MMSL (Base Year)
ELIN/PRICING SCHEDULE
CONTRACT PoP: 01 June 2025 - 31 May 2026
Base Year (FY25)
| CLIN | ELIN No | DESCRIPTION | QTY | U/I | UNIT | TOTAL |
| | | | | PRICE | AMOUNT |
| | | | | EURO | EURO |
| 0001 | A001 | Measuring of Landfill Gas Emission at the Landfill Surface Are via Flame Ionization Detector (FID) IAW the PWS and Attachment 01- CLS411, Paragraph 5.2.1 - 5.2.1.3 | | |
| A001AA | Preparation of the landill surface are for measurement | 1 | EA |
| A001AB | Measurement (FID) of the landfill gas | 1 | EA |
| A001AC | Documentation | 1 | EA |
| 0002 | A002 | Flushing/Cleaning and Camera-Inspection of Underground Leachate Water Lines, Control Shafts and Collection Basins, Performance of Pressure- and Tightness Tests IAW the PWS and Attachment 01-CLS411, Paragraph 5.2.2 - 5.2.2.13 | | |
| A002AA | TV-Inspection of leachate water lines outside the sealed landfill area (total length - 854,1 meter) | 1 | SV |
| A002AB | Semi-annual flushing and cleaning of leachate water lines (854,1 meters) outside the sealed landfill area | 2 | SV |
| A002AC | Semi-annual flushing and cleaning of leachate water control shafts (28ea) outside the sealed landfill area | 2 | SV |
| A002AD | Preparation of shaft documentation papers and sewer sections report | 28 | EA |
| A002AE | TV-inspection of 8 each control drainage lines inside the sealed landfill area (total length-734,84 meter) | 1 | SV |
| A002AF | Preparation of inspection reports for the control drainage lines inside the sealed landfill area | 8 | EA |
| A002AG | TV-inspection of leachate water drainages inside the landfill area (total length - 994,31 meter) | 1 | SV |
| A002AH | Semi-annual flushing and cleaning of the leachate water drainage lines (994,31 meters) inside the sealed landfill area | 2 | SV |
| A002AI | Preparation of inspection reports of the Video inspected leachate water lines within the landfill area | 12 | EA |
| A002AJ | Tightness inspection of leachate water carrying lines outside the sealed landfill area (total length-854,1 meter) | 1 | SV |
| A002AK | Preparation of Tightness Test Protocols for each shaft | 28 | EA |
| A002AL | Inspection of the leachate water control shafts for constructual and operational function/condition | 28 | EA |
| A002AM | Reconsideration of tighness test if tests are negative | 3 | EA |
| A002AN | Semi-annual cleaning services at the leachate water basin at Building 716 | 2 | SV |
| A002AO | Flushing of storm sewer lines at the landfill entrance area (total length-755,65 meter) | 1 | SV |
| A002AP | Cleaning of 18 ea shafts within the landfill entrance area, as well as cleaning of 14 ea Shafts and 11 ea Street Debris Shafts arround Bldg # 710 and Bldg #720 | 1 | SV |
| A002AQ | Flushing of storm sewer lines at the shredder plant facility Bldg. 710 and Bldg. 720 (587,12 meters) and the condensing water shaft (1) in front of Bldg.717 | 1 | SV |
| A002AR | Pumping and cleaning of the reserve leachate water basin near Building 716 (plastic foil basin) | 1 | SV |
| A002AS | Semi-annual flushing of lines in filling field #17 and #18 (total length-89,0 meter) | 2 | SV |
| A002AT | Semi-annual flushing, cleaning and inspection of leachate water control shafts (28 each) and the gas line collection shaft (1 each) at Bldg. 717 | 2 | SV |
| A002AV | Flushing of the leachate water pressure lines (total length-1,329 meter) and cleaning of 15 each shafts | 1 | SV |
| A002AW | Annual Measurement of the Inside Temperature as well as gradient/incline of all leachate Water Lines | 1 | SV |
| A002AX | Flushing and cleaning of the vehicle scale | 1 | SV |
| A002AY | Recording and preparation video DVD's for all TV-Inspections | 1 | SV |
| 0003 | A003 | Maintenance and Inspection of the Lambda Container Degassing Unit CHC 10 inclusive Gas Torch IAW the PWS and Attachment 01-CLS411, Paragraph 5.2.3 - 5.2.3.2.5 | | |
| A003AA | Bi-weekly function control of the Gas Torch | 26 | SV |
| A003AB | Quarterly Maintenance and Safety Inspection | 2 | SV |
| A003AC | Semi-Annual Maintenance and Safety Inspection/control for damages of the gas control station and gas collectors | 2 | SV |
