This specification document outlines requirements for replacing boilers and pumps at the Richmond Air Traffic Control Tower located at Richmond International Airport in Richmond, Virginia. The work includes removing existing hot water boilers and pumps and replacing them with new equipment, along with associated valves, gauges, piping connections, and controls integration. The project will be conducted at a critical air traffic control facility that must remain operational 24/7, requiring coordination to avoid impacts to air traffic operations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RICHMOND ATCT
BOILER REPLACEMENT
Remove Existing hot water boilers and pumps and replace with new
REPLACE BOILERS AND PUMPS NOVEMBER 2022
RICHMOND AIR TRAFFIC CONTROL TOWER
RICHMOND, VA
TABLE OF CONTENTS 00 01 00 - 1
DOCUMENT 00010 - TABLE OF CONTENTS
Section Number
Section Title
DIVISION 1 GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 10 JOB MANAGEMENT
DIVISION 23 HEATING VENTILATION AND AIR CONDITIONING
23 05 00 COMMON WORK RESULTS FOR HVAC
23 05 13 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
23 05 19 METERS AND GAUGES FOR HVAC EQUIPMENT
23 05 23 METERS AND GAUGES FOR HVAC PIPING
23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
23 05 48 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT
23 05 93 TESTING ADJUSTING AND BALANCING FOR HVAC
23 21 23 HYDRONIC PUMPS
23 51 00 BREECHINGS, CHIMNEYS, AND STACKS
DIVISION 9-FINISHES
DRAWINGS
TSC-23-210-G001 COVER
TSC-23-210-M001 GROUND FLOOR MECHANICAL PLAN
TSC-23-210-M002 DEMOLISHION PLAN
TSC-23-210-M003 NEW WORK BOILER ROOM
TSC-23-210-M004 SCHEDULES
END OF TABLE OF CONTENTS
SUMMARY OF WORK 01 11 00 - 1
SECTION 01 11 00 - SUMMARY OF WORK
PART 1-GENERAL
1.1 SCOPE OF WORK: These Contract Documents cover the requirements of the Federal Aviation Administration (FAA), Eastern Service Area (ESA) hereinafter referred to as the Government, for the work associated with the Air Traffic Control Tower (ATCT) Project, located at Richmond International Airport 5701 Gulfstream Rd, Richmond VA.
The work is at a critical facility that must remain operational 24 hours a day 7 days a week.
The Contractor must not interfere with or disrupt air traffic operations. The work shall not discharge static electricity, damage, or interfere with other equipment at the facility, and shall not compromise security.
1.2 SUMMARY OF WORK: The work includes the removal of the two natural gas fired boilers and associated hot water pumps in room 118 of the base building at the ATCT and replacing them with new boilers and pumps. The work will include all connectors, valves, and gauges to connect the boilers and pumps to the existing hot water supply and return piping. New boilers and pumps will be installed on existing maintenance pads in the same location as the existing equipment.
The existing maintenance pads can be modified to accept the new equipment. The new boilers will be connected to the existing DC system at the existing DDC panel using the same control points as the existing equipment.
This summary does not cover all aspects of the work. See other specification sections and the drawings for more detailed information.
1.3 INTENT OF CONTRACT DOCUMENTS
A. These Contract Documents (specifications and drawings) indicate the work to be performed for the project. All material, labor, equipment, tools, layout, and supervision must be furnished by the Contractor to complete the work and provide complete operating systems. The Contractor is responsible for the supervision, health and safety, inspection, and quality control of its own work, workers, work areas, and lower tiered subcontractors. Work shall be performed to ICC, NFPA, and FAA codes and standards, and manufacturers' recommendations. All work performed and all materials and equipment used will be subject to approval by the Contracting Officer. This must include, but not be limited to, construction, testing, inspection, scheduling, reporting, and submittals.
B. Titles: Titles to divisions and sections of the specifications and notes and titles on drawings referring to subcontractors, division of work by trade, or type of work are used for convenience and do not imply any separate contractual arrangements of work assignments. Such separations into titles, divisions, sections, or notes should not be construed to establish limits between the Contractor and its subcontractors.
C. Reference to known standards within the Contract Documents means the latest edition in effect on the date of solicitation, unless specified otherwise.
D. Where Contract Documents refer to "Related Work in Other Sections" or "Related Requirements", the Contractor should not consider the list of specification divisions/sections to be all-inclusive. These lists are provided as a convenience for cross-reference and coordination.
E. Order of Preference: Generally, the written word takes precedence over the drawings. Figures marked on drawings should be followed in preference to scale measurements. Large scale
SUMMARY OF WORK 01 11 00 - 2
drawings should govern small scale drawings. The Contractor should not use dimensions scaled from the drawings. All dimensions shown on the drawings must be verified by the Contractor by actual measurements in the field. Any discrepancy between the drawings and specifications and the existing conditions must be referred to the Contracting Officer for resolution before any work affected is performed. The Contractor must compare all drawings and verify the figures before laying out the work and will be responsible for any errors which might have avoided thereby.
1.4 CONTRACT DOCUMENTS
A. Specification and Drawing Review: The Contractor is responsible for complete knowledge and understanding of the Contract Documents throughout the life of the Contract. The Contractor must check the Contract Documents immediately upon their receipt and promptly notify the Contracting Officer of any discrepancies.
B. Contracting Officer: The Contracting Officer (CO) is the person designated to act on behalf of the Government in the performance of this contract. The Contracting Officer's Representative (COR) is the Contracting Officer's authorized representative. The COR is the point of contact for all work on site between the Contractor and Government. The Contractor will coordinate all work through the COR, or will keep the COR informed when dealing directly with the Contracting Officer, and the Government will coordinate through the COR to the Contractor, except in case of urgency or emergency.
