This Excel spreadsheet is a detailed Evaluation Line Item Number (ELIN) pricing schedule for a Landfill Maintenance and Monitoring Services contract at Tower Barracks, USAG Bavaria, Germany. The contract covers a base year (FY25) and three optional years (FY26-FY29), with a period of performance from June 1, 2025, to May 31, 2030. The contract includes comprehensive landfill services such as measuring landfill gas emissions, flushing and camera-inspecting underground leachate water lines, maintaining the Lambda Container Degassing Unit, monitoring gas wells and horizontal pipes, and performing vehicle scale maintenance.

Key service components include bi-weekly gas well servicing, semi-annual inspections, annual gas analysis, and on-call troubleshooting services. The contract has fixed pricing for each contract year, with increasing spare parts allocations from EUR 20,000 in the base and first option years to EUR 45,000 in the fourth option year. Additional services include documentation requirements, such as creating bi-weekly, monthly, quarterly, semi-annual, and annual statistics, and producing an annual Landfill Year Book. The solicitation is issued by the 409th Contracting Command, 928th Contracting Battalion, and will be awarded as a firm fixed-price requirements-type contract using low-price technically acceptable evaluation factors.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MMSL (Base Year)

ELIN/PRICING SCHEDULE

CONTRACT PoP: 01 June 2025 - 31 May 2026

Base Year (FY25)

