This document is a detailed Maintenance Schedule for a Lambda Degassing Unit (Technical Exhibit 02) associated with contract W912PB25RA006. The comprehensive maintenance schedule outlines quarterly (vj), semi-annual (hj), and annual (ja) inspection and maintenance requirements for multiple system components, including:
The maintenance schedule covers seven primary system areas: Facility/Container, Condensate Separator, Pipe Lines System, MSR Technology, CHC System, MAPRO (Blower Systems), and Gas Analysis Standard. Each section includes detailed technical checks and maintenance tasks, such as visual inspections, functional tests, calibration of analyzers, checking electrical systems, verifying safety mechanisms, cleaning filters, testing sensors, and documenting critical measurements. Specific technical components requiring maintenance include gas analyzers (methane, carbon dioxide, oxygen), gas cooling systems, pressure regulators, safety magnetic valves, deflagration protections, and various electrical and mechanical system elements. The schedule is meticulously structured to ensure comprehensive system monitoring and preventative maintenance across multiple technical domains.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building
| vj = vierteljährlich -quarterly | Wartungsintervalle / | |||
| hj = halbjährlicg - semi-annually | Maintenance Intervals | |||
| jä = jährlich - annually | vj | hj | jä | |
| GEBÄUDE / CONTAINER | ||||
| 1 | Sichtprüfung des Allgemeinzustandes durchführen / Visual overall inspection. | x | ||
| 2 | Türschaniere abschmieren. / Grease door hinges. | x | ||
| 3 | Dachentwässerungsablauf kontrollieren. / Check roof drainage. | x | ||
| 4 | Auf Lackschäden untersuchen / Inspect for paint chippings. | x | ||
| 5 | Steckdosen überprüfen. / Check outlets. | x | ||
| 6 | Beleuchtung überprüfen. / Check building lighting system. | x | ||
| 7 | Raumlüft überprüfen. / Check air condition. | x | ||
| 8 | Raumheizung überprüfen./ Check heating system. | x | ||
| 9 | Türdichtungen überprüfen. /Check door sealings. | x | ||
| 10 | Sicherheitstechnik überprüfen. / Check facility safety technic. | x | ||
| 11 | Visuelle Kontrolle Biltzschutz und Erdung durchführen. /Visual Inspection on lightning & grounding protection | x | ||
| 12 | Warnbeschilderung auf Zustand und Vollständigkeit überprüfen. / Check condition/completeness of warning signs. | x | ||
| 13 | Funktionskontrolle der Querbelüftung überprüfen. / Check function of ventilation system. | x |
&C&"-,Bold"&14Facility/Container &LPage 1/1
Condensate Separator
| vj = vierteljährlich -quarterly | Wartungsintervalle / | |||
| hj = halbjährlicg - semi-annually | Maintenance Intervals | |||
| jä = jährlich - annually | vj | hj | jä | |
| KONDENSATABSCHEIDER / Condensate Separator | ||||
| 1 | Visuelle Kontrolle durchführen / Visual Check. | x | ||
| 2 | Funktionstest der Kondensatpumpe durchführen / Perform function test of condensate pump. | x | ||
| 3 | Gasfiltermatte reinigen / Clean gas filter mat. | x | ||
| 4 | Gasfiltermatte erneuern falls erforderlich / Replace gas filter element if necessary. (Repair Work) | |||
| 5 | Kondensatabflauf überprüfen / Check condensate outlet. | x | ||
| 6 | Silikonschlauch der Kondensatpumpe überprüfen / Check silikon hose of condensate pump. | x | ||