1.5 MEASUREMENT AND PAYMENT
A. The contract price constitutes full compensation for furnishing all plant, labor, materials, appurtenances, and incidentals, and performing all operations necessary to construct and complete the items in accordance with these Contract Documents performed by the Contractor.
Payment for each item will be considered as full compensation, notwithstanding that all features may not be mentioned herein. No separate payment will be made for the work, services, or operations required by the Contractor, as specified in Division 1 General Requirements, to complete the project in accordance with these specifications; all costs thereof will be considered as incidental to the work.
1.6 CORRESPONDENCE: All correspondence must be addressed and delivered electronically to the Contracting Officer and the COR, and must be serially numbered commencing with number one (1), with no numbers missing or duplicated. All files/documents must be legible. Enclosures attached or transmitted with the correspondence must also be furnished electronically with copy to the COR. Each serial correspondence must include the contract number and project name and must have only one subject. The Contractor must create and maintain a serial letter log that shows the serial letter number, date, topic, and disposition if applicable. The Contractor must submit the updated serial letter log monthly.
PARTS 2 - PRODUCTS
PARTS 3 - EXECUTION
(Not used)
(Not used)
*** END OF SECTION***
JOB MANAGEMENT 01 14 10-1
SECTION 01 14 10 - JOB MANAGEMENT
PART 1 - GENERAL
1.1 SUMMARY
A. This section describes the required performance of administrative job related requirements necessary for the proper conduct of the work as indicated in this section.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Materials used on this project shall be in accordance with the requirements of the individual sections of these specifications and drawings.
2.2 MATERIALS CONTAINING ASBESTOS
A. No materials or products which contain asbestos in any form may be introduced for use on this project.
PART 3 - EXECUTION
3.1 FIELD MEASUREMENTS
A. Contractor is responsible for making complete field measurements. Check all dimensions at the job site for components requiring fit to surrounding conditions. Check shop drawings and indicate the actual dimension available at all locations.
3.2 PROJECT SAFETY AND HEALTH PROGRAM REQUIREMENTS
A. All on-site work under this Contract shall be performed in compliance with the requirements of all Federal and State Occupational Safety and Health laws and regulations as they apply to construction site activity.
1. Comply with applicable Occupational Safety and Health Standard (29 CFR 1910 and 1926) promulgated pursuant to authority of the Occupational Safety and Health Act of 1970.
2. Comply with any other applicable Federal, State, or local regulations governing workplace safety to the extent that they do not conflict with other clauses of this contract. If a conflict exists between sections of this Contract, the more stringent requirement takes precedence.
3. Take all other proper precautions to protect the safety and health of the contractor’s employees, Federal Aviation Administration employees, and the public. Provide and maintain barricades, guard rails, covered walkways, lighting devices and other protective devices necessary to warn and protect the workmen and general public from hazards at the construction site.
4. Contractor shall maintain a Project Safety and Health Plan which shall address site-specific safety and health requirements and procedures to include, but not limited to excavations, fall protection, electrical safety, scaffold safety, cranes, steel erection, welding, burning, and cutting safety, concrete and masonry work.
JOB MANAGEMENT 01 14 10-2
5. In addition to compliance with applicable statutory and regulatory requirements, the Project Safety and Health Plan shall contain provisions for mandatory safety orientation for every contractor, subcontractor, and vendor employee assigned or sent to the site. Safety orientation shall cover as a minimum the rules and regulations governing on-site construction activities, special known hazards, accident prevention, emergency procedures, and personal protection equipment requirements. Upon completion of the safety orientation, each attendee will be issued a hard hat sticker. No contractor, subcontractor or vendor employee will be allowed to enter or remain on-site without a hard hat bearing a valid safety orientation sticker.
6. As work progresses, the Plan shall be updated to adapt to new situations and new conditions.
Changes to the Project Safety and Health Plan shall be made only with full concurrence of the
COR.
7. If any unforeseen hazard should become evident during the performance of the work, bring such information to the attention of the COR, verbally and in writing. Take the necessary action to re-establish and maintain safe working conditions.
8. The Project Safety and Health Plan shall include SDS for materials and products to be used on the project. SDS shall be maintained at the project site where all employees will have access.
B. The Project Superintendent shall act as Safety Director and be responsible for the implementation, execution and oversight of the Project Safety and Health Plan. The Superintendent shall have authority from the contractor to stop work to abate hazardous conditions or unsafe practices, and to eject any contractor, subcontractor, or vendor employee from the project site for failure to comply with safety requirements. The Project Superintendent’s authority, responsibilities, and duties in the capacity of Safety Director shall be incorporated as part of the written Project Safety and Health Plan. These responsibilities shall include, but not be limited to conducting subcontractor pre-construction safety program reviews, conducting the employee safety orientation training, conducting weekly safety meetings, conducting daily site safety inspections, auditing subcontractor safety compliance, conducting accident investigations, and preparing required periodic and special safety reports.
C. When the Contractor is notified by the COR of non-compliance with the safety or health provisions of this contract, the contractor shall immediately, unless otherwise instructed, correct the unsafe or unhealthy condition. If the Contractor fails to comply promptly, all or part of the Work will be stopped by notice from the COR. There will not be any allowance for time or compensation due to work stoppage for an unsafe condition.
D. The contractor will maintain an accurate record of exposure data and all accidents incidental to work performed under this Contract. The contractor must report the exposure data and accidents to the COR.
E. All subcontracts and vendor purchase orders related to this project shall contain provisions requiring compliance with the contractor’s approved Project Safety and Health Plan.
