The document is a Table 1 summary prepared by the County of Sacramento's Department of Waste Management & Recycling (DWMR) detailing the base liner system specifications for Module 4, Phase 1 (M4P1) at Kiefer Landfill. The project involves a 32-acre side slope base liner system repair, with construction completed in May 2021 by ICS, Inc as the general contractor and Layfield Geosynthetics as the liner installer. The geosynthetic liner system includes a Wind Defender TG geosynthetic ballast system, a 60 mil HDPE geomembrane from Layfield with single-sided texturing, and a CETCO Bentomat DN-HS geosynthetic clay liner.

The comprehensive technical summary provides detailed specifications for the landfill liner system, including a 2 ft sand operations layer and specific materials used in the liner's construction. Geo-Logic Associates served as the Construction Quality Assurance (CQA) firm for the project. The document uses technical abbreviations such as GM (Geomembrane), GCL (Geosynthetic Clay Liner), SST (Single-Sided Texturing), and HDPE (High Density Polyethylene) to describe the technical components of the liner system, indicating a highly specialized infrastructure repair and maintenance project for the county's waste management facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

County of Sacramento, DWMR P:\Shared Folders\Engineering\Secured Divisional Folders\KIEFER LANDFILL\Contracts\RFP & RFBs\RFB 2023 M4P1 West Wall Liner Repair\RFP ____ Table 1 - KLF Base Liner System Summary, 3/17/2023 Page 1 of 1

Abbreviations:

GM Geomembrane LDS Leak Detection System

GCL Geosynthetic Clay Liner HDPE High Density Polyethylene SST Single-Sided Texturing

General Contractor: ICS, Inc Construction Date: May 2021 Liner Installer: Layfield Geosynthetics Area: 32 acres

CQA Firm: Geo-Logic Associates Material Notes

Wind Defender TG Layfield - 60 mil HDPE GM CETCO - Bentomat DN-HS

Primary 60 mil SST HDPE GM Primary GCL

TABLE 1

Slope 2 ft Sand Operations Layer

Geosynthetic Ballast System

Module 4, Phase 1

MODULE 4, PHASE 1 SIDE SLOPE BASE LINER SYSTEM SUMMARY, KIEFER LANDFILL

COUNTY OF SACRAMENTO, DEPARTMENT OF WASTE MANAGEMENT & RECYCLING

Sheet1

File details come from the government source that posted it. Updated .