Team Hill Military Family Retreat PWS 14 Feb 2025.pdf
PDF 283 KB Posted
- Attached to
- 75th Air Base Wing Chapel Family Retreats
- Solicitation number
- FA820125Q0011
About this file
This Performance Work Statement (PWS) details requirements for Team Hill Military Family Retreats to be conducted by the 75th Air Base Wing Chapel. The objective is to provide targeted resilience retreats for active-duty military families, focusing on preserving Air Force families, reducing service-induced stress, creating a positive retreat environment, encouraging improved communication, and fostering teamwork. The contractor will be responsible for organizing two events within one fiscal year, with specific requirements including:
Key requirements include providing facilities for up to 200 attendees, including meeting spaces, dining areas, lodging, worship facilities, and childcare for various age groups. The retreats will feature Chapel Corps Strong Family curricula covering topics like conflict resolution, communication, parenting, and emotional regulation. Specific deliverables include meal planning, photography services, off-site activities, and pre/post event surveys. The retreats must be located within 45 minutes of Hill Air Force Base, with lodging to meet four or five-star guidelines. The contract aims to support military families by providing a structured environment for resilience and relationship building.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Team Hill Military Family Retreat—Performance of Work Statement (PWS)
14 Feb 2025
1. Background:
As directed by DAFMAN 65-601, Vol. 1, 31 Mar 2021, Section 5M—Chapel and Chaplain Programs, para 5.29.1.2:
“appropriated funds are authorized for Chaplain Corps-led training, programs, conferences and retreats to assist individual members of the armed forces on Active Duty and individual members of the Reserve component in an active status, to include singles, and any immediate family members, as cited in DAFI 52-105 under Attachment 2, Authorized Chaplain Corps APF and Chaplain Tithes and Offering Funds Expenses, [Strong Family Structure], in creating, building and maintaining a strong family structure. Authorized support services may include transportation, food, lodging, childcare, supplies, fees or honoraria, training materials, and required equipment for members of the armed forces and their family members while participating in these programs even local to a military member’s
Permanent Duty Station.” The chapel creates the Performance Work Statement and all other contractual documents.
The Wing Chaplain appoints and empowers a chaplain to lead and oversee the Retreat Working Group (RWG) – consisting of personnel from the Base Chapel, Military and Family Readiness Center, Integrated Resilience Office, Child & Youth Services, and other volunteers chosen by the chaplain. The Chaplain will appoint a lead retreat director for each individual retreat.
2. Objectives:
To provide targeted resilience retreats that will help to sustain families through times of separation and assist with reunion after separation and non-deploying service members and their families who could be helped by a resilience retreat. To this end, we have the following specific objectives for the retreats:
2.1 PRESERVE AIR FORCE FAMILIES. Active-Duty families endure unique stresses due to their military service, including multiple relocations, deployments, and other mission-related factors. It can be demonstrated that resilience retreat programs have significantly helped Air Force families stay together.
2.2 REDUCE STRESS. Family Resilience retreats equip family members to deal with day-to-day service-induced stress. This resiliency program allows airmen to focus more clearly on the mission instead of distractions that may arise with a family in crisis-- particularly while away from their families.
2.3 CREATE A POSITIVE RETREAT ENVIRONMENT. Retreats are held in a location apart from normal workday and family life. Ideally, retreats should be held in a setting that is conducive to strengthening family ties and connecting AF families. The retreats should not be more than 45 min drive from Hill Air Force Base.
2.4. ENCOURAGE IMPROVED COMMUNICATION. Professional marriage and family counselors report that the primary reason for marital problems is ineffective communication. The family retreats help families openly communicate and express feelings not normally shared with each other in any other setting.
2.5 FOSTER TEAMWORK. At Team Hill Military Family retreats, Team Hill professionals and volunteers work together to serve families which has the effect of strengthening the bonds of cooperation among Hill AFB organizations. Not only have the retreats become more effective, the combined service of our organizations to all of
Team Hill has been enhanced.