F. Prior to commencing construction, representatives of the Contractor, including the Project
Superintendent, shall hold a Safety Meeting with designated representatives of the Contracting Officer for the purpose of reviewing the approved Project Safety and Health Plan and discussing the implementation of the plan.
G. The Contractor shall take all necessary precautions to prevent injury to the public, occupants, or damage to property of others. The public and occupants includes all persons not employed by the Contractor or a subcontractor.
JOB MANAGEMENT 01 14 10-3
H. Wherever practical, the work area shall be fenced, barricaded or otherwise blocked off from public or occupants to prevent unauthorized entry into the work area.
1. Provide traffic barricades and traffic control signage where construction activities occur in vehicular areas.
2. Corridors, aisles, stairways, doors and exit ways shall not be obstructed or used in a manner to encroach upon routes of ingress or egress utilized by the public or occupants, or to present an unsafe or unhealthy condition to the public or occupants.
3. Store, position and use equipment, tools, materials, scraps and trash in a manner that does not present a hazard to the public or occupants by accidental shifting, ignition or other hazardous activity.
4. Store and transport refuse and debris in a manner to prevent unsafe and unhealthy conditions for the public and occupants. Cover refuse containers, and remove refuse on a frequent regular basis acceptable. Use tarpaulins or other means to prevent loose transported materials from dropping from trucks.
3.3 FIRE PROTECTION
A. Maintain fire extinguishers at construction site in sufficient number to adequately protect the structures during construction. Provide at least one 20 pound ABC fire extinguisher at intervals not to exceed 500 feet. Provide at least one fire extinguisher for welders or other trades using open flames in the execution of their work. All construction trailers shall possess at least one 10 pound ABC fire extinguisher. Maintain “Fire Watch” personnel, with fire extinguisher in hand, during all welding/cutting or other open flame operations on, within, or near existing facility.
B. Maintain the telephone number of the local fire department and emergency services. Keep number posted conspicuously near telephones throughout site
3.4 DISRUPTION TO SERVICES
A. The loss or shut down of existing FAA air traffic control equipment or associated support equipment for any amount of time will jeopardize safety of the flying public.
B. Disruption to existing utilities, piping, or electrical services must be held to a minimum. Carefully plan work in a manner that such disruptions are coordinated with the COR. Any operation which requires shut down of some portion of the facilities operation must be closely coordinated 10 days in advance with the COR.
C. Maintain storm sewers and sanitary sewers in service at all times. In the event that it becomes necessary to disrupt one of the utilities, provide temporary service around the construction or otherwise construct the structure in a manner that the flow is not curtailed.
3.5 ENVIRONMENTAL PROTECTION AND POLLUTION CONTROL
A. The contractor shall perform all work necessary to implement and accomplish a program to prevent environmental pollution during or as a result of construction performed under this contract.
B. Take necessary precautions to prevent contamination of soil or atmosphere by the discharge of noxious substances resulting from construction operations. Provide equipment and personnel and perform emergency measures necessary to contain any spillage. If contamination of the soil does occur, excavate contaminated soil and dispose of at an off-site location in accordance with
JOB MANAGEMENT 01 14 10-4
applicable Federal, State and local regulations. Fill resulting excavations with suitable backfill and compact to the density of the surrounding undisturbed soil.
C. Take measures to prevent dispersal of pollutants into the atmosphere. Do not dump or otherwise discharge noxious, volatile or harmful fluids into drains or sewers.
3.6 HANDLING OF HAZARDOUS MATERIALS
A. If suspect hazardous materials are encountered during this project notify the COR immediately. Do not disturb suspect hazardous materials.
3.7 BLASTING
A. Blasting will not be permitted at this site.
3.8 HAUL ROUTE
A Coordinate a haul route with COR which will minimize impact to the airport operations.
3.9 MATERIALS AND EQUIPMENT
A. Ordering of Materials: Orders for materials and equipment shall be made promptly after approval of submittal in order to avoid any delay to project schedule.
B. Transportation and Delivery: Arrange for delivery to avoid impact to project schedule and to avoid impact to the operation of the existing facility. Deliver materials and equipment in their original, unopened containers bearing the manufacturers label.
C. Storage: Store materials and equipment to provide protection from damage from damage, dust and moisture. Store all flammable or volatile materials properly outdoors.
D. Store granular materials in a well-drained area on solid surfaces to prevent contamination.
E. Arrange storage in a manner to provide easy access for inspection.
F. Manufacture and Fabrication: Design, fabricate and assemble materials and equipment using the best engineering and shop practices. Manufacture all like parts of duplicate units to standard sizes and gages, to be interchangeable. Two or more items of the same kind shall identical. Equipment capacities, sizes and dimensions shown or specified shall be adhered to unless variations are approved I writing.
G. Manufacturer’s Instructions: When contract documents require that the installation of the work shall comply with the manufacturer’s printed instructions, obtain and distribute copies of such instructions to those involved in the installation, including (2) copies to the COR. Maintain one set of instructions at the job site. Strict adherence to the manufacturer’s instructions is required. When project conditions or unique circumstances require deviation from the printed instructions, consult with the COR for further guidance. Do not proceed until clear direction has been obtained.
