Specification Requirements
Thermoplastic Truck
Specification Requirements
Be sure to address each line below. Failure to do so may result in bid rejection Check If Meet or Exceed Describe Offered Alternatives Note: Equals or Alternatives offered may be evaluated by subject matter experts. Equals or Alternatives offered that are not found to meet the specification requirements may cause the bid to be rejected.
| 1. |
| This specification is intended as a general indication of the type of equipment desired. Because of the variation in types of equipment available, other configurations may be evaluated and WSDOT reserves the right to reject any and all bids which do not meet the intent of the specifications in the judgment of the Department. Bidders shall furnish complete specifications of the unit bid, including make and model numbers as well as all other pertinent data to facilitate evaluation for compliance with the intent of the specifications. See the Specification Evaluation section of the RFP. |
| 2. |
| This specification is intended to describe a thermoplastic truck. |
| 1. |
| Shall be a current model year Peterbilt 537 or equivalent. |
| 2. |
| Shall be equipped with a 13,200 pusher axle. |
| 3. |
| Shall be equipped with air brakes. |
| 4. |
| Shall be equipped with air-conditioning. |
| 5. |
| Shall have a 264” wheelbase. |
| 6. |
| Shall be equipped with an AM/FM radio. |
| 1. |
| Shall be equipped with a minimum 260 HP Paccar PX-9 turbo charged diesel engine. |
| 2. |
| Shall have an Allison 3000 RDS-P 5 automatic transmission. |
| D. |
| Equipment Parts & System Power Equipment: |
| 1. |
| 23 HP Kubota diesel engine to provide hydraulic requirements to the pre-melters installed under the material storage deck in a steel enclosure. |
| 2. |
| Fuel for the two (2) pre-melters diesel burners and diesel engine drawn from the chassis fuel tanks. |
A.
B.
C.
D.
E.
Fabricated Parts:
| 1. |
| One (1) 48” x 36”, 1,500 lb. rated capacity electric hydraulic side lift mounted on the C/L side of the unit to facilitate loading and unloading of a customer supplied thermoplastic applicator. |
| 2. |
| Steel platform with steel bulkhead, railings, side access ladders and all required clearance lights. |
| 3. |
| Six (6) flush mounted d-rings installed in material storage area of bed evenly spaced. |
| 4. |
| Bulkhead storage with six (6) cubicles to store 20# propane tanks. (Tanks not included). |
| 5. |
| Hydraulic reservoir with sight gauge, magnetic particle separator, interior baffles and “cleanout” fittings mounted under the melter feed step. |
| 6. |
| Two (2) ratchet type tie strap mechanisms (with straps) mounted to truck platform for securing pallets of material. |
| 7. |
| Two (2) toolboxes installed under the deck. |
| 8. |
| Pintel Plate installed at the rear of the unit. |
| F. |
| Marking Material System |
| 1. |
| Shall be equipped with |
| 2. |
| Two (2) diesel fired 3,000-pound capacity air-jacketed, vertical design thermoplastic pre- melting kettles (6,000 lb. total capacity) with hydraulically driven agitators and thermostatically controlled automatic ignition systems. Replaceable hardened, abrasion resistant agitator end shafts and bottom bushings installed. Kettle floors insulated with high temperature insulation blanket material. Kettle burner compartment sidewalls lined with stainless steel. “Floating” SST burner deflector plates. Internal plug type material outlet valves. Mounted at the rear of the melter. |
| 4. |
| Read only gauges mounted in the chassis cab. |
| 1. |
| One (1) WANCO (4'x8'), 25 LED light, arrow board mounted (stationary) to the rear of the kettles. Controller mounted in chassis cab. |
| 2. |
| Two (2) Federal Signal equivalent dual amber strobes mounted on the rear of the unit, one on the left-side and one on the right-side w/cab mounted controls. |
| 3. |
| Eight (8) Federal Signal LED Strobe Lights around Chassis: 2 on front, 2 on edgeline side, 2 on centerline side, 2 on rear of chassis. |
| 4. |
| Two (2) Federal Signa Scene Lights installed on upper corners of arrowboard. |
| 5. |
| Four (4) mounted 12-volt Federal Signal LED lights for night use. Two lights mounted on steel bulkhead directly behind the chassis cab. Two lights mounted at rear of truck to illuminate material dispensing valves w/cab mounted controls. |
| 6. |
| One 48” LED cab mounted light bar with amber lights and cab mounted controls. |
| 7. |
| Kettle material temperature controls mounted at the rear of the unit. |
1.
2.
3.
4.
5.
6.
7.
8.
Chassis taillights installed at the rear of the unit, under the bed.
| 9. |
| Electric Brake controller installed in cab along with trailer wiring |
| 10. |
| Backup camera system installed. |
| 1. |
| Remote mounted grease zerks for the agitator bearings (located at the spool valve mount). |
| 2. |
| Four (4) 10 lb. fire extinguishers (two each side) mounted on the front and rear corners of the Unit. |
| 5. |
| Four (4) mounted “HOT” placards. |
| 6. |
| Aluminum fenders with mud flaps installed over the rear chassis tires and wheels. |
| 7. |
| Conspicuity tape mounted on aluminum panels installed around the steel bed. |
| 8. |
| Combo Pintel Hitch installed on rear of chassis. |
EXHIBIT B TE24009 – THERMOPLASTIC TRUCK PAGE 5 OF 3