This Quality Assurance Surveillance Plan (QASP) is for the Del Rio Sector Border Patrol Auto Parts Supply Concession, a five-year Blanket Purchase Agreement (BPA) to establish an onsite parts acquisition service for the fleet maintenance program. The contract will support the Del Rio Sector Border Patrol with a full-service auto parts supply concession located at the Del Rio Sector Headquarters Garage, including remote-site services to outstations like Carrizo Springs, Eagle Pass, Uvalde, and Comstock. Services include online part ordering, parts supply, and technical advice for fleet, all-terrain vehicles, and internal combustion engine-equipped property.
The QASP outlines detailed performance standards and surveillance methods, with monthly and annual assessments of the contractor's performance across areas including quality, schedule, cost control, business relations, and management. Performance will be evaluated using a rating system from Exceptional to Unsatisfactory, with specific criteria for each year of the contract. The Contracting Officer's Representative (COR) will conduct monthly reviews using a Surveillance Activity Checklist, and performance assessments will determine the continuation of the contract, with the potential for discontinuation if performance standards are not met.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan for
Del Rio Sector Border Patrol
Auto Parts Supply Concession
1. Purpose
This Quality Assurance Surveillance Plan (QASP) is a government developed and applied document used to ensure that systematic quality assurance methods are used in the administration of this performance-based service contract. The intent is to ensure that the contractor performs in accordance with the performance metrics and that the Government receives the quality of services called for in this contract.
The intent of the Del Rio Sector Border Patrol is to establish an onsite parts acquisition service for the fleet maintenance program, to increase the efficiency and performance of the fleet maintenance program. The contract requirement is intended to support the Del Rio Sector Border
Patrol with a contract for a full-service in-house auto parts supply concession within the Del Rio
Sector Headquarters Garage, to include remote-site (internet web-access) services to outstations including but not limited to Carrizo Springs, Eagle Pass, Uvalde and Comstock. The services provided to out-stations will include online part ordering capability, and supply of parts and part-ordering related technical advice as needed. The concession shall supply a full range of auto parts supplies to support automotive and equipment part needs for fleet, all-terrain vehicles and all internal combustion engine equipped property serviced by Del Rio Sector Fleet personnel.
This action will be met by awarding a single Blanket Purchase Agreement (BPA) for a five-year period of performance. Payment under this contract will be made via Fleet Credit Cards. The
Contractor’s performance will be monitored by the Contracting Officer’s Representative (COR) and Government Authorized Representative designated by the Contracting Officer (CO). The
COR will be available to answer questions, provide for inspections, certify invoices for payment and assist in administering the contract. A properly executed QASP will assist the Government in achieving the objectives for procurement action.
2. Authority
Authority for issuance of this QASP is provided under FAR 52.246-4 Inspection of Services—
Fixed Price (AUG 1996) to be executed by the CO or a duly authorized representative.
3. Scope
To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between the Quality Control Plan and the QASP. The Contractor is responsible for management and quality control actions necessary to meet the quality standards set forth by the contract.
The QASP is put in place to provide Government surveillance oversight of the Contractor’s efforts to assure that they are timely, effective and delivering the results specified in the contract.
4. Government Responsibilities and Resources
The following Government resources shall have responsibility for the implementation of this
QASP:
Contracting Officer (CO) – The CO ensures performance of all necessary actions for effective contracting ensures compliance with the terms of the contract and safeguards the interests of the
United States in the contractual relationship. It is the CO that assures the Contractor receives impartial, fair and equitable treatment under the terms of the contract. The CO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and assures proper Government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes the contractor deems may affect contract price, terms, or conditions shall be referred to the CO for action.
5. Methods of Quality Assurance (QA) Surveillance
a. Contractor Performance Assessment – The marketplace for these (products and services) is very competitive. As such, the successful bidder has a vested interest in the Government-generated contractor performance assessment ratings under this contract. For this procurement the Government will address the quality of product or service, schedule, cost control, business relations, management, and other important areas. As this information may affect future source selections throughout CBP, and the continuation of the contract, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool with the QASP.
b. Quality Assurance Surveillance Plan (QASP) - The below listed methods of surveillance will be used by the COR in the technical administration of this QASP. In addition to the below instructions, the form used for documentation of quality assurance surveillance is the
Surveillance Activity Checklist, Enclosure (5).
6. Surveillance
Enclosures (1), (2), (3) and (4) set forth the performance standards, incentives, definitions and surveillance methods for the contractor and COR while enclosure (5) provides the checklist and means for the COR to document the results of the surveillance. Enclosure (5) will be provided to the CO monthly for inclusion into contract file.