CLINELIN NoDESCRIPTIONQTYU/IUNITTOTAL
PRICEAMOUNT
EUROEURO
0001A001Measuring of Landfill Gas Emission at the Landfill Surface Are via Flame Ionization Detector (FID) IAW the PWS and Attachment 01- CLS411, Paragraph 5.2.1 - 5.2.1.3
A001AAPreparation of the landill surface are for measurement1EA
A001ABMeasurement (FID) of the landfill gas1EA
A001ACDocumentation1EA
0002A002Flushing/Cleaning and Camera-Inspection of Underground Leachate Water Lines, Control Shafts and Collection Basins, Performance of Pressure- and Tightness Tests IAW the PWS and Attachment 01-CLS411, Paragraph 5.2.2 - 5.2.2.13
A002AATV-Inspection of leachate water lines outside the sealed landfill area (total length - 854,1 meter)1SV
A002ABSemi-annual flushing and cleaning of leachate water lines (854,1 meters) outside the sealed landfill area2SV
A002ACSemi-annual flushing and cleaning of leachate water control shafts (28ea) outside the sealed landfill area2SV
A002ADPreparation of shaft documentation papers and sewer sections report28EA
A002AETV-inspection of 8 each control drainage lines inside the sealed landfill area (total length-734,84 meter)1SV
A002AFPreparation of inspection reports for the control drainage lines inside the sealed landfill area8EA
A002AGTV-inspection of leachate water drainages inside the landfill area (total length - 994,31 meter)1SV
A002AHSemi-annual flushing and cleaning of the leachate water drainage lines (994,31 meters) inside the sealed landfill area2SV
A002AIPreparation of inspection reports of the Video inspected leachate water lines within the landfill area12EA
A002AJTightness inspection of leachate water carrying lines outside the sealed landfill area (total length-854,1 meter)1SV
A002AKPreparation of Tightness Test Protocols for each shaft28EA
A002ALInspection of the leachate water control shafts for constructual and operational function/condition28EA
A002AMReconsideration of tighness test if tests are negative3EA
A002ANSemi-annual cleaning services at the leachate water basin at Building 7162SV
A002AOFlushing of storm sewer lines at the landfill entrance area (total length-755,65 meter)1SV
A002APCleaning of 18 ea shafts within the landfill entrance area, as well as cleaning of 14 ea Shafts and 11 ea Street Debris Shafts arround Bldg # 710 and Bldg #7201SV
A002AQFlushing of storm sewer lines at the shredder plant facility Bldg. 710 and Bldg. 720 (587,12 meters) and the condensing water shaft (1) in front of Bldg.7171SV
A002ARPumping and cleaning of the reserve leachate water basin near Building 716 (plastic foil basin)1SV
A002ASSemi-annual flushing of lines in filling field #17 and #18 (total length-89,0 meter)2SV
A002ATSemi-annual flushing, cleaning and inspection of leachate water control shafts (28 each) and the gas line collection shaft (1 each) at Bldg. 7172SV
A002AVFlushing of the leachate water pressure lines (total length-1,329 meter) and cleaning of 15 each shafts1SV
A002AWAnnual Measurement of the Inside Temperature as well as gradient/incline of all leachate Water Lines1SV
A002AXFlushing and cleaning of the vehicle scale1SV
A002AYRecording and preparation video DVD's for all TV-Inspections1SV
0003A003Maintenance and Inspection of the Lambda Container Degassing Unit CHC 10 inclusive Gas Torch IAW the PWS and Attachment 01-CLS411, Paragraph 5.2.3 - 5.2.3.2.5
A003AABi-weekly function control of the Gas Torch26SV
A003ABQuarterly Maintenance and Safety Inspection2SV
A003ACSemi-Annual Maintenance and Safety Inspection/control for damages of the gas control station and gas collectors2SV
A003ADAnnual Maintenance and performance of the landfill gas analysis1SV
A003AEGas Torch Emmission Measurement (within the 2nd Option Period only)0SV
0004A004Maintenance and Monitoring of the Landfill Gas Wells and Horizontal Pipes IAW PWS and Attachment 01-CLS411, Paragraph 5.2.4 - 5.2.4.5
A004AABi-Weekly servicing of 26 each Gas Wells26EA
A004ABBi-Weekly servicing of 5 each Horizontal Gas Pipes26EA
A004ACBi-weekly control and adjust Flap Position26EA
A004ADBi-weekly gas analysis26EA
0005A005Maintenance, Inspection and Re-Calibration of the 50-ton Vehicle Scale IAW PWS and Attachment 01-CLS411, Paragraph 5.3 -5.3.2
A005AASemi-Annual Maintenance and Inspection2SV
A005ABPerformance of the mandatory Re-Calibration in Dezember 20251SV
0006Performance of On-Call Services / Troubleshooting
Performance of On-Call Sevices and Troubleshooting IAW the PWS and Attachment 01-CLS411, Paragraph 5.55SV
0007Labor Hours
Performance of repair work IAW the PWS and Attachment 01-CLS411, Paragraph 5.4 Contractor/ Subcontractor assessed hourly rate if additional repair work outside the routine maintenance work is required60LH
0008Spare Parts
Government assessed amount during contract award for the procurement and delivery of Parts and Material for repair work IAW the PWS and Attachment 01-CLS411, Paragraph 5.41JOBNOTE: Offerors shall use this Not To Exceed amount in their price proposal€ 20,000.00
0009Documentation
In the event of ordering from COR: Create and maintain all required bi-weekly-, monthly, quarterly, semi-annual and annual statistics as well as the creation of an annual summary (Annual Landfill Year Book) of all test results for the submission to the controlling authorities IAW the PWS and Attachment 01-CLS411 Paragraph 5.8 and 5.91SV
Consolidation:
CLIN 0001 (A001AA - A001AC)
CLIN 0002 (A002AA - A002AY)
CLIN 0003 (A003AA - A003AE)
CLIN 0004 (A004AA - A004AD)
CLIN 0005 (A005AA - A005AB)
CLIN 0006 On-Call Services
CLIN 0007 Labor Hours
CLIN 0008 Spare Parts€ 20,000.00
CLIN 0009 Documentation

Total CLIN 0001 - CLIN 0009

CUI - Controlled unclassified information

CUI - Controlled unclassified information

MMSL (1st OY)

ELIN / PRICING SCHEDULE

CONTRACT PoP: 01 June 2026 - 31 May 2027

1st Option Year (FY26)