| 7 | Silikonschlauch der Kondensatpumpe erneuern falls erforderlich /Replace condensate silicon hose if requi. (Repair Work) | |||
| 8 | Demister ausbauen und abdampfen / Remove and clean de-mister. | x | ||
| Sicherheitstechnik / Safety Technology | ||||
| 1 | Niveauwächter "Pumpe-Ein" überprüfen / Check Level control " Pump - On" . | x | ||
| 2 | Niveauwächter "Pumpe-Aus" überprüfen / Check Level control " Pump - Off". | x | ||
| 3 | Abschaltung "Niveau-Max" überprüfen / Check Disconnector " Level- Max". | x | ||
| 4 | Druckstufe Rohrleitungen und Armaturen (PIN) überprüfen und einstellen / Check pressure stage of pipeliine and auxilary equipment (PIN) and adjust if necessary. | x |
&C&"-,Bold"&14Condensate Separator &LPage 1/1
Pipe Lines System
| vj = vierteljährlich -quarterly | Wartungsintervalle / | |||
| hj = halbjährlicg - semi-annually | Maintenance Intervals | |||
| jä = jährlich - annually | vj | hj | jä | |
| ROHRLEITUNGSSYSTEM | ||||
| 1 | Sichtkontrolle des Rohrleitungssystems durchführen. / Visual Check of Pipeline system. | x | ||
| 2 | Trockenpatrone im Mengengaszähler prüfen (ggf. erneuern). / Check dry cartridge in Gas meter station. | x | ||
| 3 | Absperrklappen auf Gängigkeit prüfen. / Check shut-off caps for mobility. | x | ||
| 4 | Anemometereinführvorrichtung gängig halten. / Keep pressure gauge devices mobile. | x | ||
| 5 | Sämtliche Schraubverbindungen nachziehen. / Tighten all screwed connections. | x | ||
| 6 | Gasfiltermatte erneuern. / Replace gas filter mat. (Repair Work) | x | ||
| 7 | Kompensator kontrollieren. / Check Compressor. | x | ||
| 8 | Deflagrationssicherungen ausbauen und reinigen. / Remove and clean deflagration protection | x | ||
| 9 | Dichtung erneuren und montieren. / Replace & mount seal. (Repair Work) | x | ||
| 10 | Schnellschlussventil reinigen ggf. Siebe austauschen und Gehäuse auf Ölspuren überprüfen) / Clean quick shut valves ( change filter and check housing for traces of oil.) (Repair Work) | x | ||
| 11 | Rückschlagklappen ausbauen und gereinigen / Dismantle and clean one-way valve | x | ||
| 12 | Anfahrsieb prüfen / Check Drive filter. | x | ||
| 13 | Druckstufe Rohrleitungen und Armaturen dokumentieren (PN). Record pressure of pipelines and fixtures(PN). | x | ||
| Sicherheitstechnik | ||||
| 1 | Visuelle Kontrolle der Deflagrationssicherungen durchführen. / Visual inspection of the deflagration protection. | x | ||
| 2 | Sicherheitsventil ausgelöst und überprüfen. / Inspect and release Safety Ventil | x | ||
| 3 | Abschaltung " Gastemperatur max." FRS" überprüfen. / Check disconnector: gas temp. max. FRS. | x | ||
| 4 | Abschaltung "Gastemperatur max "FRS" dokumentieren (°c). / Record disconnector: gas temp. max FRS. | x | ||
| 5 | Schnellschlussventile überprüfen. / Check quick shut valve. | x | ||
| 6 | Förderdruck Max. CHC überprüfen. / Check CHC max conveyor pressure | x |
&C&"-,Bold"&14Pipe Line System &LPage 1/1
MSR-Technik
| vj = vierteljährlich -quarterly | Wartungsintervalle / | |||
| hj = halbjährlicg - semi-annually | Maintenance Intervals | |||
| jä = jährlich - annually | vj | hj | jä | |
| MSR TECHNIK | ||||
| 1 | Sichtprüfung Gesamtzustand / Perform Visual Overall Inspection | x | ||
| 2 | Gesamtzustand der Schaltanlage überprüfen. / Overall switchboard inspection. | x | ||
