Att_B_Liner_Repair_Installer_Company_and_Personnel_MQ.pdf

PDF 75 KB Posted

Attached to
Landfill Base Liner System, Sideslope Liner Repair Sacramento County, Kiefer Landfill
Solicitation number
2023-RFB-0174
Issued by
Sacramento County, California

About this file

Attachment B is a document from the Sacramento County Department of Waste Management and Recycling (DWMR) detailing minimum qualifications for geomembrane installation contractors for the Kiefer Landfill liner repair project. The document specifies rigorous requirements for both the installation company and its personnel, focusing on demonstrating extensive prior experience in waste management facility liner system projects.

The qualification requirements include the installation company having completed at least five waste management facility liner projects within the past three years, with each project being a minimum of 500,000 square feet in size. Additionally, the company must have installed a minimum of 10 million square feet of polyethylene geomembrane. Personnel qualifications are equally specific, requiring the installation supervisor/field engineer to have worked on at least two similar complex projects, the master seamer to have completed 5,000,000 square feet of geomembrane seaming work, and other seamers to have seamed a minimum of 1,000,000 square feet of geomembrane using the proposed seaming apparatus.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment B: Installer Company and Personnel Minimum Qualifications

Submit project descriptions, including project dates, size, and client contact information, for a minimum of 5 waste management facility liner projects to demonstrate Installer meets the minimum company qualifications listed below. Submit the names and qualifications of personnel the Installer proposes to use to complete the Work.

GEOMEMBRANE INSTALLATION QUALIFICATIONS

1. Company Qualifications:

a. The installation company shall have worked in a similar capacity on at least five waste management facility liner system projects in the past 3 years that are similar in complexity to the Work described in the RFB. Each of those five projects must be at least 500,000 square feet in size.

b. The installation company shall have installed a minimum of 10 million square feet of polyethylene geomembrane.

2. Personnel Qualifications:

a. Installation supervisor/field engineer shall have worked in a similar capacity on at least two jobs similar in size and complexity to the Work described in the RFB.

b. The master seamer shall have completed a minimum of 5,000,000 square feet of geomembrane seaming work using the type of seaming apparatus proposed for use on this Project.

c. Other seamers shall have seamed a minimum of 1,000,000 square feet of geomembrane.