CLINELIN NoDESCRIPTIONQTYU/IUNITTOTAL
PRICEAMOUNT
EUROEURO
1001A101Measuring of Landfill Gas Emission at the Landfill Surface Are via Flame Ionization Detector (FID) IAW the PWS and Attachment 01- CLS411, Paragraph 5.2.1 - 5.2.1.3
A101AAPreparation of the landill surface are for measurement1EA
A101ABMeasurement (FID) of the landfill gas1EA
A101ACDocumentation1EA
1002A102Flushing/Cleaning and Camera-Inspection of Underground Leachate Water Lines, Control Shafts and Collection Basins, Performance of Pressure- and Tightness Tests IAW the PWS and Attachment 01-CLS411, Paragraph 5.2.2 - 5.2.2.13
A102AATV-Inspection of leachate water lines outside the sealed landfill area (total length - 854,1 meter)1SV
A102ABSemi-annual flushing and cleaning of leachate water lines (854,1 meters) outside the sealed landfill area2SV
A102ACSemi-annual flushing and cleaning of leachate water control shafts (28ea) outside the sealed landfill area2SV
A102ADPreparation of shaft documentation papers and sewer sections report28EA
A102AETV-inspection of 8 each control drainage lines inside the sealed landfill area (total length-734,84 meter)1SV
A102AFPreparation of inspection reports for the control drainage lines inside the sealed landfill area8EA
A102AGTV-inspection of leachate water drainages inside the landfill area (total length - 994,31 meter)1SV
A102AHSemi-annual flushing and cleaning of the leachate water drainage lines (994,31 meters) inside the sealed landfill area2SV
A102AIPreparation of inspection reports of the Video inspected leachate water lines within the landfill area12EA
A102AJTightness inspection of leachate water carrying lines outside the sealed landfill area (total length-854,1 meter)1SV
A102AKPreparation of Tightness Test Protocols for each shaft28EA
A102ALInspection of the leachate water control shafts for constructual and operational function/condition28EA
A102AMReconsideration of tighness test if tests are negative3EA
A102ANSemi-annual cleaning services at the leachate water basin at Building 7162SV
A102AOFlushing of storm sewer lines at the landfill entrance area (total length-755,65 meter)1SV
A102APCleaning of 18 ea shafts within the landfill entrance area, as well as cleaning of 14 ea Shafts and 11 ea Street Debris Shafts arround Bldg # 710 and Bldg #7201SV
A102AQFlushing of storm sewer lines at the shredder plant facility Bldg. 710 and Bldg. 720 (587,12 meters) and the condensing water shaft (1) in front of Bldg.7171SV
A102ARPumping and cleaning of the reserve leachate water basin near Building 716 (plastic foil basin)1SV
A102ASSemi-annual flushing of lines in filling field #17 and #18 (total length-89,0 meter)2SV
A102ATSemi-annual flushing, cleaning and inspection of leachate water control shafts (28 each) and the gas line collection shaft (1 each) at Bldg. 7172SV
A102AVFlushing of the leachate water pressure lines (total length-1,329 meter) and cleaning of 15 each shafts1SV
A102AWAnnual Measurement of the Inside Temperature as well as gradient/incline of all leachate Water Lines1SV
A102AXFlushing and cleaning of the vehicle scale1SV
A102AYRecording and preparation video DVD's for all TV-Inspections1SV
1003A103Maintenance and Inspection of the Lambda Container Degassing Unit CHC 10 inclusive Gas Torch IAW the PWS and Attachment 01-CLS411, Paragraph 5.2.3 - 5.2.3.2.5
A103AABi-weekly function control of the Gas Torch26SV
A103ABQuarterly Maintenance and Safety Inspection2SV
A103ACSemi-Annual Maintenance and Safety Inspection/control for damages of the gas control station and gas collectors2SV
A103ADAnnual Maintenance and performance of the landfill gas analysis1SV
A103AEGas Torch Emmission Measurement (within the 2nd Option Period only)0SV
1004A104Maintenance and Monitoring of the Landfill Gas Wells and Horizontal Pipes IAW PWS and Attachment 01-CLS411, Paragraph 5.2.4 - 5.2.4.5
A104AABi-Weekly servicing of 26 each Gas Wells26EA
A104ABBi-Weekly servicing of 5 each Horizontal Gas Pipes26EA
A104ACBi-weekly control and adjust Flap Position26EA
A104ADBi-weekly gas analysis26EA
1005A105Maintenance, Inspection and Re-Calibration of the 50-ton Vehicle Scale IAW PWS and Attachment 01-CLS411, Paragraph 5.3 -5.3.2
A105AASemi-Annual Maintenance and Inspection2SV
A105ABPerformance of the mandatory Re-Calibration (within the Base Period, only)0SV
1006Performance of On-Call Services / Troubleshooting
Performance of On-Call Sevices and Troubleshooting IAW the PWS and Attachment 01-CLS411, Paragraph 5.55SV
1007Labor Hours
Performance of repair work IAW the PWS and Attachment 01-CLS411, Paragraph 5.4
Contractor/ Subcontractor assessed hourly rate if additional repair work outside the routine maintenance work is required60LH
1008Spare Parts
Government assessed amount during contract award for the procurement and delivery of Parts and Material for repair work IAW the PWS and Attachment 01-CLS411, Paragraph 5.41JOBNOTE: Offerors shall use this Not To Exceed amount in their price proposal€ 20,000.00
1009Documentation
In the event of ordering from COR: Create and maintain all required bi-weekly-, monthy, quarterly, semi-annual and annual statistics as well as the creation of an annual summary (Annual Landfill Year Book) of all test results for the submission to the controlling authorities IAW the PWS and Attachment 01-CLS411 Paragraph 5.8 and 5.91SV
Consolidation:
CLIN 1001 (A101AA - A101AC)
CLIN 1002 (A102AA - A002AY)
CLIN 1003 (A103AA - A103AE)
CLIN1004 (A104AA - A104AD)
CLIN 1005 (A105AA - A005AB)
CLIN 1006 On-Call Services
CLIN1007 Labor Hours
CLIN 1008 Spare Parts€ 20,000.00
CLIN 1009 Documentation

