T53_DID_A007_DI_ALSS_80728A_Production_Report.pdf

PDF 100 KB Posted

Attached to
T53-L-703 Engine Overhauls / Repairs Federal contract opportunity
Solicitation number
FA8124-20-R-0002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

This document contains a Data Item Description for a Depot Maintenance Production Report. The report is required on depot level maintenance contracts to provide monthly maintenance production figures including status of assets at the contractor facility, anticipated production for the next month, and a summary of unresolved problems. The report shall be submitted on Air Force Materiel Command Form 413 and include item identification, call number, contract line item number, quantities on contract and received, inducted to work, produced, shipped, on hand, condemned, and forecasts for input to work and completion. Part II requires a narrative of any production problems such as forecasts not being met or anticipated issues.

The related federal contract opportunity is a solicitation for competitive maintenance, repair and overhaul of T53-L-703 engines. Place of performance will be at the contractor's facility. Proposals are due by July 23, 2020 to Tinker AFB. The contracting office points of contact are provided. This is a total small business set-aside for the Department of the Air Force Materiel Command Lifecycle Management Center at Tinker AFB.

View the file

Other files for this federal contract opportunity

Other files attached to T53-L-703 Engine Overhauls / Repairs, newest first.
File Type Posted
FA812420R0002_______0001.pdf PDF
T53PWSJuly2020.pdf PDF
FA8124-20-R-0002 Questions and Answers.pdf PDF
T53_DID_A006_DI_ALSS_81534_Teardown_Report.pdf PDF
T53_2_YEAR_DEPOT_HISTORY_Feb2020.xlsx XLSX spreadsheet
T53_CDRL_A006_Teardown.pdf PDF
T53_DID_A013_DI_MGMT_81642_Small_Business_Reporting.pdf PDF
T53_DID_A008_DI_ADMN_81249A_PMR_Agenda.pdf PDF
T53_CDRL_A014_Test_Inspection_Report_Test_Cell_Run_Sheets.pdf PDF
T53_DID_A005_DI_ALSS_81534_CEMS.pdf PDF
T53_CDRL_A002_CEMS_Data_Reporting.pdf PDF
T53_PWS_ATTACHMENT_A_CDRLS_DIDS_SUMMARY_JAN20.xls XLS spreadsheet
T53_CDRL_A004_CEMS_TCTO_Reporting.pdf PDF
T53_CDRL_A003_CEMS_SRAN.pdf PDF
FA812420R0002.pdf PDF
T53_DID_A004_DI_MGMT_81325A_CEMS.pdf PDF
T53_CDRL_A009_PMR_Minutes.pdf PDF
Appendix_D_T53_Eval_10Jun20.docx DOCX document
T53_DID_A002_DI_MGMT_81324A_CEMS.pdf PDF
T53_CDRL_A007_Production_Report.pdf PDF
T53_CDRL_A013_Small_Business_Subcontractor_Report.pdf PDF
T53_APPENDIX_A_PWS_MAR2020.docx DOCX document
Appendix_B_T53_Pricing_Matrix_25Feb20.xlsx XLSX spreadsheet
T53_CDRL_A012_Records_Maintenance.pdf PDF
Appendix_E_T53_Incentive_Plan_8Apr20.docx DOCX document
T53_DID_A001_DI_MGMT_80227_Transition_PhaseIn.pdf PDF
T53_CDRL_A005_CEMS_Reporting_CAMS.pdf PDF
Appendix_C_T53_ITO_10Jun20.docx DOCX document
T53_CDRL_A010_Teardown_Deficiency_Report.pdf PDF
T53_DID_A014_DI_NDTI_80809B_Test_Inspection_Report_Test_Cell_Run_Sheets.pdf PDF
T53_CDRL_A011_Failure_Analysis.pdf PDF
T53_DID_A009_DI_ADMN_81250A_PMR_Minutes.pdf PDF
T53_DID_A003_DI_MGMT_81326_CEMS.pdf PDF
T53_PWS_Attachment_B_CEMS_Access_Process_for_New_Contractor.pdf PDF
T53_DID_A010_DI_ALSS_81534_Teardown_Deficiency_Report.pdf PDF
T53_DID_A012_DI_MGMT_80628_Records_Maintenance.pdf PDF
T53_CDRL_A008_PMR_Agenda.pdf PDF
T53_CDRL_A014_Attachment_1_Test_Cell_Run_Data.xlsx XLSX spreadsheet
T53_DID_A011_DI_ALSS_81534_Failure_Analysis.pdf PDF
T53_CDRL_A001_Contractor_Progress_Report_Transition_PhaseIn.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

I

DATA ITEM DESCRIPTION

I

Form A#prmwd OAF8No, 07064169 w~tif.tid-tild.....=q.,-q tlor=-.sw-. !Mdlr.a * I!.msin! t.ic.d”g - m ~ ●dwnsa,. mwcn.