| A003AD | Annual Maintenance and performance of the landfill gas analysis | 1 | SV |
| A003AE | Gas Torch Emmission Measurement (within the 2nd Option Period only) | 0 | SV |
| 0004 | A004 | Maintenance and Monitoring of the Landfill Gas Wells and Horizontal Pipes IAW PWS and Attachment 01-CLS411, Paragraph 5.2.4 - 5.2.4.5 | | |
| A004AA | Bi-Weekly servicing of 26 each Gas Wells | 26 | EA |
| A004AB | Bi-Weekly servicing of 5 each Horizontal Gas Pipes | 26 | EA |
| A004AC | Bi-weekly control and adjust Flap Position | 26 | EA |
| A004AD | Bi-weekly gas analysis | 26 | EA |
| 0005 | A005 | Maintenance, Inspection and Re-Calibration of the 50-ton Vehicle Scale IAW PWS and Attachment 01-CLS411, Paragraph 5.3 -5.3.2 | | |
| A005AA | Semi-Annual Maintenance and Inspection | 2 | SV |
| A005AB | Performance of the mandatory Re-Calibration in Dezember 2025 | 1 | SV |
| 0006 | Performance of On-Call Services / Troubleshooting | | |
| Performance of On-Call Sevices and Troubleshooting IAW the PWS and Attachment 01-CLS411, Paragraph 5.5 | 5 | SV |
| 0007 | Labor Hours | | |
| Performance of repair work IAW the PWS and Attachment 01-CLS411, Paragraph 5.4 Contractor/ Subcontractor assessed hourly rate if additional repair work outside the routine maintenance work is required | 60 | LH |
| 0008 | Spare Parts | | | | |
| Government assessed amount during contract award for the procurement and delivery of Parts and Material for repair work IAW the PWS and Attachment 01-CLS411, Paragraph 5.4 | 1 | JOB | NOTE: Offerors shall use this Not To Exceed amount in their price proposal | € 20,000.00 |
| 0009 | Documentation | | |
| In the event of ordering from COR: Create and maintain all required bi-weekly-, monthly, quarterly, semi-annual and annual statistics as well as the creation of an annual summary (Annual Landfill Year Book) of all test results for the submission to the controlling authorities IAW the PWS and Attachment 01-CLS411 Paragraph 5.8 and 5.9 | 1 | SV |
| Consolidation: | |
| CLIN 0001 (A001AA - A001AC) | |
| CLIN 0002 (A002AA - A002AY) | |
| CLIN 0003 (A003AA - A003AE) | |
| CLIN 0004 (A004AA - A004AD) | |
| CLIN 0005 (A005AA - A005AB) | |
| CLIN 0006 On-Call Services | |
| CLIN 0007 Labor Hours | |
| CLIN 0008 Spare Parts | € 20,000.00 |
| CLIN 0009 Documentation | |
Total CLIN 0001 - CLIN 0009
CUI - Controlled unclassified information
CUI - Controlled unclassified information
MMSL (1st OY)
ELIN / PRICING SCHEDULE
CONTRACT PoP: 01 June 2026 - 31 May 2027
1st Option Year (FY26)
| CLIN | ELIN No | DESCRIPTION | QTY | U/I | UNIT | TOTAL |
| | | | | PRICE | AMOUNT |
| | | | | EURO | EURO |
| 1001 | A101 | Measuring of Landfill Gas Emission at the Landfill Surface Are via Flame Ionization Detector (FID) IAW the PWS and Attachment 01- CLS411, Paragraph 5.2.1 - 5.2.1.3 | | |
| A101AA | Preparation of the landill surface are for measurement | 1 | EA |
| A101AB | Measurement (FID) of the landfill gas | 1 | EA |
| A101AC | Documentation | 1 | EA |
| 1002 | A102 | Flushing/Cleaning and Camera-Inspection of Underground Leachate Water Lines, Control Shafts and Collection Basins, Performance of Pressure- and Tightness Tests IAW the PWS and Attachment 01-CLS411, Paragraph 5.2.2 - 5.2.2.13 | | |
| A102AA | TV-Inspection of leachate water lines outside the sealed landfill area (total length - 854,1 meter) | 1 | SV |
| A102AB | Semi-annual flushing and cleaning of leachate water lines (854,1 meters) outside the sealed landfill area | 2 | SV |
| A102AC | Semi-annual flushing and cleaning of leachate water control shafts (28ea) outside the sealed landfill area | 2 | SV |
| A102AD | Preparation of shaft documentation papers and sewer sections report | 28 | EA |
| A102AE | TV-inspection of 8 each control drainage lines inside the sealed landfill area (total length-734,84 meter) | 1 | SV |
| A102AF | Preparation of inspection reports for the control drainage lines inside the sealed landfill area | 8 | EA |
| A102AG | TV-inspection of leachate water drainages inside the landfill area (total length - 994,31 meter) | 1 | SV |
| A102AH | Semi-annual flushing and cleaning of the leachate water drainage lines (994,31 meters) inside the sealed landfill area | 2 | SV |