END OF SECTION 01 04 10
COMMON WORK RESULTS FOR HVAC 23 05 00 - 1
SECTION 23 05 00 - COMMON WORK RESULTS FOR HVAC
A. This Section includes the following:
1. Piping materials and installation instructions common to most piping systems.
2. Transition fittings.
3. Dielectric fittings.
4. Mechanical sleeve seals.
5. Sleeves.
6. Escutcheons.
7. Grout.
8. Hot Tapping, Line Stopping and Bypasses.
9. Drip Pans.
10. Mechanical Demolition.
11. Equipment installation requirements common to equipment sections.
12. Painting and finishing.
13. Concrete bases.
14. Supports and anchorages.
15. For grounding of mechanical materials, see electrical sections.
16. Temporary HVAC and Local Ventilation.
1.2 DEFINITIONS
A. Finished Spaces: Spaces other than mechanical and electrical equipment rooms, furred spaces, pipe and duct chases, unheated spaces immediately below roof, spaces above ceilings, unexcavated spaces, crawlspaces, and tunnels.
B. Exposed, Interior Installations: Exposed to view indoors. Examples include finished occupied spaces, above drop ceilings, below raised access floors, attics and crawl spaces containing mechanical equipment that require access/maintenance, and mechanical equipment rooms.
C. Exposed, Exterior Installations: Exposed to view outdoors or subject to outdoor ambient temperatures and weather conditions. Examples include rooftop and cooling tower yard locations and within unheated shelters in areas exposed to building occupant contact.
D. Concealed, Interior Installations: Concealed from view and protected from physical contact by building occupants. Examples include above inaccessible hard ceilings and within inaccessible chases.
E. Concealed, Exterior Installations: Concealed from view and protected from weather conditions and physical contact by building occupants but subject to outdoor ambient temperatures.
Examples include installations within unheated shelters.
COMMON WORK RESULTS FOR HVAC 23 05 00 - 2
F. The following are industry abbreviations for plastic materials:
1. ABS: Acrylonitrile-butadiene-styrene plastic.
2. CPVC: Chlorinated polyvinyl chloride plastic.
3. PE: Polyethylene plastic.
4. PVC: Polyvinyl chloride plastic.
G. The following are industry abbreviations for rubber materials:
1. EPDM: Ethylene-propylene-diene terpolymer rubber.
2. NBR: Acrylonitrile-butadiene rubber.
1.3 SUBMITTALS
A. Product Data: For the following:
1. Piping Materials.
2. Transition fittings.
3. Dielectric fittings.
4. Mechanical sleeve seals.
5. Sleeves.
6. Escutcheons.
7. Grout.
8. Hot Tapping, Line Stopping and Bypasses.
9. Drip pans.
10. Mechanical Installation - Rigging.
11. Painting and Finishing.
12. Concrete Bases.
13. Supports and Anchorages.
14. Temporary HVAC and Local Ventilation Plan and Schedule.
B. Prepare coordination drawings to a 1/4-inch scale. Detail major elements, components, and systems of mechanical equipment and materials in relationship with other systems, installations, and building components. Show space requirements for installation and access. Show where sequence and coordination of installations are important to the efficient flow of the Work.
Show proposed locations of piping, ductwork, equipment, and materials. Include the following:
1. Planned piping layout, including valve and specialty locations and valve stem movement.
2. Planned duct systems layout, including elbow radii and duct accessories.
3. Clearances for installing and maintaining insulation.
4. Clearances for servicing and maintaining equipment include space for equipment disassembly required for periodic maintenance.
5. Equipment service connections and support details.
6. Exterior wall, floor, and foundation penetrations.
7. Fire-rated wall and floor penetrations.
8. Sizes and location of required concrete pads and bases.
9. Access panel and access door locations.
10. Scheduling, sequencing, movement, and positioning of large equipment into the building during construction. Including written rigging plan with schedule.
COMMON WORK RESULTS FOR HVAC 23 05 00 - 3
11. Floor plans, elevations, and details to indicate penetrations in floors, walls, and ceilings and their relationship to other penetrations and installations.
12. Reflected ceiling plans to coordinate and integrate installations, air outlets and inlets, light fixtures, communication systems components, sprinklers, and other ceiling-mounted items.
13. Drawings detailing fabrication and installation for metal supports and anchorage for mechanical materials and equipment. Supports and anchorage shall include vibration isolation and seismic bracing per Division 23 Section "Vibration and Seismic Control for
HVAC."
C. Welder certificates signed by Contractor certifying that welders comply with requirements specified below.
D. Rigging certificates provided by Contractor certifying that rigging operations are certified to handle specific equipment.
E. Safety Data Sheets (SDS): Submit SDS for adhesives, paints, solvents, fireproofing, sealants and any other product which may cause acute or chronic health or safety effects to facility occupants.
F. Ventilation Plan: Submit ventilation plan which defines how temporary local ventilation will be provided. The ventilation plan must be approved by COR prior to start of work.
G. Prepare and distribute operations and maintenance data as specified in Division 1 Section, "Operation and Maintenance Manual Data."
1.4 QUALITY ASSURANCE
A. Steel Support Welding: Qualify processes and operators according to AWS Dl.1, "Structural Welding Code--Steel."
B. Steel Pipe Welding: Qualify processes and operators according to ASME Boiler and Pressure
Vessel Code: Section IX, "Welding and Brazing Qualifications."
1. Comply with provisions in ASME B31, "Building Services Piping."
2. Certify that each welder has passed AWS qualification tests for welding processes involved and that certification is current.
C. Electrical Characteristics for HVAC Equipment: Equipment of higher electrical characteristics may be furnished provided such proposed equipment is approved in writing and connecting electrical services, circuit breakers, and conduit sizes are appropriately modified. If larger equipment is approved, no additional costs shall be approved for these increases. If minimum energy ratings or efficiencies are specified, equipment shall comply with requirements.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Deliver pipes and tubes with factory-applied end caps. Maintain end caps through shipping, storage, and handling to prevent pipe end damage and to prevent entrance of dirt, debris, and moisture.