7. Documentation
In addition to providing monthly reports to the CO, the COR will maintain a complete Quality
Assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the originals of the Quality Assurance Checklists. All such records will be maintained for the life of the contract. The COR shall forward these records to the CO at termination or completion of the contract.
8. Enclosures
Enclosure (1) - Performance Standards - Tasks
Enclosure (2) - Performance Standards - Data
Enclosure (3) - Incentives
Enclosure (4) - Definitions for Evaluation Areas and Ratings
Enclosure (5) - Surveillance Activity Checklist
Enclosure (1)
Del Rio Sector Border Patrol Auto Parts Supply Concession
Performance Standards – Tasks
Description Performance
Standard and
Acceptable Quality
Level (AQL)
Surveillance
Method/Measure
Incentives
5.1.1 Orientation
Briefing;
Customer requirements and objectives met, on-time, 95% of the time.
Government observation and review of submittals, monthly. *
See enclosure 3.
5.1.2 Supply
Concession.
Customer requirements and objectives met, on-time, 95% of the time.
Government observation and review of submittals, monthly. *
See enclosure 3.
Description Performance
Standard and
Acceptable Quality
Level (AQL)
Surveillance
Method/Measure
Incentives
5.1.3 Operating
Schedule
Customer requirements and objectives met, on-time, 95% of the time.
Government observation and review of submittals, monthly. *
See enclosure 3.
5.1.4 Purchase
Processing
Customer requirements and objectives met, on-time, 100% of the time.
Government observation and review of submittals, monthly. *
See enclosure 3.
5.1.5 Services
Provided
Customer requirements and objectives met, on-
Government observation and
See enclosure 3.
time, 95% of the time.
review of submittals, monthly. *
5.1.6
Transaction/Inventory
Control System
Customer requirements and objectives met, on-time, 95% of the time.
Government observation and review of submittals, monthly. *
See enclosure 3.
* Government Evaluation will be accomplished by the Government COR or PMO.
Enclosure (2)
Performance
Standards – Data
Description
Performance
Standard and
Acceptable Quality
Level (AQL)
Surveillance
Method/Measure
Incentives
5.1.7 Program
Management Plan
Customer requirements and objectives met, on-time, 95% of the time.
Government observation and review of submittals, monthly. *
See enclosure 3.
5.1.8 Computerized
Inventory Control
System Report
Customer requirements and objectives met, on-time, 95% of the time.
Government observation and review of submittals, monthly. *
See enclosure 3
Enclosure (3)
Incentives
The following incentives shall apply to performance under this order.
Contractor performance assessment will be evaluated every six
(6) months.
Assessment evaluation will be used as a basis to continue or not to
Acceptable
Performance
Definition
How Measured Incentives use this BPA.
Assessment Period
Year 1: All measurement areas rated
“Satisfactory” or above. See Enclosure
(4).
Midpoint of the assessment period (6 month) evaluation using the surveillance checklists covering the previous 6 months.
(+) Meet the acceptable performance definition as a condition for year one (1). * Continue
2nd year of contract performance.
(-) Does not meet the acceptable performance definition as a condition for year one (1).
*Performance discontinued at end of 1st year.
Year 2: All measurement areas rated “Very
Good” or above. See
Enclosure (4).
Midpoint of the assessment period
(18 month) evaluation using the surveillance checklists covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for year two (2) *Continue
3rd year of contract performance.
(-) Does not meet the acceptable performance definition as a condition for year two (2).
*Performance discontinued at end of 2nd year.
Year 3: All measurement areas rated at least
“Very Good” or above. See Enclosure
(4).
Midpoint of the assessment period
(30 month) evaluation using the surveillance checklists covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for year three (3). *Continue
4th year of contract performance
(-) Does not meet the acceptable performance definition as a condition for year three (3).
*Performance discontinued at end of 3rd year.
Year
4:
All measurement areas rated at least “Very Good”. See
Enclosure (4).
Midpoint of the assessment period (42 month) evaluation using the surveillance checklists covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for year four (4). *Continue 5th year of contract performance.
(-) Does not meet the acceptable performance definition as a condition for year four (4). *
Performance discontinued at end of
4th year.
Year
5:
All measurement areas rated at least “Very Good”. See
Enclosure (4).
End of the assessment period (54 month) evaluation using the surveillance checklists covering the previous 12 months.
* The Government reserves the right to not continue beyond the effective period of this agreement if Contractor fails to meet the performance standards.
Enclosure (4)
Definitions for Evaluation Areas and Ratings
All PWS tasks, including PWS sub-tasks, will be assessed focusing on the following:
Quality of Product or Service – Assess the Contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, integration of program management specialties, management of interfaces, and management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the Contractor meets program quality.