| 3 | Staubfilter der Schaltschranklüfter reinigen. / Clean dustfilter from cabinet ventilator. | x | ||
| 4 | Status aller Ein - Ausgänge and der SPS überprüfen. / Check state of all SPS outlets | x | ||
| 5 | Pufferbatterie in der SPS austauschen. / Replace buffer batteries in SPS (Repair Work) | x | ||
| 6 | Klemmverbindungen nachziehen / Retighten of connection clamps in the control cabinet | x | ||
| 7 | Funktionskontrolle der Rundumleuchten durchführen. / Check function of entire lighting set. | x | ||
| 8 | Funktionskontrolle der Alarmhupen durchführen. / Check function of alert horn. | x | ||
| Messgeräte/Sensoren | ||||
| 1 | Alle angezeigten Messwerte auf Plausibilität prüfen. / Check all metered value for accuracy. | x | ||
| 2 | Funktionskontrolle des Druckreglers durchführen. / Check pressure control for function. | x | ||
| 3 | Funktionskontrolle des Druckmessung durchführen. / Check function of pressure metering. | x | ||
| 4 | Funktionskontrolle der Mengenregelung durchführen. / Check function of quanitity control. | x | ||
| 5 | Funktionskontrolle der Mengenmessung durchführen ./ Check function of quanitity metering. | x | ||
| 6 | Funktionskontrolle der Temperatureregelung durchführen. / Check function of temperature control. | x | ||
| 7 | Funktionskontrolle der Termperaturemessung durchführen. / Check function of temperature metering. | x | ||
| 8 | Signale des Schreibers auf Plausibilität überprüfen. / Check recorder Signal for accuracy. | x | ||
| 9 | Funktionskontrolles der Mengenmessung durchführen. / Check function of quanitity metering | x | ||
| 10 | Funktionskontrolle des Manometers durchführen. (ggf. Nullpunkt justieren) / Check function of pressure gauge.(Adjust if necessary) | x | ||
| 11 | Funktionskontrolle des Thermometers durchführen. / Check function of thermometer. | x | ||
| Gaswarnanlage | ||||
| 1 | Funktionskontrolle und Kalibierung der RLÜ durchführen. / Check function and Calibration of the RLU. | x | ||
| Brandmeldeanlage | ||||
| 1 | Funktionskontrolle der Rauchmelder durchführen. / Check function of fire alarm. | x | ||
| 2 | Visuelle Kontrolle der Feuerlöscher durchführen. / Visual check of fire extinguisher. | x | ||
| 3 | Nächster Prüftermin für Feuerlöscher dokumentieren (MMJJJJ)./ Record next fire extinguisher target date. (MM/JJJJ) | x |
&C&"-,Bold"&14MSR - Technique &LPage 1/1
CHC SYSTEM
| vj = vierteljährlich -quarterly | Wartungsintervalle / | |||
| hj = halbjährlicg - semi-annually | Maintenance Intervals | |||
| jä = jährlich - annually | vj | hj | jä | |
| CHC - SYSTEM | ||||
| 1 | Visuelle Gesamt- und Funktionskontrolle CHC durchführen / Perform function control of CHC | x | ||
| 2 | Sichtkontrolle der Thermoelemente durchführen. / Perform visual inspection of thermometer elements. | x | ||
| 3 | Abstand der Zündelektroden kontrollieren. / Check distance of ignition electrode. | x | ||
| 4 | Abstand der Zündelektroden dokumentieren (mm). / Record distance of ignition electrode | x | ||
| 5 | Zündtransformator auf Funktion prüfen. / Check ignition transformer. | x | ||
| 6 | Zündtransformator auf Schwitzwasser im Gehäuse überprüfen. / Check ignition transformer for condensation | x | ||
| 7 | Isolation der Zündkabel überprüfen. / Check the insulation of ignition cable. | x | ||