3. Scope:
The Contractor is responsible for providing retreat services that fulfill Chapel and Retreat Working Group (RWG) requirements. Two (2) events within the span of one fiscal year (1 Oct – 30 Sep) ensuring that the events do not coincide within the same quarter as another retreat and shall be scheduled in coordination with the COR/75 ABW
Chapel Staff. The events will be scheduled at least sixty (60) days in advance. The Team Hill Military Family
Retreat is led by chaplains and coordinated through the RWG. Curricula is required but not limited to include education/discussion on the subsequent topics: conflict resolution, communication, parenting, emotional regulation and deployment/reintegration. Chapel Corps Strong Family curricula will be utilized at each retreat. Additional speakers/content may supplement Strong Family Curricula and must be approved by the 75 ABW Chaplain or RWG
POC prior to retreat. The RWG will build each retreat using the Contractor’s pricing schedule, fulfilling retreat requirements with the appropriate services. The Team Hill Military Family Retreat requirements include the following call areas:
Call Area 1—Scheduling
Call Area 2—Speaker(s)
Call Area 3—Meeting Facilities
Call Area 4—Dining Facilities and Catering Requirements
Call Area 5—Lodging Facilities
Call Area 6—Worship Facilities
Call Area 7—Off-site Activities
Call Area 8–Photographer
Call Area 9—Volunteers
Call Area 10–Event Management
Call Area 11—Location and Geographic Restrictions
Call Area 12 – Participant Survey
4. Specific Calls:
4.1. Call Area 1—Scheduling. The Retreat Working Group (RWG) shall provide dates for each retreat based on the wing calendar, operational tempo, and the availability of the retreat venue. Discrepancies regarding requested dates between the RWG and the Contractor may be negotiated to a mutually agreed upon date which meets this criteria.
The Contractor shall reserve and secure the use of the following facilities to accommodate as many as 200 attendees and volunteers for the retreat:
1. Meeting Facilities
2. Dining Facilities
3. Lodging Facilities
4. Worship Facilities
5. Childcare Facilities
DELIVERABLE:
1. Available retreat dates
2. Location of retreat facilities
4.2. Call Area 2—Speaker(s). If the Wing Chaplain and Retreat Working Group deems it necessary, the contractor shall provide a speaker. With approval from the Wing Chaplain, the Contractor can arrange, schedule and pay a speaker or team of speakers for the retreat event.
4.3. Meeting Facilities. All retreat attendees must be able to see, hear, and interact with the guest speaker. Event leaders and speakers must be able to give speeches, instructions, and announcements. If location changes from prior retreats, the RWG has the opportunity to tour the new venue and approve or reject space for consideration.
4.3.1– Resilience Session (Adults) The Contractor shall provide seating (and tables) for as many at 120 adults for a minimum of two (2) resilience sessions per retreat weekend. This may be part of the dining space if the resilience sessions are not interrupted by set up for meals. Exact attendance numbers and configuration requirements shall be provided by the RWG to the Contractor no later than 1 week prior to each event.
4.3.2 – Resilience Sessions for Youth Activities. The contractor shall provide space for three (3) age groups of youth activities: 6- 8 yr. olds, 9-12 yr. olds, 13-18 yr. olds
Space 1 should hold up to 50 children ages 6-8 yrs old and be empty of furnishings and hazardous/unsafe materials.
If furnishings exist, the RWG should be able to adjust location of furnishings. Retreat Working Group may provide folding tables, totes with supplies, arts & craft materials, toys, games, equipment, etc. The space should have 10 round and/or rectangular tables and chairs for up to 50 children for activity areas. The space should be near restrooms. The space should be near the other age group spaces. The space needs to have the ability to be closed off by doors, or easily barricaded to prevent children from exiting the space. The space shall permit light snacks/refreshments to be served that may be provided and brought in by the Retreat Working Group or provided by the contractor. The space should have 2-4 garbage cans and liners. If location changes from prior retreats, the RWG has the opportunity to tour the new venue and approve or reject space for consideration.
Space 2 should hold up to 50 children ages 9-12 yrs old and be empty of furnishings and hazardous/unsafe material. If furnishings exist, the RWG should be able to adjust location of furnishings. Retreat Working Group may provide folding tables, totes with supplies, arts & craft materials, toys, games, equipment, etc. The space should have 10 round and/or rectangular tables and chairs for up to 50 children for activity areas. The space should be near restrooms. The space should be near the other age group spaces. The space shall permit light snacks/refreshments to be served that may be provided and brought in by the Retreat Working Group or provided by the contractor. The space should have 2-4 garbage cans and liners. If location changes from prior retreats, the RWG has the opportunity to tour the new venue and approve or reject space for consideration.