Total CLIN 1001 - CLIN 1009

CUI - Controlled unclassified information

CUI - Controlled unclassified information

MMSL (2nd OY)

ELIN/PRICING SCHEDULE

CONTRACT PoP: 01 June 2027 - 31 May 2028

2nd Option Year (FY27)

CLINELIN NoDESCRIPTIONQTYU/IUNITTOTAL
PRICEAMOUNT
EUROEURO
2001A201Measuring of Landfill Gas Emission at the Landfill Surface Are via Flame Ionization Detector (FID) IAW the PWS and Attachment 01- CLS411, Paragraph 5.2.1 - 5.2.1.3
A201AAPreparation of the landill surface are for measurement1EA
A201ABMeasurement (FID) of the landfill gas1EA
A201ACDocumentation1EA
2002A202Flushing/Cleaning and Camera-Inspection of Underground Leachate Water Lines, Control Shafts and Collection Basins, Performance of Pressure- and Tightness Tests IAW the PWS and Attachment 01-CLS411, Paragraph 5.2.2 - 5.2.2.13
A202AATV-Inspection of leachate water lines outside the sealed landfill area (total length - 854,1 meter)1SV
A202ABSemi-annual flushing and cleaning of leachate water lines (854,1 meters) outside the sealed landfill area2SV
A202ACSemi-annual flushing and cleaning of leachate water control shafts (28ea) outside the sealed landfill area2SV
A202ADPreparation of shaft documentation papers and sewer sections report28EA
A202AETV-inspection of 8 each control drainage lines inside the sealed landfill area (total length-734,84 meter)1SV
A202AFPreparation of inspection reports for the control drainage lines inside the sealed landfill area8EA
A202AGTV-inspection of leachate water drainages inside the landfill area (total length - 994,31 meter)1SV
A202AHSemi-annual flushing and cleaning of the leachate water drainage lines (994,31 meters) inside the sealed landfill area2SV
A202AIPreparation of inspection reports of the Video inspected leachate water lines within the landfill area12EA
A202AJTightness inspection of leachate water carrying lines outside the sealed landfill area (total length-854,1 meter)1SV
A202AKPreparation of Tightness Test Protocols for each shaft28EA
A202ALInspection of the leachate water control shafts for constructual and operational function/condition28EA
A202AMReconsideration of tighness test if tests are negative3EA
A202ANSemi-annual cleaning services at the leachate water basin at Building 7162SV
A202AOFlushing of storm sewer lines at the landfill entrance area (total length-755,65 meter)1SV
A202APCleaning of 18 ea shafts within the landfill entrance area, as well as cleaning of 14 ea Shafts and 11 ea Street Debris Shafts arround Bldg # 710 and Bldg #7201SV
A202AQFlushing of storm sewer lines at the shredder plant facility Bldg. 710 and Bldg. 720 (587,12 meters) and the condensing water shaft (1) in front of Bldg.7171SV
A202ARPumping and cleaning of the reserve leachate water basin near Building 716 (plastic foil basin)1SV
A202ASSemi-annual flushing of lines in filling field #17 and #18 (total length-89,0 meter)2SV
A202ATSemi-annual flushing, cleaning and inspection of leachate water control shafts (28 each) and the gas line collection shaft (1 each) at Bldg. 7172SV