| 8 | Isolation der Zündstecker überprüfen. / Check the insulation of ignition switch. | x | ||
| 9 | Visuelle Kontrolle der Deflagrationssicherungen/ Perform visuell control of deflagration fuses | x | ||
| 10 | Startdruckschalter auf Funktion überprüfen / Perform function test of ignition switch | x | ||
| 11 | Elektrische Steuerung überprüfen / Review electrical control system | x | ||
| 12 | Kontrolle auf Kondensat in den Gasleitungen / Review for and Clean condensate in gas pipes | x | ||
| Brennertechnik | ||||
| 1 | Visuelle Kontrolle am Brennernetz / Visuell control of burner network | x | ||
| 2 | Brennernetz ausgebauen und reinigen. / Dismantel and cleanburner net | x | ||
| 3 | Gas-Luftgemischkammer auf Ablagerungen kontrollieren. / Chack Gas - Air Chamber for sediments | x | ||
| 4 | Gas-Luftgemischkammer reinigen. / Clean Gas - Air Chamber | x | ||
| 5 | Kompensator kontrollieren / Inspect compensator | x | ||
| Sicherheitstechnik | ||||
| 1 | Sämtliche Schraubverbindungen überprüfen / Inspect all screw connections | x | ||
| 2 | Thermostate überprüfen / Review and function test of thermostates | x | ||
| 3 | Sichtkontrolle der Thermoelements durchführen. / Perform visual inspection of thermometer elements. | x | ||
| 4 | Druckwächter überprüfen / Inspect pressure controller | x | ||
| 5 | Visuelle Kontrolle Blitzschutz und Erdung durchführen / Perfor visuell control of lighting protection and grounding | x | ||
| 6 | Übertemperturabschaltung CHC überprüfen (ggf. Einstellen). / Check exessive heat disconnector CHC and reset if requ. | x | ||
| 7 | Übertemperturabschaltung CHC Dokumentieren ( °c) / Record temperature of exessive heat disconnector | x | ||
| 8 | Untertemperaturabschaltung CHC überprüfen ( ggf.einstellen). / Check subnormal temperatur and adjust if necessary | x | ||
| 9 | Untertemperatur CHC dokumentieren (°c). / Record CHC subnormal temperatur | x |
&C&"-,Bold"&14CHC - Unit &LPage 1/1
MAPRO
| vj = vierteljährlich -quarterly | Wartungsintervalle / | |||
| hj = halbjährlicg - semi-annually | Maintenance Intervals | |||
| jä = jährlich - annually | vj | hj | jä | |
| x | ||||
| MAPRO GEBLÄSE Gasgebläse | ||||
| 1 | Vibrationskontrolle durchgeführen. / Inspect vibration | x | ||
| 2 | Schaufelräder auf Verschließ und Ablagerung kontrollieren. / Check bucket wheel on ware and tear and residues | x | ||
| 3 | Betriebstemperature prüfen. / Check operating temperature. | x | ||
| 4 | Gebläse - Gehäuse entwässern. / Drain ventilator housing | x | ||
| Luftgebläse | ||||
| 1 | Vibrationskontrolle durchführen. / Inspect vibration | x | ||
| 2 | Schaufelräder auf Verschließ und Ablagerung kontrollieren. / Check bucket wheel on ware and tear and residues | x | ||
| 3 | Lufteinlasssieb reinigen./ Clean air admission filter | x | ||
| 4 | Betriebstemperature prüfen./ Check operating temperature. | x | ||
| 5 | Ansaugfilter reinigen. / Check and clean suction filter | x | ||
| 6 | Ansaugfilter erneuern./ Replace suction filter if necessary. (Repair Work) | x | ||
| 7 | Gebläse - Gehäuse entwässern / Drain ventilator housing | x | ||
| Elektromotor | ||||
| 1 | Antriebsmotor abschmieren / Grease drive motor. | x | ||
| 2 | Rillenkugellager des Antriebsmotors mit Stethoskop durchführen./ Check grooved bearing of drive motor with stethoscope. | x | ||