Space 3 should hold up to 30 youth ages 13-18 yr olds. The space should have comfortable seating and have or have access to 7 round and/or rectangular tables and chairs for up to 30 teens. The space should be near restrooms.
The space should be near the other age group spaces. The space shall permit light snacks/refreshments to be served.
The space should have 2-4 garbage cans and liners. If location changes from prior retreats, the RWG has the opportunity to tour the new venue and approve or reject space for consideration.
4.3.3 – Child Care space. The contractor shall provide space for three (2) age groups of for 1-2 yr. olds and 3-
5 yr. olds for child care.
Space 4 should hold 20 children ages 1-2 yrs old and be empty of furnishings and hazardous/unsafe materials.
Retreat Working Group may provide totes with supplies, toys, soft elements, rest mats, equipment, etc. If furnishings exist, the RWG should be able to adjust location of furnishings. The space should have a sink/running water or immediate access to running water. The space should be near the other age group spaces. The space needs to have the ability to be closed off by doors, or easily barricaded to prevent children from exiting the space. The space shall permit light snacks/refreshments to be served that may be provided and brought in by the Retreat
Working Group or provided by the contractor. The space shall allow for diaper changing and disposal. The space should have 2-4 garbage cans and liners. If location changes from prior retreats, the RWG has the opportunity to tour the new venue and approve or reject space for consideration.
Space 5 should hold 50 children ages 3-5 yrs old and be empty of furnishings and hazardous/unsafe materials.
Retreat Working Group may provide folding tables, totes with supplies, arts & craft materials, toys, games, equipment, etc. If furnishings exist, the RWG should be able to adjust location of furnishings. The space should be near a sink/running water and be near restrooms. The space should be near the other age group spaces. The space needs to have the ability to be closed off by doors, or easily barricaded to prevent children from exiting the space, and large enough for a bouncy castle and/or other gross motor activities. The space shall permit light snacks/refreshments to be served that may be provided and brought in by the Retreat Working Group or provided by the contractor. The space should have 2-4 garbage cans and liners. If location changes from prior retreats, the RWG has the opportunity to tour the new venue and approve or reject space for consideration.
DELIVERABLES:
1. Detailed description or diagrams of assigned facilities for all of 4.3 spaces for initial call only
2. List of available audio/ visual equipment and hookups in facility for all 4.3 spaces for initial call only
4.4. Call Area 4 – Dining Facilities and Catering Requirements The contractor shall provide seating for as many as 200 participants for all included meals. This seating should be near where the family meals will be served. Exact attendance numbers and configuration requirements shall be provided by the RWG to the Contractor no later than 1 week prior to each event. Dinner seating arrangements and place settings will be mutually agreed upon by the
Contractor and the RWG prior to the retreat. If location changes from prior retreats, the RWG has the opportunity to tour the new venue and approve or reject space for consideration.
4.4.1. Call Area 4.1 – Meals - The contractor shall provide six (6) meals for each participant, 75 ABW Chapel
Staff, Retreat Volunteers, COR, and Retreat Working Group. All meals should consider this event has youth and adult participants. The food should be appealing to all. All meals must be able to accommodate for dietary restrictions on a case-by-case basis and include common allergens on food labels. Depending on the season and weather, catering and banquet choices may include outdoor dining or box lunches. Any catering and banquet selection will be agreed upon by the RWG and the Contractor prior to the retreat. Meals must meet with the minimum food requirements listed below.
4.4.1.1 Meals shall consist of the following: two (2) breakfasts, two (2) lunches, and two (2) dinners or one (1) breakfast, two (2) lunches, two (2) dinners, and one (1) brunch style meal on Sunday. The schedule will determine which option is ideal and will be communicated to the Contractor NLT 45 days prior to the retreat.
4.4.1.2 Breakfast buffet shall include a variety of options to include proteins, assorted pastries, oatmeal, fresh fruit, yogurt, and assorted cereals. Breakfast must also include water, juice, milk, and coffee. Coffee shall include sugar and minimally two (creamers).
4.4.1.3 Lunch buffets shall include a minimum of two main meal choices, a salad (with 2 dressing choices), and 2 desert choices. Lunch must also include water, iced tea, lemonade, coffee and assorted soft drinks to include diet soda.
