TE-AE Mass Notification System Inspection Checklist.docx
DOCX document 13 KB Posted
- Attached to
- Fire Protection Services
- Solicitation number
- W91151-22-R-0002
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBIT AE
MASS NOTIFICATION SYSTEM INSPECTION CHECKLIST
| Building #: | Contact Person: | Phone#: | |||
| Has Contact Person Been Notified of Test: Yes | No | Time: | |||
| Has Ft. Hood Fire Dept Been Notified: Yes | No | Time: | |||
| Testing/Inspection Conducted By: | NICET# Date: |
System Information:
Panel Manufacturer:
System Monitoring:
Is this system monitored: Yes No If yes, type of transmitter?
SYSTEM TESTS AND INSPECTION *
| TEST RESULTS | Comments: | |
| QTY PASSED | QTY FAILED |
Button Stations
LOC
Remote Mic Speaker/Strobes ______ ______ _______________________ Speakers Strobes Cluster Horn ______ ______ _______________________ Horn ______ ______ _______________________ Horn/Strobe ______ ______ _______________________
Mass Notification Panel
Functional Comments:
| Lamps/LEDs | Yes | No | N/A | ||
| Fuses | Yes | No | N/A | ||
| Trouble Signals | Yes | No | N/A | ||
| Zone Disable | Yes | No | N/A | ||
| Supervisory Signal | Yes | No | N/A | ||
| Ground Fault | Yes | No | N/A |
Microphone Yes___ No______ N/A______ ________________________
| Transmitter | Yes | No | N/A |
| Batteries | Yes | No | N/A |
Other:
TECHNICAL EXHIBIT AJ
MASS NOTIFICATION SYSTEM INSPECTION CHECKLIST
Building #: Contact Person: Phone#:
POWER SUPPLIES
| Primary (Main): Nominal Voltage: | Amps: |
| Overcurrent Protection: Type: | Amps: |
Location of Primary Supply Panel:
| Has Lockout Been Provide: Yes | No | Is Circuit Breaker Labeled: Yes | No | |
| Secondary: | Battery Amp-Hour Rating: |
Calculated Battery Back-up Capacity in Hours:
| Backup Generator Providing Power to Mass System: Yes | No | |
| System Restored to Normal Operation: Date: | Time: |
Inspectors Signature:
* ALL DEFICIENCIES MUST BE FULLY EXPLAINED ON COMMENT/DEFICIENCY PAGE
COMMENTS/DEFICIENCIES
File details come from the government source that posted it. Updated .