A202AVFlushing of the leachate water pressure lines (total length-1,329 meter) and cleaning of 15 each shafts1SV
A202AWAnnual Measurement of the Inside Temperature as well as gradient/incline of all leachate Water Lines1SV
A202AXFlushing and cleaning of the vehicle scale1SV
A202AYRecording and preparation video DVD's for all TV-Inspections1SV
2003A203Maintenance and Inspection of the Lambda Container Degassing Unit CHC 10 inclusive Gas Torch IAW the PWS and Attachment 01-CLS411, Paragraph 5.2.3 - 5.2.3.2.5
A203AABi-weekly function control of the Gas Torch26SV
A203ABQuarterly Maintenance and Safety Inspection2SV
A203ACSemi-Annual Maintenance and Safety Inspection/control for damages of the gas control station and gas collectors2SV
A203ADAnnual Maintenance and performance of the landfill gas analysis1SV
A203AEGas Torch Emmission Measurement (within the 2nd Option Period only)1SV
2004A204Maintenance and Monitoring of the Landfill Gas Wells and Horizontal Pipes IAW PWS and Attachment 01-CLS411, Paragraph 5.2.4 - 5.2.4.5
A204AABi-Weekly servicing of 26 each Gas Wells26EA
A204ABBi-Weekly servicing of 5 each Horizontal Gas Pipes26EA
A204ACBi-weekly control and adjust Flap Position26EA
A204ADBi-weekly gas analysis26EA
2005A205Maintenance, Inspection and Re-Calibration of the 50-ton Vehicle Scale IAW PWS and Attachment 01-CLS411, Paragraph 5.3 -5.3.2
A205AASemi-Annual Maintenance and Inspection2SV
A205ABPerformance of the mandatory Re-Calibration (within the Base Period, only)0SV
2006Performance of On-Call Services / Troubleshooting
Performance of On-Call Sevices and Troubleshooting IAW the PWS and Attachment 01-CLS411, Paragraph 5.55SV
2007Labor Hours
Performance of repair work IAW the PWS and Attachment 01-CLS411, Paragraph 5.4
Contractor/ Subcontractor assessed hourly rate if additional repair work outside the routine maintenance work is required60LH
2008Spare Parts
Government assessed amount during contract award for the procurement and delivery of Parts and Material for repair work IAW the PWS and Attachment 01-CLS411, Paragraph 5.41JOBNOTE: Offerors shall use this Not To Exceed amount in their price proposal€ 20,000.00
2009Documentation
In the event of ordering from COR: Create and maintain all required bi-weekly-, monthy, quarterly, semi-annual and annual statistics as well as the creation of an annual summary (Annual Landfill Year Book) of all test results for the submission to the controlling authorities IAW the PWS and Attachment 01-CLS411 Paragraph 5.8 and 5.91SV
Consolidation:
CLIN 2001 (A201AA - A201AC)
CLIN 2002 (A202AA - A202AY)
CLIN 2003 (A203AA - A203AE)
CLIN 2004 (A204AA - A204AD)
CLIN 2005 (A205AA - A205AB)
CLIN 2006 On-Call Services
CLIN 2007 Labor Hours
CLIN 2008 Spare Parts€ 20,000.00
CLIN 2009 Documentation

Total CLIN 2001 - CLIN 2009

CUI - Controlled unclassified information

CUI - Controlled unclassified information

MMSL (3rd OY)

ELIN/PRICING SCHEDULE

CONTRACT PoP: 01 June 2028 - 31 May 2029

3rd Option Year (FY28)