4.4.1.4 If the schedule requires, a separate meal for children may be considered (in a different room) and may include a variety of sandwiches, pizza, or chicken strips. This meal will also include fruit and two beverage options in addition to water such as juice, lemonade, or milk. As with all other meals, allergens will be accommodated, and a list of allergens will be provided.
4.4.1.5 Dinner buffets shall include a hot meal with the minimum of 2 meat choices as well as a vegetarian options
(upon request), a salad (with 2 dressing choices), 3 side options and 2 desert choices. Dinner must also include water, iced tea, lemonade, coffee and assorted soft drinks to include diet soda. If the RWG develops a schedule that benefits a boxed dinner, this will be approved by the COR and will be high quality boxed meal service.
4.4.1.6 The contractor will submit a finalized menu for all meals to the 75 ABW Chapel Staff and RWG no later than thirty (30) business days before the event and will prepare food labels for all meals.
4.4.1.7 The contractor shall provide packaged snacks for the Youth activities during the two (2) resilience sessions where the youth are not with their parents. These snacks many include things like cookies and crackers and should not include any tree nuts. The ingredients should be clearly labeled on the packaging. Considerations shall be given to youth with food allergies such that all youth have the option to have a snack during the session. A child friendly beverage shall also be provided /available during these sessions. This may include juice and/or water.
1. Meal menu choices to include list of all common allergens per menu item submitted to RWG no later than one week prior
2. Detailed description or diagram layout of building and seating plan for call only
4.4.2. Call Area 4.3 - Coffee and Espresso/Soda bar. If the RWG deems it necessary to provide a coffee and espresso bar. The contractor shall provide the labor, coffee, and supplies (coffee, milk, sugar, tea, syrups, cups, stirs, lids, etc.) for as many as 200 attendees.
4.5. Call Area 5 - Lodging Facilities. The Contractor shall provide lodging for as many as 200 retreat attendees and any volunteers who need lodging. Lodging is provided in most part through a partnership between Wolf Creek
Foundation and Mountain Luxury Lodging, Mountain Luxury Real Estate. Lodging must be approved by the chaplain and will be luxurious, four (4) or five (5) star or equivalent lodging. Lodging may consist of condominiums and/or homes. Homes and condominiums may have shared living, dining, and common areas. Homes and condominiums will have a minimum of two private bedrooms. A list of available lodging choices to include number of available beds shall be provided no later than one week prior to each retreat. Lodging assignments of retreat attendees will be made by the Contractor in coordination with RWG.
1. Finalized lodging list matching families to lodging venues appropriate for size of family and age/sex of kids to include any special needs accommodations no later than 2 days before start of event.
2. Staff to check participates in and navigate late adjustments to lodging to accommodate wait listed families or family/lodging mismatch.
4.6. Call Area 6 - Worship Facilities. If requested, the Contractor shall provide an onsite facility and seating for as many as 50 people per retreat for one worship service. Worship attendees must be able to see, hear, and interact with a Chaplain from their seats. Venues for the worship services may include outdoor seating if weather allows.
Depending on the schedule determined by RWG, the RWG and COR may determine that off site worship services on a per retreat basis would be acceptable and would be advertised in the schedule of events for the participants. The
RWG will work with the Contractor to determine if outdoor venues may be used.
1. Detailed description or layout of building and seating plan for call only
2. List of available audio/video equipment and hookups in facility for call only
4.7. Call Area 7 - Off-site Activities. The Contractor shall provide for off-site activities for as many as 200 retreat participants. Examples of off-site activities could include hiking, hayrides, laser tag, skiing, snowshoeing, boating, and bouncy castles. The RWG will coordinate with the Contractor to determine off-site activities for each event.
1. Availability, maps, and other details of off-site activities
2. Coordinate, schedule and pay activity vendor(s)
4.8. Call Area 8 - Photographer. The Contractor shall provide a photographer for all participant families who desire photos. A digital copy of the photo will be provided to the families directly from the photographer with applicable copyright restrictions removed to allow the family to share digitally and print as desired.
1. Photographer, backdrop, and all equipment to provide up to fifty (50) family portraits sessions.
4.9. Call Area 9 - Volunteers. The Contractor shall allow Team Hill Military Family Retreat volunteers to work in a variety of roles in support of the retreat. These roles shall include, but are not limited to: childcare, facility arrangement, activity leadership, transportation, and logistics.