PWti-tiW ~~. -.9? I? W*~*~*=W~W:.: *M-m=wu$nW$bbm—*wvhwdti r,wkteMtiG— - .C4-- +- ,~-- ~ -- w-r~w-,..m ~- B,-** f- ~,=... - -- CMUc=.u $11s1- o-n Hlprwv.s%lm12ti.AJ%fn%vAml.ma M x.cMaiLad”— — WWEOl w(0701dlsawnKq+a m mm.

TITLE z. uXNmFlmnoN NUMBER

Depot Maintenance Production Report

DI-ALSS-80728A

o~~PTIO;:PUllPOSE depot maintenance production report is a two-part report which provides the government with monthly maintenance production figures, status of assets at the co,>tractor facility, anticipated production for the next month, and a summary of unresolved problems at the end of the report period.

APPRCVAL OATE 5. OFFICE OF PRIMARY RESPONN81UTY (OPW

mMMool

Sa. DTIC APPLKARLE bb. GIDEP APPLICABLE

970124

WPLK&TION /INTERRELATIONSHIP

7.1 This data item description contains the format, COL1teIIt and preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

7.2 This data item description may be used on any depot level naintekance contract.

7.3 This DID supersedes DID DI-ILSS-8072S.

UPlWYU uMflA510N 9t. APpLIWLE FORMS 9b. N4SC NuM8ER

AFNC Form 413 F7225

PREPARATION lNSTRUCllWS

10.1 Content and format. This report shall be on zn Air Force Nateriel Command Form 413, Depot Maintenance Production Report. The report shall consist of two parts and contain data as follows:

a. Part I.

(1) As of date. The year, month and day applicable to the report. Data must be through the end of the month.

(2) Block 1, Air Force management code. lle Federal Supply Class (FSC) and the

Materiel Management Code (NMC) when appropriate.

(3) Block 2, Contractor and activity address code (AAC) . The name of the business and the DOD activity address code (AAC) assigned to you for shipment of material.

(4) Block 3, Contract number. Contract number.

(5) Block 4, Item manager Air Logistics Center (IllALC) . The applicable aCCOUL1t code of the prime ALC.

(6) BlOck 5, Contracting ALC or A~c procu~iw w-y. me d-iwtion Of the agency, that awarded the contract.

(7) Block 6, Contract administraciO1l Office (CAO). me Office designated as

CAO,in the contract.

(8) Column A, item identificatio,l. The national stock number (NSN) of the item bei,]greported.

(9) Column B, call number. Nhen the awarded cont,ract is a call (order) type, .DISTIU6UTION STATEMENT

DISTRIBUTION STATl@lENTA: Approved for public release; distribution is unlimited.

DI-ALSS-80728A

Block 10, Preparation Instructions (Continued) this is the applicable call number. When an item is awarded on more than one call, it is repeated for each call until completed. If the current report completes the call, the word “completed” is in the blank block.

(10) Column C, C/ELIN.. The contract exhibit line item number assigned to the NSN in the contract.

(11) Column D, quantity on contracc or call. D-1 is the quantity of the end items to be repaired on each call or contract quantity when calls do not apply. DE2 is the quantity scheduled for repair during the quarter including the report month. D-3 is the qua~tity scheduled for repair cumulative to date.

(12) column E, reparable. received. Number of reparable items received for repair. E-1 is the quantity of reparable received during the report month. E-2 is the quantity of reparable received cumulative from the start of contract through report month.

(13) Column F, q“arltity inducted to work. The quantity inducted to work during report month.

(14) Column G, quantity produced . The quantity produced during the month.

(15) Column H, serviceable shipped. Serviceable shipped from repair facility. H-1 is che serviceable shipped through report month. H-2 is serviceable shipped cumulative from start of contract.

(16) Column I, serviceable on hand. The quantity of reparable on hand awaiting input or condemnation.

(17) Colwnn J, reparable on hand. The number of reparable on hand awaiting input or condemnat ion.

(18) Colmm K, reparable shipped. The reparable shipped during report month.

(19) Column L, quantity condemned. l’hequantity condemned. L-1 is che q“-antity condeumed during report month. L-2 is the quantity condemned cumulative from start of contract.

(20) Column M, forecast in to work. The number of items scheduled to be input to work during next month.

(21) column N, forecast to complete. The quantity of items scheduled to be completed next month.

b. Part 11, production problems. The report shall contain a second pare in narrative format which shall be attached to the Air Force Materiel Command Form 413. This part is required if:

(1) Previous reports production forecast was not shipped..

“(2.) Current forecast does not equal contract scheduled quantity.

(3] Contract anticipates a problem in the near future.

I Page 2 of 2 Pages

I

File details come from the government source that posted it. Updated .