| A102AI | Preparation of inspection reports of the Video inspected leachate water lines within the landfill area | 12 | EA |
| A102AJ | Tightness inspection of leachate water carrying lines outside the sealed landfill area (total length-854,1 meter) | 1 | SV |
| A102AK | Preparation of Tightness Test Protocols for each shaft | 28 | EA |
| A102AL | Inspection of the leachate water control shafts for constructual and operational function/condition | 28 | EA |
| A102AM | Reconsideration of tighness test if tests are negative | 3 | EA |
| A102AN | Semi-annual cleaning services at the leachate water basin at Building 716 | 2 | SV |
| A102AO | Flushing of storm sewer lines at the landfill entrance area (total length-755,65 meter) | 1 | SV |
| A102AP | Cleaning of 18 ea shafts within the landfill entrance area, as well as cleaning of 14 ea Shafts and 11 ea Street Debris Shafts arround Bldg # 710 and Bldg #720 | 1 | SV |
| A102AQ | Flushing of storm sewer lines at the shredder plant facility Bldg. 710 and Bldg. 720 (587,12 meters) and the condensing water shaft (1) in front of Bldg.717 | 1 | SV |
| A102AR | Pumping and cleaning of the reserve leachate water basin near Building 716 (plastic foil basin) | 1 | SV |
| A102AS | Semi-annual flushing of lines in filling field #17 and #18 (total length-89,0 meter) | 2 | SV |
| A102AT | Semi-annual flushing, cleaning and inspection of leachate water control shafts (28 each) and the gas line collection shaft (1 each) at Bldg. 717 | 2 | SV |
| A102AV | Flushing of the leachate water pressure lines (total length-1,329 meter) and cleaning of 15 each shafts | 1 | SV |
| A102AW | Annual Measurement of the Inside Temperature as well as gradient/incline of all leachate Water Lines | 1 | SV |
| A102AX | Flushing and cleaning of the vehicle scale | 1 | SV |
| A102AY | Recording and preparation video DVD's for all TV-Inspections | 1 | SV |
| 1003 | A103 | Maintenance and Inspection of the Lambda Container Degassing Unit CHC 10 inclusive Gas Torch IAW the PWS and Attachment 01-CLS411, Paragraph 5.2.3 - 5.2.3.2.5 | | |
| A103AA | Bi-weekly function control of the Gas Torch | 26 | SV |
| A103AB | Quarterly Maintenance and Safety Inspection | 2 | SV |
| A103AC | Semi-Annual Maintenance and Safety Inspection/control for damages of the gas control station and gas collectors | 2 | SV |
| A103AD | Annual Maintenance and performance of the landfill gas analysis | 1 | SV |
| A103AE | Gas Torch Emmission Measurement (within the 2nd Option Period only) | 0 | SV |
| 1004 | A104 | Maintenance and Monitoring of the Landfill Gas Wells and Horizontal Pipes IAW PWS and Attachment 01-CLS411, Paragraph 5.2.4 - 5.2.4.5 | | |
| A104AA | Bi-Weekly servicing of 26 each Gas Wells | 26 | EA |
| A104AB | Bi-Weekly servicing of 5 each Horizontal Gas Pipes | 26 | EA |
| A104AC | Bi-weekly control and adjust Flap Position | 26 | EA |
| A104AD | Bi-weekly gas analysis | 26 | EA |
| 1005 | A105 | Maintenance, Inspection and Re-Calibration of the 50-ton Vehicle Scale IAW PWS and Attachment 01-CLS411, Paragraph 5.3 -5.3.2 | | |
| A105AA | Semi-Annual Maintenance and Inspection | 2 | SV |
| A105AB | Performance of the mandatory Re-Calibration (within the Base Period, only) | 0 | SV |
| 1006 | Performance of On-Call Services / Troubleshooting | | |
| Performance of On-Call Sevices and Troubleshooting IAW the PWS and Attachment 01-CLS411, Paragraph 5.5 | 5 | SV |
| 1007 | | Labor Hours |
| | | Performance of repair work IAW the PWS and Attachment 01-CLS411, Paragraph 5.4 |
| Contractor/ Subcontractor assessed hourly rate if additional repair work outside the routine maintenance work is required | 60 | LH | |
| 1008 | Spare Parts | | | | |
| Government assessed amount during contract award for the procurement and delivery of Parts and Material for repair work IAW the PWS and Attachment 01-CLS411, Paragraph 5.4 | 1 | JOB | NOTE: Offerors shall use this Not To Exceed amount in their price proposal | € 20,000.00 |
| 1009 | Documentation | | |