B. Protect stored pipes and tubes from moisture and dirt. Elevate above grade. When stored inside, do not exceed structural capacity of the floor.
COMMON WORK RESULTS FOR HVAC 23 05 00 - 4
C. Protect flanges, fittings, and piping specialties from moisture and dirt.
D. Provide covered shelters for storage of all mechanical equipment. Cover all equipment with polyethylene covering.
E. Rigging Company shall provide certificate(s) for handling equipment movement for each specific piece of equipment and rigging technique.
1.6 COORDINATION
A. Arrange for pipe spaces, chases, slots, and openings in building structure during progress of construction, to allow for HVAC installations.
B. Coordinate installation of required supporting devices and set sleeves m poured-in-place concrete and other structural components as they are constructed.
C. Coordinate requirements for access panels and doors for HVAC items requiring access that are concealed behind finished surfaces.
D. Coordinate installation, startup, testing and balancing of equipment with commissioning work.
Refer to Division 1 Section, "General Commissioning Requirements."
E. Provide written rigging plan and make available onsite.
2.1 MANUFACTURERS
A. In other Part 2 articles where subparagraph titles below introduce lists, the following requirements apply for product selection:
1. Known Acceptable Source: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the manufacturers specified.
2.2 PIPE, TUBE, AND FITTINGS
A. Refer to individual Divisions 23 Piping Sections for pipe, tube, and fitting materials and joining methods.
B. Pipe Threads: ASME B1.20.1 for factory-threaded pipe and pipe fittings.
2.3 JOINING MATERIALS
A. Refer to individual Divisions 23 Piping Sections for special joining materials not listed below.
B. Pipe-Flange Gasket Materials: Suitable for chemical and thermal conditions of piping system contents.
COMMON WORK RESULTS FOR HVAC 23 05 00 - 5
1. ASME B16.21, nonmetallic, flat, asbestos-free, 1/8-inch maximum thickness unless thickness or specific material is indicated.
a. Full-Face Type: For flat-face, Class 125, cast-iron and cast-bronze flanges.
2. AWWA Cll0, rubber, flat face, 1/8 inch thick, unless otherwise indicated; and full-face or ring type, unless otherwise indicated.
C. Flange Bolts and Nuts: ASME Bl8.2.1, carbon steel, unless otherwise indicated.
D. Solder Filler Metals: ASTM B 32, lead-free alloys. Include water-flushable flux according to
ASTMB 813.
E. Brazing Filler Metals: AWS A5.8, BCuP Series, copper-phosphorus alloys for general-duty brazing, unless otherwise indicated; and AWS A5.8, BAgl, silver alloy for refrigerant piping, unless otherwise indicated.
F. Welding Filler Metals: Comply with AWS Dl0.12 for welding materials appropriate for wall thickness and chemical analysis of steel pipe being welded.
2.4 TRANSITION FITTINGS
A. AWWA Transition Couplings: Same size as, and with pressure rating at least equal to and with ends compatible with, piping to be joined.
1. Known Acceptable Source:
a. Cascade Waterworks Mfg. Co.
b. Dresser Industries, Inc.; DMD Div.
c. Ford Meter Box Company, Incorporated (The); Pipe Products Div.
d. JCM Industries.
e. Smith-Blair, Inc.
f. Viking Johnson.
2. Underground Piping (NPS 2) and Larger: AWWA C219, metal sleeve-type coupling.
3. Aboveground Pressure Piping: Pipe fitting.
2.5 DIELECTRIC FITTINGS
A. Description: Combination fitting of copper alloy and ferrous materials with threaded, solder-joint, plain, or weld-neck end connections that match piping system materials.
B. Insulating Material: Suitable for system fluid, pressure, and temperature.
C. Dielectric Unions: Factory-fabricated, union assembly, for 250-psig minimum working pressure at 180 deg F.
COMMON WORK RESULTS FOR HVAC 23 05 00 - 6
a. Capitol Manufacturing Co.
b. Central Plastics Company.
c. Eclipse, Inc.
d. Epco Sales, Inc.
e. Hart Industries, International, Inc.
f. Watts Industries, Inc.; Water Products Div.
g. Zurn Industries, Inc.; Wilkins Div.
D. Dielectric Flanges: Factory-fabricated, companion-flange assembly, for 150- or 300-psig minimum working pressure as required to suit system pressures.
a. Capitol Manufacturing Co.
b. Central Plastics Company.
c. Epco Sales, Inc.
d. Watts Industries, Inc.; Water Products Div.
E. Dielectric-Flange Kits: Companion-flange assembly for field assembly. Include flanges, full-face- or ring-type neoprene or phenolic gasket, phenolic or polyethylene bolt sleeves, phenolic washers, and steel backing washers.
a. Advance Products & Systems, Inc.
b. Calpico, Inc.
c. Central Plastics Company.
d. Pipeline Seal and Insulator, Inc.
2. Separate companion flanges and steel bolts and nuts shall have 150- or 300-psig minimum working pressure where required to suit system pressures.
F. Dielectric Couplings: Galvanized-steel coupling with inert and noncorrosive, thermoplastic lining; threaded ends; and 300-psig minimum working pressure at 225 deg F.
a. Calpico, Inc.
b. Lochinvar Corp.
G. Dielectric Nipples: Electroplated steel nipple with inert and noncorrosive, thermoplastic lining;
plain or threaded ends; and 300-psig minimum working pressure at 225 deg F.
a. Perfection Corp.
b. Precision Plumbing Products, Inc.
c. Sioux Chief Manufacturing Co., Inc.
d. Victaulic Co. of America.
