TE-B - Bldg Dimensions - Lightning Protection.pdf
PDF 1 MB Posted
- Attached to
- Amend 0003 - Lightning Prot FT Leavenworth - Add Q&A - Update TE-A Federal contract opportunity
- Solicitation number
- W91QF424R0007
About this file
This document provides measurements and facility listings for lightning protection inspection and testing at Fort Leavenworth. The file includes square footage measurements for 16 buildings at the facility ranging from 100 to 48,176 square feet. It also lists dimensions for structures including a bell tower, smokestacks, and a control tower.
The related federal contract opportunity is solicitation number W91QF424R0007 for lightning protection services at Fort Leavenworth. Offerors are directed to Section L paragraph 5 for site visit information. The solicitation is issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Eustis.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| TE-A - Facilities List - LPS v20240411.pdf | ||
| DPW Responses to Questions.pdf | ||
| Amend_0003_LPS_Add_Vendor_Q-As_Update_TE-A.pdf | ||
| Amend_0002-W91QF4-24-R-0007_LPS_Extend_Closing_Date.pdf | ||
| Amend_0001-W91QF4-24-R-0007_LPS_Extend_Closing_Date.pdf | ||
| TE-M - Military Corrections Complex Security.pdf | ||
| TE-A - Facilities List - LPS 20230727.pdf | ||
| PWS-LPS.pdf | ||
| WD-KS2015-5105_dtd_26_DEC_2023.pdf | ||
| TE-S - Sample LV-DES-LAC-APPLICATION.pdf | ||
| W91QF4-24-R-0007_RFP_LPS.pdf | ||
| TE-C - Sample Isometric Projection of Bunker.pdf | ||
| TE-iW - iWATCH Army Training for Contractors.pdf | ||
| TE-R - Sample Key Personnel Roster.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lightning Protection Inspection and Testing
Facility List and Measurements Measurements do not account for roof slopes
• 52 – CAC Headquarters
• 102 -
• 132 – Hangar & Control Tower
• 286 -
• 314 -
• 336 -
• 399 -
• 466 -
• 467 -
• 472 -
• 474 -
• 1148, 1149, 1150 & 1151 – Bn HQ’s and COF’s
• 1155, 1156 & 1157 – Bde HQ and Tactical Vehicle Maintenance (TEMF)
Smokestack Bell Tower
20 70
Bldg 52 – 31,556 sf w/bell tower
Bldg 102 – 9,560 sf
Bldg 132 Hangar with Control Tower – 38,976 sf
Control tower
Bldg 286 - 9,561 sf
Bldg 314 – 16,084 sf
Bldg 336 – 100 sf smokestack only
Smoke stack
Bldg 399 – 300 sf smokestack only
Bldg 466 – 8,929 sf
Bldg 467 – 8,830 sf
Bldg 472 – 6,966 sf
Bldg 474 – 225 sf smokestack only
Bldg 1148 – 9,991 sf Bldg 1149 – 48,176 sf
Bldg 1150 – 48,176 sf Bldg 1151 – 9,991 sf
Bldg 1155 – 10,864 sf Bldg 1156 – 18,752 sf Bldg 1157 – 18,752 sf
1156 & 1157 are tactical vehicle motor pool maintenance facilities and are secured
| Lightning Protection Inspection and Testing |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
File details come from the government source that posted it. Updated .