Schedule – Assess the Contractor’s adherence to the required delivery schedule by assessing the
Contractor’s efforts during the assessment period which contribute to and or effect the schedule variance. Also address significance of scheduled events (i.e., design reviews), discuss causes, and assess the effectiveness of Contractor corrective actions.
Cost Control – Assess the Contractor’s effectiveness in forecasting, managing, and controlling contract cost. Is the contractor experiencing cost growth or under-run? If so, discuss the causes and contractor-proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon contractor provided person-hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the Contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort should be assessed.
Business Relations – Assess the timelines, completeness and quality of problem identification, corrective action plans, proposal submittals, Contractor’s reasonable and cooperative behavior, effective business relations, and customer satisfaction.
Management – Assess the Contractor’s success with timely award and management of subcontracts. Discuss the extent to which the Contractor discharges its responsibility for integration and coordination of all activity needed to execute the contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by contract; communicates appropriate information to affected program elements in a timely manner. Assess the Contractor’s risk mitigation plans. If applicable, identify any other management areas that are unique to the contract.
Other areas – Assess additional evaluation areas unique to the contract or cannot be captured elsewhere.
The evaluation ratings are as follows:
Exceptional – Performance meets contractual requirements and exceeds many of the
Government’s benefit. The contractual performance of the task and sub-task being assessed were accomplished with few minor problems for which corrective actions taken by the contractor are highly effective.
Very Good - Performance meets contractual requirements and exceeds some of the
Government’s benefit. The contractual performance of the task and sub-task being assessed were accomplished with some minor problems for which corrective actions taken by the contractor are effective.
Satisfactory - Performance meets contractual requirements. The contractual performance of the task and sub-task contain some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal - Performance does not meet some contractual requirements. The contractual performance of the task and sub-task being assessed reflect a serious problem for which the contractor has not yet been identified for corrective actions. The Contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory – Performance does not meet most contractual requirements, and recovery is not likely in a timely manner. The contractual performance of the task or sub-task contains a serious problem(s) for which the contractor’s actions appear or were ineffective.
Enclosure (5)
Surveillance Activity Checklist
Monthly Surveillance:
The COR will perform a monthly assessment of Quality, Schedule, Cost Control, Business
Relations, Management, and Other Areas as applicable utilizing the contractor performance evaluation rating definitions listed in enclosure (4).
Description Surveillance Method
Measurement
Date Planned Date Completed
5.1.1 Orientation
Briefing;
Customer requirements and objectives met, on-time, 95% of the time.
Government observation and review of submittals, monthly. *
5.1.2 Supply
Concession.
Customer requirements and objectives met, on-time, 95% of the time.
Government observation and
5.1.3 Operating
Schedule
Customer requirements and objectives met, on-time, 95% of the time.
Government observation and
5.1.4 Purchase
Processing
Customer requirements and objectives met, on-time, 100% of the time.
Government observation and
5.1.5 Services
Provided
Customer requirements and objectives met, on-time, 95% of the time.
Government observation and
5.1.6
Transaction/Invento ry Control System
Customer requirements and objectives met, on-time, 95% of the time.
Government observation and
5.1.7 Program
Management Plan
Customer requirements and objectives met, on-
15 Days after award
Document (updated as needed)
5.1.8 Computerized
Inventory Control
System Report
Customer requirements and objectives met, on-
15 Days after award
Monthly Summary of Ratings:
Quality Schedule
Number of Exceptional ____ Number of Exceptional ____
Number of Very Good ____ Number of Very Good ____
Number of Satisfactory ____ Number of Satisfactory ____
Number of Marginal ____ Number of Marginal ____
Number of Unsatisfactory ____ Number of Unsatisfactory ____
Cost Control Business Relations
Number of Exceptional ____ Number of Exceptional ____
Number of Very Good ____ Number of Very Good ____
Number of Satisfactory ____ Number of Satisfactory ____
Number of Marginal ____ Number of Marginal ____
Number of Unsatisfactory ____ Number of Unsatisfactory ____
Management Other Areas
Number of Exceptional ____ Number of Exceptional ____
Number of Very Good ____ Number of Very Good ____
Number of Satisfactory ____ Number of Satisfactory ____
Number of Marginal ____ Number of Marginal ____
Number of Unsatisfactory ____ Number of Unsatisfactory ____
Annual Surveillance:
The COR will perform an annual assessment of overall contract performance utilizing the contractor performance evaluation rating definitions listed in enclosure (4) and the monthly summary of ratings.
Description Surveillance
Method
Measure
Date
Planned
Date
Completed
Summary
Rating/Results
Quality of Product or Service
Review of
Monthly Ratings.
TBD
Schedule
Cost Control
Business
Relations
Management
Other Areas