2.6 MECHANICAL SLEEVE SEALS
COMMON WORK RESULTS FOR HVAC 23 05 00 - 7
A. Description: Modular sealing element unit, designed for field assembly, to fill annular space between pipe and sleeve.
a. Advance Products & Systems, Inc.
b. Calpico, Inc.
c. Metraflex Co.
d. Linkseal, a division of Pipeline Seal and Insulator, Inc.
2. Sealing Elements: EPDM interlocking links shaped to fit surface of pipe. Include type and number required for pipe material and size of pipe.
3. Pressure Plates: Stainless steel. Include two for each sealing element.
4. Connecting Bolts and Nuts: Stainless steel of length required to secure pressure plates to sealing elements. Include one for each sealing element.
2.7 SLEEVES
A. Galvanized-Steel Sheet: 0.0239-inch minimum thickness; round tube closed with welded longitudinal joint.
B. Steel Pipe: ASTM A 53, Type E, Grade B, Schedule 40, galvanized, plain ends.
2.8 GROUT
A. Description: ASTM C 1107, Grade B, nonshrink and nonmetallic, dry hydraulic-cement grout.
1. Characteristics: Post-hardening, volume-adjusting, nonstaining, noncorrosive, nongaseous, and recommended for interior and exterior applications.
2. Design Mix: 5000-psi, 28-day compressive strength.
3. Packaging: Premixed and factory packaged.
2.9 DRIP PANS
A. Provide drip pans fabricated from minimum 22 gauge galvanized sheet metal with water tight joints and three inch high sides. Reinforce top with structural angle or by rolling top lip of side over 1/4 inch diameter steel rod. Provide drain hole, gasket, and flange at bottom low point for 1-inch drain line connection. Slope drip-pan minimum of 1/8-inch 1-ft towards drain connection.
Support drip pan every 6-ft.
2.10 HOT TAPPING, LINE STOPPING AND BYPASSING
A. Known Acceptable Source: TDW Inc.
B. Hot tap connections with stopple fittings shall be made in the hydronic system where shown on the drawings to bypass or isolate existing portions of the system without interruption of service.
COMMON WORK RESULTS FOR HVAC 23 05 00 - 8
C. Hot tap fittings, stopple fittings, and accessories shall meet ANSI class 150 service ratings after plugging equipment has been removed.
D. Stopple tee shall be 3-way type, to facilitate connection and use of a plugging machine to temporarily isolate a portion of the existing piping, while allowing flow to be diverted to new piping. Bag style line (inflatable) line stops or line plugs are not permitted.
E. Tees shall be fabricated from ASTM A106 grade B pipe, or ASTM A234 Grade WPB steel.
F. Tee shall be provided with a matching cover flange and gasket, bolts and plastic caplugs, and a completion plug with O-ring.
G. Completion plug with O-ring shall allow plugging of 3-way tee for application of cover flange at the end of the hot tapping procedure.
H. Provide necessary services and equipment for hot tap connections.
3.1 MECHANICAL DEMOLITION
A. Refer to Division 1 Sections "Cutting and Patching" and "Selective Demolition" for general demolition requirements and procedures.
B. Disconnect, demolish, and remove mechanical systems, equipment, and components indicated to be removed.
1. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.
2. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with same or compatible piping material. Piping located below concrete floor slabs on grade shall be filled with concrete slurry.
3. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.
4. Ducts to Be Abandoned in Place: Cap or plug ducts with same or compatible ductwork material.
5. Equipment to Be Removed: Disconnect and cap services and remove equipment, including bases, hangers, supports, etc.
6. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment; when appropriate, reinstall, reconnect, and make equipment operational.
7. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and deliver to owner.
C. If pipe, insulation, or equipment to remain is damaged in appearance or is unserviceable, remove damaged or unserviceable portions and replace with new products of equal capacity and quality.
COMMON WORK RESULTS FOR HVAC 23 05 00 - 9
3.2 PIPING SYSTEMS - COMMON REQUIREMENTS
A. Install piping according to the following requirements and Division 23 Sections specifying piping systems.
B. Be aware that the space beneath the access floor will be used as an air delivery plenum and as such the installer shall take the necessary precautions when installing work so as not to impact the integrity of the plenum space specific to air leakage and cleanliness. Any penetrations or holes in the underfloor plenum created for or resulting from the work performed under this division shall be properly sealed to prevent air leakage.
C. Be aware that the sound control within this facility is required and as such the installer shall take the necessary precautions when installing work so as not to impact the integrity of sound rated partitions around critical spaces, fan rooms, mechanical rooms and boiler rooms. Any penetrations or holes in floors or partitions created for or resulting from the work performed under this division shall be properly sealed with acoustical joint sealant .
D. Drawing plans, schematics, and diagrams indicate general location and arrangement of piping systems. Indicated locations and arrangements were used to size pipe and calculate friction loss, expansion, pump sizing, and other design considerations. Install piping as indicated unless deviations to layout are approved on Coordination Drawings.
E. Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless specifically indicated otherwise.
F. Install piping above accessible ceilings to allow sufficient space for ceiling panel removal.
G. Install piping to permit valve servicing.
H. Install piping at indicated slopes.
I. Install piping free of sags and bends.
J. Install fittings for changes in direction and branch connections.
K. Install piping to allow application of insulation.
L. Select system components with pressure rating equal to or greater than system operating pressure.
M. Install escutcheons for penetrations of walls, ceilings, and floors according to the following:
1. Piping:
a. Piping with Fitting or Sleeve Protruding from Wall: One-piece, deep-pattern type.
b. Chrome-Plated Piping: One-piece, cast-brass type with polished chrome-plated finish.
c. Insulated Piping: One-piece, stamped-steel type with spring clips.
d. Bare Piping at Wall and Floor Penetrations in Finished Spaces: One-piece, cast-brass type with polished chrome-plated finish.
e. Bare Piping at Wall and Floor Penetrations in Finished Spaces: One-piece, stamped-steel type.
