Omnibus Multidiscipline Engineering Services II

(OMES-II)

All deliverables and requirements must follow the guidelines in NNG17CR69C with no exceptions

Task Order Statement of Work (SOW)

Date: February 2021 Task Name: OSAM-1 Ground System and Mission Operation Task No. 24 / Mod: 7 Task Monitor (TM): Redacted Contract number: NNG17CR69C Contract SOW Reference: Function 1 (Technology Development Services), Section L (Robotic Technology Services) and Section M (Autonomous Rendezvous and Docking Services)

I. Scope

a. Background –

The objective of the On-orbit Servicing, Assembly, and Manufacturing (OSAM)-1 Mission is to advance robot servicing of spacecraft and demonstrate in-space robotic manufacturing and assembly (IRMA). OSAM-1 will demonstrate the following five essential technologies: 1) autonomous rendezvous and capture, 2) tele-operated robots, 3) transfer of propellant to an operational spacecraft in Low Earth Orbit (LEO), 4) on-orbit assembly of an antenna assembly, and 5) on-orbit manufacturing of a beam.

The OSAM-1 Mission will launch in 2025 to provide client satellite refueling and life extension services. The OSAM-1 Mission consists of OSAM-1 Servicing Vehicle (SV), Launch Vehicle (LV), and OSAM-1 Ground Element (GE). The OSAM-1 Servicing Vehicle (SV) is the servicing spacecraft is the spacecraft that will rendezvous with, capture, and service the Landsat 7 satellite and perform in-space assembly and manufacturing.

The OSAM-1 Space Vehicle (SV) consists of a Servicing Payload, a SPIDER Payload, and a Spacecraft Bus (“Spacecraft”). The Spacecraft will provide standard operating services for the vehicle, including propulsion, attitude control, electric power, command and data handling (C&DH), communications, and thermal control. The Spacecraft also contains the supply tanks with transferable hydrazine for servicing Landsat 7. The Spacecraft design is based on the SSL 1300-series bus. The 1300 spacecraft has been flown for many years by MSI in Geosynchronous Earth Orbit (GEO) missions. The design is being modified and qualified for OSAM-1 LEO mission.

All deliverables and requirements must follow the guidelines in NNG17CR69C with no exceptions

The Launch Vehicle (LV) Element is the Expendable Launch Vehicle (ELV) and corresponding support services. Also contained in this element are the integration and processing facilities and support functions, including all SV specific Ground Support Equipment (GSE) and associated local ground control systems required.

The OSAM-1 Ground Element (GE) consists of the ground system and all mission control functions which interface with existing ground stations to communicate with the SV. The Ground Element will provide a mission operations center for the mission and establish communication networks between ground segments.

This Statement of Work (SOW) specifies work to be done and services to be provided in support of the OSAM-1 Mission for the Ground Segment and Mission Operations. This task provides support of all levels of OSAM-1 Mission system and subsystem engineering, technology development, system design, documentation, fabrication, integration and test for the ground system and mission operations. It is organized to match the OSAM-1 Work Breakdown Structure (WBS) Elements.

FY21/22 work covered under this task will focus on the SW development, deployment, test and verification of GE SW Builds 1&1.1 in the operational facilities. GE Software Build 2 will also be initiated this contract year. IT Security efforts will include artifact generation for Authority-to-Test (ATT) and Authority-to-Operate (ATO) approval. In addition, the contractor will lead SPIDER GS detailed design efforts, e.g., architecture, requirements, interfaces, and associated technologies necessary to support the delta GE CDR for the SPIDER ground systems/interfaces. Operations activities will include documentation and operational planning in preparation for the GE delta CDR, Mission CDR, Build 1 Ground Readiness Test efforts, and the Mission Operations Review (MOR), as well as preparation for and execution of the initial End-to-End test.

b. Summary of work –

The paragraphs below document anticipated OSAM-1 efforts and schedule in FY21 and FY22.

As described in the Deliverable Items and Schedule section below, details of this work are subject to change at the discretion of the Task Monitor.

The Contractor shall provide the NASA Exploration and In-Space Services (NExIS) Projects Division with appropriate manpower to support the OSAM-1 project as described below:

Project Management Support for the Ground Segment Development and Mission Operations Project management for the ground segment and the mission operations is considered part of the effort. Overall project management support is not included in this task. The generation of reports from subsystems; preparing reports for Program, Center, and HQ management;

planning, preparation for, and performing reviews for both internal and external review panels for the ground segment and Mission Operations efforts are considered to be part of this effort. The contractor shall also support the development of project documentation and other products as needed to prepare for programmatic, technical, and other reviews. The contractor shall lead efforts to plan, prepare for, and perform design, integration, testing, and operations of ground system hardware and software systems. The contractor shall provide support to any Earned Value Management (EVM) implementation done on the project.