CLINELIN NoDESCRIPTIONQTYU/IUNITTOTAL
PRICEAMOUNT
EUROEURO
3001A301Measuring of Landfill Gas Emission at the Landfill Surface Are via Flame Ionization Detector (FID) IAW the PWS and Attachment 01- CLS411, Paragraph 5.2.1 - 5.2.1.3
A301AAPreparation of the landill surface are for measurement1EA
A301ABMeasurement (FID) of the landfill gas1EA
A301ACDocumentation1EA
3002A302Flushing/Cleaning and Camera-Inspection of Underground Leachate Water Lines, Control Shafts and Collection Basins, Performance of Pressure- and Tightness Tests IAW the PWS and Attachment 01-CLS411, Paragraph 5.2.2 - 5.2.2.13
A302AATV-Inspection of leachate water lines outside the sealed landfill area (total length - 854,1 meter)1SV
A302ABSemi-annual flushing and cleaning of leachate water lines (854,1 meters) outside the sealed landfill area2SV
A302ACSemi-annual flushing and cleaning of leachate water control shafts (28ea) outside the sealed landfill area2SV
A302ADPreparation of shaft documentation papers and sewer sections report28EA
A302AETV-inspection of 8 each control drainage lines inside the sealed landfill area (total length-734,84 meter)1SV
A302AFPreparation of inspection reports for the control drainage lines inside the sealed landfill area8EA
A302AGTV-inspection of leachate water drainages inside the landfill area (total length - 994,31 meter)1SV
A302AHSemi-annual flushing and cleaning of the leachate water drainage lines (994,31 meters) inside the sealed landfill area2SV
A302AIPreparation of inspection reports of the Video inspected leachate water lines within the landfill area12EA
A302AJTightness inspection of leachate water carrying lines outside the sealed landfill area (total length-854,1 meter)1SV
A302AKPreparation of Tightness Test Protocols for each shaft28EA
A302ALInspection of the leachate water control shafts for constructual and operational function/condition28EA
A302AMReconsideration of tighness test if tests are negative3EA
A302ANSemi-annual cleaning services at the leachate water basin at Building 7162SV
A302AOFlushing of storm sewer lines at the landfill entrance area (total length-755,65 meter)1SV
A302APCleaning of 18 ea shafts within the landfill entrance area, as well as cleaning of 14 ea Shafts and 11 ea Street Debris Shafts arround Bldg # 710 and Bldg #7201SV
A302AQFlushing of storm sewer lines at the shredder plant facility Bldg. 710 and Bldg. 720 (587,12 meters) and the condensing water shaft (1) in front of Bldg.7171SV
A302ARPumping and cleaning of the reserve leachate water basin near Building 716 (plastic foil basin)1SV
A302ASSemi-annual flushing of lines in filling field #17 and #18 (total length-89,0 meter)2SV
A302ATSemi-annual flushing, cleaning and inspection of leachate water control shafts (28 each) and the gas line collection shaft (1 each) at Bldg. 7172SV
A302AVFlushing of the leachate water pressure lines (total length-1,329 meter) and cleaning of 15 each shafts1SV
A302AWAnnual Measurement of the Inside Temperature as well as gradient/incline of all leachate Water Lines1SV
A302AXFlushing and cleaning of the vehicle scale1SV
A302AYRecording and preparation video DVD's for all TV-Inspections1SV
3003A303Maintenance and Inspection of the Lambda Container Degassing Unit CHC 10 inclusive Gas Torch IAW the PWS and Attachment 01-CLS411, Paragraph 5.2.3 - 5.2.3.2.5
A303AABi-weekly function control of the Gas Torch26SV
A303ABQuarterly Maintenance and Safety Inspection2SV
A303ACSemi-Annual Maintenance and Safety Inspection/control for damages of the gas control station and gas collectors2SV
A303ADAnnual Maintenance and performance of the landfill gas analysis1SV
A303AEGas Torch Emmission Measurement (within the 2nd Option Period only)0SV
3004A304Maintenance and Monitoring of the Landfill Gas Wells and Horizontal Pipes IAW PWS and Attachment 01-CLS411, Paragraph 5.2.4 - 5.2.4.5
A304AABi-Weekly servicing of 26 each Gas Wells26EA
A304ABBi-Weekly servicing of 5 each Horizontal Gas Pipes26EA
A304ACBi-weekly control and adjust Flap Position26EA
A304ADBi-weekly gas analysis26EA
3005A305Maintenance, Inspection and Re-Calibration of the 50-ton Vehicle Scale IAW PWS and Attachment 01-CLS411, Paragraph 5.3 -5.3.2
A305AASemi-Annual Maintenance and Inspection2SV
A305ABPerformance of the mandatory Re-Calibration (within the Base+3rd Period, only)1SV
3006Performance of On-Call Services / Troubleshooting
Performance of On-Call Sevices and Troubleshooting IAW the PWS and Attachment 01-CLS411, Paragraph 5.55SV
3007Labor Hours
Performance of repair work IAW the PWS and Attachment 01-CLS411, Paragraph 5.4
Contractor/ Subcontractor assessed hourly rate if additional repair work outside the routine maintenance work is required60LH
3008Spare Parts
Government assessed amount during contract award for the procurement and delivery of Parts and Material for repair work IAW the PWS and Attachment 01-CLS411, Paragraph 5.41JOBNOTE: Offerors shall use this Not To Exceed amount in their price proposal€ 40,000.00
3009Documentation
In the event of ordering from COR: Create and maintain all required bi-weekly-, monthy, quarterly, semi-annual and annual statistics as well as the creation of an annual summary (Annual Landfill Year Book) of all test results for the submission to the controlling authorities IAW the PWS and Attachment 01-CLS411 Paragraph 5.8 and 5.91SV
Consolidation:
CLIN 3001 (A301AA - A301AC)
CLIN 3002 (A302AA - A302AY)
CLIN 3003 (A303AA - A303AE)
CLIN 3004 (A304AA - A304AD)
CLIN 3005 (A305AA - A305AB)
CLIN 3006 On-Call Services
CLIN 3007 Labor Hours
CLIN 3008 Spare Parts€ 40,000.00
CLIN 3009 Documentation