COMMON WORK RESULTS FOR HVAC 23 05 00 - 10
f. Bare Piping at Ceiling Penetrations in Finished Spaces: One-piece, cast-brass type with polished chrome-plated finish.
g. Bare Piping at Ceiling Penetrations in Finished Spaces: One-piece, stamped-steel type and set screw.
h. Bare Piping in Unfinished Service Spaces: One-piece, cast-brass type with polished chrome-plated finish.
i. Bare Piping in Unfinished Service Spaces: One-piece, stamped-steel type with concealed hinge and set screw or spring clips.
j. Bare Piping in Equipment Rooms: One-piece, cast-brass type.
k. Bare Piping in Equipment Rooms: One-piece, stamped-steel type with set screw or spring clips.
l. Bare Piping at Floor Penetrations in Equipment Rooms: One-piece, floor-plate type.
N. Sleeves are not required for core-drilled holes.
0. Permanent sleeves are not required for holes formed by removable PE sleeves.
P. Install sleeves for pipes passing through concrete and masonry walls and concrete floor and roof slabs.
Q. Install sleeves for pipes passing through concrete and masonry walls, gypsum-board partitions, and concrete floor and roof slabs.
1. Cut sleeves to length for mounting flush with both surfaces.
a. Exception: Extend sleeves installed in floors of mechanical equipment areas or other wet areas 2 inches above finished floor level. Extend cast-iron sleeve fittings below floor slab as required to secure clamping ring if ring is specified.
2. Install sleeves in new walls and slabs as new walls and slabs are constructed.
3. Install sleeves that are large enough to provide 1/4-inch annular clear space between sleeve and pipe or pipe insulation. Use the following sleeve materials:
a. Steel Pipe Sleeves: For pipes smaller than NPS 6.
b. Steel Sheet Sleeves: For pipes NPS 6 and larger, penetrating gypsum-board partitions.
c. Stack Sleeve Fittings: For pipes penetrating floors with membrane waterproofing.
Secure flashing between clamping flanges. Install section of cast-iron soil pipe to extend sleeve to 2 inches above finished floor level.
1) Seal space outside of sleeve fittings with grout.
4. Except for underground wall penetrations, seal annular space between sleeve and pipe or pipe insulation, using joint sealants appropriate for size, depth, and location of joint.
R. Aboveground, Exterior-Wall Pipe Penetrations: Seal penetrations using sleeves and mechanical sleeve seals. Select sleeve size to allow for 1-inch annular clear space between pipe and sleeve for installing mechanical sleeve seals.
1. Install steel pipe for sleeves smaller than 6 inches in diameter.
2. Install cast-iron "wall pipes" for sleeves 6 inches and larger in diameter.
COMMON WORK RESULTS FOR HVAC 23 05 00 - 11
3. Mechanical Sleeve Seal Installation: Select type and number of sealing elements required for pipe material and size. Position pipe in center of sleeve. Assemble mechanical sleeve seals and install in annular space between pipe and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make watertight seal.
S. Underground, Exterior-Wall Pipe Penetrations: Install cast-iron "wall pipes" for sleeves. Seal pipe penetrations using mechanical sleeve seals. Select sleeve size to allow for 1-inch annular clear space between pipe and sleeve for installing mechanical sleeve seals.
1. Mechanical Sleeve Seal Installation: Select type and number of sealing elements required seals and install in annular space between pipe and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make watertight seal. Seal exterior side of wall penetration with elastomeric or urethane sealant that remains pliable after curing.
T. Existing Underground, Exterior-Wall Pipe Penetrations: clean and prepare existing penetration for mechanical sleeve seals. Seal pipe penetrations using mechanical sleeve seals.
1. Mechanical Sleeve Seal Installation: Select type and number of sealing elements required seals and install in annular space between pipe and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make watertight seal. Seal exterior side of wall penetration with elastomeric or urethane sealant that remains pliable after curing.
U. Fire-Barrier Penetrations: Maintain indicated fire rating of walls, partitions, ceilings, and floors at pipe penetrations. Seal pipe penetrations with firestop materials.
V. Verify final equipment locations for roughing-in.
W. Refer to equipment specifications in other Sections of these Specifications for roughing-in requirements.
3.3 PIPING JOINT CONSTRUCTION
A. Join pipe and fittings according to the following requirements and Division 23 Sections specifying piping systems.
B. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe.
C. Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before assembly.
D. Soldered Joints: Apply ASTM B 813, water-flushable flux, unless otherwise indicated, to tube end. Construct joints according to ASTM B 828 or CDA's "Copper Tube Handbook," using lead-free solder alloy complying with ASTM B 32.
E. Brazed Joints: Construct joints according to AWS's "Brazing Handbook," "Pipe and Tube"
Chapter, using copper-phosphorus brazing filler metal complying with AWS A5.8.
F. Threaded Joints: Thread pipe with tapered pipe threads according to ASME Bl.20.1. Cut threads
COMMON WORK RESULTS FOR HVAC 23 05 00 - 12
full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full ID.
Join pipe fittings and valves as follows:
1. Apply appropriate tape or thread compound to external pipe threads unless dry seal threading is specified.
2. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or damaged. Do not use pipe sections that have cracked or open welds.
G. Welded Joints: Construct joints according to AWS D10.12, using qualified processes and welding operators according to Part 1 "Quality Assurance" Article.