| In the event of ordering from COR: Create and maintain all required bi-weekly-, monthy, quarterly, semi-annual and annual statistics as well as the creation of an annual summary (Annual Landfill Year Book) of all test results for the submission to the controlling authorities IAW the PWS and Attachment 01-CLS411 Paragraph 5.8 and 5.9 | 1 | SV |
| Consolidation: | |
| CLIN 1001 (A101AA - A101AC) | |
| CLIN 1002 (A102AA - A002AY) | |
| CLIN 1003 (A103AA - A103AE) | |
| CLIN1004 (A104AA - A104AD) | |
| CLIN 1005 (A105AA - A005AB) | |
| CLIN 1006 On-Call Services | |
| CLIN1007 Labor Hours | |
| CLIN 1008 Spare Parts | € 20,000.00 |
| CLIN 1009 Documentation | |
Total CLIN 1001 - CLIN 1009
CUI - Controlled unclassified information
CUI - Controlled unclassified information
MMSL (2nd OY)
ELIN/PRICING SCHEDULE
CONTRACT PoP: 01 June 2027 - 31 May 2028
2nd Option Year (FY27)
| CLIN | ELIN No | DESCRIPTION | QTY | U/I | UNIT | TOTAL |
| | | | | PRICE | AMOUNT |
| | | | | EURO | EURO |
| 2001 | A201 | Measuring of Landfill Gas Emission at the Landfill Surface Are via Flame Ionization Detector (FID) IAW the PWS and Attachment 01- CLS411, Paragraph 5.2.1 - 5.2.1.3 | | |
| A201AA | Preparation of the landill surface are for measurement | 1 | EA |
| A201AB | Measurement (FID) of the landfill gas | 1 | EA |
| A201AC | Documentation | 1 | EA |
| 2002 | A202 | Flushing/Cleaning and Camera-Inspection of Underground Leachate Water Lines, Control Shafts and Collection Basins, Performance of Pressure- and Tightness Tests IAW the PWS and Attachment 01-CLS411, Paragraph 5.2.2 - 5.2.2.13 | | |
| A202AA | TV-Inspection of leachate water lines outside the sealed landfill area (total length - 854,1 meter) | 1 | SV |
| A202AB | Semi-annual flushing and cleaning of leachate water lines (854,1 meters) outside the sealed landfill area | 2 | SV |
| A202AC | Semi-annual flushing and cleaning of leachate water control shafts (28ea) outside the sealed landfill area | 2 | SV |
| A202AD | Preparation of shaft documentation papers and sewer sections report | 28 | EA |
| A202AE | TV-inspection of 8 each control drainage lines inside the sealed landfill area (total length-734,84 meter) | 1 | SV |
| A202AF | Preparation of inspection reports for the control drainage lines inside the sealed landfill area | 8 | EA |
| A202AG | TV-inspection of leachate water drainages inside the landfill area (total length - 994,31 meter) | 1 | SV |
| A202AH | Semi-annual flushing and cleaning of the leachate water drainage lines (994,31 meters) inside the sealed landfill area | 2 | SV |
| A202AI | Preparation of inspection reports of the Video inspected leachate water lines within the landfill area | 12 | EA |
| A202AJ | Tightness inspection of leachate water carrying lines outside the sealed landfill area (total length-854,1 meter) | 1 | SV |
| A202AK | Preparation of Tightness Test Protocols for each shaft | 28 | EA |
| A202AL | Inspection of the leachate water control shafts for constructual and operational function/condition | 28 | EA |
| A202AM | Reconsideration of tighness test if tests are negative | 3 | EA |
| A202AN | Semi-annual cleaning services at the leachate water basin at Building 716 | 2 | SV |
| A202AO | Flushing of storm sewer lines at the landfill entrance area (total length-755,65 meter) | 1 | SV |
| A202AP | Cleaning of 18 ea shafts within the landfill entrance area, as well as cleaning of 14 ea Shafts and 11 ea Street Debris Shafts arround Bldg # 710 and Bldg #720 | 1 | SV |
| A202AQ | Flushing of storm sewer lines at the shredder plant facility Bldg. 710 and Bldg. 720 (587,12 meters) and the condensing water shaft (1) in front of Bldg.717 | 1 | SV |
| A202AR | Pumping and cleaning of the reserve leachate water basin near Building 716 (plastic foil basin) | 1 | SV |
| A202AS | Semi-annual flushing of lines in filling field #17 and #18 (total length-89,0 meter) | 2 | SV |
| A202AT | Semi-annual flushing, cleaning and inspection of leachate water control shafts (28 each) and the gas line collection shaft (1 each) at Bldg. 717 | 2 | SV |
| A202AV | Flushing of the leachate water pressure lines (total length-1,329 meter) and cleaning of 15 each shafts | 1 | SV |
| A202AW | Annual Measurement of the Inside Temperature as well as gradient/incline of all leachate Water Lines | 1 | SV |