Total CLIN 3001 - CLIN 3009

MMSL (4th OY)

ELIN/PRICING SCHEDULE

CONTRACT PoP: 01 June 2029 - 31 May 2030

4th Option Year (FY29)

CLINELIN NoDESCRIPTIONQTYU/IUNITTOTAL
PRICEAMOUNT
EUROEURO
4001A401Measuring of Landfill Gas Emission at the Landfill Surface Are via Flame Ionization Detector (FID) IAW the PWS and Attachment 01- CLS411, Paragraph 5.2.1 - 5.2.1.3
A401AAPreparation of the landill surface are for measurement1EA
A401ABMeasurement (FID) of the landfill gas1EA
A401ACDocumentation1EA
4002A402Flushing/Cleaning and Camera-Inspection of Underground Leachate Water Lines, Control Shafts and Collection Basins, Performance of Pressure- and Tightness Tests IAW the PWS and Attachment 01-CLS411, Paragraph 5.2.2 - 5.2.2.13
A402AATV-Inspection of leachate water lines outside the sealed landfill area (total length - 854,1 meter)1SV
A402ABSemi-annual flushing and cleaning of leachate water lines (854,1 meters) outside the sealed landfill area2SV
A402ACSemi-annual flushing and cleaning of leachate water control shafts (28ea) outside the sealed landfill area2SV
A402ADPreparation of shaft documentation papers and sewer sections report28EA
A402AETV-inspection of 8 each control drainage lines inside the sealed landfill area (total length-734,84 meter)1SV
A402AFPreparation of inspection reports for the control drainage lines inside the sealed landfill area8EA
A402AGTV-inspection of leachate water drainages inside the landfill area (total length - 994,31 meter)1SV
A402AHSemi-annual flushing and cleaning of the leachate water drainage lines (994,31 meters) inside the sealed landfill area2SV
A402AIPreparation of inspection reports of the Video inspected leachate water lines within the landfill area12EA
A402AJTightness inspection of leachate water carrying lines outside the sealed landfill area (total length-854,1 meter)1SV
A402AKPreparation of Tightness Test Protocols for each shaft28EA
A402ALInspection of the leachate water control shafts for constructual and operational function/condition28EA
A402AMReconsideration of tighness test if tests are negative3EA
A402ANSemi-annual cleaning services at the leachate water basin at Building 7162SV
A402AOFlushing of storm sewer lines at the landfill entrance area (total length-755,65 meter)1SV
A402APCleaning of 18 ea shafts within the landfill entrance area, as well as cleaning of 14 ea Shafts and 11 ea Street Debris Shafts arround Bldg # 710 and Bldg #7201SV
A402AQFlushing of storm sewer lines at the shredder plant facility Bldg. 710 and Bldg. 720 (587,12 meters) and the condensing water shaft (1) in front of Bldg.7171SV
A402ARPumping and cleaning of the reserve leachate water basin near Building 716 (plastic foil basin)1SV
A402ASSemi-annual flushing of lines in filling field #17 and #18 (total length-89,0 meter)2SV
A402ATSemi-annual flushing, cleaning and inspection of leachate water control shafts (28 each) and the gas line collection shaft (1 each) at Bldg. 7172SV
A402AVFlushing of the leachate water pressure lines (total length-1,329 meter) and cleaning of 15 each shafts1SV
A402AWAnnual Measurement of the Inside Temperature as well as gradient/incline of all leachate Water Lines1SV