4.10. Call Area 10 - Event Management. The Retreat Working Group (RWG), overseen by a Religious Support
Team (RST), will lead and direct the retreat. The RWG, or their designees, will maintain oversight of all events, activities, and functions of the retreat, and will coordinate with the retreat lodge as needed. The retreat lodge shall provide responsible points of contact to help resolve any problems or concerns that might occur during the retreat weekend. The Contractor will provide 24-hour emergency points of contact for lodging issues.
4.11. Call Area 11 - Location and Geographic Restrictions. Team Hill Military Family Retreats shall be physically located in the counties of Weber, Davis, or Salt Lake for ease of transportation for attendees, volunteers, and Air Force and Team Hill leaders. The retreat location should be no more than 45 minutes’ drive from Hill Air
Force Base. Specifically, the lodging location is applicable to the Eden Valley/Huntsville area homeowners that donate their homes for use by Wolf Creek Foundation for the Hill Air Force Base Family Retreats. If location changes from prior retreats, the RWG has the opportunity to tour the new venue and approve or reject space for consideration.
4.12. Call Area 12 – Participant Survey. The contractor shall conduct, analyze, and provide results of a pre and post retreat survey to the RWG within five (5) working days at the conclusion of each event. The questions of the survey will be a collaborative effort of the contractor and the RWG such that the RWG has usable effectiveness data and general event feedback for continuous event improvement.
1. Raw and analyzed results of pre/post event survey
5.1. Required Documents for Submission of Quote
5.2. Security. Additional Security Requirements. Contractor will not discuss with outside parties or sources specific information about retreats or concentrations of military members and dependents.
5.3 Inspection and Acceptance Criteria (Quality Assurance). Contract is firm fixed-price. A ‘combo’
Invoice/Receiving Report shall be filed in Wide Area Workflow ‘WAWF’ in accordance with DFAR 252.232-7006.
The combo Invoice/Receiving Report shall be accepted by the Wing Chaplain or his delegated WAWF officer.
Pay Official DoDAAC F0300
Issue by DoDAAC FA8201
Admin DoDAAC FA8201
Inspect by DoDAAC F2D0BS
Ship to Code F2D0BS
Service Approver (DoDAAC) F2D0BS
Service Acceptor (DoDAAC) F2D0BS
The Government will evaluate the Contractor’s performance and document the performance using the Attachment 1
Customer Survey and Attachment 2 Corrective Action Report (CAR). The chaplain overseeing the RWG shall act as the Contracting Officer Representative (COR) of the Contracting Officer (CO) and shall participate in the administration of this contract.
The COR or alternate shall inform the Contractor when discrepancies occur and shall request corrective action. The
Contracting Officer, or alternate, shall make a notation of the discrepancy with the date, time, and discrepancy that was noted; and request the authorized Contractor’s representative to initial the entry and provide the appropriate corrective action.
Evaluation Criteria:
6.1 Services Summary
PERFORMANCE OBJECTIVE PWS
PARA
PERFORMANCE
THRESHOLD
COMPLIANCE
Large meeting facilities shall be clean and attendees able to see, hear, and interact with the speakers
4.3.1. Written complaint by retreat
attendees and/or RWG working/volunteering at retreat
There shall not be more than 5 written complaints (CCR) per event
Space for three age groups for
Resilience Sessions for Youth Activities shall be clean and appropriate for age
4.3.2 Written complaint by retreat
attendees and/or RWG working/volunteering at retreat
There shall not be more than 5 written
PWS Call
Deliverable Title & Description
Frequency/Schedule
4.1 Available retreat dates Submitted with initial call order only and four months prior to each subsequent event
4.3 List of available audio/ visual equipment and
hookups in facility
Submitted with initial call order only
4.3 Detailed description or diagrams of assigned
facilities
Submitted with initial call order only
4.4 Location of retreat and detailed description
indicating how facility meets requirements.