| A202AX | Flushing and cleaning of the vehicle scale | 1 | SV |
| A202AY | Recording and preparation video DVD's for all TV-Inspections | 1 | SV |
| 2003 | A203 | Maintenance and Inspection of the Lambda Container Degassing Unit CHC 10 inclusive Gas Torch IAW the PWS and Attachment 01-CLS411, Paragraph 5.2.3 - 5.2.3.2.5 | | |
| A203AA | Bi-weekly function control of the Gas Torch | 26 | SV |
| A203AB | Quarterly Maintenance and Safety Inspection | 2 | SV |
| A203AC | Semi-Annual Maintenance and Safety Inspection/control for damages of the gas control station and gas collectors | 2 | SV |
| A203AD | Annual Maintenance and performance of the landfill gas analysis | 1 | SV |
| A203AE | Gas Torch Emmission Measurement (within the 2nd Option Period only) | 1 | SV |
| 2004 | A204 | Maintenance and Monitoring of the Landfill Gas Wells and Horizontal Pipes IAW PWS and Attachment 01-CLS411, Paragraph 5.2.4 - 5.2.4.5 | | |
| A204AA | Bi-Weekly servicing of 26 each Gas Wells | 26 | EA |
| A204AB | Bi-Weekly servicing of 5 each Horizontal Gas Pipes | 26 | EA |
| A204AC | Bi-weekly control and adjust Flap Position | 26 | EA |
| A204AD | Bi-weekly gas analysis | 26 | EA |
| 2005 | A205 | Maintenance, Inspection and Re-Calibration of the 50-ton Vehicle Scale IAW PWS and Attachment 01-CLS411, Paragraph 5.3 -5.3.2 | | |
| A205AA | Semi-Annual Maintenance and Inspection | 2 | SV |
| A205AB | Performance of the mandatory Re-Calibration (within the Base Period, only) | 0 | SV |
| 2006 | Performance of On-Call Services / Troubleshooting | | |
| Performance of On-Call Sevices and Troubleshooting IAW the PWS and Attachment 01-CLS411, Paragraph 5.5 | 5 | SV |
| 2007 | | Labor Hours |
| | | Performance of repair work IAW the PWS and Attachment 01-CLS411, Paragraph 5.4 |
| Contractor/ Subcontractor assessed hourly rate if additional repair work outside the routine maintenance work is required | 60 | LH | |
| 2008 | Spare Parts | | | | |
| Government assessed amount during contract award for the procurement and delivery of Parts and Material for repair work IAW the PWS and Attachment 01-CLS411, Paragraph 5.4 | 1 | JOB | NOTE: Offerors shall use this Not To Exceed amount in their price proposal | € 20,000.00 |
| 2009 | Documentation | | |
| In the event of ordering from COR: Create and maintain all required bi-weekly-, monthy, quarterly, semi-annual and annual statistics as well as the creation of an annual summary (Annual Landfill Year Book) of all test results for the submission to the controlling authorities IAW the PWS and Attachment 01-CLS411 Paragraph 5.8 and 5.9 | 1 | SV |
| Consolidation: | |
| CLIN 2001 (A201AA - A201AC) | |
| CLIN 2002 (A202AA - A202AY) | |
| CLIN 2003 (A203AA - A203AE) | |
| CLIN 2004 (A204AA - A204AD) | |
| CLIN 2005 (A205AA - A205AB) | |
| CLIN 2006 On-Call Services | |
| CLIN 2007 Labor Hours | |
| CLIN 2008 Spare Parts | € 20,000.00 |
| CLIN 2009 Documentation | |
Total CLIN 2001 - CLIN 2009
CUI - Controlled unclassified information
CUI - Controlled unclassified information
MMSL (3rd OY)
ELIN/PRICING SCHEDULE
CONTRACT PoP: 01 June 2028 - 31 May 2029
3rd Option Year (FY28)
| CLIN | ELIN No | DESCRIPTION | QTY | U/I | UNIT | TOTAL |
| | | | | PRICE | AMOUNT |
| | | | | EURO | EURO |
| 3001 | A301 | Measuring of Landfill Gas Emission at the Landfill Surface Are via Flame Ionization Detector (FID) IAW the PWS and Attachment 01- CLS411, Paragraph 5.2.1 - 5.2.1.3 | | |
| A301AA | Preparation of the landill surface are for measurement | 1 | EA |
| A301AB | Measurement (FID) of the landfill gas | 1 | EA |
| A301AC | Documentation | 1 | EA |
| 3002 | A302 | Flushing/Cleaning and Camera-Inspection of Underground Leachate Water Lines, Control Shafts and Collection Basins, Performance of Pressure- and Tightness Tests IAW the PWS and Attachment 01-CLS411, Paragraph 5.2.2 - 5.2.2.13 | | |
| A302AA | TV-Inspection of leachate water lines outside the sealed landfill area (total length - 854,1 meter) | 1 | SV |
| A302AB | Semi-annual flushing and cleaning of leachate water lines (854,1 meters) outside the sealed landfill area | 2 | SV |
| A302AC | Semi-annual flushing and cleaning of leachate water control shafts (28ea) outside the sealed landfill area | 2 | SV |