A402AXFlushing and cleaning of the vehicle scale1SV
A402AYRecording and preparation video DVD's for all TV-Inspections1SV
4003A403Maintenance and Inspection of the Lambda Container Degassing Unit CHC 10 inclusive Gas Torch IAW the PWS and Attachment 01-CLS411, Paragraph 5.2.3 - 5.2.3.2.5
A403AABi-weekly function control of the Gas Torch26SV
A403ABQuarterly Maintenance and Safety Inspection2SV
A403ACSemi-Annual Maintenance and Safety Inspection/control for damages of the gas control station and gas collectors2SV
A403ADAnnual Maintenance and performance of the landfill gas analysis1SV
A403AEGas Torch Emmission Measurement (within the 2nd Option Period only)0SV
4004A404Maintenance and Monitoring of the Landfill Gas Wells and Horizontal Pipes IAW PWS and Attachment 01-CLS411, Paragraph 5.2.4 - 5.2.4.5
A404AABi-Weekly servicing of 26 each Gas Wells26EA
A404ABBi-Weekly servicing of 5 each Horizontal Gas Pipes26EA
A404ACBi-weekly control and adjust Flap Position26EA
A404ADBi-weekly gas analysis26EA
4005A405Maintenance, Inspection and Re-Calibration of the 50-ton Vehicle Scale IAW PWS and Attachment 01-CLS411, Paragraph 5.3 -5.3.2
A405AASemi-Annual Maintenance and Inspection2SV
A405ABPerformance of the mandatory Re-Calibration (within the Base+3rd Period, only)1SV
4006Performance of On-Call Services / Troubleshooting
Performance of On-Call Sevices and Troubleshooting IAW the PWS and Attachment 01-CLS411, Paragraph 5.55SV
4007Labor Hours
Performance of repair work IAW the PWS and Attachment 01-CLS411, Paragraph 5.4
Contractor/ Subcontractor assessed hourly rate if additional repair work outside the routine maintenance work is required60LH
4008Spare Parts
Government assessed amount during contract award for the procurement and delivery of Parts and Material for repair work IAW the PWS and Attachment 01-CLS411, Paragraph 5.41JOBNOTE: Offerors shall use this Not To Exceed amount in their price proposal€ 45,000.00
4009Documentation
In the event of ordering from COR: Create and maintain all required bi-weekly-, monthy, quarterly, semi-annual and annual statistics as well as the creation of an annual summary (Annual Landfill Year Book) of all test results for the submission to the controlling authorities IAW the PWS and Attachment 01-CLS411 Paragraph 5.8 and 5.91SV
Consolidation:
CLIN 4001 (A401AA - A401AC)
CLIN 4002 (A402AA - A402AY)
CLIN 4003 (A403AA - A303AE)
CLIN 4004 (A404AA - A404AD)
CLIN 4005 (A405AA - A405AB)
CLIN 4006 On-Call Services
CLIN 4007 Labor Hours
CLIN 4008 Spare Parts€ 45,000.00
CLIN 4009 Documentation

Total CLIN 4001 - CLIN 4009

Sheet1

CHANGE REQUEST
for Contract # W912PB-08-0014, 2nd Option
Following Line Item must be changed:
ITEMDESCRIPTIONQUANTITYU/IUNITTOTAL
Following Line Item must be changed:
2003Operation of the Recycling Yard in2MO
accordance with Performance Work
Statement, para 2.5.
Operation days: Monday thru Saturday
Fixed Service

Following Line Item must be added:

2010Operation of the Recycling Yard in10MO
accordance with Performance Work
Statement, para 2.5.
Operation days: Tuesday/Thursday/Saturday
Fixed Service