Hardware and Software Design, Analysis, Fabrication, and Test FY21-22 efforts will include the detailed design, analysis, prototyping, development, fabrication, integration, test, and verification of OSAM-1 ground system components for all elements contained in this SOW.

c. Required skills/knowledge –

The contractor shall provide the ground systems personnel and facilities necessary to continue the NExIS’ advancement of the state of robotic servicing technology with the goal to enable on-orbit servicing of satellites that were not designed with servicing in mind as well as satellites launched with those capabilities. In order to achieve this objective, the following skills are essential:

- Experience in designing, developing, integrating, testing, and operating ground systems capable of supporting the autonomous rendezvous with on-orbit spacecraft,

- Knowledge of the full life-cycle development process of a ground system for a NASA mission, including systems and software engineering principles, tools, and processes

- Experience designing, building, and supporting IT infrastructure for a new observatory, to include the planning and integration of IT infrastructure that follows NASA requirements, industry standards, and best practices

- Proficiency with operating systems across various platforms and versions (RHEL and Ubuntu Linux, OS X/macOS, and Windows) and familiarization with interoperability methodologies.

- Experience with enterprise virtualization technologies (VMware, Hyper-V), including experience with system and application-level containerization technologies

- Working experience with ASIST command and telemetry systems including database development and scripting.

- Working experience with Guidance, Navigation, and Control systems for LEO spacecraft (e.g., orbit determination, maneuvers, autonomy supervision of Payload RPO, situational awareness of orbit/attitude, checkout and calibration of bus and payload). As a clarification of anticipated support, only the GNC lead position is supported under this SOW under the guidance, navigation and control systems effort.

- Experience in software and systems engineering as applied to monitoring and operating space flight systems

- Knowledge of space system mission operations for LEO spacecraft and relevant technical standards such as CCSDS and TCP/IP

- Working knowledge of orbital rendezvous, autonomous operation, and robotic servicing concept of operations, timelines, driving requirements, verification and validation activities, and current state of the art capabilities

- Experience in developing project plans, schedules, and processes for integrating and testing spaceflight control systems

- Experience in managing a team of specialized engineers and innovators in solving on-orbit performance issues of satellites

II. Period of Performance

The period during which the work for this task shall be performed is from task award through April 29, 2022.

III. Subtask Description

Monitor and/or the Contract Resource Analyst. Excel-based Supplemental reporting using 533 data may be requested as needed.

IV. Deliverables/Schedules/Milestones

(See Contract sections B.1 and C.3)

Deliverables for these tasks shall include reports and presentations describing system trade studies, design, participation in component, subsystem, and system-level reviews, ground tests, etc., and algorithm mathematical specifications, analysis and test results, and ground system software deliveries and delivery documentation as defined by the Task Monitor. Deliverables include the above items at the discretion of the Task Monitor, all of which will be produced by a multi-disciplinary team from multiple contracting sources, and thus not a direct deliverable from this Task.

V. Management Approach

a. Staff Allocation, Expertise, and Skill Mix

The contractor shall staff this work item with the appropriate skill mix and staffing level for the work. Some manpower positions shall be filled with individuals possessing appropriate security clearance.

b. Configuration Management

Systems and documents will be covered under the OSAM-1 Configuration Management Procedure.

c. Facilities

Appropriate Information Technology devices to support the analyses, specification development, and report development are required. It shall be the contractor’s responsibility to provide and set up local workstations and network connections at the contractor’s off-site facilities as required, and to install any required tools and utilities on the contractor’s equipment.

d. Risk Management and Best Practices

The contractor shall manage schedule, cost, and technical risk through monitoring and reporting of progress and performance metrics, identifying issues well in advance of negative consequences, recommending corrective action to the TM, and implementing corrective actions with the compliance of the TM. The contractor shall comply with the Restore-L Risk Management Plan (RMP), RL-MGMT-PLAN-0090 Rev A, February 2020.

e. Performance Metrics

The TM will evaluate the work performed for this task based on technical merit. The TM will utilize detailed performance metrics that reflect the contractor’s performance in meeting research analysis, specific mission requirements, deliverables and delivery schedule, and the contractor’s cost. The TM's technical evaluation of the task performance will be a subjective combination of performance metrics, technical quality of deliverables, cost control, significant events, innovations and meeting requirements set forth in the SOW.

f. Government Furnished Facilities, Equipment, Software and Other Resources

The Government will provide account and passwords to government-furnished workstations where existing versions of various relevant software packages shall be maintained. It shall be the contractor’s responsibility to complete any GSFC required security-related training courses.

g. Quality Assurance Requirements (See Clause I.1 1852.216-80 TASK ORDERING PROCEDURE (d) (4) and QA plan)

The contractor shall comply with the OSAM-1 RL-SMA-REQ-0006, titled “Restore-L Mission Assurance Requirements”, Revision A W/Waiver, dated January 2020.