Submitted with initial call order only
4.6 Available A/V equipment and hookups list for
retreat location
Submitted with initial call order only
Detailed written proposal of anticipated cost supplementation for initial call order only
Submitted with initial call order only complaints (CCR) per event
Space for two groups for Child Care shall be clean and appropriate for age
4.3.3 Written complaint by retreat
attendees and/or RWG working/volunteering at retreat
There shall not be more than 5 written complaints (CCR)
Audio/visual and public address systems/equipment and hookups working properly
4.3 Visual inspection of facility 90% compliance
Meal menu choices to RWG no later than one week prior to retreat to include list of all common allergens per menu item.
4.4 Receipt of menu Within 1 day grace
period.
Finalized lodging list matching families to lodging venues appropriate for size of family and age of kids to include any special needs accommodations no later than 2 days before start of event.
4.5 Receipt of assigned lodging per
family
There shall not be more than 5 written complaints (CCR)
Lodging meets four- or five-star guidelines.
4.5. Written complaint by retreat
attendees, Hill AFB personnel working/volunteering at retreat
There shall not be more than 5 written complaints per event
Worship attendees shall be able to see, hear, and interact with the chaplain from their seats
4.6. Written complaint by retreat
attendees, Hill AFB personnel working/volunteering at retreat
There shall not be more than 5 written complaints per event
7.0 PERFORMANCE REQUIREMENTS AND METHOD OF SURVEILLANCE.
7.1 CUSTOMER COMPLAINT FORM (ATTACHMENT 1):
7.1.1 The purpose of the Customer Service Survey is to document contractor’s performance through documented surveys. Documented surveys will support if contractor’s performance is in question or does not meet the PWS requirements in the contract.
7.1.2 The contractor is responsible for implementing and delivering performance that meets the PWS plan. The
PWS provides the structure for the government’s surveillance of the contractor’s performance to assure that it meets the PWS requirements. It is the government’s responsibility to be objective, fair and consistent in evaluating contractor performance.
7.1.3 The customer service survey is intended to facilitate open communication. In addition, the customer service survey is flexibility to allow for an increase or decrease in the level of surveillance necessary based on contractors performance and should recognize unforeseen or uncontrollable circumstances that might occur outside the control of the contractor.
7.2 Corrective Action Report
In evaluating the quality of contractor’s performance, the following performance ratings may be used when evaluating using the Contractor Performance Rating Report.
Performance
Rating
Criteria
Satisfactory Performance meets the compliance criteria for each of the performance objectives in the services summary.
Unsatisfactory Performance does not meet the compliance criteria for each of the performance objectives in the services summary.
8. GOVERNMENT FURNISHED PROPERTY AND SERVICES.
8.1 No Government Furnished Property provided
9. GENERAL INFORMATION
10.1. SECURITY REQUIREMENTS. The Contractor is not required to obtain security clearance for all necessary personnel requiring access to Hill AFB.
10.2. PHYSICAL SECURITY. The Contractor shall be responsible for safeguarding all Government property provided for Contractor use. At the close of each work period, Government property, and materials shall be secured.
10.3 HOURS OF OPERATION. Normal Hours of Operation. The Contractor shall perform the services required under this contract from 0800 hours on Friday until the following Sunday at 1500 hours of the retreat weekend. The
Contractor may work, with prior approval of the Contracting Officer, extended hours to ensure timely completion of work at no additional cost to the Government.
10.3.1 The Contractor shall attend RWG meetings at the request of the RWG to coordinate each event details and provide status report.
10.4. RECORDS. The Contractor shall be responsible for creating, maintaining, and disposing of only those
Government-required records that are specifically cited in this PWS, or required by the provisions of a mandatory directive listed in Applicable Publications and Forms. If requested by the Government, the Contractor shall provide the original record or a reproducible copy of any such record within five (5) business days of receipt of the request.
10.5 ENVIRONMENTAL CONTROLS:
10.5.1. Compliance with Laws and Regulations. The Contractor shall be knowledgeable of, and comply with all applicable federal, state, and local laws, regulations, and requirements. The Contractor shall emphasize compliance and support to environmental laws and protections. In the event environmental laws/regulations change during the term of this contract, the Contractor is required to comply as such laws come into effect. If there is an increase or decrease in cost as a result of the change, the Contractor shall inform the Contracting Officer pursuant to notice requirements and negotiate a modification to the contract.
10.5.2. Notification of Environmental Spills. Normal reporting procedures for reporting of spills to civilian law enforcement and fire department agencies shall be followed.
