EA 1
40 SE Smokestack installation and personal safety equipment 1 EA 1
41 CG CO-Generator BHKW 1 EA 4
42 PL Industrial Plotter 5 EA 1
43 LZ Laser Plotter 1 EA 1
AFH Option 2 Period: 1 June 2023 - 31 May 2024
Preventive Maintenance
Item No DESCRIPTION Units EA
PM
Visits
Preventive Maintenance as prescribed in TE 2 and TE 3
1 HY Motor Driven Sliding Door 108 EA 1 2 JK Emergency Light Equipment 42 EA 1 3 SS Ducts (meter ea) 1750 EA 1 4 FU Ventilation System w/Heat 108 EA 2 5 HD Gas Burner System 108 EA 1 6 FS Ventilation Exhaust System incl. Exhaust Hoods, Fans and Grease Filter 120 EA 2 7 FP Forced Air oil fired Boiler System up to 50kW on/off controlled 2 EA 1 8 FP Forced Air oil fired Boiler System over 50kW with two stage control 1 EA 1 9 QS Gas Distro Network Maintenance Urlas 2 EA 1