| A302AD | Preparation of shaft documentation papers and sewer sections report | 28 | EA |
| A302AE | TV-inspection of 8 each control drainage lines inside the sealed landfill area (total length-734,84 meter) | 1 | SV |
| A302AF | Preparation of inspection reports for the control drainage lines inside the sealed landfill area | 8 | EA |
| A302AG | TV-inspection of leachate water drainages inside the landfill area (total length - 994,31 meter) | 1 | SV |
| A302AH | Semi-annual flushing and cleaning of the leachate water drainage lines (994,31 meters) inside the sealed landfill area | 2 | SV |
| A302AI | Preparation of inspection reports of the Video inspected leachate water lines within the landfill area | 12 | EA |
| A302AJ | Tightness inspection of leachate water carrying lines outside the sealed landfill area (total length-854,1 meter) | 1 | SV |
| A302AK | Preparation of Tightness Test Protocols for each shaft | 28 | EA |
| A302AL | Inspection of the leachate water control shafts for constructual and operational function/condition | 28 | EA |
| A302AM | Reconsideration of tighness test if tests are negative | 3 | EA |
| A302AN | Semi-annual cleaning services at the leachate water basin at Building 716 | 2 | SV |
| A302AO | Flushing of storm sewer lines at the landfill entrance area (total length-755,65 meter) | 1 | SV |
| A302AP | Cleaning of 18 ea shafts within the landfill entrance area, as well as cleaning of 14 ea Shafts and 11 ea Street Debris Shafts arround Bldg # 710 and Bldg #720 | 1 | SV |
| A302AQ | Flushing of storm sewer lines at the shredder plant facility Bldg. 710 and Bldg. 720 (587,12 meters) and the condensing water shaft (1) in front of Bldg.717 | 1 | SV |
| A302AR | Pumping and cleaning of the reserve leachate water basin near Building 716 (plastic foil basin) | 1 | SV |
| A302AS | Semi-annual flushing of lines in filling field #17 and #18 (total length-89,0 meter) | 2 | SV |
| A302AT | Semi-annual flushing, cleaning and inspection of leachate water control shafts (28 each) and the gas line collection shaft (1 each) at Bldg. 717 | 2 | SV |
| A302AV | Flushing of the leachate water pressure lines (total length-1,329 meter) and cleaning of 15 each shafts | 1 | SV |
| A302AW | Annual Measurement of the Inside Temperature as well as gradient/incline of all leachate Water Lines | 1 | SV |
| A302AX | Flushing and cleaning of the vehicle scale | 1 | SV |
| A302AY | Recording and preparation video DVD's for all TV-Inspections | 1 | SV |
| 3003 | A303 | Maintenance and Inspection of the Lambda Container Degassing Unit CHC 10 inclusive Gas Torch IAW the PWS and Attachment 01-CLS411, Paragraph 5.2.3 - 5.2.3.2.5 | | |
| A303AA | Bi-weekly function control of the Gas Torch | 26 | SV |
| A303AB | Quarterly Maintenance and Safety Inspection | 2 | SV |
| A303AC | Semi-Annual Maintenance and Safety Inspection/control for damages of the gas control station and gas collectors | 2 | SV |
| A303AD | Annual Maintenance and performance of the landfill gas analysis | 1 | SV |
| A303AE | Gas Torch Emmission Measurement (within the 2nd Option Period only) | 0 | SV |
| 3004 | A304 | Maintenance and Monitoring of the Landfill Gas Wells and Horizontal Pipes IAW PWS and Attachment 01-CLS411, Paragraph 5.2.4 - 5.2.4.5 | | |
| A304AA | Bi-Weekly servicing of 26 each Gas Wells | 26 | EA |
| A304AB | Bi-Weekly servicing of 5 each Horizontal Gas Pipes | 26 | EA |
| A304AC | Bi-weekly control and adjust Flap Position | 26 | EA |
| A304AD | Bi-weekly gas analysis | 26 | EA |
| 3005 | A305 | Maintenance, Inspection and Re-Calibration of the 50-ton Vehicle Scale IAW PWS and Attachment 01-CLS411, Paragraph 5.3 -5.3.2 | | |
| A305AA | Semi-Annual Maintenance and Inspection | 2 | SV |
| A305AB | Performance of the mandatory Re-Calibration (within the Base+3rd Period, only) | 1 | SV |
| 3006 | Performance of On-Call Services / Troubleshooting | | |
| Performance of On-Call Sevices and Troubleshooting IAW the PWS and Attachment 01-CLS411, Paragraph 5.5 | 5 | SV |
| 3007 | | Labor Hours |
| | | Performance of repair work IAW the PWS and Attachment 01-CLS411, Paragraph 5.4 |
