TE-AB Chemical System Inspection Checklist.docx
DOCX document 13 KB Posted
- Attached to
- Fire Protection Services
- Solicitation number
- W91151-22-R-0002
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBIT AB
CHEMICAL SYSTEM INSPECTION CHECKLIST
Building #: Contact Person: Phone#:
Has Contact Person Been Notified of Test: Yes No Time:
Has Ft. Hood Fire Dept Been Notified: Yes No Time:
Testing/Inspection Conducted By: Date:
License#:
Manufacturer:
Hood #: Type of System: Dry Wet Other
SYSTEM TESTS AND INSPECTION
General Information:
Number of Nozzles:
Are all appliances protected with nozzles Yes No
Are Duct and Plenum Nozzles in Place Yes No
Are all nozzles clean and properly positioned Yes No
Are all cylinders clean and free of defects Yes No
Are cylinder pressure gauges in the proper range Yes No
Pressure gage reading
Cylinder Weight Lbs. Size Gallons
Is the cylinder weight/size proper Yes No
Result of fusible link cutting test Pass Fail
Number of fusible links Fusible link operating temperature
Number of links replaced Replacement links operating temperature
Number of links turned in
TECHNICAL EXHIBIT AF
INSPECTION OF CHEMICAL SYSTEM
Building #: Contact Person: Phone#:
Result of manual activation test Pass Fail
Are all manual pulls unobstructed Yes No
Do fuel shutoff valve operate Yes No
Fuel Type
Was the system returned to service Yes No
Contact Person and Fire Dept notified of System Return to Service Yes No
System Restored to Normal Operation: Date: Time:
Inspectors Signature:
COMMENTS/DEFICIENCIES
File details come from the government source that posted it. Updated .