VI. ODC (Travel and Procurement)

(See I.1 1852.216-80 TASK ORDERING PROCEDURE d(6), please provide a BOE for all proposed ODC’s to determine the reasonableness)

Local and non-local travel may be required for this task. Travel requirements may include, but are not limited to, Maxar Bus and SPIDER facilities in CA and/or WA, Kennedy Space Center, Johnson Space Center, West Virginia Robotics Lab, and other OSAM-1 partner and vendor site visits.

VII. Work Location

This work shall be performed primarily on-site at the Goddard Space Flight Center, but the contractor may be required to perform some work at telework sites, the contractor’s facility, at the Naval Research Laboratory, and at several other NASA and contractor test facilities.

VIII. Reporting Requirements

a. Weekly or Bi-weekly status report

The contractor shall generate Performance Reports every week or bi-weekly to the TM. The report shall include, as a minimum, a summary of the week’s highlights/accomplishments, milestones/schedule/deliverables, risks and customer meetings.

b. Monthly Progress Reports

The contractor shall report status in person or via teleconference to the TM or designated alternates on a monthly basis. Reports shall include informal presentation of interim results, status of development activities, and action item status. The contractor shall provide all reports at least one day in advance of the monthly meeting via email, and maintain an email distribution list with the concurrence of the TM. The contractor shall also support the TM in the preparation of status reviews for internal and external funding agencies. The contractor shall comply with any and all additional requests for status meetings and reports. The contractor shall deliver all documents in portable document format (PDF) electronic form to the TM, or as directed by the TM.

IX. Security Requirements

This task shall comply with IT security requirements as documented in the Servicing Study IT security plan for all systems. Some positions may require security clearances at a Top Secret level or higher. DoD 5220.22-M, Section 4 applies to this contract. Access to COMSEC controlled information in the performance of duty requires a briefing before access is granted. COMSEC information can be both unclassified and classified. Access will be limited to the minimum as necessary, and will be on a strict need-to-know basis.

X. Safety

The contractor shall develop and maintain a documented Quality Assurance (QA) program in compliance with document number RL-SMA-REQ-0006, titled “Restore-L Mission Assurance Requirements”, Revision A W/Waiver, dated January 2020. The program shall provide for quality and reliability engineering, system safety, and materials control for all fabrication, integration, and verification testing of all systems, sub-systems, and components of OSAM-1 hardware.

The program and the related documentation shall be at a sufficient level of maturity to comply with the requirements of all NASA pass all major project life cycle reviews.

XI. Data Rights

This SOW shall adhere to the following Data Rights clause, as stated in this contract: “the default Data Rights clause under this contract is FAR 52.227-14 RIGHTS IN DATA-GENERAL as modified by NASA FAR Supplement 1852.227-14-Alternate II and Alternate III and GSFC 52.227-

90. Any exceptions to this clause will be covered by FAR 52.227-17 RIGHTS IN DATA-SPECIAL WORKS as modified by NASA FAR Supplement 1852.227-17, and, if applicable, GSFC 52-227.93.”

XII. Applicable Documents

In the performance of this task, the contractor shall comply with the following documents:

1) NPR 7123.1C NASA Systems Engineering Processes and Requirements (w/Change 1)

2) NPR 7150.2C NASA Software Engineering Requirements

3) GPR 7150.3A Goddard Software Acquisition Requirements

4) GPD 7150.0A Software Engineering

5) GPR 7150.4 Software Safety and Software Reliability Process

6) OSAM-1 Configuration Management Procedure, RL-MGMT-PROC-0110 Revision-

7) OSAM-1 Risk Management Plan (RMP), RL-MGMT-PLAN-0090

8) OSAM-1 Work Breakdown Structure (WBS) and Dictionary, RL-MGMT-WBS-0002

9) OSAM-1 Mission Level 2 Requirements, RL-SYS-REQ-0003

10) OSAM-1 Systems Engineering Management Plan (SEMP), RL-SYS-PLAN-0003

11) OSAM-1 Mission Assurance Requirements (MAR), RL-SMA-REQ-0006

12) OSAM-1 Mission Project Security Plan, RL-MGMT-PLAN-0002

XIII. References

NPR 7120.8A NASA Research and Technology Development Program and Project Management Requirements