H. Flanged Joints: Select appropriate gasket material, size, type, and thickness for service application. Install gasket concentrically positioned. Use suitable lubricants on bolt threads.
3.4 PIPING CONNECTIONS
A. Make connections according to the following, unless otherwise indicated:
1. Install unions, in piping NPS 2 and smaller, adjacent to each valve and at final connection to each piece of equipment.
2. Install flanges, in piping NPS 2-1/2 and larger, adjacent to flanged valves and at final connection to each piece of equipment.
3. Dry Piping Systems: Install dielectric unions and flanges to connect piping materials of dissimilar metals.
4. Wet Piping Systems: Install dielectric coupling and nipple fittings to connect piping materials of dissimilar metals.
3.5 EQUIPMENT INSTALLATION - COMMON REQUIREMENTS
A. Install equipment to allow maximum possible headroom unless specific mounting heights are not indicated.
B. Install equipment level and plumb, parallel, and perpendicular to other building systems and components in exposed interior spaces, unless otherwise indicated.
C. Install HVAC equipment to facilitate service, maintenance, and repair or replacement of components. Connect equipment for ease of disconnecting, with minimum interference to other installations. Extend grease fittings to accessible locations.
D. Install equipment to allow right of way for piping installed at required slope.
E. Provide onsite rigging certificates and schedule.
3.6 PAINTING
A. Damage and Touchup: Repair marred and damaged factory-painted finishes with materials and procedures to match original factory finish.
COMMON WORK RESULTS FOR HVAC 23 05 00 - 13
3.7 CONCRETE BASES
A. Concrete Bases: Anchor equipment to concrete base according to equipment manufacturer's written instructions.
1. Construct concrete bases of sizes indicated, but not less than 3 inches and not more than 6 inches larger in both directions than supported unit. Height of concrete base shall be as indicated on plans. Where no height is indicated, base shall be 4 inches high.
2. Install dowel rods to connect concrete base to concrete floor. Unless otherwise indicated, install dowel rods on 18-inch centers around the full perimeter of the base.
3. Install epoxy-coated anchor bolts for supported equipment that extend through concrete base, and anchor into structural concrete floor.
4. Place and secure anchorage devices. Use supported equipment manufacturer's setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.
5. Install anchor bolts to elevations required for proper attachment to supported equipment.
6. Install anchor bolts according to anchor-bolt manufacturer's written instructions.
7. Use 3000-psi, 28-day compressive-strength concrete and reinforcement.
3.8 ERECTION OF METAL SUPPORTS AND ANCHORAGES
A. Cut, fit, and place miscellaneous metal supports accurately in location, alignment, and elevation to support and anchor HVAC materials and equipment.
B. Field Welding: Comply with AWS Dl.l.
3.9 GROUTING
A. Mix and install grout for HVAC equipment base bearing surface, pump and other equipmentbase plates and anchors
B. Clean surfaces that will come into contact with grout.
C. Provide forms as required for placement of grout
D. Avoid air entrapment during placement of grout.
E. Place grout, completely filling equipment bases
F. Place grout on concrete bases and provide smooth bearing surface for equipment.
G. Place grout around anchors.
H. Cure placed grout.
COMMON WORK RESULTS FOR HVAC 23 05 00 - 14
3.10 TEMPORARY HVAC AND LOCAL VENTILATION
A. Provide local ventilation during construction for any activity, which produces vapors, gases, odors, dust, fumes, etc. Air shall be exhausted to the exterior of the building. Provide ventilation for welding operations and for the application or use of adhesives, paints, solvents, fireproofing, sealants or any other product, which may cause acute or chronic health or safety effects to facility occupants. Ventilation shall comply with Occupational Safety and Health Administration (OSHA) and American Conference of Government Industrial Hygienists (ACGIH) requirements. The ventilation shall maintain the dust, gas, odor, fume, and vapor concentrations below the OSHA and ACGIH exposure limits as defined on the product SDS and in "TLVs and BEIs, Threshold Limit Values for Chemical Substances and Physical Agents."
B. Provide local ventilation as required to remove dust, fumes and vapors from the work area and to prevent the spread of dust, fumes, and vapors to other occupied areas of the facility.
C. Provide temporary heating as required to maintain a minimum space temperature of 55 degrees
Fahrenheit within the work area. Comply with applicable NFPA and OSHA requirements for partially occupied buildings under constructions.
END OF SECTION 23 05 00
23 05 13 - 1 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
SECTION 23 05 13 - COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
A. Section includes general requirements for single-phase and polyphase, general-purpose, horizontal, small and medium, squirrel-cage induction motors for use on ac power systems up to 600 V and installed at equipment manufacturer's factory or shipped separately by equipment manufacturer for field installation.
1.2 COORDINATION
A. Coordinate features of motors, installed units, and accessory devices to be compatible with the following:
1. Motor controllers.
2. Torque, speed, and horsepower requirements of the load.
3. Ratings and characteristics of supply circuit and required control sequence.
4. Ambient and environmental conditions of installation location.
5. For motors replaced within existing to remain equipment: Coordinate motor mounting frame size of existing equipment for new motor selection.
6. For motors with internal heater(s): Coordinate circuiting requirements for separate circuit or branch circuit per motor manufacturers recommended installation method.
2.1 GENERAL MOTOR REQUIREMENTS
A. Comply with requirements in this Section except when stricter requirements are specified in HVAC equipment schedules or Sections.
B. Comply with NEMA MG 1 unless otherwise indicated.
C. Comply with IEEE 841 for severe-duty motors.
2.2 MOTOR CHARACTERISTICS
A. Duty: Continuous duty at ambient temperature of 40 deg C…