Tech3_Contract Discrepancy Reports.pdf

PDF 56 KB Posted

Attached to
DLPT5 Full Range Test Item Development Federal contract opportunity
Solicitation number
W91QF425R0003
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Eustis

About this file

This document outlines Contract Discrepancy Report procedures and includes excerpts from both a COR handbook and section 246.407 regarding nonconforming supplies or services. The quality assurance section specifies that the government evaluates contractor performance using PWS surveillance methods and PRS guidelines, with the COR submitting Contract Discrepancy Reports (DA Form 5479) through the Contracting Office when defective performance is observed.

The document details required surveillance documentation including DA Forms 54372 (Contract Monitoring & Surveillance Report), 5475-R (COR Schedule), 5477-R (Customer Complaints), 5476-R (Surveillance Activity Checklists), and 5479-R (Contract Discrepancy Report). It outlines procedures for handling nonconforming materials or services discovered after acceptance, requiring written contractor notification, requests for repair/replacement at no cost to the government, and possible consideration of refunds. Special provisions are included for aviation or ship critical safety items, requiring approval from the head of design control activity for acceptance of nonconforming items.

View the file

Other files for this federal contract opportunity

Other files attached to DLPT5 Full Range Test Item Development, newest first.
File Type Posted
Tech19_TestSpecs-FLO-LanguageSpecs.pdf PDF
Tech20-B-DOMINO_contract_manager.pdf PDF
Tecch 11 DLPT Style Guide.pdf PDF
Tech14_Consolidated Item Review Criteria.pdf PDF
DLPT5 Fairness Review Guidelines_5July2022.docx DOCX document
Tech17-E-Addendum to IBS manual.pdf PDF
1_Technical Exhibits Chart.xlsx XLSX spreadsheet
W91QF425R0003 F.pdf PDF
Tech16-B-IBS_v1_Manual.pdf PDF
Tech exhibit 24 Performance Assessment Questionnaire.docx DOCX document
Tech8-10-F-IBS Contractor Full Introduction and Passage Rating Variables.pptx PPTX presentation
Tech7_B-Text Typology_PPT_.pptx PPTX presentation
Tech2_DLPT5 Framework.pdf PDF
Tech4_DLPT 5 Presentation.pptx PPTX presentation
Tech18-A-DOMINO_Contract_Orientation (CCB 241).pptx PPTX presentation
Tech15-A-IBS_v1_Manual.pdf PDF
Tech6 A Text Modes and Passage Rating.pdf PDF
Exhibit 3_Test Specs (Technical Exhibit).pdf PDF
Tech21-C-DOMINO_contract_item_developer_(CCB_202).pdf PDF
Tech12_Rendering_Guidelines_for_Contractors.pptx PPTX presentation
Tech13-Rules for Writing MC DLPT items.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Discrepancy Reports

Quality Assurance. The government will evaluate the contractor’s performance under this contract using the method of surveillance specified in the PWS and based on adherence to guidelines established in Deliverables and PRS. When an observation indicates defective performance, the COR will submit a Contract Discrepancy Report (DA Form 5479) through the Contracting Office.

This is from a COR handbook:

x Surveillance Documentation o DA FM 54372 - Contract Monitoring & Surveillance Report o DA FM 5475-R - COR Schedule o DA FM 5477-R - Customer Complaints o DA FM 5476-R - Surveillance Activity Checklists o DA FM 5479-R - Contract Discrepancy Report o Progress schedules approved by the Contracting Officer o Progress reports submitted by the contractor o Laboratory test reports (Note: in some construction contracts the technical specifications require laboratory tests for some materials used in the performance of the contract, including, samples, photographs, witness statements, and other factual data) o Records of unusually severe conditions that affected contract performance in accordance with the respective default clause. For example, weather conditions are particularly important for construction contracts and other contracts that call for performance outside.

o Delinquency Reports

246.407 Nonconforming supplies or services.

(f) If nonconforming material or services are discovered after acceptance, the defect appears to be the fault of the contractor, any warranty has expired, and there are no other contractual remedies, the contractingofficer—

(i) Shall notify the contractor in writing of the nonconforming material or service;

(ii) Shall request that the contractor repair or replace the material, or perform the service, at no cost to the Government;

and

(iii) May accept consideration if offered. For guidance on solicitation of a refund, see Subpart 242.71.

(S-70) The head of the design control activity is the approval authority for acceptance of any nonconforming aviation or ship critical safety items or nonconforming modification, repair, or overhaul of such items (see 209.270). Authority for acceptance of minor nonconformance’s in aviation or ship critical safety items may be delegated as determined appropriate by the design control activity. See additional information at PGI 246.407.

246.407 Nonconforming supplies or services.

File details come from the government source that posted it. Updated .