10.5.3. Material Storage and Use. The Contractor shall follow manufacturer’s guidelines and professional recommendations for control of humidity, temperature, cleanliness, and materials handling, including hazardous materials.
10.5.4. GOVERNMENT OBSERVATIONS. Government personnel, other than Contracting Officers may, from time-to-time, with CO coordination, observe Contractor operations. However, these personnel may not interfere with
Contractor performance or make any changes to the contract.
10.6. SAFETY REQUIREMENTS. In performing work under this contract, the Contractor shall:
10.6.1. Conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work.
10.7.2. Take such additional immediate precautions as the Contracting Officer may reasonably require for safety and mishap prevention purposes.
10.7.3. Develop and provide at the start of the orientation period or the start of the first operational performance period a safety plan for the protection of Government property and personnel and to provide a safe work environment for Contractor personnel.
10.7.4. Provide protection to Government property to prevent damage during the period of time the property is under the control or in possession of the Contractor.
10.7.5. Include clauses in all subcontracts to require Subcontractors to comply with the safety provisions of this contract as applicable.
10.7.6. Record and report promptly (within one hour) to the Contracting Officer or designated government representative, all available facts relating to each instance of damage to Government property or injury to either
Contractor or Government personnel.
10.7.7. In the event of an accident/mishap, take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence until released by the accident/mishap investigative authority through the Contracting Officer.
10.7.8. If the Government elects to conduct an investigation of the accident/mishap, the Contractor shall cooperate fully and assist Government personnel in the conduct of an investigation until it is completed.
10.7.9. Include a clause in each applicable subcontract requiring the sub-contractor's cooperation and assistance in accident reporting and investigation.
10.8. TRAINING. Current certification standards for the state of Utah for foodservice and lodging operations are required.
10.9. SPECIAL QUALIFICATIONS. Contractor employees working with food shall have a food handler’s permit in accordance with Utah state law.
10.10. CONTINUATION OF ESSENTIAL DOD CONTRACTOR SERVICES DURING
CRISIS IAW DoDI 3020.37. In accordance with AFI 63—124, paragraph 2.7.1, and DODI 3020.37 this requirement is not considered mission essential.
11. Manpower Reporting for Contract Performance
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the [NAMED COMPONENT] via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil.
Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year
(FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October* of each calendar year. Contractors may direct questions to the CMRA help desk.
*Reporting Period: Contractors are required to input data by 31 October of each year.
Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.
User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.
12. APPENDICES
http://www.ecmra.mil/
A. Acronyms & Abbreviations List
B. Definitions for Hill AFB Local Area Travel
APPENDIX A
ACRONYMS AND ABBREVIATIONS
Acronym/Abbreviation Definition
AF Air Force
AFB Air Force Base
AFI Air Force Instruction
AGE Aerospace Ground Equipment
CA Contract Administrator
CDC Child Development Center
Ch Chaplain
CO Contracting Officer
COR Contracting Officer Representative
DO Department of Defense
DoDI Department of Defense Instruction
EMT Emergency Medical Technician
EPA Environmental Protection Agency
LRS Logistics Readiness Squadron
NLT No Later Than
OCO Overseas Contingency Operation
O&M Operations and Maintenance
OSHA Occupational Safety and Health Administration
PBSC Performance Based Service Contracting
PPI Past Performance Information
PWS Performance-Based Work Statement
QA Quality Assurance
QAP Quality Assurance Personnel
QAPC Quality Assurance Program Coordinator
QASP Quality Assurance Surveillance Plan
QC Quality Control
QCP Quality Control Plan
RST Religious Support Team
RWG Retreat Working Group
SOW Statement of Work
SS Services Summary
1. Attachment 1 -Customer Complaint Record
CUSTOMER COMPLAINT RECORD
DATE/TIME OF COMPLAINT
SOURCE OF COMPLAINT
ORGANIZATION
BUILDING NUMBER
INDIVIDUAL
PHONE NUMBER
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
2. CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4. FUNCTIONAL AREA
5. SUSPENSE DATE
6. CONTROL NUMBER
7. DEFICIENCY MAJOR MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. QUALITY ASSURANCE PERSONNEL (COR)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE
11. COR DETERMINATION
ACCEPTED REJECTED
12. CLOSE DATE
File details come from the government source that posted it. Updated .