| Contractor/ Subcontractor assessed hourly rate if additional repair work outside the routine maintenance work is required | 60 | LH | |
| 3008 | Spare Parts | | | | |
| Government assessed amount during contract award for the procurement and delivery of Parts and Material for repair work IAW the PWS and Attachment 01-CLS411, Paragraph 5.4 | 1 | JOB | NOTE: Offerors shall use this Not To Exceed amount in their price proposal | € 40,000.00 |
| 3009 | Documentation | | |
| In the event of ordering from COR: Create and maintain all required bi-weekly-, monthy, quarterly, semi-annual and annual statistics as well as the creation of an annual summary (Annual Landfill Year Book) of all test results for the submission to the controlling authorities IAW the PWS and Attachment 01-CLS411 Paragraph 5.8 and 5.9 | 1 | SV |
| Consolidation: | |
| CLIN 3001 (A301AA - A301AC) | |
| CLIN 3002 (A302AA - A302AY) | |
| CLIN 3003 (A303AA - A303AE) | |
| CLIN 3004 (A304AA - A304AD) | |
| CLIN 3005 (A305AA - A305AB) | |
| CLIN 3006 On-Call Services | |
| CLIN 3007 Labor Hours | |
| CLIN 3008 Spare Parts | € 40,000.00 |
| CLIN 3009 Documentation | |
Total CLIN 3001 - CLIN 3009
MMSL (4th OY)
ELIN/PRICING SCHEDULE
CONTRACT PoP: 01 June 2029 - 31 May 2030
4th Option Year (FY29)
| CLIN | ELIN No | DESCRIPTION | QTY | U/I | UNIT | TOTAL |
| | | | | PRICE | AMOUNT |
| | | | | EURO | EURO |
| 4001 | A401 | Measuring of Landfill Gas Emission at the Landfill Surface Are via Flame Ionization Detector (FID) IAW the PWS and Attachment 01- CLS411, Paragraph 5.2.1 - 5.2.1.3 | | |
| A401AA | Preparation of the landill surface are for measurement | 1 | EA |
| A401AB | Measurement (FID) of the landfill gas | 1 | EA |
| A401AC | Documentation | 1 | EA |
| 4002 | A402 | Flushing/Cleaning and Camera-Inspection of Underground Leachate Water Lines, Control Shafts and Collection Basins, Performance of Pressure- and Tightness Tests IAW the PWS and Attachment 01-CLS411, Paragraph 5.2.2 - 5.2.2.13 | | |
| A402AA | TV-Inspection of leachate water lines outside the sealed landfill area (total length - 854,1 meter) | 1 | SV |
| A402AB | Semi-annual flushing and cleaning of leachate water lines (854,1 meters) outside the sealed landfill area | 2 | SV |
| A402AC | Semi-annual flushing and cleaning of leachate water control shafts (28ea) outside the sealed landfill area | 2 | SV |
| A402AD | Preparation of shaft documentation papers and sewer sections report | 28 | EA |
| A402AE | TV-inspection of 8 each control drainage lines inside the sealed landfill area (total length-734,84 meter) | 1 | SV |
| A402AF | Preparation of inspection reports for the control drainage lines inside the sealed landfill area | 8 | EA |
| A402AG | TV-inspection of leachate water drainages inside the landfill area (total length - 994,31 meter) | 1 | SV |
| A402AH | Semi-annual flushing and cleaning of the leachate water drainage lines (994,31 meters) inside the sealed landfill area | 2 | SV |
| A402AI | Preparation of inspection reports of the Video inspected leachate water lines within the landfill area | 12 | EA |
| A402AJ | Tightness inspection of leachate water carrying lines outside the sealed landfill area (total length-854,1 meter) | 1 | SV |
| A402AK | Preparation of Tightness Test Protocols for each shaft | 28 | EA |
| A402AL | Inspection of the leachate water control shafts for constructual and operational function/condition | 28 | EA |
| A402AM | Reconsideration of tighness test if tests are negative | 3 | EA |
| A402AN | Semi-annual cleaning services at the leachate water basin at Building 716 | 2 | SV |
| A402AO | Flushing of storm sewer lines at the landfill entrance area (total length-755,65 meter) | 1 | SV |
| A402AP | Cleaning of 18 ea shafts within the landfill entrance area, as well as cleaning of 14 ea Shafts and 11 ea Street Debris Shafts arround Bldg # 710 and Bldg #720 | 1 | SV |
| A402AQ | Flushing of storm sewer lines at the shredder plant facility Bldg. 710 and Bldg. 720 (587,12 meters) and the condensing water shaft (1) in front of Bldg.717 | 1 | SV |
| A402AR | Pumping and cleaning of the reserve leachate water basin near Building 716 (plastic foil basin) | 1 | SV |
