This document is a Technical Exhibit that provides a Performance Requirements Summary (PRS) for a federal contract opportunity related to Cathodic Protection services at Joint Base Lewis-McChord (JBLM) and Yakima Training Center (YTC).
The PRS outlines five key performance objectives for the contractor, including conducting annual cathodic protection surveys, performing routine preventative maintenance, submitting detailed survey reports, completing any necessary repairs/replacements within the period of performance, and submitting all required deliverables on time. The performance thresholds and surveillance methods are clearly defined for each objective.
The related federal contract opportunity is for "Cathodic Services at JBLM and YTC", with a Solicitation Number of W911S8R240012. It is a firm-fixed-price contract that will be awarded to the responsive and responsible offeror with the lowest reasonable and realistic price. Key requirements include registration in the System for Award Management (SAM) database with the appropriate NAICS code, and submission of a quote by September 9, 2024 that includes a completed pricing schedule and required certifications.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBIT 1
PERFORMANCE REQUIREMENTS SUMMARY
Performance Objective Standard Performance Threshold
Method of Surveillance
PRS #1
Annual Cathodic Protection Survey
(PWS 5.1.1)
The Contractor shall perform annual cathodic protection surveys in accordance with PWS paragraph 5.1.1.
100% of work completed as scheduled.
Periodic Sampling
PRS #2
Routine Preventative Maintenance
(PWS 5.1.2)
The Contractor shall perform routine preventative maintenance in accordance with PWS paragraph 5.1.2.
100% of work completed as scheduled.
Periodic Sampling
PRS #3
Detailed Survey Report
(PWS 5.1.3)
The Contractor shall submit a detailed survey report in accordance with PWS paragraph 5.1.3.
Detailed survey report(s) received in accordance with PWS paragraph 5.1.3.
Performance will not be considered complete until reports are submitted to and approved by the COR.
100% Inspection
PRS #4
Over and Above
(PWS 5.2)
The Contractor shall complete repairs / replacement within the period of performance of the issued task order in accordance with PWS paragraph 5.2.
Not more than one (1) re-work during the surveillance period.
100% Inspection (following each occurrence)
PRS #5
Deliverables
(PWS 5.6)
The Contractor shall submit the documents identified in the Deliverables in accordance with PWS paragraph 5.6.
Not more than two (2) documents submitted late per month.
Discrepancies shall be corrected within one
(1) iteration and not more than five (5) business days following notification.
100% Inspection