Tabulation of Bids~1.pdf

PDF 75 KB Posted

Attached to
ITB - Seven Mile Lane Left Turn Lane Paving, CR1704
Solicitation number
S-C01510-00009956
Issued by
Lake County, Albany City, Oregon

About this file

This document is a Tabulation of Bids for the "Seven Mile Lane Left Turn Lane Paving" project, a county-level asphalt paving initiative in Linn County, Oregon. The project scope involves furnishing, installing, maintaining, and removing traffic control devices; asphalt pavement saw cutting; cold plane pavement removal; installing asphalt concrete pavement; installing temporary pavement markers; and performing additional incidental work. Bids are due by 9:15 AM on April 23, 2024, with a bid opening at approximately 9:35 AM the same day at the Linn County Courthouse. The contract completion time limit is September 27, 2024. The bid schedule includes items for mobilization, temporary protection and direction of traffic, pollution control plan, asphalt pavement saw cutting, cold plane pavement removal, Level 3 asphalt concrete mixture, and extra for asphalt driveways. The project has a 0% assigned Disadvantaged Business Enterprise (DBE) contract goal, and the work is subject to Oregon prevailing wage rate requirements.

The lowest total bid amount is $205,126.00, submitted by RiverBend Construction, Inc. No separate payment will be made for asphalt tack coat, unused or excess asphalt concrete pavement, or temporary pavement markings. Contracts will only be awarded to bidders who are prequalified with both the Oregon Department of Transportation and the Linn County Road Department at the time of bid opening. The project is funded by the state and local jurisdictions of Linn County and Albany City, but the solicitation does not provide any specific award value or budget range information.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEVEN MILE LANE LEFT TURN LANE PAVING

TABULATION OF BIDS

$232,338.50 $235,011.10 $239,438.00 $245,505.00 $259,795.00 $749,999.42 $205,126.00

ITEM # ITEM UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL

1 Mobilization LS 1 $15,500.00 $15,500.00 $5,660.00 $5,660.00 $15,000.00 $15,000.00 $20,000.00 $20,000.00 $25,900.00 $25,900.00 $120,000.00 $120,000.00 $20,000.00 $20,000.00

2 Temporary Protection and Direction of Traffic LS 1 $16,000.00 $16,000.00 $20,400.00 $20,400.00 $10,800.00 $10,800.00 $10,000.00 $10,000.00 $12,000.00 $12,000.00 $30,000.00 $30,000.00 $5,000.00 $5,000.00

3 Pollution Control Plan LS 1 $750.00 $750.00 $275.00 $275.00 $150.00 $150.00 $1,000.00 $1,000.00 $300.00 $300.00 $20,000.00 $20,000.00 $250.00 $250.00

4 Asphalt Pavement Saw Cutting FT 86 $7.00 $602.00 $5.10 $438.60 $3.00 $258.00 $10.00 $860.00 $2.50 $215.00 $190.17 $16,354.62 $1.00 $86.00

5 Cold Plane Pavement Removal, 0-2" Depth SY 483 $15.50 $7,486.50 $13.30 $6,423.90 $10.00 $4,830.00 $15.00 $7,245.00 $20.00 $9,660.00 $80.00 $38,640.00 $10.00 $4,830.00

6 Level 3, 1/2" ACP Mixture TON 1,840 $100.00 $184,000.00 $107.29 $197,413.60 $110.00 $202,400.00 $110.00 $202,400.00 $113.00 $207,920.00 $190.22 $350,004.80 $94.00 $172,960.00

7 Extra for Asphalt Driveways EA 4 $2,000.00 $8,000.00 $1,100.00 $4,400.00 $1,500.00 $6,000.00 $1,000.00 $4,000.00 $950.00 $3,800.00 $43,750.00 $175,000.00 $500.00 $2,000.00

*Notes

Roy Houck Construction LLC was deemed non-responsive and was disqualified for not being prequalified with Linn County.

Linn County had 1 discrepancy in the solicitation documents for the quantity of bid item 7. There should be 4 Each. The discrepancy in quantity of Bid Item 7 does not change the outcome of the low bidder.

Knife River Corporation - Northwest had 1 discrepency in their Bid Schedule:

1. Bid Item 7 - Bid shows a unit price of $1,100/Each. The estimated quantity is 4 Each. When multiplied together the result is $4,400.00. Their total showed $5,500.00

KNL Industries, Inc. - 1 change has been made to their Bid Schedule:

1. Bid Item 7 - Bid shows a unit price of $1,000/Each. The estimated quantity should be 4 Each. When multiplied together the result is $4,000.00. Their total showed $5,000.00

North Santiam Paving Co. - 1 change has been made to their Bid Schedule:

1. Bid Item 7 - Bid shows a unit price of $950/Each. The estimated quantity should be 4 Each. When multiplied together the result is $3,800. Their total showed $4,750.00

KNL Industries, Inc. North Santiam Paving Co. CNH Remodeling, LLC Roy Houck Construction

LLC

Wildish Construction Co.

RiverBend Construction, Inc.

Knife River Corporation -

Northwest

File details come from the government source that posted it. Updated .