| Sicherheitstechnik | ||||
| 1 | Abschaltung " Förderdruck max. Verdichter" überprüfen / Check compressor shut-off" delivery pressure max". | x | ||
| 2 | Abschaltung"Förderdruck max Verdichter" dokumentieren (mbar) / Record compressor shut-off " delivery pressure max" (mbar) | x | ||
| 3 | Abschaltung "Saugdruck max Verdichter" überprüfen / Check shut-off " suction pressure max" | x | ||
| 4 | Abschaltung "Gastemperatur max. Verdichter" überprüfen / Check shut-off "gas temp.max of compactor." | x | ||
| 5 | Abschaltung " Gastemperatur max. Verdichter" dokumentieren (°C ) / Record "gas temp max of compactor". | x | ||
| 6 | Abschaltung " Überstrom Verdichtermotor" überprüfen / Check shut-off " excess current of compactor" | x | ||
| 7 | Überstrom Verdichter dokumentieren (A) / Record results of " excess current of compactor:. | x | ||
| 8 | Kaltleiterauslösegerät/ Motorvollschutz überprüfen. / Check posistor releaser/motor full protection | x | ||
| Allgemein | ||||
| 1 | Visuelle und akustische Kontrolle durchführen. / Perform visual and acoustical inspection. | x | ||
| 2 | Sichtprüfung Gesamtzustand durchführen / Perform visual overall Inspection. | x |
&C&"-,Bold"&14MAPRO &LPages 1/2
Gas Analyse Std
| vj = vierteljährlich -quarterly | Wartungsintervalle / | |||
| hj = halbjährlicg - semi-annually | Maintenance Intervals | |||
| jä = jährlich - annually | vj | hj | jä | |
| GASANALYSE STANDARD | ||||
| Allgemein | ||||
| 1 | Sichtkontrolle durchgeführen. / Perform visual inspection. | x | ||
| 2 | Alle angezeigten Messwerte auf Plausibilität prüfen. / Check all metered values for accuracy. | x | ||
| 3 | Begleitheizung und Isolierung der Messgasleitung überprüfen. / Check tract heating and Insulations of gas metering pipelines. | x | ||
| 4 | Dichtheitskontrolle aller Leitungen und Verbindungen durchführen. / Check tightness of all pipelines and connections | x | ||
| 5 | Funktionskontrolle Messgasaufbereitung überpüfen. / Perform function test of gas treatment processing uint. | x | ||
| Methan- Analysator | ||||
| 1 | Analysator kalibrieren. / Calibrate analysator. | x | ||
| 2 | Prüfgaskonzentration CH4 dokumentieren (Vol.%) / Record test gas concentrate CH4 (Vol %) | x | ||
| 3 | Gaseinfilter in den Analysatoren tauschen. / Replace gas fine filter in the Analysator. | x | ||
| 4 | Auf Dchheit prüfen / Check for leakage. | x | ||
| 5 | Pufferbatterie prüfen (ggf. Austauschen). / Check buffer battery and replace if needed. | x | ||
| 6 | Systemparameter überprüfen (ggf.richtig stellen) / Check the system parameter and correct if needed. | x | ||
| 7 | Ausgangsstromsignal gemessen und mit Messwert vergleiichen. /Meter power signal outlet and compare with the metering guidline | x | ||
| 8 | Grenzwert für Voralarm prüfen. / Check limit for pre-alert. | x | ||
| 9 | Grenzwert für Voralarm dokumentieren. / Record limit for pre-alert | x | ||
| 10 | Grenzwert für Hauptalarm prüfen. / Check limit for main-alert. | x | ||
| 11 | Grenzwert für Hauptalarm dokumentieren. / Record limit for main alert | x | ||
| Kohlenstoffdioxid-Analyzsator | ||||
| 1 | Analysator kalibrieren. / Calibrate Analysator. | x | ||
| 2 | Prüfgaskonzentration CO2 dokumentieren ( Vol.%) / Record testing gas C02 documented( Vol.%) | x | ||