| A402AS | Semi-annual flushing of lines in filling field #17 and #18 (total length-89,0 meter) | 2 | SV |
| A402AT | Semi-annual flushing, cleaning and inspection of leachate water control shafts (28 each) and the gas line collection shaft (1 each) at Bldg. 717 | 2 | SV |
| A402AV | Flushing of the leachate water pressure lines (total length-1,329 meter) and cleaning of 15 each shafts | 1 | SV |
| A402AW | Annual Measurement of the Inside Temperature as well as gradient/incline of all leachate Water Lines | 1 | SV |
| A402AX | Flushing and cleaning of the vehicle scale | 1 | SV |
| A402AY | Recording and preparation video DVD's for all TV-Inspections | 1 | SV |
| 4003 | A403 | Maintenance and Inspection of the Lambda Container Degassing Unit CHC 10 inclusive Gas Torch IAW the PWS and Attachment 01-CLS411, Paragraph 5.2.3 - 5.2.3.2.5 | | |
| A403AA | Bi-weekly function control of the Gas Torch | 26 | SV |
| A403AB | Quarterly Maintenance and Safety Inspection | 2 | SV |
| A403AC | Semi-Annual Maintenance and Safety Inspection/control for damages of the gas control station and gas collectors | 2 | SV |
| A403AD | Annual Maintenance and performance of the landfill gas analysis | 1 | SV |
| A403AE | Gas Torch Emmission Measurement (within the 2nd Option Period only) | 0 | SV |
| 4004 | A404 | Maintenance and Monitoring of the Landfill Gas Wells and Horizontal Pipes IAW PWS and Attachment 01-CLS411, Paragraph 5.2.4 - 5.2.4.5 | | |
| A404AA | Bi-Weekly servicing of 26 each Gas Wells | 26 | EA |
| A404AB | Bi-Weekly servicing of 5 each Horizontal Gas Pipes | 26 | EA |
| A404AC | Bi-weekly control and adjust Flap Position | 26 | EA |
| A404AD | Bi-weekly gas analysis | 26 | EA |
| 4005 | A405 | Maintenance, Inspection and Re-Calibration of the 50-ton Vehicle Scale IAW PWS and Attachment 01-CLS411, Paragraph 5.3 -5.3.2 | | |
| A405AA | Semi-Annual Maintenance and Inspection | 2 | SV |
| A405AB | Performance of the mandatory Re-Calibration (within the Base+3rd Period, only) | 1 | SV |
| 4006 | Performance of On-Call Services / Troubleshooting | | |
| Performance of On-Call Sevices and Troubleshooting IAW the PWS and Attachment 01-CLS411, Paragraph 5.5 | 5 | SV |
| 4007 | | Labor Hours |
| | | Performance of repair work IAW the PWS and Attachment 01-CLS411, Paragraph 5.4 |
| Contractor/ Subcontractor assessed hourly rate if additional repair work outside the routine maintenance work is required | 60 | LH | |
| 4008 | Spare Parts | | | | |
| Government assessed amount during contract award for the procurement and delivery of Parts and Material for repair work IAW the PWS and Attachment 01-CLS411, Paragraph 5.4 | 1 | JOB | NOTE: Offerors shall use this Not To Exceed amount in their price proposal | € 45,000.00 |
| 4009 | Documentation | | |
| In the event of ordering from COR: Create and maintain all required bi-weekly-, monthy, quarterly, semi-annual and annual statistics as well as the creation of an annual summary (Annual Landfill Year Book) of all test results for the submission to the controlling authorities IAW the PWS and Attachment 01-CLS411 Paragraph 5.8 and 5.9 | 1 | SV |
| Consolidation: | |
| CLIN 4001 (A401AA - A401AC) | |
| CLIN 4002 (A402AA - A402AY) | |
| CLIN 4003 (A403AA - A303AE) | |
| CLIN 4004 (A404AA - A404AD) | |
| CLIN 4005 (A405AA - A405AB) | |
| CLIN 4006 On-Call Services | |
| CLIN 4007 Labor Hours | |
| CLIN 4008 Spare Parts | € 45,000.00 |
| CLIN 4009 Documentation | |
Total CLIN 4001 - CLIN 4009
Sheet1
| CHANGE REQUEST |
| for Contract # W912PB-08-0014, 2nd Option |
| Following Line Item must be changed: | | | | | |
| ITEM | DESCRIPTION | QUANTITY | U/I | UNIT | TOTAL |
| Following Line Item must be changed: | | | |
| 2003 | Operation of the Recycling Yard in | 2 | MO |
| accordance with Performance Work | | |
| Statement, para 2.5. | | |
| Operation days: Monday thru Saturday | | |
| Fixed Service | | |
Following Line Item must be added:
| 2010 | Operation of the Recycling Yard in | 10 | MO |
| accordance with Performance Work | | |
| Statement, para 2.5. | | |
| Operation days: Tuesday/Thursday/Saturday | | |
| Fixed Service | | |