| 3 | Kalibrierwertabweichung (%) / Record difference of caligrated value (%)? | x | ||
| 4 | Gasfeinfilter in den analysatoren tauschen auf Dichtheit prüfen / Check gas fine filter in the analysators | x | ||
| 5 | Auf Dichtheit prüfen / Check for leakage | x | ||
| 6 | Pufferbatterie prüfen (ggf. Austauschen) / Check buffer batteries and replaced if needed | x | ||
| 7 | Systemparameter überprüfen (ggf. Richtig stellen) / Check system parameter and reset if necessary | x | ||
| 8 | Ausgangsstromsignal messen und mit Messwert vergleichen / Meter power outlet signal and compare metering value | x | ||
| Wartungsintervalle / | ||||
| Maintenance Intervals | ||||
| Sauersoff-Analysator | vj | hj | jä | |
| 1 | Analysator kalibrieren / Calibrate analysator | x | ||
| 2 | Prüfgaskonzentration O2 dokumentieren ( Vol. %) / Record test gas concentrade O2 (%Vol) | x | ||
| 3 | Kalibrienwertabweichung (%) / Difference of calibration value (%) | x | ||
| 4 | Gasfeinfilter in den Analysatoren tauschen. / Replace gas fine filter insdie analysator. (Repair Work) | x | ||
| 5 | Auf Dichtheit prüfen./ Check for leakage | x | ||
| 6 | Pufferbatterie prüfen. (ggf. austauschen)./ Check buffer batteries and replace if needed (Repair Work) | x | ||
| 7 | Systemparameter überprüfen (ggf. Richtig stellen) / Check the system parameter and reset if needed. | x | ||
| 8 | Ausgangsstromsignal messen und mit Messwert vergleichen. / Meter power signal outlet and compare with metering value. | x | ||
| 9 | Grenzwert für Voralarm prüfen. / Check limit for pre-alarm | x | ||
| 10 | Grenzwert für voralarm dokumentieren. / Record limit value of pre-alarm | x | ||
| 11 | Grenzwert für Hauptalarm prüfen / Check limit value for main alarm | x | ||
| 12 | Grenzwert für Hauptalarm dokumentieren. /Record limit value of main alarm | x | ||
| Messgaskühlung | ||||
| 1 | Sichtkontrolle durchführen./ Visual inspection | x | ||
| 2 | Funktionskontrolle durchführen./ Perform function control | x | ||
| 3 | Messwert dokumentieren (°c ). / Record appraised value (°c ) | x | ||
| 4 | Gasein- und Gasaustritt reinigen. / Clean gas in - and outlet | x | ||
| 5 | Statusanzeige überprüfen. / Check Status indicator. | x | ||
| Gasfiltertechnik | ||||
| 1 | Messgasfeinfilter auf Feuchtigkeit kontrollieren. / Check gas fine filter for moisture. | x | ||
| 2 | Messgasfeinfilter austauschen. / Replace fine filter if necessary (Repair Work) | x | ||
| 3 | Specialfilter Wasser und Partikel prüfen / Check special filter -Water- and Particle Filter | x | ||
| 4 | Specialfilter Wasser und Partikel austauschen / Replace special filter elements (Repair Work) | x | ||
| 5 | Messgasentahmefilter prüfen / Check filter of gas sampling tab | x | ||
| 6 | Messgasentahmefilter austauschen / Replace filter element of gas sampling tab if necessary (Repair Work) | x | ||
| Gasdruckregler | ||||
| 1 | Funktionskontrolle durchführen. / Check function control | x | ||
| 2 | Druck einstellen/ Adjust pressure | x | ||
| 3 | Sicherheits-und Arbeitsmembrane prüfen / Check safety and work membrane | x | ||
| 4 | Sicherheits-und Arbeitsmembrane austauschen. / Replace safety and work membrane if necessary (Repair Work) | x | ||
| Prüfgasflaschen / Kalibriersystem | ||||
| 1 | Fülldruck Prüfgasflasche dokumentieren (bar) / Record filling pressure of test gas bottle (bar) | x | ||
| 2 | Fülldruck Druckluftflasche dokumentieren (bar) / Record filling pressures of compressed air cylinder (bar) | x | ||
| 3 | Prüfdatum Prüfgasflasche dokumentieren (MMJJJJ) / Record inspection date of test gas bottle (bar) (MMJJJJ) | x | ||
| 4 | Armatur Prüfgasflasche prüfen. / Check Armature of test gas bottle | x | ||
| 5 | Armatur Drückluftlasche prüfen. / Check Armature of compressed air cylinder | x | ||
| x | ||||
| Wartungsintervalle / | ||||
| Maintenance Intervals | ||||
| Gaswarnanlage | vj | hj | jä | |
| 1 | Funktionskontrolle und Kalibrierung der Raumluftüberwachung / Check control function and calibration of RLU? | x | ||
| Luftstromüberwachung | ||||
| 1 | Luftstromüberwachung reinigen /Clean air flow control | x | ||
| 2 | Luftstromüberwachung überprüfen / Check Air flow control. | x | ||
| Schaltschrankbelüftung /-heizung | ||||
| 1 | Staubfilter prüfen / Check dustfilter. | x | ||
| 2 | Staubfilter der Schranklüfter erneuern. Replace dustfilter of cabinet ventilator. (Repair Work) | x | ||
| 1 | Funktionskontrolle der Schranklüfter durchführen./ Perform function test of the cabinet ventilator. | x | ||
| 2 | Schaltschrankheizung überprüfen / Check heating device of control cabinet | x | ||
| 3 | Einschaltwert der Heizung dokumentieren (°c ) / Record limit value of heating device (°c ) | x | ||
| Messgasdurchflussmessung | ||||
| 1 | Messgasdurchfluss überprüfen ( auf ca. 50l einstellen ) / Check flow rate test gas ( adjust at appr. 50l ) | x | ||
| 2 | Abschaltwert Min. prüfen / Check disconnection min value. | x | ||
| 3 | Abschaltwert dokumentieren (L/h)/ Recor disconnection value | x | ||
| Vakuumpumpe | ||||
| 1 | Funktionskontrolle durchführen. / Perform function test | x | ||
| 2 | Kontrolle auf Lageräusche durchführen / Check for bearing noises | x | ||
| Feuchtefühler | ||||
| 1 | Demontiert und reinigen / Dismount and cleaned. | |||
| 2 | Funktionskontrolle durchführen / Check control functions. | |||
| Schlauchpumpe | ||||
| 1 | Funktionskontrolle durchführen / Check control functions. | |||
| 2 | Drehrichtung nach Stromabschaltung prüfen./ Check turn direction after power shut-off. | x | ||
| 3 | Anpressrollen überprüft? / Check contract wheels. | x | ||
| Walkschlauch erneuern/ Renew air intake hose (Repair Work) | ||||
| Sicherheitsmagnetventil | ||||
| 1 | Funktionskontrolle durchführen. / Perform function test | x | ||
| 2 | Magnetventil demoniert und Sieb gereinigen. / Dismount magnetic valve and clean filter element | x | ||
| 3 | Auf Dichtheit prüfen / Check for leakage. | x | ||
| Deflagration/Detonationssicherungen | ||||
| 1 | Visuelle Kontrolle der Deflagrationssicherung durchführen / Perform visual inspection of deflagration fuses . | x | ||
| 2 | Deflagrationssicherungen demonieren, reinigen und prüfen. / Dismantle, clean and inspect deflagration fuses | x | ||
| 3 | Dichtungen erneuren und montieren./ Replace gaskets if necessary (Repair Work) | x | ||
| Elektrische Steuerung | ||||
| 1 | Funktionskontrolle durchführen / Perform function check | x | ||
| 2 | Schaltelemente prüfen (Sichtprüfung) / Visual inspection of circuit components | x | ||
| 3 | Klemmverbindungen nachziehen / Re-torque clamp connections | x | ||
| 4 | Verdrahtung auf Nagetierbiß überprüfen / Check wiring for rodent bites | x |